| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$34,639.55 |
$36,279.70 |
$80,000.00 |
$25,170.70 |
$35,194.85 |
$35,000.00 |
$48,500.00 |
| 20 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,450 | LF |
$3.00 |
$2.73 |
$2.24 |
$2.24 |
$2.24 |
$2.46 |
$6.00 |
$6.00 |
| 30 | 221(E)2600 |
TEMPORARY SILT DIKE | 400 | LF |
$13.00 |
$15.25 |
$12.49 |
$12.49 |
$12.49 |
$13.74 |
$30.00 |
$20.00 |
| 40 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 2 | EA |
$450.00 |
$1,092.70 |
$895.00 |
$895.00 |
$895.00 |
$984.50 |
$225.00 |
$1,500.00 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 734 | SY |
$5.00 |
$8.49 |
$6.95 |
$10.00 |
$6.95 |
$7.65 |
$7.00 |
$8.00 |
| 60 | 307(K)4200 |
STABILIZED SUBGRADE | 6,051 | SY |
$9.00 |
$9.41 |
$9.93 |
$15.00 |
$27.87 |
$11.07 |
$20.00 |
$15.00 |
| 70 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 167 | TON |
$40.00 |
$40.36 |
$65.58 |
$40.25 |
$49.08 |
$62.11 |
$60.00 |
$80.00 |
| 80 | 407(B)7300 |
TACK COAT | 3,392 | GAL |
$4.00 |
$5.63 |
$5.98 |
$3.00 |
$3.00 |
$3.30 |
$5.00 |
$5.00 |
| 90 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,352 | TON |
$120.00 |
$95.32 |
$100.51 |
$106.38 |
$92.50 |
$101.75 |
$120.00 |
$105.00 |
| 100 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,854 | TON |
$130.00 |
$128.78 |
$133.15 |
$132.25 |
$115.00 |
$126.50 |
$150.00 |
$140.00 |
| 110 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 50 | TON |
$120.00 |
$272.94 |
$286.56 |
$125.00 |
$100.00 |
$110.00 |
$150.00 |
$120.00 |
| 120 | 412 3100 |
COLD MILLING PAVEMENT | 10,563 | SY |
$4.00 |
$3.55 |
$1.50 |
$8.50 |
$4.60 |
$5.06 |
$10.00 |
$6.00 |
| 130 | 509(B)0300 |
CLASS A CONCRETE | 1 | CY |
$1,000.00 |
$1,733.34 |
$1,820.00 |
$2,250.00 |
$1,200.00 |
$4,636.83 |
$1,500.00 |
$1,500.00 |
| 140 | 509(D)0500 |
CLASS C CONCRETE | 7 | CY |
$500.00 |
$558.63 |
$588.48 |
$410.00 |
$325.00 |
$821.48 |
$800.00 |
$850.00 |
| 150 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 130 | LB |
$2.00 |
$8.50 |
$8.78 |
$2.64 |
$1.50 |
$5.49 |
$3.00 |
$2.60 |
| 160 | 611(G)0354 |
INLET (SMD-TYPE 2) | 1 | EA |
$4,500.00 |
$6,123.23 |
$6,480.11 |
$6,500.00 |
$3,371.00 |
$5,413.39 |
$8,500.00 |
$8,500.00 |
| 170 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 100 | LF |
$60.00 |
$75.25 |
$79.31 |
$65.00 |
$82.00 |
$60.99 |
$135.00 |
$210.00 |
| 180 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,262 | SY |
$8.00 |
$16.78 |
$10.00 |
$25.00 |
$9.00 |
$2.93 |
$35.00 |
$15.00 |
| 190 | 619(B)6368 |
REMOVAL OF DRAINAGE INLETS | 2 | EA |
$5,000.00 |
$3,637.38 |
$3,388.83 |
$2,075.00 |
$818.00 |
$1,105.16 |
$250.00 |
$1,000.00 |
| 200 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 3,920 | LF |
$7.00 |
$6.10 |
$6.00 |
$6.00 |
$5.00 |
$5.50 |
$7.50 |
$5.00 |
| 210 | 619(C)6600 |
SAWING PAVEMENT | 2,840 | LF |
$4.00 |
$6.71 |
$7.30 |
$3.70 |
$2.50 |
$3.60 |
$9.00 |
$21.00 |
| 220 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,637.5 | LF |
$35.00 |
$31.74 |
$21.00 |
$21.00 |
$26.00 |
$28.60 |
$38.00 |
$80.00 |
| 230 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$2,200.00 |
$1,831.34 |
$964.00 |
$964.00 |
$1,500.00 |
$1,650.00 |
$1,300.00 |
$9,500.00 |
| 240 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,100.00 |
$3,662.67 |
$3,050.00 |
$3,050.00 |
$3,000.00 |
$3,300.00 |
$4,000.00 |
$9,500.00 |
| 250 | 623(I)2030 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$2,800.00 |
$1,831.34 |
$1,350.00 |
$1,350.00 |
$1,500.00 |
$1,650.00 |
$2,000.00 |
$9,500.00 |
| 260 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,700.00 |
$3,662.67 |
$3,005.00 |
$3,005.00 |
$3,000.00 |
$3,300.00 |
$4,000.00 |
$9,500.00 |
| 270 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$40.00 |
$26.95 |
$53.55 |
$20.50 |
$91.00 |
$36.95 |
$25.00 |
$150.00 |
| 280 | 504(B)5300 |
SAW-CUT GROOVING | 1,443.6 | SY |
$6.00 |
$6.35 |
$13.01 |
$5.20 |
$5.20 |
$5.72 |
$8.00 |
$60.00 |
| 290 | 505(A)6200 |
BRIDGE DECK CONCRETE OVERLAY | 1,443.6 | SY |
$180.00 |
$126.04 |
$186.45 |
$140.00 |
$85.00 |
$186.45 |
$140.00 |
$250.00 |
| 300 | 505(E)6600 |
HYDRODEMOLITION | 1,443.6 | SY |
$200.00 |
$107.44 |
$165.00 |
$85.00 |
$75.00 |
$165.00 |
$80.00 |
$250.00 |
| 310 | 509(B)0320 |
CLASS A CONCRETE | 1.1 | CY |
$2,000.00 |
$2,294.26 |
$3,494.23 |
$2,000.00 |
$4,000.00 |
$6,987.43 |
$1,000.00 |
$1,500.00 |
| 320 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$100,000.00 |
$146,262.58 |
$143,780.00 |
$135,000.00 |
$145,000.00 |
$131,780.00 |
$180,000.00 |
$169,850.00 |
| 330 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$30,000.00 |
$27,347.93 |
$24,640.00 |
$30,000.00 |
$20,000.00 |
$24,640.00 |
$105,000.00 |
$42,500.00 |
| 340 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 10 | SY |
$800.00 |
$524.98 |
$473.00 |
$450.00 |
$475.00 |
$473.00 |
$800.00 |
$6,500.00 |
| 350 | 517 9110 |
ELASTOMERIC COATING | 1,390 | SF |
$25.00 |
$26.86 |
$24.20 |
$22.00 |
$13.00 |
$24.20 |
$30.00 |
$50.00 |
| 360 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 27 | LF |
$50.00 |
$48.84 |
$44.00 |
$50.00 |
$14.00 |
$44.00 |
$35.00 |
$52.00 |
| 370 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$200.00 |
$152.61 |
$137.50 |
$200.00 |
$90.00 |
$137.50 |
$150.00 |
$150.00 |
| 380 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 26.3 | SY |
$900.00 |
$1,037.76 |
$935.00 |
$1,000.00 |
$425.00 |
$935.00 |
$1,000.00 |
$1,080.00 |
| 390 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 33.1 | SY |
$50.00 |
$61.04 |
$55.00 |
$50.00 |
$20.00 |
$55.00 |
$60.00 |
$50.00 |
| 400 | 601(C)1330 |
TYPE II SPECIAL. PLAIN RIPRAP | 300 | TON |
$150.00 |
$56.49 |
$64.40 |
$81.50 |
$92.00 |
$75.99 |
$135.00 |
$120.00 |
| 410 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$40.00 |
$18.10 |
$21.40 |
$20.50 |
$91.00 |
$51.03 |
$25.00 |
$150.00 |
| 420 | 501(G)1800 |
CLSM BACKFILL | 186.2 | CY |
$250.00 |
$207.11 |
$207.00 |
$235.00 |
$260.00 |
$227.47 |
$400.00 |
$320.00 |
| 430 | 504(A)5200 |
APPROACH SLAB | 279.2 | SY |
$300.00 |
$311.91 |
$285.00 |
$330.00 |
$275.00 |
$310.17 |
$335.00 |
$420.00 |
| 440 | 504(B)5300 |
SAW-CUT GROOVING | 1,748.8 | SY |
$6.00 |
$6.35 |
$5.20 |
$5.20 |
$5.20 |
$5.72 |
$11.00 |
$60.00 |
| 450 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,085.4 | LF |
$145.00 |
$96.30 |
$136.50 |
$138.00 |
$175.00 |
$199.87 |
$130.00 |
$420.00 |
| 460 | 506(A)7200 |
STRUCTURAL STEEL | 500 | LB |
$7.00 |
$42.73 |
$38.50 |
$40.00 |
$25.00 |
$57.39 |
$10.00 |
$60.00 |
| 470 | 509(A)0210 |
CLASS AA CONCRETE | 347.2 | CY |
$850.00 |
$1,272.98 |
$1,185.00 |
$1,075.00 |
$1,400.00 |
$1,231.86 |
$1,700.00 |
$1,250.00 |
| 480 | 509(B)0320 |
CLASS A CONCRETE | 0.6 | CY |
$2,000.00 |
$2,296.17 |
$1,400.00 |
$3,697.50 |
$4,000.00 |
$6,390.44 |
$1,000.00 |
$1,250.00 |
| 490 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 116,570 | LB |
$1.60 |
$1.52 |
$1.70 |
$1.68 |
$2.00 |
$1.74 |
$3.00 |
$2.20 |
| 500 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$150,000.00 |
$171,779.18 |
$166,770.00 |
$160,000.00 |
$215,000.00 |
$154,770.00 |
$115,000.00 |
$201,580.00 |
| 510 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$50,000.00 |
$27,347.93 |
$24,640.00 |
$30,000.00 |
$20,000.00 |
$24,640.00 |
$75,000.00 |
$42,500.00 |
| 520 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,064 | SY |
$6.00 |
$6.71 |
$8.80 |
$5.50 |
$8.00 |
$6.05 |
$5.00 |
$8.50 |
| 530 | 517 9110 |
ELASTOMERIC COATING | 1,618 | SF |
$25.00 |
$26.86 |
$24.20 |
$22.00 |
$13.00 |
$24.20 |
$30.00 |
$31.00 |
| 540 | 518(B)0300 |
SEALED EXPANSION JOINTS | 112.5 | LF |
$375.00 |
$324.91 |
$350.00 |
$385.00 |
$450.00 |
$352.29 |
$425.00 |
$650.00 |
| 550 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 31 | LF |
$50.00 |
$48.84 |
$44.00 |
$50.00 |
$14.00 |
$44.00 |
$35.00 |
$52.00 |
| 560 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2.7 | GAL |
$200.00 |
$152.61 |
$137.50 |
$200.00 |
$90.00 |
$137.50 |
$150.00 |
$150.00 |
| 570 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 45.5 | SY |
$850.00 |
$1,037.76 |
$935.00 |
$1,000.00 |
$425.00 |
$935.00 |
$1,000.00 |
$1,500.00 |
| 580 | 523(A)3200 |
SEALER CRACK PREPARATION | 37 | LF |
$10.00 |
$12.21 |
$35.00 |
$10.00 |
$5.00 |
$11.00 |
$5.00 |
$500.00 |
| 590 | 523(B)3300 |
SEALER RESIN | 0.5 | GAL |
$200.00 |
$268.60 |
$45.00 |
$220.00 |
$25.00 |
$242.00 |
$125.00 |
$5,000.00 |
| 600 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 57.2 | SY |
$50.00 |
$61.04 |
$55.00 |
$50.00 |
$20.00 |
$55.00 |
$60.00 |
$50.00 |
| 610 | 601(C)1330 |
TYPE II SPECIAL. PLAIN RIPRAP | 300 | TON |
$150.00 |
$86.57 |
$161.16 |
$81.50 |
$92.00 |
$71.43 |
$125.00 |
$150.00 |
| 620 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$250,000.00 |
$177,449.58 |
$143,765.96 |
$300,000.00 |
$178,000.00 |
$299,287.69 |
$55,000.00 |
$51,500.00 |
| 630 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 3,960 | LF |
$0.5000 |
$1.22 |
$0.5700 |
$0.5700 |
$1.00 |
$1.10 |
$0.7500 |
$1.50 |
| 640 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$300.00 |
$244.18 |
$750.00 |
$750.00 |
$200.00 |
$275.00 |
$1,000.00 |
$490.00 |
| 650 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 68 | EA |
$20.00 |
$61.04 |
$15.35 |
$15.35 |
$50.00 |
$55.00 |
$20.00 |
$75.00 |
| 660 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 29,839 | LF |
$1.00 |
$1.04 |
$0.8500 |
$0.8500 |
$0.8500 |
$0.9400 |
$1.20 |
$1.50 |
| 670 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 5,374 | LF |
$3.00 |
$2.08 |
$2.80 |
$2.80 |
$1.70 |
$1.87 |
$3.30 |
$2.50 |
| 680 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 148 | EA |
$8.00 |
$18.31 |
$12.50 |
$12.50 |
$15.00 |
$16.50 |
$3.30 |
$25.00 |
| 690 | 871(A)2200 |
IMPACT ATTENUATOR | 2 | EA |
$30,000.00 |
$30,522.24 |
$32,629.38 |
$31,625.00 |
$33,000.00 |
$32,989.65 |
$36,500.00 |
$35,000.00 |
| 700 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,375 | LF |
$7.00 |
$77.27 |
$44.92 |
$7.00 |
$59.50 |
$5.32 |
$15.00 |
$40.00 |
| 710 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 15,340 | LF |
$1.50 |
$2.44 |
$2.45 |
$2.45 |
$2.00 |
$2.20 |
$3.00 |
$3.00 |
| 720 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 5,660 | LF |
$0.5000 |
$0.7900 |
$0.6600 |
$0.6600 |
$0.6500 |
$0.7200 |
$1.00 |
$1.20 |
| 730 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 879 | EA |
$8.00 |
$9.77 |
$6.70 |
$6.70 |
$8.00 |
$8.80 |
$10.00 |
$9.00 |
| 740 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 743 | EA |
$8.00 |
$9.77 |
$6.70 |
$6.70 |
$8.00 |
$8.80 |
$10.00 |
$9.00 |
| 750 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,020 | SD |
$20.00 |
$12.21 |
$14.00 |
$14.00 |
$20.00 |
$11.00 |
$20.00 |
$15.00 |
| 760 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,950 | LF |
$30.00 |
$33.50 |
$19.95 |
$26.00 |
$21.65 |
$21.01 |
$25.00 |
$50.00 |
| 770 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 6,850 | LF |
$7.00 |
$8.79 |
$3.00 |
$4.25 |
$3.75 |
$11.57 |
$5.00 |
$42.00 |
| 780 | 878(B)5300 |
MODULAR GLARE SCREEN (TEMPORARY) | 22,350 | SD |
$1.00 |
$0.1800 |
$0.1200 |
$0.1200 |
$0.1500 |
$0.1700 |
$0.1200 |
$1.50 |
| 790 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 660 | SD |
$15.00 |
$21.98 |
$1.00 |
$1.00 |
$18.00 |
$19.80 |
$1.00 |
$25.00 |
| 800 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,560 | SD |
$0.6500 |
$0.3100 |
$0.0200 |
$0.0200 |
$0.2500 |
$0.2800 |
$0.0200 |
$0.5000 |
| 810 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,360 | SD |
$1.00 |
$1.22 |
$3.00 |
$4.00 |
$1.00 |
$1.10 |
$3.00 |
$1.80 |
| 820 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,180 | SD |
$2.00 |
$3.66 |
$1.30 |
$1.30 |
$3.00 |
$3.30 |
$1.30 |
$4.00 |
| 830 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 6,900 | SD |
$2.00 |
$3.05 |
$0.7500 |
$0.7500 |
$2.50 |
$2.75 |
$0.7500 |
$3.50 |
| 840 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 22,320 | SD |
$0.5000 |
$0.3100 |
$2.25 |
$3.00 |
$0.2500 |
$0.2800 |
$2.25 |
$0.5000 |
| 850 | 880(F)6700 |
DRUMS | 31,320 | SD |
$0.5000 |
$0.5500 |
$0.9500 |
$0.9500 |
$0.4500 |
$0.5000 |
$0.9500 |
$0.9000 |
| 860 | 880(G)6805 |
CHANNELIZER CONES | 3,000 | SD |
$0.5000 |
$0.5500 |
$3.00 |
$4.00 |
$0.4500 |
$0.5000 |
$3.00 |
$0.9000 |
| 870 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 1,000 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 880 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 2,408 | SD |
$20.00 |
$30.52 |
$16.00 |
$16.00 |
$25.00 |
$27.50 |
$16.00 |
$50.00 |
| 890 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 1,000 | LF |
$10.00 |
$10.27 |
$2.73 |
$2.73 |
$3.25 |
$4.86 |
$3.20 |
$120.00 |
| 900 | 628(C)7400 |
END ANCHORS | 2 | EA |
$7,500.00 |
$8,238.26 |
$8,435.00 |
$8,435.00 |
$9,185.00 |
$2,274.33 |
$10,000.00 |
$5,000.00 |
| 910 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$14,315.07 |
$32,000.00 |
$25,000.00 |
$12,000.00 |
$18,700.00 |
$20,000.00 |
$50,000.00 |
| 920 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,052.22 |
$5,000.00 |
$12,750.00 |
$30,000.00 |
$3,850.00 |
$3,500.00 |
$38,500.00 |
| 930 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$223,806.81 |
$228,470.93 |
$225,000.00 |
$467,003.37 |
$245,590.62 |
$480,000.00 |
$385,000.00 |