| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$235,000.00 |
$212,829.75 |
$280,000.00 |
$315,000.00 |
$271,000.00 |
$335,001.01 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 160,702 | CY |
$8.50 |
$6.55 |
$7.91 |
$7.93 |
$15.00 |
$8.00 |
$7.71 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 42,376 | CY |
$10.00 |
$6.55 |
$0.2500 |
$7.86 |
$15.00 |
$8.70 |
$14.51 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$150,000.00 |
$151,260.98 |
$206,000.00 |
$121,938.40 |
$203,000.00 |
$167,000.01 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 19,940 | LF |
$2.65 |
$2.20 |
$3.25 |
$2.09 |
$2.00 |
$2.10 |
$2.05 |
| 60 | 221(D)2500 |
TEMPORARY SEDIMENT BASIN | 6 | EA |
$6,000.00 |
$850.00 |
$1,588.18 |
$4,600.00 |
$400.00 |
$6,795.00 |
$1,000.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 11,998 | LF |
$9.25 |
$7.55 |
$10.59 |
$10.25 |
$17.00 |
$10.25 |
$9.75 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 311,656 | SY |
$2.00 |
$2.30 |
$2.32 |
$2.25 |
$2.25 |
$2.25 |
$2.15 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 64.4 | AC |
$900.00 |
$750.00 |
$1,359.33 |
$1,300.00 |
$800.00 |
$1,306.25 |
$1,250.05 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 64.4 | AC |
$935.00 |
$850.00 |
$1,060.27 |
$1,020.00 |
$800.00 |
$1,019.00 |
$975.05 |
| 110 | 241 3100 |
MOWING | 128.8 | AC |
$240.00 |
$125.00 |
$320.80 |
$300.00 |
$300.00 |
$308.25 |
$295.05 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 17,064 | CY |
$65.00 |
$58.50 |
$60.61 |
$63.50 |
$65.00 |
$62.45 |
$65.51 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 85,427 | SY |
$7.50 |
$5.90 |
$5.68 |
$8.50 |
$8.00 |
$8.30 |
$6.51 |
| 140 | 325 0100 |
SEPARATOR FABRIC | 104,926 | SY |
$2.00 |
$1.95 |
$1.44 |
$1.40 |
$1.00 |
$1.35 |
$1.61 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 15,987 | TON |
$35.00 |
$31.50 |
$28.63 |
$31.30 |
$30.00 |
$30.85 |
$37.11 |
| 160 | 407(B)7300 |
TACK COAT | 30,023 | GAL |
$3.50 |
$3.00 |
$3.52 |
$2.76 |
$3.00 |
$4.65 |
$4.02 |
| 170 | 408 8100 |
PRIME COAT | 30,053 | GAL |
$3.50 |
$3.00 |
$0.5400 |
$2.00 |
$1.00 |
$3.35 |
$6.02 |
| 180 | 409(A)9200 |
FABRIC REINFORCEMENT | 26,645 | SY |
$2.75 |
$2.65 |
$1.61 |
$3.40 |
$1.00 |
$9.70 |
$5.82 |
| 190 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 29,001 | TON |
$135.00 |
$102.00 |
$84.41 |
$94.00 |
$82.00 |
$107.00 |
$116.52 |
| 200 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 14,646 | TON |
$110.00 |
$88.35 |
$83.60 |
$90.00 |
$75.00 |
$100.00 |
$109.22 |
| 210 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 17,529 | TON |
$118.00 |
$106.55 |
$106.89 |
$110.50 |
$95.00 |
$111.00 |
$148.12 |
| 220 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,533 | TON |
$142.00 |
$112.00 |
$96.66 |
$116.00 |
$85.00 |
$129.00 |
$122.82 |
| 230 | 412 3100 |
COLD MILLING PAVEMENT | 104,404 | SY |
$2.60 |
$2.20 |
$2.67 |
$2.20 |
$3.00 |
$2.40 |
$2.82 |
| 240 | 509(A)0200 |
CLASS AA CONCRETE | 1,152 | CY |
$675.00 |
$580.00 |
$987.27 |
$598.00 |
$875.00 |
$925.50 |
$800.00 |
| 250 | 509(D)0500 |
CLASS C CONCRETE | 25 | CY |
$515.00 |
$550.00 |
$561.52 |
$510.00 |
$700.00 |
$1,063.00 |
$800.00 |
| 260 | 511(A)2200 |
REINFORCING STEEL | 178,238 | LB |
$1.50 |
$1.40 |
$2.14 |
$1.30 |
$1.00 |
$1.35 |
$1.50 |
| 270 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 455 | TON |
$71.00 |
$55.60 |
$69.68 |
$56.00 |
$65.00 |
$55.25 |
$60.00 |
| 280 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 18 | TON |
$68.00 |
$32.00 |
$96.53 |
$77.00 |
$100.00 |
$75.90 |
$60.00 |
| 290 | 602(B)2310 |
REVETMENT MATTRESSES | 4,190 | SY |
$60.00 |
$64.00 |
$56.74 |
$51.50 |
$60.00 |
$141.05 |
$135.05 |
| 300 | 609(B)4335 |
1'-8" COMB.CRB.& GUT.(6" MNTBLE) | 5,837 | LF |
$40.00 |
$26.00 |
$25.54 |
$25.50 |
$35.00 |
$47.00 |
$40.00 |
| 310 | 611(G)7754 |
INLET CI DES. 2 (STD) | 26 | EA |
$5,550.00 |
$4,079.00 |
$4,208.66 |
$4,410.00 |
$5,200.00 |
$4,336.00 |
$6,578.01 |
| 320 | 613(A)5208 |
18" R.C.PIPE CLASS III | 3,619 | LF |
$92.00 |
$34.55 |
$93.81 |
$56.00 |
$115.00 |
$55.75 |
$102.61 |
| 330 | 613(A)5216 |
24" R.C.PIPE CLASS III | 353 | LF |
$118.00 |
$48.55 |
$103.87 |
$87.50 |
$125.00 |
$86.10 |
$132.11 |
| 340 | 613(A)5220 |
30" R.C.PIPE CLASS III | 79 | LF |
$150.00 |
$70.00 |
$151.64 |
$108.00 |
$150.00 |
$106.50 |
$179.21 |
| 350 | 613(A)5224 |
36" R.C.PIPE CLASS III | 452 | LF |
$186.00 |
$137.45 |
$176.36 |
$153.00 |
$180.00 |
$150.05 |
$219.11 |
| 360 | 613(A)5228 |
42" R.C.PIPE CLASS III | 26 | LF |
$240.00 |
$174.00 |
$195.03 |
$203.00 |
$225.00 |
$200.00 |
$340.01 |
| 370 | 613(A)5378 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 61 | LF |
$410.00 |
$265.00 |
$437.25 |
$315.00 |
$350.00 |
$310.00 |
$335.01 |
| 380 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 7,118 | LF |
$13.50 |
$18.00 |
$6.78 |
$15.00 |
$10.00 |
$15.25 |
$25.00 |
| 390 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 280 | LF |
$20.00 |
$18.00 |
$13.42 |
$15.50 |
$10.00 |
$15.50 |
$25.00 |
| 400 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 27 | EA |
$720.00 |
$980.00 |
$1,595.64 |
$920.00 |
$900.00 |
$904.00 |
$1,523.01 |
| 410 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 12 | EA |
$1,240.00 |
$1,100.00 |
$1,835.34 |
$1,044.00 |
$1,100.00 |
$1,027.25 |
$1,626.01 |
| 420 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,800.00 |
$1,555.00 |
$2,456.97 |
$1,245.00 |
$1,200.00 |
$1,225.00 |
$1,716.01 |
| 430 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$2,600.00 |
$2,100.00 |
$2,607.24 |
$1,835.00 |
$1,800.00 |
$1,805.00 |
$2,806.01 |
| 440 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$3,850.00 |
$3,000.00 |
$3,009.62 |
$2,540.00 |
$2,200.00 |
$2,500.00 |
$3,683.01 |
| 450 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 76 | EA |
$1,750.00 |
$1,480.00 |
$1,491.54 |
$1,350.00 |
$1,700.00 |
$1,762.50 |
$1,800.00 |
| 460 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 8 | EA |
$2,300.00 |
$1,880.00 |
$2,193.44 |
$1,992.00 |
$2,500.00 |
$3,940.00 |
$2,000.00 |
| 470 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 14 | EA |
$3,000.00 |
$3,400.00 |
$4,503.85 |
$4,090.00 |
$4,200.00 |
$3,985.00 |
$2,400.00 |
| 480 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$70,000.00 |
$81,197.48 |
$80,000.00 |
$175,000.00 |
$31,350.00 |
$90,000.01 |
| 490 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,443 | SY |
$11.00 |
$3.00 |
$7.50 |
$8.26 |
$6.00 |
$8.10 |
$7.61 |
| 500 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 3,237 | LF |
$4.80 |
$3.00 |
$2.99 |
$2.92 |
$3.00 |
$2.85 |
$2.73 |
| 510 | 619(C)6600 |
SAWING PAVEMENT | 59,951 | LF |
$2.65 |
$1.85 |
$1.26 |
$2.65 |
$3.00 |
$4.70 |
$3.00 |
| 520 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,013 | LF |
$32.00 |
$25.20 |
$26.08 |
$25.00 |
$25.00 |
$25.08 |
$24.03 |
| 530 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$2,200.00 |
$1,600.00 |
$1,630.16 |
$1,565.00 |
$2,000.00 |
$1,567.50 |
$1,500.03 |
| 540 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 9 | EA |
$3,800.00 |
$3,360.00 |
$3,477.67 |
$3,330.00 |
$3,500.00 |
$3,345.00 |
$3,200.03 |
| 550 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$3,500.00 |
$3,205.00 |
$3,314.66 |
$3,175.00 |
$3,500.00 |
$3,188.00 |
$3,050.03 |
| 560 | 624(A)3200 |
FENCE-STYLE WWF | 10,406 | LF |
$11.20 |
$6.80 |
$9.78 |
$13.00 |
$10.00 |
$9.90 |
$9.04 |
| 570 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,955 | LF |
$9.65 |
$5.45 |
$7.50 |
$6.25 |
$7.50 |
$7.10 |
$6.94 |
| 580 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 9,662 | LF |
$9.00 |
$5.50 |
$7.61 |
$6.75 |
$8.00 |
$7.35 |
$7.04 |
| 590 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,369 | LF |
$10.50 |
$5.70 |
$7.88 |
$7.55 |
$8.50 |
$8.60 |
$7.24 |
| 600 | 624(E)3600 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 150 | LF |
$61.00 |
$36.55 |
$31.52 |
$21.00 |
$35.00 |
$38.00 |
$29.04 |
| 610 | 624(E)3641 |
FENCE-STYLE CLF (8'HIGH, CLASS B) | 290 | LF |
$300.00 |
$45.00 |
$36.95 |
$27.50 |
$40.00 |
$56.45 |
$34.04 |
| 620 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 28 | EA |
$205.00 |
$110.00 |
$108.67 |
$104.00 |
$110.00 |
$104.50 |
$100.03 |
| 630 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 6 | EA |
$350.00 |
$210.00 |
$217.36 |
$208.00 |
$220.00 |
$209.00 |
$200.03 |
| 640 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 44 | EA |
$60.00 |
$52.50 |
$54.34 |
$52.00 |
$55.00 |
$52.25 |
$50.03 |
| 650 | 629(E)7600 |
MAILBOX | 46 | EA |
$63.00 |
$105.00 |
$108.67 |
$104.00 |
$110.00 |
$104.50 |
$100.03 |
| 660 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 73 | SY |
$9.40 |
$1.45 |
$1.18 |
$26.00 |
$10.00 |
$15.75 |
$5.00 |
| 670 | 602(B)2300 |
ARTICULATING CONCRETE BLOCK | 16,693 | SF |
$20.00 |
$5.50 |
$22.01 |
$14.85 |
$17.00 |
$29.75 |
$20.00 |
| 680 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 283,400 | LF |
$0.2000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 690 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 283,400 | LF |
$0.2000 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 700 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 420 | SD |
$22.00 |
$5.25 |
$5.43 |
$5.20 |
$7.00 |
$5.20 |
$5.03 |
| 710 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 37,740 | SD |
$0.1500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0300 |
| 720 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,900 | SD |
$0.5000 |
$1.10 |
$1.09 |
$1.04 |
$1.00 |
$1.05 |
$1.03 |
| 730 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,320 | SD |
$1.65 |
$3.68 |
$3.80 |
$3.64 |
$4.00 |
$3.65 |
$3.53 |
| 740 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,200 | SD |
$1.00 |
$0.2600 |
$0.2700 |
$0.2600 |
$0.3000 |
$0.3000 |
$0.2300 |
| 750 | 880(C)6420 |
WING BARRICADES | 900 | SD |
$0.9500 |
$0.5300 |
$0.5400 |
$0.5200 |
$0.5500 |
$0.5000 |
$0.5300 |
| 760 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 9,120 | SD |
$0.4000 |
$2.10 |
$2.17 |
$2.08 |
$2.20 |
$2.10 |
$2.03 |
| 770 | 880(G)6805 |
CHANNELIZER CONES | 38,220 | SD |
$0.3500 |
$1.05 |
$1.09 |
$1.04 |
$1.10 |
$1.05 |
$1.03 |
| 780 | 880(I)7000 |
FLAGGER | 840 | SD |
$110.00 |
$25.00 |
$27.19 |
$50.00 |
$200.00 |
$267.00 |
$300.00 |
| 790 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 51 | EA |
$150.00 |
$52.55 |
$54.34 |
$52.00 |
$60.00 |
$52.25 |
$50.03 |
| 800 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 10 | EA |
$340.00 |
$367.00 |
$380.37 |
$365.00 |
$400.00 |
$365.50 |
$350.03 |
| 810 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 286 | SF |
$37.00 |
$25.55 |
$27.17 |
$26.00 |
$30.00 |
$26.15 |
$25.03 |
| 820 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 529 | LF |
$14.00 |
$11.60 |
$11.95 |
$11.50 |
$12.00 |
$11.50 |
$11.03 |
| 830 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 58 | EA |
$22.00 |
$28.00 |
$27.17 |
$26.00 |
$30.00 |
$26.15 |
$25.03 |
| 840 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 90,842 | LF |
$0.8000 |
$0.7700 |
$0.7900 |
$0.7600 |
$0.8000 |
$0.7500 |
$0.7300 |
| 850 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$183,500.00 |
$80,000.00 |
$106,802.66 |
$92,000.00 |
$95,000.00 |
$105,000.00 |
$75,000.00 |
| 860 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$4,500.00 |
$3,803.70 |
$32,840.26 |
$10,000.00 |
$11,000.00 |
$5,000.00 |
| 870 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$50,000.00 |
$37,524.16 |
$45,000.00 |
$15,000.00 |
$21,200.00 |
$25,000.00 |
| 880 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$800,000.00 |
$650,000.00 |
$703,959.71 |
$650,000.00 |
$775,000.00 |
|
$125,000.00 |