| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$95,000.00 |
$52,000.00 |
$39,000.00 |
$60,000.00 |
$28,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,999 | CY |
$12.00 |
$30.00 |
$10.00 |
$14.80 |
$39.00 |
$18.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 596 | CY |
$20.00 |
$30.00 |
$5.00 |
$22.00 |
$46.00 |
$50.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$30,000.00 |
$28,000.00 |
$30,000.00 |
$35,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,684 | LF |
$4.25 |
$3.00 |
$2.00 |
$4.90 |
$4.75 |
$6.00 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 6 | EA |
$400.00 |
$600.00 |
$115.00 |
$590.00 |
$550.00 |
$10.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 161 | LF |
$14.50 |
$20.00 |
$11.00 |
$20.55 |
$19.50 |
$20.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 9,001 | SY |
$4.75 |
$5.00 |
$5.00 |
$4.65 |
$4.95 |
$6.00 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 1.86 | AC |
$1,600.00 |
$1,200.00 |
$1,415.00 |
$1,515.00 |
$1,600.00 |
$2,500.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 1.86 | AC |
$1,800.00 |
$1,200.00 |
$2,590.00 |
$2,800.00 |
$2,900.00 |
$2,500.00 |
| 110 | 241 3100 |
MOWING | 3.72 | AC |
$425.00 |
$500.00 |
$250.00 |
$275.00 |
$25.00 |
$950.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 2,206 | CY |
$75.00 |
$60.00 |
$100.00 |
$79.00 |
$100.00 |
$65.00 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 9,164 | SY |
$10.25 |
$9.00 |
$20.00 |
$9.80 |
$18.00 |
$12.00 |
| 140 | 325 0100 |
SEPARATOR FABRIC | 10,823 | SY |
$2.50 |
$5.00 |
$8.00 |
$4.20 |
$2.00 |
$2.20 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,068 | TON |
$43.50 |
$25.00 |
$47.00 |
$56.00 |
$50.00 |
$65.00 |
| 160 | 407(B)7300 |
TACK COAT | 3,382 | GAL |
$4.00 |
$3.00 |
$0.5000 |
$3.15 |
$3.25 |
$3.54 |
| 170 | 408 8100 |
PRIME COAT | 3,132 | GAL |
$5.50 |
$1.00 |
$0.2500 |
$3.15 |
$4.00 |
$6.00 |
| 180 | 409(A)9200 |
FABRIC REINFORCEMENT | 1,775 | SY |
$5.10 |
$3.00 |
$4.50 |
$3.30 |
$3.25 |
$9.00 |
| 190 | 409(B)9300 |
BITUMINOUS BINDER | 444 | GAL |
$7.75 |
$3.00 |
$0.5000 |
$4.30 |
$4.30 |
$9.96 |
| 200 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,825 | TON |
$115.00 |
$90.00 |
$90.00 |
$107.00 |
$102.00 |
$110.40 |
| 210 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,597 | TON |
$130.00 |
$110.00 |
$128.00 |
$139.00 |
$124.00 |
$134.40 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 14,746 | SY |
$4.50 |
$3.00 |
$6.00 |
$9.00 |
$4.85 |
$9.12 |
| 230 | 613(A)5208 |
18" R.C.PIPE CLASS III | 39 | LF |
$120.00 |
$105.00 |
$130.00 |
$155.00 |
$150.00 |
$185.00 |
| 240 | 613(A)5216 |
24" R.C.PIPE CLASS III | 49 | LF |
$125.00 |
$115.00 |
$170.00 |
$172.00 |
$190.00 |
$192.00 |
| 250 | 613(A)5400 |
14" X 23" R.C.PIPE ELL. CLASS HE-III | 67 | LF |
$130.00 |
$145.00 |
$140.00 |
$210.00 |
$200.00 |
$210.00 |
| 260 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$950.00 |
$800.00 |
$1,450.00 |
$1,840.00 |
$1,650.00 |
$3,500.00 |
| 270 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,250.00 |
$900.00 |
$1,650.00 |
$1,940.00 |
$1,780.00 |
$4,650.00 |
| 280 | 613(L)6800 |
14" X 23" PREFAB. CULVERT END SEC., ELLI | 6 | EA |
$1,660.00 |
$1,300.00 |
$1,350.00 |
$4,500.00 |
$1,685.00 |
$6,500.00 |
| 290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$52,454.50 |
$5,089.95 |
$25,000.00 |
$60,000.00 |
$19,500.00 |
| 300 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,772 | SY |
$9.50 |
$5.00 |
$14.00 |
$12.00 |
$23.00 |
$10.00 |
| 310 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 225 | LF |
$6.75 |
$5.00 |
$5.00 |
$7.00 |
$5.25 |
$10.00 |
| 320 | 619(B)6400 |
REMOVAL OF CURB | 84 | LF |
$13.25 |
$5.00 |
$30.00 |
$29.00 |
$10.00 |
$12.00 |
| 330 | 619(C)6600 |
SAWING PAVEMENT | 3,730 | LF |
$4.75 |
$3.00 |
$3.00 |
$7.00 |
$5.50 |
$25.00 |
| 340 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 500 | LF |
$30.00 |
$30.00 |
$25.00 |
$28.00 |
$26.50 |
$69.00 |
| 350 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,000.00 |
$3,500.00 |
$3,400.00 |
$3,700.00 |
$3,675.00 |
$6,580.00 |
| 360 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,500.00 |
$3,000.00 |
$2,600.00 |
$2,900.00 |
$2,800.00 |
$6,580.00 |
| 370 | 624(B)3340 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 2 | EA |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$600.00 |
$3,850.00 |
| 380 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 679 | LF |
$10.50 |
$9.00 |
$9.50 |
$9.50 |
$9.25 |
$29.00 |
| 390 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,895 | LF |
$11.50 |
$10.00 |
$10.00 |
$10.00 |
$9.50 |
$32.00 |
| 400 | 624(D)3500 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,500.00 |
$1,500.00 |
$1,460.00 |
$1,600.00 |
$1,400.00 |
$5,000.00 |
| 410 | 624(E)3610 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 646 | LF |
$50.00 |
$32.00 |
$31.50 |
$35.00 |
$38.00 |
$83.00 |
| 420 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$240.00 |
$200.00 |
$100.00 |
$125.00 |
$105.00 |
$650.00 |
| 430 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 3 | EA |
$310.00 |
$100.00 |
$50.00 |
$57.00 |
$55.00 |
$500.00 |
| 440 | 629(E)7600 |
MAILBOX | 3 | EA |
$140.00 |
$100.00 |
$50.00 |
$60.00 |
$55.00 |
$650.00 |
| 450 | 504(D)5420 |
CONCRETE RAIL (TR4) | 84 | LF |
$125.00 |
$250.00 |
$185.00 |
$221.33 |
$250.00 |
$410.00 |
| 460 | 509(A)0210 |
CLASS AA CONCRETE | 22 | CY |
$1,500.00 |
$1,200.00 |
$410.00 |
$1,340.00 |
$1,750.00 |
$950.00 |
| 470 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 1,900 | LB |
$2.80 |
$3.00 |
$4.25 |
$4.00 |
$6.00 |
$2.20 |
| 480 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$185.00 |
$100.00 |
$75.00 |
$85.00 |
$80.00 |
$180.00 |
| 490 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 37 | SF |
$50.00 |
$35.00 |
$30.00 |
$34.00 |
$32.00 |
$33.60 |
| 500 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 47 | LF |
$12.00 |
$15.00 |
$10.00 |
$12.00 |
$11.00 |
$22.80 |
| 510 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 18 | EA |
$22.00 |
$30.00 |
$25.00 |
$27.30 |
$27.50 |
$30.00 |
| 520 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 20,845 | LF |
$1.35 |
$0.7000 |
$0.7000 |
$0.7600 |
$0.7500 |
$1.32 |
| 530 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 1,600 | LF |
$2.60 |
$2.00 |
$1.50 |
$1.64 |
$1.60 |
$4.80 |
| 540 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 24 | LF |
$20.00 |
$20.00 |
$10.00 |
$12.00 |
$10.80 |
$18.00 |
| 550 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 11 | EA |
$385.00 |
$200.00 |
$185.00 |
$205.00 |
$200.00 |
$300.00 |
| 560 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 4,880 | LF |
$0.6000 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.6000 |
| 570 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 4,880 | LF |
$0.7000 |
$0.2500 |
$0.2000 |
$0.1900 |
$0.2000 |
$0.6000 |
| 580 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 270 | SD |
$16.00 |
$15.00 |
$14.00 |
$15.60 |
$15.00 |
$18.00 |
| 590 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 675 | LF |
$30.00 |
$20.00 |
$28.50 |
$29.00 |
$76.00 |
$42.00 |
| 600 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 675 | LF |
$5.50 |
$5.00 |
$3.30 |
$8.00 |
$15.00 |
$12.00 |
| 610 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,750 | SD |
$0.2500 |
$0.1000 |
$0.2500 |
$0.1200 |
$0.1200 |
$1.20 |
| 620 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,520 | SD |
$0.6500 |
$0.3000 |
$0.2500 |
$0.2900 |
$0.2700 |
$2.40 |
| 630 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,925 | SD |
$1.20 |
$0.3000 |
$0.2500 |
$0.2900 |
$0.2700 |
$3.60 |
| 640 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$1.25 |
$3.00 |
$2.50 |
$2.78 |
$2.70 |
$1.80 |
| 650 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,665 | SD |
$0.8500 |
$3.00 |
$2.50 |
$2.78 |
$2.70 |
$0.6000 |
| 660 | 880(F)6700 |
DRUMS | 15,750 | SD |
$0.3000 |
$0.2500 |
$0.2000 |
$0.2400 |
$0.2200 |
$0.7800 |
| 670 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$35,000.00 |
$25,000.00 |
$24,600.00 |
$28,000.00 |
$15,800.00 |
| 680 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$15,000.00 |
$3,500.00 |
$6,500.00 |
$12,900.00 |
| 690 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$5,000.00 |
$9,000.00 |
$13,600.00 |
$5,000.00 |
$59,800.00 |
| 700 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$132,650.00 |
$145,000.00 |
$132,250.00 |
$128,000.00 |
$250,000.00 |
$128,500.00 |