| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$80,000.00 |
$20,600.00 |
$77,500.00 |
$172,000.00 |
$48,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,541 | CY |
$10.00 |
$11.00 |
$19.11 |
$21.60 |
$15.00 |
$32.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 51,391 | CY |
$12.00 |
$13.00 |
$12.11 |
$13.70 |
$17.50 |
$34.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$70,000.00 |
$50,000.00 |
$10,094.00 |
$11,400.00 |
$73,000.00 |
$74,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,305 | LF |
$4.00 |
$3.15 |
$3.09 |
$3.50 |
$3.90 |
$6.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 182 | LF |
$20.00 |
$21.00 |
$20.60 |
$23.25 |
$28.50 |
$10.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 32,053 | SY |
$4.00 |
$3.40 |
$3.34 |
$3.80 |
$4.55 |
$6.50 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 9.34 | AC |
$1,200.00 |
$1,050.00 |
$1,030.00 |
$1,163.00 |
$1,395.00 |
$1,200.00 |
| 90 | 307(K)4200 |
STABILIZED SUBGRADE | 11,991 | SY |
$10.00 |
$9.85 |
$9.34 |
$10.55 |
$9.05 |
$9.50 |
| 100 | 311(C)6400 |
PROCESS EXISTING BASE & SURFACE,METHOD C | 2,580 | LF |
$5.00 |
$3.50 |
$3.09 |
$3.50 |
$5.87 |
$28.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,516 | TON |
$35.00 |
$35.00 |
$41.05 |
$46.35 |
$56.00 |
$55.00 |
| 120 | 407(B)7300 |
TACK COAT | 738 | GAL |
$5.00 |
$2.75 |
$4.12 |
$3.70 |
$3.30 |
$4.20 |
| 130 | 408 8100 |
PRIME COAT | 4,195 | GAL |
$5.00 |
$2.25 |
$6.18 |
$4.85 |
$1.10 |
$4.80 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,241 | TON |
$125.00 |
$108.50 |
$116.39 |
$125.15 |
$145.68 |
$148.80 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,196 | TON |
$140.00 |
$112.00 |
$144.20 |
$137.80 |
$155.15 |
$162.00 |
| 160 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 60 | CY |
$35.00 |
$45.00 |
$41.20 |
$40.70 |
$39.00 |
$75.00 |
| 170 | 509(A)0200 |
CLASS AA CONCRETE | 287.95 | CY |
$1,000.00 |
$650.00 |
$978.50 |
$872.40 |
$727.90 |
$790.00 |
| 180 | 509(D)0500 |
CLASS C CONCRETE | 12 | CY |
$750.00 |
$555.00 |
$824.00 |
$494.33 |
$668.00 |
$750.00 |
| 190 | 511(A)2200 |
REINFORCING STEEL | 38,508 | LB |
$1.50 |
$1.70 |
$1.54 |
$1.70 |
$1.55 |
$1.90 |
| 200 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 568 | TON |
$80.00 |
$70.00 |
$71.92 |
$70.50 |
$65.25 |
$98.00 |
| 210 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 192 | TON |
$85.00 |
$60.00 |
$82.51 |
$114.00 |
$89.50 |
$98.00 |
| 220 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 1,032 | LF |
$75.00 |
$45.00 |
$38.11 |
$38.40 |
$38.00 |
$39.00 |
| 230 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 49 | SY |
$120.00 |
$135.00 |
$120.51 |
$110.50 |
$127.00 |
$110.00 |
| 240 | 613(A)5216 |
24" R.C.PIPE CLASS III | 212 | LF |
$110.00 |
$92.00 |
$106.25 |
$120.00 |
$163.00 |
$155.00 |
| 250 | 613(B)5500 |
12" CORR. GALV. STEEL PIPE | 72 | LF |
$60.00 |
$65.00 |
$41.24 |
$46.60 |
$80.50 |
$110.00 |
| 260 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 26 | LF |
$60.00 |
$72.00 |
$49.90 |
$56.35 |
$90.00 |
$142.00 |
| 270 | 613(L)6700 |
12" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$375.00 |
$1,550.00 |
$432.34 |
$488.25 |
$445.00 |
$2,900.00 |
| 280 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$850.00 |
$1,780.00 |
$532.74 |
$601.60 |
$560.00 |
$3,800.00 |
| 290 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,300.00 |
$2,400.00 |
$1,581.09 |
$1,785.50 |
$1,620.00 |
$4,500.00 |
| 300 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$65,000.00 |
$8,755.00 |
$9,887.00 |
$61,000.00 |
$20,000.00 |
| 310 | 619(B)6352 |
REMOVAL OF FENCE | 525 | LF |
$4.00 |
$2.50 |
$2.06 |
$2.30 |
$2.50 |
$10.00 |
| 320 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 8,900 | SY |
$8.00 |
$3.55 |
$6.18 |
$6.75 |
$9.83 |
$10.00 |
| 330 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 19 | SY |
$20.00 |
$25.00 |
$25.75 |
$29.00 |
$28.00 |
$50.00 |
| 340 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 214 | LF |
$30.00 |
$15.00 |
$8.24 |
$9.30 |
$30.00 |
$20.00 |
| 350 | 619(B)6472 |
REMOVAL OF EXISTING SLAB | 322 | SY |
$35.00 |
$20.00 |
$9.94 |
$11.20 |
$32.00 |
$10.00 |
| 360 | 619(C)6600 |
SAWING PAVEMENT | 143 | LF |
$10.00 |
$5.00 |
$30.90 |
$18.40 |
$10.00 |
$45.00 |
| 370 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,175 | LF |
$35.00 |
$26.25 |
$25.75 |
$29.00 |
$27.90 |
$68.00 |
| 380 | 623(F)1712 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 8 | EA |
$1,200.00 |
$1,575.00 |
$1,545.00 |
$1,745.00 |
$1,700.00 |
$8,950.00 |
| 390 | 624(A)3200 |
FENCE-STYLE WWF | 469 | LF |
$18.00 |
$17.75 |
$17.51 |
$17.95 |
$18.90 |
$68.00 |
| 400 | 624(H)3900 |
(PL) GATE | 1 | EA |
$1,000.00 |
$1,100.00 |
$1,030.00 |
$2,500.00 |
$1,400.00 |
$5,500.00 |
| 410 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$240.00 |
$208.00 |
$206.00 |
$233.00 |
$270.00 |
$950.00 |
| 420 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$125.00 |
$210.00 |
$206.00 |
$233.00 |
$267.00 |
$500.00 |
| 430 | 629(E)7600 |
MAILBOX | 1 | EA |
$110.00 |
$205.00 |
$206.00 |
$233.00 |
$290.00 |
$1,500.00 |
| 440 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 140 | CY |
$30.00 |
$35.00 |
$41.20 |
$29.00 |
$25.00 |
$75.00 |
| 450 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 64 | CY |
$35.00 |
$55.00 |
$41.20 |
$40.70 |
$32.00 |
$75.00 |
| 460 | 501(C)1400 |
SUBSTRUCTURE EXCAVATION ROCK | 450 | CY |
$120.00 |
$65.00 |
$103.00 |
$87.25 |
$49.00 |
$185.00 |
| 470 | 509(A)0210 |
CLASS AA CONCRETE | 580.5 | CY |
$900.00 |
$650.00 |
$701.14 |
$843.27 |
$720.65 |
$798.00 |
| 480 | 511(A)2210 |
REINFORCING STEEL | 96,560 | LB |
$1.35 |
$1.65 |
$1.49 |
$1.65 |
$1.49 |
$1.90 |
| 490 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 135 | TON |
$95.00 |
$80.00 |
$148.21 |
$116.00 |
$110.00 |
$98.00 |
| 500 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$120.00 |
$78.00 |
$77.25 |
$87.00 |
$84.00 |
$60.00 |
| 510 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$400.00 |
$262.00 |
$257.50 |
$290.80 |
$275.00 |
$240.00 |
| 520 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 480 | SD |
$250.00 |
$68.25 |
$66.95 |
$76.00 |
$71.55 |
$180.00 |
| 530 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 9 | SF |
$45.00 |
$52.50 |
$51.50 |
$58.00 |
$54.90 |
$24.00 |
| 540 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 7,252 | LF |
$1.00 |
$1.05 |
$1.03 |
$1.16 |
$1.09 |
$0.6000 |
| 550 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 1,200 | LF |
$0.5000 |
$0.1100 |
$0.1000 |
$0.1200 |
$0.1400 |
$1.20 |
| 560 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,626 | LF |
$25.00 |
$23.85 |
$23.43 |
$81.40 |
$27.70 |
$38.00 |
| 570 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 4,610 | LF |
$4.50 |
$3.93 |
$3.86 |
$8.10 |
$5.60 |
$10.00 |
| 580 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,680 | SD |
$1.00 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.2900 |
$1.20 |
| 590 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,400 | SD |
$2.00 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.2800 |
$1.50 |
| 600 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,880 | SD |
$2.00 |
$1.57 |
$1.54 |
$1.75 |
$1.71 |
$0.0600 |
| 610 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,640 | SD |
$0.5000 |
$2.62 |
$2.57 |
$2.90 |
$2.74 |
$0.3600 |
| 620 | 880(F)6700 |
DRUMS | 3,600 | SD |
$0.5000 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.2900 |
$0.6000 |
| 630 | 880(I)7000 |
FLAGGER | 60 | SD |
$200.00 |
$50.00 |
$206.00 |
$144.00 |
$289.00 |
$410.00 |
| 640 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,125.00 |
$20,000.00 |
$19,570.00 |
$76,000.00 |
$24,000.00 |
$24,800.00 |
| 650 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$4,120.00 |
$21,000.00 |
$4,000.00 |
$21,000.00 |
| 660 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$145,000.00 |
$159,330.43 |
$152,530.00 |
$228,000.00 |
$289,000.00 |