| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$160,000.00 |
$125,000.00 |
$55,000.00 |
$65,835.00 |
$65,800.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 89,782 | CY |
$12.00 |
$8.00 |
$4.38 |
$11.70 |
$7.20 |
$12.50 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 10,720 | CY |
$14.00 |
$0.5000 |
$19.08 |
$0.1100 |
$7.20 |
$25.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$110,000.00 |
$147,928.00 |
$98,770.29 |
$154,660.00 |
$218,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,115 | LF |
$3.50 |
$2.00 |
$2.11 |
$2.01 |
$2.00 |
$3.50 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 868 | LF |
$12.00 |
$15.00 |
$15.72 |
$14.97 |
$15.20 |
$20.00 |
| 70 | 221(F)2730 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 34 | CY |
$500.00 |
$165.00 |
$99.45 |
$606.58 |
$522.50 |
$500.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 259,467 | SY |
$3.00 |
$2.00 |
$2.16 |
$2.05 |
$2.10 |
$3.10 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 53.17 | AC |
$1,500.00 |
$800.00 |
$1,079.00 |
$1,027.10 |
$1,039.80 |
$1,200.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 53.17 | AC |
$1,350.00 |
$800.00 |
$866.00 |
$824.78 |
$835.00 |
$980.00 |
| 110 | 241 3100 |
MOWING | 106.34 | AC |
$350.00 |
$200.00 |
$244.01 |
$154.84 |
$235.15 |
$380.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 22,386 | CY |
$55.00 |
$54.00 |
$55.21 |
$55.98 |
$79.25 |
$69.00 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 114,332 | SY |
$8.00 |
$7.00 |
$8.19 |
$8.35 |
$6.85 |
$10.20 |
| 140 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 110,308 | SY |
$3.50 |
$3.00 |
$4.05 |
$3.70 |
$3.70 |
$3.50 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 9,424 | TON |
$30.00 |
$25.00 |
$28.49 |
$28.28 |
$38.80 |
$85.00 |
| 160 | 407(B)7300 |
TACK COAT | 24,470 | GAL |
$4.00 |
$3.00 |
$3.09 |
$3.23 |
$4.50 |
$3.42 |
| 170 | 408 8100 |
PRIME COAT | 67,212 | GAL |
$1.50 |
$1.00 |
$4.01 |
$3.70 |
$3.35 |
$3.90 |
| 180 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 15,728 | TON |
$115.00 |
$75.00 |
$95.98 |
$89.05 |
$89.50 |
$101.75 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 26,171 | TON |
$110.00 |
$70.00 |
$90.28 |
$80.85 |
$82.50 |
$95.30 |
| 200 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 16,941 | TON |
$130.00 |
$85.00 |
$110.07 |
$99.59 |
$97.90 |
$116.70 |
| 210 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,763 | TON |
$125.00 |
$80.00 |
$97.06 |
$84.64 |
$122.10 |
$98.00 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 58,202 | SY |
$3.50 |
$2.00 |
$2.77 |
$1.75 |
$3.00 |
$3.20 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 116 | CY |
$35.00 |
$30.00 |
$46.09 |
$46.22 |
$36.30 |
$80.00 |
| 240 | 509(A)0200 |
CLASS AA CONCRETE | 293 | CY |
$850.00 |
$800.00 |
$620.32 |
$622.00 |
$751.20 |
$980.00 |
| 250 | 509(D)0500 |
CLASS C CONCRETE | 301 | CY |
$500.00 |
$600.00 |
$409.39 |
$410.50 |
$371.00 |
$760.00 |
| 260 | 511(A)2200 |
REINFORCING STEEL | 44,418 | LB |
$1.50 |
$1.00 |
$1.40 |
$1.40 |
$1.35 |
$2.10 |
| 270 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 61 | TON |
$70.00 |
$80.00 |
$67.63 |
$63.61 |
$73.15 |
$85.00 |
| 280 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 11 | TON |
$50.00 |
$50.00 |
$59.94 |
$81.01 |
$52.25 |
$69.00 |
| 290 | 611(G)9054 |
INLET CDI 30SK RCP DES.2 | 1 | EA |
$4,500.00 |
$5,500.00 |
$5,415.00 |
$7,818.60 |
$3,901.00 |
$10,000.00 |
| 300 | 611(H)0734 |
ADD'L DEPTH IN INLET CDI RCP 30SK DES. 2 | 9.92 | VF |
$800.00 |
$200.00 |
$160.27 |
$332.91 |
$312.55 |
$650.00 |
| 310 | 613(A)5216 |
24" R.C.PIPE CLASS III | 748 | LF |
$120.00 |
$125.00 |
$66.56 |
$132.73 |
$92.50 |
$190.00 |
| 320 | 613(A)5224 |
36" R.C.PIPE CLASS III | 110 | LF |
$225.00 |
$165.00 |
$115.29 |
$177.82 |
$161.80 |
$205.00 |
| 330 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 110 | LF |
$200.00 |
$180.00 |
$132.56 |
$186.38 |
$164.25 |
$280.00 |
| 340 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 836 | LF |
$60.00 |
$60.00 |
$67.08 |
$75.72 |
$44.40 |
$182.00 |
| 350 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 216 | LF |
$90.00 |
$80.00 |
$111.48 |
$107.68 |
$63.50 |
$215.00 |
| 360 | 613(B)5544 |
60" CORR. GALV. STEEL PIPE | 90 | LF |
$200.00 |
$160.00 |
$211.16 |
$335.14 |
$133.85 |
$620.00 |
| 370 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 124 | LF |
$85.00 |
$65.00 |
$130.71 |
$142.97 |
$56.05 |
$240.00 |
| 380 | 613(L)6636 |
36" X 22" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$2,500.00 |
$2,000.00 |
$1,705.00 |
$2,374.24 |
$2,169.40 |
$259.00 |
| 390 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 10 | EA |
$1,250.00 |
$1,000.00 |
$714.00 |
$1,322.46 |
$1,066.95 |
$3,850.00 |
| 400 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,000.00 |
$1,800.00 |
$1,440.00 |
$2,108.63 |
$1,874.75 |
$4,800.00 |
| 410 | 613(L)6744 |
60" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$4,500.00 |
$4,000.00 |
$3,398.00 |
$4,639.21 |
$4,454.85 |
$12,500.00 |
| 420 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 36 | EA |
$2,250.00 |
$1,800.00 |
$2,179.00 |
$2,011.73 |
$1,933.25 |
$2,400.00 |
| 430 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$3,000.00 |
$2,900.00 |
$2,613.00 |
$2,392.32 |
$2,037.75 |
$3,650.00 |
| 440 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$3,500.00 |
$4,000.00 |
$3,189.00 |
$2,664.16 |
$3,135.00 |
$3,900.00 |
| 450 | 613(M)6988 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$4,000.00 |
$6,000.00 |
$4,184.00 |
$3,207.87 |
$5,747.50 |
$5,800.00 |
| 460 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$80,000.00 |
$35,000.00 |
$80,000.00 |
$85,482.02 |
$35,843.50 |
$39,800.00 |
| 470 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,136 | SY |
$10.00 |
$10.00 |
$6.53 |
$7.41 |
$10.75 |
$15.00 |
| 480 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 46,135 | SY |
$9.00 |
$6.00 |
$3.55 |
$5.57 |
$7.85 |
$12.00 |
| 490 | 619(C)6600 |
SAWING PAVEMENT | 8,344 | LF |
$3.00 |
$3.00 |
$6.51 |
$3.26 |
$3.15 |
$25.00 |
| 500 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 3,390 | LF |
$10.00 |
$9.00 |
$8.64 |
$8.00 |
$8.10 |
$25.00 |
| 510 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,931 | LF |
$12.00 |
$10.00 |
$8.91 |
$8.26 |
$8.35 |
$29.00 |
| 520 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$250.00 |
$180.00 |
$191.00 |
$180.65 |
$182.90 |
$850.00 |
| 530 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 5 | EA |
$400.00 |
$230.00 |
$246.00 |
$232.26 |
$235.10 |
$500.00 |
| 540 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 17 | EA |
$150.00 |
$60.00 |
$55.00 |
$163.12 |
$52.25 |
$150.00 |
| 550 | 629(E)7600 |
MAILBOX | 17 | EA |
$200.00 |
$100.00 |
$109.00 |
$103.23 |
$104.50 |
$650.00 |
| 560 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 400 | CY |
$16.00 |
$15.00 |
$22.23 |
$22.29 |
$18.80 |
$98.00 |
| 570 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 146 | CY |
$50.00 |
$30.00 |
$46.09 |
$46.22 |
$36.30 |
$65.00 |
| 580 | 501(F)1700 |
GRANULAR BACKFILL | 430 | CY |
$80.00 |
$50.00 |
$100.31 |
$100.58 |
$85.20 |
$75.00 |
| 590 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$30,000.00 |
$13,058.00 |
$92,180.00 |
$124,086.09 |
$62,700.00 |
$148,500.00 |
| 600 | 509(A)0210 |
CLASS AA CONCRETE | 307.3 | CY |
$900.00 |
$1,100.00 |
$620.32 |
$622.00 |
$772.80 |
$940.00 |
| 610 | 511(A)2210 |
REINFORCING STEEL | 24,320 | LB |
$1.60 |
$1.25 |
$1.40 |
$1.40 |
$1.35 |
$1.80 |
| 620 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 21,600 | LB |
$1.80 |
$1.75 |
$2.49 |
$2.50 |
$1.70 |
$2.20 |
| 630 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 54 | LF |
$60.00 |
$10.00 |
$32.53 |
$32.62 |
$78.35 |
$45.00 |
| 640 | 613(S)7700 |
STANDARD BEDDING MATERIAL, CLASS B | 12 | CY |
$100.00 |
$100.00 |
$64.53 |
$64.70 |
$99.25 |
$80.00 |
| 650 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$96,290.30 |
$43,379.00 |
$11,060.16 |
$28,215.00 |
$24,500.00 |
| 660 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 22,342 | LF |
$0.4000 |
$0.3000 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2000 |
| 670 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 36,567 | LF |
$0.3000 |
$0.3000 |
$0.1500 |
$0.1400 |
$0.1500 |
$0.1900 |
| 680 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$200.00 |
$100.00 |
$109.00 |
$103.23 |
$104.50 |
$120.00 |
| 690 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 69 | SF |
$35.00 |
$40.00 |
$38.24 |
$36.13 |
$36.58 |
$45.00 |
| 700 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 144 | LF |
$15.00 |
$15.00 |
$12.02 |
$11.35 |
$11.50 |
$15.00 |
| 710 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 117,920 | LF |
$1.00 |
$0.6500 |
$0.6900 |
$0.6500 |
$0.7000 |
$0.7500 |
| 720 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 3,107 | LF |
$1.50 |
$2.00 |
$1.64 |
$1.55 |
$1.55 |
$2.00 |
| 730 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 180 | LF |
$2.50 |
$15.00 |
$10.93 |
$10.32 |
$10.45 |
$12.00 |
| 740 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 15 | EA |
$250.00 |
$165.00 |
$164.00 |
$154.84 |
$156.75 |
$180.00 |
| 750 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$175,000.00 |
$210,000.00 |
$100,000.00 |
$64,403.45 |
$120,175.00 |
$105,200.00 |
| 760 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 248,800 | CY |
$12.00 |
$8.00 |
$4.98 |
$9.71 |
$5.85 |
$11.50 |
| 770 | 202(D)2500 |
UNCLASSIFIED BORROW | 10,000 | CY |
$14.00 |
$0.5000 |
$21.86 |
$0.1100 |
$7.20 |
$24.00 |
| 780 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$150,000.00 |
$130,000.00 |
$145,732.00 |
$399,511.91 |
$157,795.00 |
$98,500.00 |
| 790 | 221(B)2300 |
TEMPORARY SILT FENCE | 6,680 | LF |
$3.50 |
$2.00 |
$2.11 |
$2.01 |
$2.05 |
$3.50 |
| 800 | 221(E)2600 |
TEMPORARY SILT DIKE | 9,456 | LF |
$12.00 |
$15.00 |
$15.72 |
$14.97 |
$15.15 |
$3.40 |
| 810 | 221(F)2730 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 10 | CY |
$500.00 |
$165.00 |
$136.10 |
$817.03 |
$522.50 |
$500.00 |
| 820 | 230(A)7200 |
SOLID SLAB SODDING | 269,510 | SY |
$3.00 |
$2.00 |
$2.16 |
$2.05 |
$2.10 |
$3.10 |
| 830 | 232(B)9300 |
SEEDING METHOD B | 56 | AC |
$1,500.00 |
$800.00 |
$1,079.00 |
$1,027.10 |
$1,039.75 |
$1,200.00 |
| 840 | 233(A)0200 |
VEGETATIVE MULCHING | 200 | AC |
$1,350.00 |
$800.00 |
$866.00 |
$824.78 |
$834.95 |
$980.00 |
| 850 | 241 3100 |
MOWING | 111 | AC |
$350.00 |
$200.00 |
$244.00 |
$163.12 |
$235.10 |
$340.00 |
| 860 | 303(A)1200 |
AGGREGATE BASE TYPE A | 54,942 | CY |
$55.00 |
$54.00 |
$55.20 |
$57.46 |
$79.25 |
$68.00 |
| 870 | 307(K)4200 |
STABILIZED SUBGRADE | 275,695 | SY |
$8.00 |
$7.00 |
$7.29 |
$8.51 |
$6.75 |
$10.50 |
| 880 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 267,817 | SY |
$3.50 |
$3.00 |
$4.06 |
$3.53 |
$3.60 |
$3.50 |
| 890 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20,454 | TON |
$30.00 |
$25.00 |
$27.30 |
$28.55 |
$40.25 |
$70.00 |
| 900 | 407(B)7300 |
TACK COAT | 37,479 | GAL |
$4.00 |
$3.00 |
$3.09 |
$3.17 |
$3.60 |
$3.42 |
| 910 | 408 8100 |
PRIME COAT | 61,808 | GAL |
$1.50 |
$1.00 |
$4.01 |
$3.69 |
$3.55 |
$3.90 |
| 920 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 29,233 | TON |
$115.00 |
$75.00 |
$95.98 |
$98.55 |
$89.20 |
$101.75 |
| 930 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 67,699 | TON |
$110.00 |
$70.00 |
$90.28 |
$80.13 |
$82.30 |
$95.30 |
| 940 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 19,748 | TON |
$130.00 |
$85.00 |
$110.07 |
$98.64 |
$97.65 |
$116.70 |
| 950 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,272 | TON |
$125.00 |
$80.00 |
$97.06 |
$87.61 |
$104.35 |
$98.00 |
| 960 | 412 3100 |
COLD MILLING PAVEMENT | 3,703 | SY |
$3.50 |
$2.00 |
$2.77 |
$6.19 |
$2.90 |
$3.20 |
| 970 | 501(G)1810 |
CLSM BACKFILL | 80 | CY |
$150.00 |
$200.00 |
$257.56 |
$287.14 |
$156.75 |
$350.00 |
| 980 | 509(D)0500 |
CLASS C CONCRETE | 729 | CY |
$400.00 |
$600.00 |
$409.39 |
$410.50 |
$370.95 |
$920.00 |
| 990 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 229 | TON |
$70.00 |
$80.00 |
$68.94 |
$90.47 |
$73.15 |
$89.00 |
| 1,000 | 609(B)4320 |
1'-8" COMB.CRB.& GUT.(4" MNTBLE) | 240 | LF |
$50.00 |
$65.00 |
$43.32 |
$43.45 |
$36.60 |
$38.00 |
| 1,010 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 310 | SY |
$150.00 |
$115.00 |
$105.74 |
$106.02 |
$99.25 |
$125.00 |
| 1,020 | 611(G)9012 |
INLET CDI RCP DES. 4 | 2 | EA |
$2,800.00 |
$7,500.00 |
$6,918.00 |
$9,876.53 |
$6,184.30 |
$6,800.00 |
| 1,030 | 611(H)0692 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 2.68 | VF |
$500.00 |
$400.00 |
$335.05 |
$523.33 |
$468.65 |
$500.00 |
| 1,040 | 613(A)5208 |
18" R.C.PIPE CLASS III | 3,240 | LF |
$100.00 |
$110.00 |
$54.56 |
$69.22 |
$67.60 |
$185.00 |
| 1,050 | 613(A)5216 |
24" R.C.PIPE CLASS III | 1,410 | LF |
$120.00 |
$125.00 |
$66.55 |
$105.30 |
$92.40 |
$199.00 |
| 1,060 | 613(A)5220 |
30" R.C.PIPE CLASS III | 664 | LF |
$190.00 |
$140.00 |
$86.39 |
$143.78 |
$114.20 |
$205.00 |
| 1,070 | 613(A)5224 |
36" R.C.PIPE CLASS III | 1,120 | LF |
$225.00 |
$165.00 |
$115.32 |
$227.39 |
$167.10 |
$220.00 |
| 1,080 | 613(A)5232 |
48" R.C.PIPE CLASS III | 574 | LF |
$250.00 |
$215.00 |
$189.44 |
$316.66 |
$264.85 |
$255.00 |
| 1,090 | 613(A)5276 |
36" R.C.PIPE CLASS IV | 114 | LF |
$220.00 |
$180.00 |
$136.63 |
$402.97 |
$187.35 |
$240.00 |
| 1,100 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 136 | LF |
$200.00 |
$140.00 |
$105.62 |
$122.36 |
$122.80 |
$252.00 |
| 1,110 | 613(A)5374 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 180 | LF |
$200.00 |
$265.00 |
$216.92 |
$278.46 |
$292.90 |
$320.00 |
| 1,120 | 613(B)5500 |
12" CORR. GALV. STEEL PIPE | 1,780 | LF |
$30.00 |
$50.00 |
$52.29 |
$100.48 |
$37.10 |
$148.00 |
| 1,130 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 540 | LF |
$60.00 |
$60.00 |
$67.26 |
$113.05 |
$44.35 |
$180.00 |
| 1,140 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,000 | LF |
$30.00 |
$10.00 |
$31.23 |
$33.65 |
$31.35 |
$45.00 |
| 1,150 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 500 | LF |
$30.00 |
$10.00 |
$38.80 |
$22.51 |
$31.35 |
$45.00 |
| 1,160 | 613(L)6620 |
28" X 18" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$900.00 |
$1,500.00 |
$1,209.00 |
$1,235.11 |
$1,618.71 |
$3,500.00 |
| 1,170 | 613(L)6656 |
51" X 31" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$1,000.00 |
$3,700.00 |
$3,361.00 |
$3,907.51 |
$4,197.75 |
$5,800.00 |
| 1,180 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 136 | EA |
$700.00 |
$900.00 |
$633.00 |
$1,225.53 |
$975.65 |
$2,100.00 |
| 1,190 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 44 | EA |
$1,250.00 |
$1,000.00 |
$714.00 |
$1,301.14 |
$1,065.20 |
$2,900.00 |
| 1,200 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 18 | EA |
$950.00 |
$1,400.00 |
$1,094.00 |
$1,686.18 |
$1,487.40 |
$3,800.00 |
| 1,210 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 14 | EA |
$2,000.00 |
$1,800.00 |
$1,440.00 |
$2,038.84 |
$1,871.25 |
$5,600.00 |
| 1,220 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,500.00 |
$3,100.00 |
$2,649.00 |
$3,839.71 |
$3,486.60 |
$8,900.00 |
| 1,230 | 613(M)6976 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$3,500.00 |
$2,958.00 |
$1,984.53 |
$3,657.50 |
$6,800.00 |
| 1,240 | 613(M)6992 |
TYPE DD4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$4,200.00 |
$4,926.00 |
$4,077.80 |
$4,911.50 |
$6,980.00 |
| 1,250 | 613(M)6996 |
TYPE EE4 CULVERT END TREATMENT | 2 | EA |
$3,500.00 |
$5,500.00 |
$5,918.00 |
$3,751.58 |
$4,389.00 |
$7,250.00 |
| 1,260 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 15 | EA |
$250.00 |
$1,200.00 |
$699.00 |
$701.39 |
$261.25 |
$4,250.00 |
| 1,270 | 613(W)8130 |
36" JACKED CONDUIT | 152 | LF |
$500.00 |
$1,000.00 |
$1,286.00 |
$1,298.63 |
$1,336.85 |
$850.00 |
| 1,280 | 613(W)8140 |
48" JACKED CONDUIT | 224 | LF |
$600.00 |
$1,200.00 |
$1,404.00 |
$1,408.77 |
$1,565.62 |
$1,250.00 |
| 1,290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$150,000.00 |
$65,000.00 |
$63,233.19 |
$141,115.77 |
$71,536.50 |
$48,000.00 |
| 1,300 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 92,618 | SY |
$9.00 |
$6.00 |
$3.57 |
$5.00 |
$7.85 |
$12.00 |
| 1,310 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 281 | SY |
$8.00 |
$10.00 |
$8.17 |
$9.03 |
$10.70 |
$11.00 |
| 1,320 | 619(C)6600 |
SAWING PAVEMENT | 5,799 | LF |
$3.00 |
$3.00 |
$6.51 |
$3.10 |
$3.15 |
$25.00 |
| 1,330 | 624(A)3200 |
FENCE-STYLE WWF | 2,890 | LF |
$9.00 |
$11.00 |
$11.14 |
$10.32 |
$10.45 |
$25.00 |
| 1,340 | 624(B)3360 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 2 | EA |
$2,000.00 |
$1,200.00 |
$1,337.00 |
$1,238.72 |
$1,254.00 |
$3,250.00 |
| 1,350 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 7,360 | LF |
$12.00 |
$10.00 |
$8.91 |
$8.26 |
$8.35 |
$35.00 |
| 1,360 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 26 | EA |
$250.00 |
$180.00 |
$191.00 |
$180.65 |
$182.90 |
$850.00 |
| 1,370 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 7 | EA |
$400.00 |
$230.00 |
$246.00 |
$232.26 |
$235.10 |
$500.00 |
| 1,380 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 44 | EA |
$150.00 |
$60.00 |
$55.00 |
$163.12 |
$52.25 |
$150.00 |
| 1,390 | 629(E)7600 |
MAILBOX | 44 | EA |
$200.00 |
$100.00 |
$109.00 |
$103.23 |
$104.50 |
$650.00 |
| 1,400 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 218,174 | LF |
$0.5000 |
$0.1000 |
$0.0800 |
$0.0700 |
$0.0500 |
$0.1000 |
| 1,410 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 12,271 | LF |
$1.50 |
$1.00 |
$1.09 |
$1.03 |
$1.05 |
$1.20 |
| 1,420 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 3,000 | EA |
$1.00 |
$1.00 |
$1.00 |
$0.5200 |
$0.5000 |
$0.6500 |
| 1,430 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 11,641 | LF |
$0.5000 |
$0.2500 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2000 |
| 1,440 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 116 | EA |
$0.7000 |
$6.00 |
$5.00 |
$5.16 |
$5.25 |
$5.80 |
| 1,450 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 116 | EA |
$0.7000 |
$6.00 |
$5.00 |
$5.16 |
$5.25 |
$5.80 |
| 1,460 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 330 | SD |
$20.00 |
$25.00 |
$21.85 |
$20.65 |
$20.90 |
$29.00 |
| 1,470 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,395 | LF |
$25.00 |
$25.00 |
$24.04 |
$22.71 |
$23.00 |
$55.00 |
| 1,480 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,395 | LF |
$12.00 |
$10.00 |
$4.37 |
$4.13 |
$4.20 |
$19.00 |
| 1,490 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 500 | SD |
$6.00 |
$10.00 |
$5.46 |
$5.16 |
$5.25 |
$5.80 |
| 1,500 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 47,340 | SD |
$0.6000 |
$0.1500 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1500 |
| 1,510 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 38,095 | SD |
$1.00 |
$0.5500 |
$0.5500 |
$0.5200 |
$0.5000 |
$0.7500 |
| 1,520 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 11,535 | SD |
$3.00 |
$2.30 |
$2.46 |
$2.32 |
$2.35 |
$2.80 |
| 1,530 | 880(C)6405 |
CONSTRUCTION BARRICADES(TYPE II) | 3,900 | SD |
$0.8000 |
$0.3000 |
$0.2700 |
$0.2600 |
$0.2500 |
$0.5000 |
| 1,540 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 56,825 | SD |
$4.00 |
$0.3000 |
$0.2700 |
$0.2600 |
$0.2500 |
$0.5000 |
| 1,550 | 880(D)6500 |
VERTICAL PANELS | 44,125 | SD |
$0.3000 |
$0.1000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1000 |
| 1,560 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 96,600 | SD |
$0.8000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1000 |
| 1,570 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 22,620 | SD |
$0.7500 |
$1.00 |
$1.08 |
$1.03 |
$1.05 |
$1.20 |
| 1,580 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 1,140 | SD |
$0.6500 |
$1.00 |
$1.09 |
$1.03 |
$1.05 |
$1.20 |
| 1,590 | 880(F)6700 |
DRUMS | 171,370 | SD |
$0.3500 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.2000 |
| 1,600 | 880(G)6800 |
TUBE CHANNELIZERS | 2,065 | SD |
$0.4000 |
$1.30 |
$1.37 |
$1.29 |
$1.30 |
$1.40 |
| 1,610 | 880(G)6805 |
CHANNELIZER CONES | 29,840 | SD |
$0.5000 |
$0.5500 |
$0.5500 |
$0.5200 |
$0.5500 |
$0.7500 |
| 1,620 | 880(I)7000 |
FLAGGER | 90 | SD |
$200.00 |
$180.00 |
$2,253.28 |
$763.09 |
$130.65 |
$550.00 |
| 1,630 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,020 | SD |
$20.00 |
$15.00 |
$10.93 |
$10.32 |
$10.45 |
$15.00 |
| 1,640 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 47,460 | LF |
$0.4000 |
$0.3000 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2500 |
| 1,650 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 51,540 | LF |
$0.3000 |
$0.3000 |
$0.1500 |
$0.1400 |
$0.1500 |
$0.2500 |
| 1,660 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 50 | EA |
$200.00 |
$100.00 |
$82.00 |
$77.42 |
$78.40 |
$120.00 |
| 1,670 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$500.00 |
$500.00 |
$437.00 |
$412.91 |
$418.00 |
$500.00 |
| 1,680 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 361.04 | SF |
$35.00 |
$40.00 |
$38.24 |
$36.13 |
$36.60 |
$45.00 |
| 1,690 | 851(C)2415 |
2" SQUARE TUBE POST | 49 | LF |
$15.00 |
$15.00 |
$10.93 |
$10.32 |
$10.45 |
$15.00 |
| 1,700 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 592 | LF |
$15.00 |
$15.00 |
$12.02 |
$11.35 |
$11.50 |
$21.00 |
| 1,710 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 130,690 | LF |
$1.00 |
$0.6500 |
$0.6900 |
$0.6500 |
$0.6500 |
$0.8000 |
| 1,720 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 60 | LF |
$2.50 |
$15.00 |
$16.39 |
$15.48 |
$15.70 |
$20.00 |
| 1,730 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 176 | EA |
$250.00 |
$165.00 |
$166.00 |
$154.84 |
$156.75 |
$220.00 |
| 1,740 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 500 | LF |
$1.00 |
$1.10 |
$1.09 |
$1.03 |
$1.05 |
$1.20 |
| 1,750 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$215,000.00 |
$175,000.00 |
$10,053.00 |
$325,000.00 |
$234,163.60 |
$85,000.00 |
| 1,760 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$3,253.00 |
$154,100.00 |
$41,800.00 |
$65,800.00 |
| 1,770 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$50,000.00 |
$30,000.00 |
$25,485.00 |
$40,900.00 |
$26,125.00 |
$180,000.00 |
| 1,780 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,150,775.88 |
|
|
|
|
|