| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$10,500.00 |
$9,000.00 |
$13,000.00 |
$28,500.00 |
$9,815.71 |
$8,910.00 |
$36,000.00 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 11,528 | CY |
$9.50 |
$12.00 |
$7.50 |
$9.11 |
$10.40 |
$10.00 |
$9.08 |
$10.00 |
$10.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 500 | CY |
$20.00 |
$20.00 |
$0.0100 |
$19.00 |
$7.50 |
$16.97 |
$15.40 |
$12.00 |
$17.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$30,500.00 |
$19,000.00 |
$27,536.00 |
$26,500.00 |
$36,174.83 |
$32,539.93 |
$25,000.00 |
$35,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,510 | LF |
$4.50 |
$4.00 |
$3.65 |
$4.80 |
$4.50 |
$4.24 |
$3.85 |
$3.50 |
$4.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,092 | LF |
$15.00 |
$15.00 |
$12.50 |
$14.00 |
$8.00 |
$14.54 |
$13.20 |
$12.00 |
$15.00 |
| 70 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 54 | CY |
$210.00 |
$175.00 |
$180.00 |
$180.00 |
$172.50 |
$206.01 |
$187.00 |
$170.00 |
$200.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 32,019 | SY |
$3.50 |
$2.90 |
$3.65 |
$3.92 |
$4.40 |
$3.51 |
$3.19 |
$2.90 |
$3.30 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 6.62 | AC |
$1,600.00 |
$250.00 |
$2,000.00 |
$2,200.00 |
$500.00 |
$2,423.63 |
$2,200.00 |
$2,000.00 |
$2,500.00 |
| 100 | 241 3100 |
MOWING | 13.24 | AC |
$325.00 |
$500.00 |
$525.00 |
$530.00 |
$150.00 |
$605.91 |
$550.00 |
$500.00 |
$600.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 10,786 | SY |
$9.00 |
$7.95 |
$9.00 |
$12.00 |
$12.00 |
$7.08 |
$12.00 |
$6.00 |
$11.00 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 40 | TON |
$60.00 |
$35.00 |
$50.00 |
$50.76 |
$48.00 |
$53.32 |
$48.40 |
$50.00 |
$55.00 |
| 140 | 407(B)7300 |
TACK COAT | 2,278 | GAL |
$4.00 |
$3.50 |
$3.20 |
$6.80 |
$3.14 |
$8.09 |
$3.45 |
$3.50 |
$7.00 |
| 150 | 408 8100 |
PRIME COAT | 4,493 | GAL |
$6.00 |
$5.00 |
$5.00 |
$7.38 |
$4.97 |
$8.96 |
$5.47 |
$4.50 |
$8.00 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,551 | TON |
$115.00 |
$115.00 |
$115.00 |
$126.96 |
$130.00 |
$137.36 |
$124.75 |
$119.50 |
$125.00 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,134 | TON |
$135.00 |
$120.00 |
$123.00 |
$134.54 |
$135.00 |
$150.27 |
$129.21 |
$124.00 |
$140.00 |
| 180 | 509(D)0500 |
CLASS C CONCRETE | 101 | CY |
$550.00 |
$470.00 |
$450.00 |
$637.05 |
$490.00 |
$498.87 |
$500.00 |
$636.00 |
$600.00 |
| 190 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 33 | TON |
$80.00 |
$70.00 |
$70.00 |
$98.16 |
$98.00 |
$103.00 |
$93.50 |
$80.00 |
$95.00 |
| 200 | 613(A)5208 |
18" R.C.PIPE CLASS III | 54 | LF |
$100.00 |
$82.25 |
$75.00 |
$88.56 |
$112.00 |
$93.31 |
$84.70 |
$105.00 |
$200.00 |
| 210 | 613(A)5224 |
36" R.C.PIPE CLASS III | 216 | LF |
$230.00 |
$206.50 |
$175.00 |
$220.00 |
$283.00 |
$204.80 |
$185.90 |
$145.00 |
$115.00 |
| 220 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 50 | LF |
$160.00 |
$110.10 |
$115.00 |
$100.26 |
$146.50 |
$113.91 |
$103.40 |
$120.00 |
$215.00 |
| 230 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 60 | LF |
$220.00 |
$168.35 |
$210.00 |
$251.00 |
$230.00 |
$215.70 |
$195.80 |
$170.00 |
$150.00 |
| 240 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 188 | LF |
$30.00 |
$21.35 |
$25.00 |
$35.00 |
$52.00 |
$11.57 |
$40.00 |
$83.00 |
$35.00 |
| 250 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 63 | LF |
$35.00 |
$29.00 |
$35.00 |
$30.00 |
$57.50 |
$20.77 |
$40.00 |
$83.00 |
$35.00 |
| 260 | 613(M)6992 |
TYPE DD4 CULVERT END TREATMENT | 2 | EA |
$5,000.00 |
$11,500.00 |
$5,000.00 |
$4,630.00 |
$6,310.00 |
$5,216.47 |
$4,500.00 |
$6,550.00 |
$2,500.00 |
| 270 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$2,300.00 |
$3,655.00 |
$3,000.00 |
$3,400.00 |
$2,135.00 |
$1,820.54 |
$3,500.00 |
$2,730.00 |
$3,000.00 |
| 280 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$2,900.00 |
$5,140.00 |
$3,500.00 |
$3,800.00 |
$2,862.00 |
$2,474.25 |
$3,600.00 |
$3,822.00 |
$3,000.00 |
| 290 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,100.00 |
$1,650.00 |
$1,200.00 |
$1,250.00 |
$1,600.00 |
$9,452.17 |
$1,000.00 |
$1,800.00 |
$8,500.00 |
| 300 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$26,000.00 |
$15,000.00 |
$15,000.00 |
$24,000.00 |
$25,000.00 |
$12,845.25 |
$11,660.00 |
$24,500.00 |
$13,000.00 |
| 310 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 6,923 | SY |
$9.00 |
$2.50 |
$2.35 |
$9.42 |
$4.00 |
$8.03 |
$2.50 |
$4.00 |
$11.00 |
| 320 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 662 | LF |
$7.00 |
$6.00 |
$8.00 |
$6.00 |
$4.00 |
$12.00 |
$10.89 |
$6.00 |
$12.00 |
| 330 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,127 | LF |
$14.00 |
$9.00 |
$9.30 |
$11.78 |
$10.00 |
$9.69 |
$8.80 |
$9.00 |
$10.00 |
| 340 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 2 | EA |
$300.00 |
$250.00 |
$200.00 |
$800.00 |
$400.00 |
$517.57 |
$300.00 |
$250.00 |
$200.00 |
| 350 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 1,760 | CY |
$10.00 |
$15.00 |
$7.50 |
$12.00 |
$10.12 |
$13.57 |
$12.32 |
$10.00 |
$13.00 |
| 360 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 371 | CY |
$25.00 |
$50.00 |
$15.00 |
$19.00 |
$25.30 |
$13.24 |
$50.00 |
$20.00 |
$15.00 |
| 370 | 502 3101 |
TEMPORARY EARTH RETAINAGE | 50 | LF |
$500.00 |
$555.00 |
$400.00 |
$850.00 |
$1,250.00 |
$999.56 |
$250.00 |
$2,401.00 |
$300.00 |
| 380 | 509(A)0210 |
CLASS AA CONCRETE | 734.6 | CY |
$770.00 |
$483.00 |
$700.00 |
$708.40 |
$700.00 |
$801.86 |
$1,000.00 |
$999.00 |
$1,150.00 |
| 390 | 511(A)2210 |
REINFORCING STEEL | 121,610 | LB |
$1.55 |
$1.50 |
$1.15 |
$1.47 |
$1.47 |
$1.43 |
$2.00 |
$1.00 |
$1.25 |
| 400 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$20,000.00 |
$30,900.00 |
$35,000.00 |
$31,000.00 |
$43,546.00 |
$72,500.00 |
$12,000.00 |
| 410 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 8,000 | LF |
$1.30 |
$1.50 |
$1.50 |
$1.90 |
$1.92 |
$2.12 |
$1.93 |
$1.24 |
$1.50 |
| 420 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 2,158 | LF |
$3.20 |
$2.00 |
$3.00 |
$3.00 |
$2.20 |
$2.42 |
$2.20 |
$1.90 |
$2.25 |
| 430 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 210 | SD |
$150.00 |
$120.00 |
$120.00 |
$158.00 |
$110.00 |
$121.18 |
$110.00 |
$116.00 |
$116.00 |
| 440 | 828 0110 |
(PL)DETECTION SYSTEM (RADAR) | 1 | LSUM |
$260,000.00 |
$8,500.00 |
$13,000.00 |
$2,750.00 |
$2,750.00 |
$3,029.54 |
$2,750.00 |
$8,050.00 |
$10,500.00 |
| 450 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 10,852 | LF |
$0.5500 |
$0.5500 |
$0.5500 |
$0.2700 |
$0.2500 |
$0.2800 |
$0.2500 |
$0.5200 |
$0.6500 |
| 460 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 11,082 | LF |
$0.4400 |
$0.5000 |
$0.5000 |
$0.2300 |
$0.2200 |
$0.2400 |
$0.2200 |
$0.4700 |
$0.6000 |
| 470 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 208 | EA |
$10.00 |
$22.00 |
$22.00 |
$8.70 |
$8.80 |
$9.69 |
$8.80 |
$21.00 |
$25.00 |
| 480 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 840 | SD |
$15.00 |
$15.50 |
$16.00 |
$8.70 |
$8.80 |
$9.69 |
$8.80 |
$15.00 |
$15.00 |
| 490 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,472 | LF |
$30.00 |
$17.50 |
$18.00 |
$31.50 |
$33.00 |
$34.54 |
$31.35 |
$17.20 |
$20.00 |
| 500 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,412 | LF |
$7.00 |
$3.50 |
$3.15 |
$8.15 |
$8.00 |
$8.48 |
$7.70 |
$3.00 |
$4.00 |
| 510 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,780 | SD |
$1.20 |
$0.0500 |
$0.1000 |
$0.0400 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0500 |
$0.0500 |
| 520 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 840 | SD |
$1.50 |
$11.00 |
$12.00 |
$5.50 |
$10.00 |
$6.06 |
$5.50 |
$11.00 |
$11.00 |
| 530 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,250 | SD |
$1.90 |
$0.0200 |
$0.0400 |
$0.0400 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0200 |
| 540 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,780 | SD |
$2.10 |
$0.0200 |
$0.0400 |
$0.2900 |
$0.2800 |
$0.3000 |
$0.2800 |
$0.0200 |
$0.0200 |
| 550 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 10,500 | SD |
$1.00 |
$1.50 |
$1.55 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0700 |
$1.50 |
$1.50 |
| 560 | 880(G)6805 |
CHANNELIZER CONES | 7,350 | SD |
$1.50 |
$0.7500 |
$0.6500 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0700 |
$0.6000 |
$0.6000 |
| 570 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 448 | SD |
$25.00 |
$15.00 |
$13.00 |
$13.10 |
$13.20 |
$14.54 |
$13.20 |
$12.00 |
$12.00 |
| 580 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$2,000.00 |
$12,000.00 |
$12,705.00 |
$30,000.00 |
$11,558.61 |
$15,000.00 |
$10,700.00 |
$13,000.00 |
| 590 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,500.00 |
$5,000.00 |
$3,500.00 |
$4,000.00 |
$5,875.00 |
$3,635.45 |
$10,000.00 |
$5,000.00 |
$3,500.00 |
| 600 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$165,000.00 |
$132,500.00 |
$114,000.00 |
$153,000.00 |
$150,000.00 |
$162,000.00 |
$141,939.00 |
$285,870.00 |
$222,000.00 |