| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$1,404.00 |
$12,000.00 |
$5,500.00 |
$2,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 202 | CY |
$15.00 |
$14.00 |
$35.00 |
$35.00 |
$25.00 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 640 | LF |
$4.50 |
$2.36 |
$4.95 |
$5.59 |
$4.00 |
| 40 | 221(E)2600 |
TEMPORARY SILT DIKE | 80 | LF |
$13.00 |
$13.65 |
$24.50 |
$27.69 |
$25.00 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 552 | SY |
$6.00 |
$7.35 |
$6.95 |
$7.85 |
$6.00 |
| 60 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 22 | TON |
$40.00 |
$45.00 |
$110.00 |
$150.00 |
$55.00 |
| 70 | 407(B)7300 |
TACK COAT | 269 | GAL |
$6.00 |
$5.25 |
$5.00 |
$5.65 |
$7.00 |
| 80 | 408 8100 |
PRIME COAT | 134 | GAL |
$9.00 |
$6.30 |
$6.00 |
$6.78 |
$7.00 |
| 90 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 53 | TON |
$175.00 |
$208.00 |
$198.00 |
$223.75 |
$200.00 |
| 100 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 251 | TON |
$200.00 |
$208.00 |
$198.00 |
$223.75 |
$200.00 |
| 110 | 412 3100 |
COLD MILLING PAVEMENT | 1,423 | SY |
$16.00 |
$12.60 |
$12.00 |
$13.56 |
$15.00 |
| 120 | 509(D)0500 |
CLASS C CONCRETE | 9 | CY |
$500.00 |
$690.00 |
$2,500.00 |
$980.00 |
$750.00 |
| 130 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 580 | LF |
$7.00 |
$4.46 |
$5.00 |
$3.00 |
$10.00 |
| 140 | 619(C)6600 |
SAWING PAVEMENT | 80 | LF |
$6.00 |
$13.24 |
$5.00 |
$8.00 |
$15.00 |
| 150 | 623 1100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,750.00 |
$2,050.00 |
$3,500.00 |
$2,500.00 |
$750.00 |
| 160 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$40.00 |
$26.25 |
$26.00 |
$28.25 |
$30.00 |
| 170 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,100.00 |
$3,675.00 |
$2,600.00 |
$3,955.00 |
$3,500.00 |
| 180 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,700.00 |
$3,360.00 |
$2,600.00 |
$3,616.00 |
$3,200.00 |
| 190 | 501(G)1800 |
CLSM BACKFILL | 100 | CY |
$300.00 |
$422.00 |
$325.00 |
$296.20 |
$400.00 |
| 200 | 504(A)5200 |
APPROACH SLAB | 152.6 | SY |
$375.00 |
$495.00 |
$400.00 |
$345.00 |
$325.00 |
| 210 | 504(B)5300 |
SAW-CUT GROOVING | 142.6 | SY |
$12.00 |
$44.12 |
$19.80 |
$22.77 |
$29.00 |
| 220 | 504(E)5500 |
CONCRETE PARAPET | 70.4 | LF |
$275.00 |
$233.00 |
$250.00 |
$225.00 |
$120.00 |
| 230 | 505(A)6200 |
BRIDGE DECK CONCRETE OVERLAY | 95 | SY |
$230.00 |
$125.00 |
$175.00 |
$205.09 |
$150.00 |
| 240 | 505(B)6300 |
REMOVING EXISTING OVERLAY | 95 | SY |
$100.00 |
$129.00 |
$125.00 |
$181.20 |
$100.00 |
| 250 | 509 0100 |
SPECIAL CONCRETE FINISH | 734 | SY |
$40.00 |
$43.50 |
$35.00 |
$29.38 |
$35.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 2.8 | CY |
$2,500.00 |
$859.00 |
$4,000.00 |
$5,670.59 |
$1,500.00 |
| 270 | 511 2100 |
MECHANICAL SPLICES | 11 | EA |
$100.00 |
$79.00 |
$40.00 |
$30.00 |
$50.00 |
| 280 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 885 | LB |
$4.00 |
$3.97 |
$2.00 |
$5.62 |
$3.00 |
| 290 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$400.00 |
$200.00 |
$250.00 |
$456.73 |
$350.00 |
| 300 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 5 | SY |
$800.00 |
$400.00 |
$600.00 |
$1,000.00 |
$700.00 |
| 310 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 758 | SY |
$7.00 |
$11.50 |
$11.00 |
$4.90 |
$5.00 |
| 320 | 517 9110 |
ELASTOMERIC COATING | 2,870 | SF |
$27.50 |
$23.00 |
$19.00 |
$22.60 |
$28.00 |
| 330 | 518(B)0300 |
SEALED EXPANSION JOINTS | 46.8 | LF |
$400.00 |
$587.00 |
$525.00 |
$388.72 |
$450.00 |
| 340 | 518(J)0800 |
PREFORMED SILICONE FOAM JOINTS | 93.6 | LF |
$120.00 |
$94.00 |
$90.00 |
$86.67 |
$100.00 |
| 350 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 170 | LF |
$40.00 |
$33.80 |
$20.00 |
$33.90 |
$35.00 |
| 360 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 4.6 | GAL |
$150.00 |
$111.00 |
$100.00 |
$113.00 |
$150.00 |
| 370 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 108 | SY |
$1,100.00 |
$792.00 |
$600.00 |
$875.75 |
$1,000.00 |
| 380 | 523(A)3200 |
SEALER CRACK PREPARATION | 2,150 | LF |
$4.50 |
$2.81 |
$1.00 |
$2.90 |
$5.00 |
| 390 | 523(B)3300 |
SEALER RESIN | 27 | GAL |
$100.00 |
$57.72 |
$20.50 |
$40.00 |
$125.00 |
| 400 | 523(C)3400 |
DECK AREA SEALED (FLOODCOATS) | 4,264 | SY |
$20.00 |
$13.22 |
$10.00 |
$14.81 |
$20.00 |
| 410 | 524(A)4200 |
(SP) CARBON FIBER-REINFORCED POLYMER | 1,523 | SF |
$70.00 |
$50.59 |
$28.00 |
$46.00 |
$100.00 |
| 420 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 139 | SY |
$50.00 |
$42.00 |
$20.00 |
$38.42 |
$60.00 |
| 430 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 36 | EA |
$1,000.00 |
$250.00 |
$900.00 |
$488.75 |
$2,200.00 |
| 440 | 540 8132 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | LSUM |
$5,000.00 |
$9,280.00 |
$12,000.00 |
$12,392.99 |
$3,600.00 |
| 450 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$24,577.00 |
$14,500.00 |
$27,799.88 |
$5,000.00 |
| 460 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$25.00 |
$26.25 |
$25.00 |
$28.25 |
$22.00 |
| 470 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 6,700 | LF |
$0.7500 |
$1.03 |
$1.00 |
$1.11 |
$2.00 |
| 480 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$150.00 |
$131.25 |
$125.00 |
$141.25 |
$110.00 |
| 490 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,350 | LF |
$1.50 |
$1.31 |
$1.50 |
$1.41 |
$2.60 |
| 500 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 6,700 | LF |
$0.5000 |
$0.1600 |
$0.1000 |
$0.1700 |
$0.7500 |
| 510 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 360 | SD |
$20.00 |
$10.50 |
$10.00 |
$11.30 |
$16.00 |
| 520 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,500 | LF |
$30.00 |
$10.50 |
$30.00 |
$15.82 |
$22.00 |
| 530 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,387.5 | LF |
$7.00 |
$2.10 |
$2.00 |
$1.70 |
$5.00 |
| 540 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,880 | SD |
$0.6500 |
$0.5300 |
$0.3500 |
$0.5700 |
$0.0200 |
| 550 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,440 | SD |
$1.00 |
$1.05 |
$1.00 |
$1.13 |
$1.25 |
| 560 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,880 | SD |
$2.00 |
$1.58 |
$3.00 |
$1.70 |
$0.0200 |
| 570 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 540 | SD |
$2.00 |
$0.2600 |
$1.00 |
$0.2900 |
$0.0200 |
| 580 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 5,760 | SD |
$0.5000 |
$0.1600 |
$0.0500 |
$0.1700 |
$1.10 |
| 590 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 8,370 | SD |
$0.3000 |
$0.2600 |
$0.0500 |
$0.2900 |
$1.65 |
| 600 | 880(F)6700 |
DRUMS | 1,980 | SD |
$0.5000 |
$0.2600 |
$0.2500 |
$0.2900 |
$0.0200 |
| 610 | 880(G)6805 |
CHANNELIZER CONES | 8,370 | SD |
$0.5000 |
$0.2600 |
$0.1000 |
$0.2900 |
$1.50 |
| 620 | 880(I)7000 |
FLAGGER | 30 | SD |
$200.00 |
$20.00 |
$10.00 |
$10.00 |
$12.00 |
| 630 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$20.00 |
$10.50 |
$15.00 |
$11.30 |
$12.00 |
| 640 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$3,150.00 |
$3,000.00 |
$4,600.00 |
$7,500.00 |
| 650 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$80,000.00 |
$62,375.51 |
$100,734.05 |
$73,378.00 |
$95,000.00 |