| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,090 | CY |
$20.00 |
$50.00 |
$25.00 |
$50.00 |
$40.00 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 483 | CY |
$25.00 |
$24.00 |
$50.00 |
$58.00 |
$40.00 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,950 | LF |
$3.50 |
$4.00 |
$5.00 |
$6.95 |
$6.00 |
| 40 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 15 | CY |
$255.00 |
$115.00 |
$500.00 |
$450.00 |
$150.00 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 4,673 | SY |
$5.00 |
$5.00 |
$8.00 |
$7.50 |
$7.00 |
| 60 | 232(A)9200 |
SEEDING METHOD A | 0.97 | AC |
$1,675.00 |
$3,000.00 |
$2,500.00 |
$1,795.00 |
$2,500.00 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 0.97 | AC |
$1,375.00 |
$3,000.00 |
$2,500.00 |
$1,795.00 |
$2,500.00 |
| 80 | 240(A)2210 |
REMOVING TREES 13" TO 18" IN DIAMETER | 1 | EA |
$1,500.00 |
$2,600.00 |
$2,500.00 |
$1,250.00 |
$350.00 |
| 90 | 240(A)2220 |
REMOVING TREES 19" TO 24" IN DIAMETER | 1 | EA |
$2,000.00 |
$3,800.00 |
$5,000.00 |
$2,100.00 |
$450.00 |
| 100 | 240(A)2230 |
REMOVING TREES 25" & MORE IN DIAMETER | 1 | EA |
$2,500.00 |
$5,200.00 |
$5,500.00 |
$3,400.00 |
$500.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 188 | CY |
$70.00 |
$142.00 |
$60.00 |
$108.00 |
$75.00 |
| 120 | 310(B)5300 |
SUBGRADE, METHOD B | 5,270 | SY |
$3.95 |
$4.00 |
$12.00 |
$6.80 |
$10.00 |
| 130 | 325 0100 |
SEPARATOR FABRIC | 934 | SY |
$2.76 |
$4.40 |
$3.00 |
$2.00 |
$6.00 |
| 140 | 407(B)7300 |
TACK COAT | 36 | GAL |
$5.77 |
$7.00 |
$10.00 |
$5.50 |
$7.00 |
| 150 | 408 8100 |
PRIME COAT | 117 | GAL |
$3.86 |
$16.00 |
$12.00 |
$13.20 |
$9.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 950 | TON |
$124.35 |
$150.00 |
$162.00 |
$132.00 |
$200.00 |
| 170 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 180 | TON |
$144.07 |
$136.00 |
$162.00 |
$122.00 |
$200.00 |
| 180 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 60 | TON |
$278.98 |
$150.00 |
$162.00 |
$134.00 |
$200.00 |
| 190 | 509(A)0200 |
CLASS AA CONCRETE | 177 | CY |
$766.32 |
$978.00 |
$785.00 |
$925.00 |
$3,000.00 |
| 200 | 511(A)2200 |
REINFORCING STEEL | 561 | LB |
$1.54 |
$2.20 |
$2.50 |
$3.00 |
$6.00 |
| 210 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 153 | TON |
$58.43 |
$85.00 |
$80.00 |
$98.00 |
$125.00 |
| 220 | 610(A)5200 |
4" CONCRETE SIDEWALK | 193 | SY |
$84.14 |
$84.00 |
$85.00 |
$115.00 |
$110.00 |
| 230 | 610(A)5220 |
6" CONCRETE SIDEWALK | 221 | SY |
$102.75 |
$212.00 |
$95.00 |
$130.00 |
$120.00 |
| 240 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 45 | SY |
$104.77 |
$112.00 |
$110.00 |
$130.00 |
$135.00 |
| 250 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 192 | SF |
$48.86 |
$48.00 |
$45.00 |
$40.00 |
$50.00 |
| 260 | 612(A)3200 |
MANHOLES ADJUST TO GRADE | 1 | EA |
$1,712.18 |
$5,200.00 |
$2,000.00 |
$1,600.00 |
$1,500.00 |
| 270 | 612(E)3600 |
VALVE BOXES ADJUST TO GRADE | 4 | EA |
$677.14 |
$345.00 |
$850.00 |
$600.00 |
$500.00 |
| 280 | 612(H)3900 |
VALVE RESET | 2 | EA |
$1,444.18 |
$350.00 |
$5,000.00 |
$13,000.00 |
$500.00 |
| 290 | 612(I)4000 |
WATER METER RESET | 1 | EA |
$2,904.20 |
$3,899.82 |
$1,850.00 |
$4,500.00 |
$500.00 |
| 300 | 613(A)5224 |
36" R.C.PIPE CLASS III | 16 | LF |
$202.07 |
$264.00 |
$250.00 |
$240.00 |
$400.00 |
| 310 | 613(EE)5965 |
15" CORRUGATED POLYPROPYLENE PIPE | 164 | LF |
$118.87 |
$152.00 |
$146.00 |
$117.00 |
$100.00 |
| 320 | 613(EE)5985 |
42" CORRUGATED POLYPROPYLENE PIPE | 32 | LF |
$287.74 |
$208.00 |
$280.00 |
$330.00 |
$400.00 |
| 330 | 613(L)6704 |
15" PREFAB. CULVERT END SEC., ROUND | 3 | EA |
$533.41 |
$1,570.00 |
$2,500.00 |
$1,150.00 |
$2,000.00 |
| 340 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,350.70 |
$3,920.00 |
$6,500.00 |
$2,860.00 |
$4,000.00 |
| 350 | 619(B)6300 |
REMOVAL OF HEADWALL | 1 | EA |
$1,512.88 |
$2,400.00 |
$2,500.00 |
$1,250.00 |
$2,000.00 |
| 360 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 222 | LF |
$12.34 |
$17.00 |
$10.00 |
$19.00 |
$15.00 |
| 370 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 626 | SY |
$6.35 |
$28.00 |
$10.00 |
$21.50 |
$25.00 |
| 380 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 11 | SY |
$17.19 |
$58.00 |
$10.00 |
$41.00 |
$20.00 |
| 390 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 40 | SY |
$9.06 |
$22.00 |
$5.00 |
$20.00 |
$20.00 |
| 400 | 619(B)6392 |
REMOVAL OF EXISTING STRUCTURES | 1 | EA |
$500.00 |
$18,700.00 |
$15,000.00 |
$20,000.00 |
$10,000.00 |
| 410 | 619(B)6400 |
REMOVAL OF CURB | 49 | LF |
$15.00 |
$17.00 |
$10.00 |
$19.00 |
$20.00 |
| 420 | 619(B)6404 |
REMOVAL OF SIDEWALK | 106 | SY |
$17.50 |
$31.00 |
$10.00 |
$25.00 |
$20.00 |
| 430 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 124 | LF |
$67.31 |
$19.00 |
$20.00 |
$20.00 |
$20.00 |
| 440 | 622(A)0220 |
2" PIPE RAILING | 46 | LF |
$200.00 |
$250.00 |
$150.00 |
$310.00 |
$500.00 |
| 450 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$750.00 |
$3,100.00 |
$500.00 |
$215.00 |
$500.00 |
| 460 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$138.46 |
$123.00 |
$65.00 |
$105.00 |
$250.00 |
| 470 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$400.00 |
$369.00 |
$400.00 |
$430.00 |
$450.00 |
| 480 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 9.25 | SF |
$37.55 |
$61.50 |
$20.00 |
$55.00 |
$550.00 |
| 490 | 851(C)2410 |
1 3/4" SQUARE TUBE POST | 74 | LF |
$12.09 |
$24.00 |
$19.00 |
$9.75 |
$15.00 |
| 500 | 851(C)2415 |
2" SQUARE TUBE POST | 23 | LF |
$11.49 |
$24.00 |
$24.00 |
$10.80 |
$12.00 |
| 510 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 243 | LF |
$1.62 |
$6.00 |
$10.00 |
$5.40 |
$5.00 |
| 520 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 536 | LF |
$16.20 |
$31.00 |
$20.00 |
$16.00 |
$17.00 |
| 530 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$1.46 |
$1.25 |
$0.6000 |
$0.2500 |
$0.5000 |
| 540 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 18 | SD |
$2.92 |
$1.25 |
$1.80 |
$10.00 |
$8.00 |
| 550 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,520 | SD |
$2.41 |
$0.9000 |
$0.5000 |
$0.2500 |
$0.0200 |
| 560 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 720 | SD |
$0.6300 |
$0.6000 |
$0.5000 |
$4.35 |
$2.30 |
| 570 | 880(F)6700 |
DRUMS | 3,060 | SD |
$0.3300 |
$0.6000 |
$0.5000 |
$0.2500 |
$0.4000 |
| 580 | 880(I)7000 |
FLAGGER | 12 | SD |
$320.52 |
$280.00 |
$600.00 |
$500.00 |
$5.00 |
| 590 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,250.00 |
$8,700.00 |
$20,000.00 |
$36,000.00 |
$26,000.00 |
| 600 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,280.00 |
$15,000.00 |
$3,500.00 |
$3,500.00 |
| 610 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 1 | EA |
$5,500.00 |
$7,200.00 |
$6,500.00 |
$4,500.00 |
$5,000.00 |
| 620 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$30,139.48 |
$42,100.00 |
$50,000.00 |
$87,000.00 |
$125,000.00 |