| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$75,793.85 |
$15,750.00 |
$8,929.00 |
$60,000.00 |
$25,000.00 |
$15,169.83 |
$75,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,300 | CY |
$15.11 |
$13.00 |
$29.33 |
$25.00 |
$15.00 |
$36.66 |
$30.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$58,346.10 |
$16,750.00 |
$16,196.29 |
$20,000.00 |
$25,000.00 |
$68,127.60 |
$50,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 9,242 | LF |
$3.45 |
$5.10 |
$3.37 |
$3.00 |
$4.50 |
$4.27 |
$3.85 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 301 | LF |
$14.99 |
$20.00 |
$17.73 |
$15.00 |
$19.70 |
$17.08 |
$15.40 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 10,600 | SY |
$4.65 |
$6.00 |
$7.19 |
$5.00 |
$4.49 |
$4.27 |
$3.85 |
| 70 | 303(A)1200 |
AGGREGATE BASE TYPE A | 700 | CY |
$84.84 |
$97.00 |
$104.59 |
$135.00 |
$140.00 |
$156.67 |
$110.00 |
| 80 | 407(B)7300 |
TACK COAT | 8 | GAL |
$7.38 |
$35.00 |
$164.82 |
$10.00 |
$3.00 |
$93.52 |
$5.00 |
| 90 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 24 | TON |
$216.53 |
$280.00 |
$607.74 |
$300.00 |
$375.00 |
$252.13 |
$200.00 |
| 100 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12 | TON |
$272.67 |
$310.00 |
$617.34 |
$350.00 |
$725.00 |
$384.05 |
$250.00 |
| 110 | 509(A)0200 |
CLASS AA CONCRETE | 15.2 | CY |
$976.07 |
$610.00 |
$837.75 |
$900.00 |
$963.00 |
$2,035.48 |
$2,500.00 |
| 120 | 511(A)2200 |
REINFORCING STEEL | 2,370 | LB |
$2.06 |
$2.85 |
$1.30 |
$2.50 |
$1.91 |
$5.29 |
$2.50 |
| 130 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 75 | TON |
$99.15 |
$101.00 |
$219.26 |
$110.00 |
$80.00 |
$138.42 |
$125.00 |
| 140 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 464 | LF |
$18.04 |
$12.00 |
$16.58 |
$12.00 |
$15.00 |
$35.17 |
$40.00 |
| 150 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 4,264 | LF |
$39.95 |
$40.00 |
$37.36 |
$45.00 |
$48.00 |
$55.45 |
$70.00 |
| 160 | 610(A)5200 |
4" CONCRETE SIDEWALK | 6,547 | SY |
$69.25 |
$78.75 |
$75.30 |
$85.00 |
$87.63 |
$105.52 |
$108.00 |
| 170 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 1,907 | SY |
$79.48 |
$102.00 |
$121.20 |
$110.00 |
$113.04 |
$116.14 |
$135.00 |
| 180 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 322 | SF |
$45.36 |
$45.00 |
$52.71 |
$40.00 |
$35.00 |
$57.15 |
$65.00 |
| 190 | 613(A)5224 |
36" R.C.PIPE CLASS III | 9 | LF |
$183.05 |
$165.75 |
$658.52 |
$185.00 |
$710.12 |
$352.44 |
$300.00 |
| 200 | 613(A)5404 |
19" X 30" R.C.PIPE ELL. CLASS HE-III | 69 | LF |
$131.69 |
$118.90 |
$471.11 |
$165.00 |
$272.00 |
$195.09 |
$300.00 |
| 210 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$2,476.07 |
$2,955.00 |
$1,610.61 |
$3,000.00 |
$3,570.00 |
$2,730.46 |
$2,850.00 |
| 220 | 619(B)6352 |
REMOVAL OF FENCE | 1,623 | LF |
$3.41 |
$3.50 |
$16.77 |
$5.00 |
$3.00 |
$13.46 |
$10.00 |
| 230 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 988 | LF |
$11.67 |
$12.00 |
$20.96 |
$15.00 |
$15.00 |
$21.31 |
$20.00 |
| 240 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,113 | SY |
$15.79 |
$15.00 |
$28.63 |
$15.00 |
$15.00 |
$26.14 |
$12.00 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,042 | SY |
$8.97 |
$14.00 |
$16.06 |
$15.00 |
$15.00 |
$21.47 |
$15.00 |
| 260 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 496 | SY |
$16.93 |
$15.00 |
$36.06 |
$15.00 |
$15.00 |
$26.02 |
$12.00 |
| 270 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 225 | SY |
$16.24 |
$13.00 |
$18.16 |
$15.00 |
$15.00 |
$22.79 |
$15.00 |
| 280 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 219 | SY |
$11.58 |
$8.50 |
$16.24 |
$15.00 |
$15.00 |
$21.30 |
$12.00 |
| 290 | 619(B)6404 |
REMOVAL OF SIDEWALK | 74 | SY |
$21.49 |
$12.00 |
$17.56 |
$15.00 |
$15.00 |
$19.46 |
$20.00 |
| 300 | 622(A)0200 |
PIPE RAILING | 55 | LF |
$254.12 |
$175.00 |
$184.37 |
$150.00 |
$330.20 |
$183.98 |
$176.00 |
| 310 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 4 | EA |
$323.12 |
$1,210.00 |
$325.00 |
$250.00 |
$350.00 |
$588.99 |
$350.00 |
| 320 | 643 4160 |
TRAIL CROSSING CONCRETE FLUME | 30 | EA |
$2,001.28 |
$1,500.00 |
$1,876.67 |
$1,750.00 |
$3,500.00 |
$4,403.24 |
$2,500.00 |
| 330 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 6,590 | LF |
$0.5100 |
$0.9500 |
$0.3000 |
$1.00 |
$0.2900 |
$0.3000 |
$0.2800 |
| 340 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,890 | SD |
$0.3600 |
$0.6200 |
$0.6000 |
$0.0100 |
$0.5400 |
$0.6100 |
$0.5500 |
| 350 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,040 | SD |
$0.5600 |
$0.9000 |
$0.3000 |
$0.0100 |
$0.2800 |
$0.3000 |
$0.2800 |
| 360 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 420 | SD |
$1.47 |
$0.8000 |
$1.20 |
$0.0100 |
$1.11 |
$1.22 |
$1.10 |
| 370 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 840 | SD |
$1.36 |
$0.9000 |
$6.00 |
$0.0100 |
$5.47 |
$6.10 |
$5.50 |
| 380 | 880(G)6805 |
CHANNELIZER CONES | 70,980 | SD |
$0.3400 |
$0.5500 |
$0.0400 |
$0.0100 |
$0.0500 |
$0.0400 |
$0.0400 |
| 390 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 7 | EA |
$148.64 |
$320.00 |
$120.00 |
$100.00 |
$145.00 |
$121.98 |
$110.00 |
| 400 | 836 7110 |
RECTANGULAR RAPID FLASHING BEACON | 16 | EA |
$12,304.26 |
$6,720.15 |
$5,100.00 |
$6,700.00 |
$4,830.00 |
$5,184.19 |
$4,675.00 |
| 410 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 264.4 | SF |
$35.42 |
$72.32 |
$36.00 |
$0.0100 |
$34.00 |
$36.59 |
$33.00 |
| 420 | 851(C)2415 |
2" SQUARE TUBE POST | 542 | LF |
$9.50 |
$12.95 |
$10.80 |
$0.0100 |
$10.20 |
$10.98 |
$9.90 |
| 430 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 475 | LF |
$4.11 |
$1.50 |
$2.40 |
$2.00 |
$2.18 |
$2.44 |
$2.20 |
| 440 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 3,535 | LF |
$1.64 |
$2.55 |
$1.80 |
$2.00 |
$1.57 |
$1.83 |
$1.65 |
| 450 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 845 | LF |
$13.82 |
$20.00 |
$12.00 |
$16.00 |
$12.00 |
$12.20 |
$11.00 |
| 460 | 856(B)8303 |
(SP) TRAF.STR.(PLURAL-COMPONENT)(SYM,WRD,ETC) | 20 | EA |
$360.66 |
$1,120.00 |
$480.00 |
$350.00 |
$437.00 |
$487.92 |
$440.00 |
| 470 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 18 | EA |
$316.56 |
$205.00 |
$270.00 |
$65.00 |
$255.00 |
$274.46 |
$247.50 |
| 480 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 25 | LF |
$3.25 |
$58.00 |
$6.00 |
$3.00 |
$6.10 |
$6.10 |
$5.50 |
| 490 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,207.33 |
$20,900.00 |
$21,348.00 |
$35,000.00 |
$34,500.00 |
$21,067.26 |
$22,811.74 |
| 500 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,072.19 |
$4,300.00 |
$9,473.13 |
$2,500.00 |
$4,250.00 |
$21,516.30 |
$16,085.00 |
| 510 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$107,000.00 |
$80,000.00 |
$93,931.60 |
$115,000.00 |
$76,570.00 |
$88,659.32 |
$130,000.00 |