| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$30,000.00 |
$95,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 32,472 | CY |
$18.00 |
$23.00 |
$15.00 |
$8.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 2,922 | CY |
$10.00 |
$2.00 |
$19.00 |
$10.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$90,000.00 |
$50,000.00 |
$350,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 7,710 | LF |
$3.60 |
$2.40 |
$2.25 |
$2.60 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,918 | LF |
$13.00 |
$13.79 |
$12.95 |
$13.00 |
| 70 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 25 | CY |
$155.00 |
$548.53 |
$234.52 |
$290.00 |
| 80 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 8 | EA |
$500.00 |
$846.68 |
$795.00 |
$300.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 73,493 | SY |
$3.50 |
$2.55 |
$2.39 |
$2.50 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 15.18 | AC |
$1,400.00 |
$899.93 |
$845.00 |
$845.00 |
| 110 | 241 3100 |
MOWING | 30.36 | AC |
$340.00 |
$211.94 |
$199.00 |
$200.00 |
| 120 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$5,400.00 |
$4,000.00 |
$5,000.00 |
$8,500.00 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 53,004 | SY |
$7.50 |
$9.90 |
$12.00 |
$15.00 |
| 140 | 317 7100 |
CEMENT TREATED BASE | 49,079 | SY |
$25.00 |
$25.10 |
$26.00 |
$28.00 |
| 150 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 55,929 | SY |
$3.00 |
$5.00 |
$6.55 |
$0.0100 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,006 | TON |
$34.00 |
$76.90 |
$25.00 |
$53.00 |
| 170 | 407(B)7300 |
TACK COAT | 4,261 | GAL |
$3.60 |
$3.30 |
$3.10 |
$5.00 |
| 180 | 408 8100 |
PRIME COAT | 19,560 | GAL |
$3.80 |
$0.2500 |
$4.25 |
$1.00 |
| 190 | 410(A)0220 |
POLYMER-MODIFIED EMULSIFIED ASPHALT | 2,510 | GAL |
$5.00 |
$12.92 |
$6.00 |
$6.00 |
| 195 | 410(C)0410 |
TYPE II MINERAL AGGREGATE | 97 | TON |
$550.00 |
$969.03 |
$450.00 |
$450.00 |
| 200 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 2,991 | TON |
$120.00 |
$119.81 |
$112.50 |
$155.00 |
| 210 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,724 | TON |
$110.00 |
$115.02 |
$108.00 |
$130.00 |
| 220 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,375 | TON |
$115.00 |
$134.72 |
$126.50 |
$175.00 |
| 230 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,419 | TON |
$112.00 |
$123.81 |
$116.25 |
$148.00 |
| 240 | 412 3100 |
COLD MILLING PAVEMENT | 32,505 | SY |
$3.50 |
$3.20 |
$3.00 |
$5.00 |
| 250 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 14,949 | SY |
$48.00 |
$25.00 |
$30.00 |
$30.00 |
| 260 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 30,048 | SY |
$32.00 |
$39.00 |
$44.00 |
$40.00 |
| 270 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 13,124 | CY |
$200.00 |
$231.00 |
$252.00 |
$290.00 |
| 280 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 936 | CY |
$35.00 |
$8.56 |
$25.00 |
$29.74 |
| 290 | 509(A)0200 |
CLASS AA CONCRETE | 27 | CY |
$1,000.00 |
$750.99 |
$1,200.00 |
$2,000.00 |
| 300 | 509(D)0500 |
CLASS C CONCRETE | 312 | CY |
$450.00 |
$466.06 |
$425.00 |
$565.00 |
| 310 | 511(A)2200 |
REINFORCING STEEL | 3,996 | LB |
$2.10 |
$1.10 |
$2.00 |
$5.00 |
| 320 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 304 | LF |
$30.00 |
$27.00 |
$6.50 |
$20.00 |
| 330 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 619 | SY |
$115.00 |
$108.97 |
$85.00 |
$115.00 |
| 340 | 611(G)0354 |
INLET (SMD-TYPE 2) | 5 | EA |
$5,000.00 |
$4,000.00 |
$4,865.00 |
$6,600.00 |
| 350 | 613(A)5208 |
18" R.C.PIPE CLASS III | 218 | LF |
$105.00 |
$130.00 |
$165.00 |
$110.00 |
| 360 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$860.00 |
$1,500.00 |
$1,455.00 |
$1,200.00 |
| 370 | 613(S)7700 |
STANDARD BEDDING MATERIAL, CLASS B | 31 | CY |
$60.00 |
$105.00 |
$44.90 |
$120.00 |
| 380 | 613(V)8000 |
TRENCH EXCAVATION | 100 | CY |
$23.00 |
$25.00 |
$26.50 |
$65.00 |
| 390 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$76,319.00 |
$35,000.00 |
$150,000.00 |
| 400 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 122 | LF |
$10.00 |
$5.00 |
$8.16 |
$15.00 |
| 410 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 30,482 | SY |
$9.50 |
$15.00 |
$14.00 |
$10.00 |
| 420 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 6,891 | SY |
$9.50 |
$15.00 |
$14.00 |
$10.00 |
| 430 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 9,580 | SY |
$16.00 |
$20.00 |
$14.00 |
$12.00 |
| 440 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 1,642 | SY |
$15.00 |
$10.00 |
$12.00 |
$19.00 |
| 450 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 1,979 | SY |
$10.00 |
$10.00 |
$10.00 |
$16.00 |
| 460 | 619(B)6464 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 147 | SY |
$8.00 |
$15.00 |
$10.00 |
$17.00 |
| 470 | 619(C)6600 |
SAWING PAVEMENT | 3,489 | LF |
$4.50 |
$6.00 |
$12.00 |
$3.00 |
| 480 | 625(D)4500 |
REMOVE AND RECONSTRUCT GUARDRAIL | 766 | LF |
$18.00 |
$53.25 |
$50.00 |
$50.00 |
| 490 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 131,366 | LF |
$0.5000 |
$0.0600 |
$0.0600 |
$0.1000 |
| 500 | 857(B)9300 |
CONSTRUCTION TRAFFIC STR.(PAINT)(ARROWS) | 116 | EA |
$99.00 |
$42.60 |
$40.00 |
$40.00 |
| 510 | 857(E)9600 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 2,832 | EA |
$3.00 |
$0.6900 |
$0.6500 |
$0.6500 |
| 520 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 110,013 | LF |
$0.3500 |
$0.0400 |
$0.0400 |
$0.0500 |
| 530 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,125 | SD |
$0.6000 |
$1.15 |
$1.00 |
$1.00 |
| 540 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 15,073 | SD |
$0.9000 |
$0.2700 |
$0.2500 |
$0.2500 |
| 550 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,582 | SD |
$1.25 |
$1.73 |
$1.50 |
$1.50 |
| 560 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,520 | SD |
$3.30 |
$1.15 |
$1.00 |
$1.00 |
| 570 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 14,092 | SD |
$1.00 |
$0.5500 |
$0.5000 |
$0.5000 |
| 580 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 36,566 | SD |
$0.6200 |
$0.0900 |
$0.0800 |
$0.1000 |
| 590 | 880(F)6700 |
DRUMS | 700 | SD |
$0.5000 |
$1.10 |
$1.00 |
$1.00 |
| 600 | 880(G)6800 |
TUBE CHANNELIZERS | 6,370 | SD |
$1.20 |
$1.73 |
$1.50 |
$1.50 |
| 610 | 880(G)6805 |
CHANNELIZER CONES | 33,461 | SD |
$0.4000 |
$0.5300 |
$0.5000 |
$0.5000 |
| 620 | 880(I)7000 |
FLAGGER | 58 | SD |
$275.00 |
$349.77 |
$410.40 |
$500.00 |
| 630 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 400 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 640 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,232 | SD |
$20.00 |
$10.65 |
$10.00 |
$10.00 |
| 650 | 804(A)2200 |
STRUCTURAL CONCRETE | 11.24 | CY |
$1,000.00 |
$585.75 |
$550.00 |
$550.00 |
| 660 | 804(B)2300 |
REINFORCING STEEL | 2,076 | LB |
$3.50 |
$2.13 |
$2.00 |
$2.00 |
| 670 | 805(A)3236 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 1 | EA |
$12,000.00 |
$7,987.50 |
$7,500.00 |
$10,530.00 |
| 680 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 104 | EA |
$122.00 |
$53.25 |
$50.00 |
$50.00 |
| 690 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$450.00 |
$399.38 |
$375.00 |
$375.00 |
| 700 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 1,243 | SF |
$40.00 |
$29.82 |
$28.00 |
$28.00 |
| 710 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 530 | SF |
$50.00 |
$39.14 |
$36.75 |
$36.75 |
| 720 | 851(A)2210 |
6"@20 GALV.STL.WD.FLANGE BM.POST | 208 | LF |
$50.00 |
$45.80 |
$43.00 |
$43.00 |
| 730 | 851(B)2320 |
3 1/2"@9.11 GALV.STL.PIPE POST | 309 | LF |
$30.00 |
$28.76 |
$27.00 |
$27.00 |
| 740 | 851(C)2415 |
2" SQUARE TUBE POST | 423 | LF |
$11.50 |
$9.59 |
$9.00 |
$9.00 |
| 750 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 777 | LF |
$12.00 |
$11.72 |
$11.00 |
$11.00 |
| 760 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 55,500 | LF |
$1.00 |
$0.7500 |
$0.7000 |
$0.7000 |
| 770 | 856(A)8211 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(8" WIDE) | 710 | LF |
$1.90 |
$1.33 |
$1.25 |
$1.25 |
| 780 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 822 | LF |
$2.80 |
$3.20 |
$3.00 |
$3.00 |
| 790 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 471 | LF |
$15.00 |
$6.39 |
$6.00 |
$6.00 |
| 800 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 40 | EA |
$400.00 |
$266.25 |
$250.00 |
$250.00 |
| 810 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 25,750 | LF |
$0.3000 |
$0.1200 |
$0.1100 |
$0.1100 |
| 820 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 100 | LF |
$75.00 |
$40.47 |
$60.00 |
$38.00 |
| 830 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 350 | LF |
$35.00 |
$15.44 |
$18.00 |
$14.50 |
| 840 | 803(A)1210 |
PULL BOX(SIZE I) | 2 | EA |
$1,980.00 |
$2,343.00 |
$1,740.00 |
$2,560.00 |
| 850 | 804(A)2200 |
STRUCTURAL CONCRETE | 3.28 | CY |
$950.00 |
$1,183.22 |
$2,030.00 |
$1,115.00 |
| 860 | 804(B)2300 |
REINFORCING STEEL | 568 | LB |
$4.20 |
$3.07 |
$2.50 |
$3.00 |
| 870 | 805(A)3228 |
(PL)REMOVAL OF LIGHT POLE | 2 | EA |
$1,000.00 |
$521.85 |
$1,050.00 |
$2,005.00 |
| 880 | 805(D)3504 |
(PL)REMOVE & RESET LIGHT POLE | 16 | EA |
$2,000.00 |
$2,236.50 |
$2,100.00 |
$2,100.00 |
| 890 | 806(C)4512 |
40' MTG & 10' HLMA(G.STL.) | 2 | EA |
$6,000.00 |
$6,123.75 |
$6,000.00 |
$5,750.00 |
| 900 | 807 5120 |
BREAKAWAY BASE (DES. B) | 2 | EA |
$1,100.00 |
$1,065.00 |
$1,100.00 |
$1,000.00 |
| 910 | 809(A)7200 |
ROADWAY LUMINAIRE | 2 | EA |
$2,500.00 |
$1,831.80 |
$2,500.00 |
$1,720.00 |
| 920 | 811 9110 |
1/C NO.2 ELECT.COND. | 1,000 | LF |
$3.00 |
$2.40 |
$2.80 |
$2.25 |
| 930 | 811 9160 |
2/C NO.12 ELECT.COND. | 110 | LF |
$3.00 |
$2.13 |
$3.80 |
$2.00 |
| 940 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 20 | LF |
$42.00 |
$40.47 |
$60.00 |
$38.00 |
| 950 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 10 | LF |
$30.00 |
$15.44 |
$45.50 |
$14.50 |
| 960 | 802(B)0328 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 460 | LF |
$45.00 |
$48.99 |
$50.00 |
$46.00 |
| 970 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 25 | LF |
$36.00 |
$20.24 |
$100.00 |
$19.00 |
| 980 | 803(A)1220 |
PULL BOX(SIZE II) | 2 | EA |
$2,500.00 |
$2,566.65 |
$1,890.00 |
$2,410.00 |
| 990 | 804(A)2200 |
STRUCTURAL CONCRETE | 7.7 | CY |
$1,100.00 |
$1,183.22 |
$1,800.00 |
$1,115.00 |
| 1,000 | 804(B)2300 |
REINFORCING STEEL | 1,128 | LB |
$3.00 |
$3.17 |
$2.70 |
$3.00 |
| 1,010 | 805(A)3256 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$20,000.00 |
$12,620.25 |
$4,650.00 |
$11,850.00 |
| 1,020 | 806(A)4276 |
32'MH POLE,TWIN TS & 10'LMA(G.STL.) | 1 | EA |
$80,000.00 |
$70,290.00 |
$80,000.00 |
$66,000.00 |
| 1,030 | 809(A)7200 |
ROADWAY LUMINAIRE | 1 | EA |
$2,400.00 |
$849.87 |
$1,490.00 |
$800.00 |
| 1,040 | 811 9120 |
1/C NO.6 ELECT.COND. | 270 | LF |
$3.60 |
$2.13 |
$3.70 |
$2.00 |
| 1,050 | 811 9130 |
1/C NO.10 ELECT.COND. | 280 | LF |
$2.60 |
$1.07 |
$2.50 |
$1.00 |
| 1,060 | 825(A)8200 |
SIGNAL SYSTEM CONTROLLER UPGRADE | 1 | EA |
$24,000.00 |
$11,715.00 |
$14,000.00 |
$11,000.00 |
| 1,070 | 828 0110 |
(PL)DETECTION SYSTEM (RADAR) | 1 | LSUM |
$140,000.00 |
$49,203.00 |
$85,000.00 |
$46,200.00 |
| 1,080 | 831 3120 |
1WAY3SEC.ADJ.SIG.HD.S-6 | 4 | EA |
$1,070.00 |
$1,001.10 |
$1,110.00 |
$940.00 |
| 1,090 | 831 3124 |
1WAY3SEC.ADJ.SIG.HD.S-9 | 3 | EA |
$1,170.00 |
$1,001.10 |
$1,110.00 |
$940.00 |
| 1,100 | 831 3148 |
1WAY4SEC.ADJ.SIG.HD.S-16 | 1 | EA |
$1,400.00 |
$1,331.25 |
$1,300.00 |
$1,250.00 |
| 1,110 | 833 5100 |
BACKPLATE | 8 | EA |
$265.00 |
$266.25 |
$200.00 |
$250.00 |
| 1,120 | 834(A)6205 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 210 | LF |
$6.00 |
$4.26 |
$6.50 |
$4.00 |
| 1,130 | 834(A)6210 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 100 | LF |
$8.00 |
$6.39 |
$8.00 |
$6.00 |
| 1,140 | 834(A)6225 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE | 750 | LF |
$10.00 |
$8.52 |
$10.00 |
$8.00 |
| 1,150 | 840(B)0300 |
E.P.S. OPTICAL DETECTOR | 2 | EA |
$2,800.00 |
$1,293.98 |
$865.00 |
$1,215.00 |
| 1,160 | 840(C)0400 |
E.P.S. OPTICAL DETECTOR CABLE | 375 | LF |
$3.50 |
$5.33 |
$3.15 |
$5.00 |
| 1,170 | 840(D)0500 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 1 | EA |
$3,800.00 |
$4,238.70 |
$2,355.00 |
$3,980.00 |
| 1,180 | 850(C)1400 |
MAST ARM MOUNTED SIGNS(ALUM.) | 97.5 | SF |
$150.00 |
$87.33 |
$83.50 |
$82.00 |
| 1,190 | 880(N)7500 |
(SP) TEMP. TRAFF. SIGNAL SPAN WIRE EQUIP | 1 | LSUM |
$180,000.00 |
$73,365.72 |
$75,000.00 |
$69,000.00 |
| 1,200 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$163,000.00 |
$125,000.00 |
$90,000.00 |
| 1,210 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$20,167.59 |
$50,000.00 |
$50,000.00 |
| 1,220 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$486,628.00 |
$536,000.54 |
$525,000.00 |
$636,434.87 |