| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$17,000.00 |
$5,000.00 |
$14,100.84 |
$5,500.00 |
$28,000.00 |
$50,000.00 |
$13,800.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,876 | CY |
$10.00 |
$8.00 |
$7.50 |
$13.05 |
$12.37 |
$26.00 |
$30.00 |
$30.48 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,058 | CY |
$14.00 |
$12.00 |
$5.00 |
$9.52 |
$26.40 |
$30.00 |
$25.00 |
$34.50 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$25,000.00 |
$5,000.00 |
$34,669.92 |
$2,750.00 |
$33,500.00 |
$50,000.00 |
$11,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,228 | LF |
$3.50 |
$2.54 |
$2.00 |
$3.06 |
$2.73 |
$5.25 |
$3.25 |
$2.86 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 5,857 | SY |
$6.00 |
$3.01 |
$5.00 |
$3.63 |
$3.24 |
$3.23 |
$4.00 |
$3.39 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 2 | AC |
$1,300.00 |
$867.00 |
$1.00 |
$1,045.82 |
$935.00 |
$1,500.00 |
$1,200.00 |
$977.50 |
| 80 | 241 3100 |
MOWING | 6 | AC |
$350.00 |
$386.58 |
$1.00 |
$466.31 |
$416.90 |
$100.00 |
$500.00 |
$435.85 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 335 | CY |
$100.00 |
$135.76 |
$75.00 |
$62.06 |
$76.45 |
$72.55 |
$55.00 |
$79.35 |
| 100 | 325 0100 |
SEPARATOR FABRIC | 3,118 | SY |
$3.00 |
$3.04 |
$2.50 |
$2.17 |
$3.17 |
$1.65 |
$3.00 |
$3.62 |
| 110 | 326(B)1300 |
GEOGRID REINFORCEMENT | 3,118 | SY |
$3.00 |
$3.04 |
$2.50 |
$108.17 |
$2.73 |
$8.20 |
$3.00 |
$4.89 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 341 | TON |
$35.00 |
$42.00 |
$35.00 |
$37.08 |
$35.84 |
$36.00 |
$55.00 |
$49.45 |
| 130 | 407(B)7300 |
TACK COAT | 429 | GAL |
$4.00 |
$6.26 |
$5.50 |
$5.54 |
$6.60 |
$3.55 |
$5.00 |
$4.60 |
| 140 | 408 8100 |
PRIME COAT | 2,176 | GAL |
$5.00 |
$7.44 |
$8.80 |
$5.87 |
$8.80 |
$3.00 |
$5.00 |
$6.90 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 657 | TON |
$130.00 |
$139.37 |
$160.00 |
$120.48 |
$164.17 |
$136.00 |
$210.00 |
$155.25 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 414 | TON |
$145.00 |
$164.19 |
$160.00 |
$146.75 |
$173.69 |
$142.00 |
$225.00 |
$178.25 |
| 170 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 9 | CY |
$30.00 |
$35.00 |
$25.00 |
$59.83 |
$44.00 |
$32.00 |
$30.00 |
$51.75 |
| 180 | 509(A)0200 |
CLASS AA CONCRETE | 35 | CY |
$439.00 |
$1,065.85 |
$750.00 |
$1,028.40 |
$775.81 |
$980.00 |
$1,800.00 |
$1,052.25 |
| 190 | 511(A)2200 |
REINFORCING STEEL | 3,371 | LB |
$1.50 |
$1.45 |
$1.75 |
$1.30 |
$1.81 |
$1.62 |
$5.00 |
$2.13 |
| 200 | 613(A)5216 |
24" R.C.PIPE CLASS III | 34 | LF |
$100.00 |
$105.00 |
$125.00 |
$167.24 |
$148.50 |
$65.00 |
$175.00 |
$97.75 |
| 210 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 36 | LF |
$30.00 |
$20.00 |
$25.00 |
$42.94 |
$36.30 |
$20.00 |
$30.00 |
$56.35 |
| 220 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 12 | LF |
$20.00 |
$20.00 |
$25.00 |
$42.96 |
$75.90 |
$18.00 |
$30.00 |
$46.00 |
| 230 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 1,053 | LF |
$16.00 |
$18.00 |
$12.50 |
$20.12 |
$14.85 |
$19.00 |
$30.00 |
$25.30 |
| 240 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 68 | LF |
$19.00 |
$20.00 |
$12.50 |
$22.91 |
$15.67 |
$18.00 |
$30.00 |
$23.58 |
| 250 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$2,300.00 |
$2,400.00 |
$3,000.00 |
$2,441.48 |
$3,025.00 |
$2,850.00 |
$3,500.00 |
$3,047.50 |
| 260 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 8 | EA |
$1,100.00 |
$1,200.00 |
$250.00 |
$593.81 |
$550.00 |
$200.00 |
$1,500.00 |
$862.50 |
| 270 | 613(U)7950 |
PIPE UNDERDRAIN COVER MAT'L. | 4 | CY |
$90.00 |
$150.00 |
$250.00 |
$47.60 |
$82.50 |
$35.00 |
$250.00 |
$115.00 |
| 280 | 613(V)8000 |
TRENCH EXCAVATION | 15 | CY |
$30.00 |
$35.00 |
$25.00 |
$27.56 |
$60.39 |
$12.00 |
$35.00 |
$80.50 |
| 290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$1,200.00 |
$2,500.00 |
$2,500.00 |
$8,423.64 |
$6,050.00 |
$15,000.00 |
$15,000.00 |
$11,500.00 |
| 300 | 619(B)6300 |
REMOVAL OF HEADWALL | 1 | EA |
$1,500.00 |
$1,500.00 |
$2,500.00 |
$1,387.28 |
$2,200.00 |
$2,850.00 |
$3,000.00 |
$862.50 |
| 310 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,480 | SY |
$15.00 |
$16.00 |
$5.00 |
$11.83 |
$3.85 |
$4.20 |
$25.00 |
$18.98 |
| 320 | 619(C)6600 |
SAWING PAVEMENT | 48 | LF |
$10.00 |
$8.00 |
$5.00 |
$12.46 |
$18.15 |
$5.00 |
$10.00 |
$4.89 |
| 330 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 188 | LF |
$26.00 |
$26.52 |
$24.20 |
$31.99 |
$28.60 |
$28.66 |
$32.00 |
$29.90 |
| 340 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,600.00 |
$1,530.00 |
$1,442.00 |
$1,845.57 |
$1,650.00 |
$1,650.00 |
$2,500.00 |
$1,725.00 |
| 350 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$3,700.00 |
$3,672.00 |
$3,300.00 |
$4,429.36 |
$3,960.00 |
$3,960.00 |
$4,500.00 |
$4,140.00 |
| 360 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,600.00 |
$2,856.00 |
$2,310.00 |
$3,445.06 |
$3,080.00 |
$3,080.00 |
$4,000.00 |
$3,220.00 |
| 370 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 11 | EA |
$17.50 |
$25.50 |
$17.75 |
$30.76 |
$27.50 |
$27.50 |
$33.00 |
$28.75 |
| 380 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 13,110 | CY |
$12.00 |
$6.00 |
$7.50 |
$12.28 |
$9.66 |
$15.00 |
$30.00 |
$5.38 |
| 390 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 948 | CY |
$35.00 |
$25.00 |
$20.00 |
$12.28 |
$44.00 |
$35.00 |
$30.00 |
$118.14 |
| 400 | 504(D)5420 |
CONCRETE RAIL (TR4) | 192.17 | LF |
$140.00 |
$125.00 |
$125.00 |
$130.58 |
$91.59 |
$135.00 |
$135.00 |
$212.58 |
| 410 | 509(A)0210 |
CLASS AA CONCRETE | 2,192.5 | CY |
$830.00 |
$509.00 |
$750.00 |
$596.50 |
$775.81 |
$685.00 |
$520.00 |
$799.95 |
| 420 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 429,160 | LB |
$1.75 |
$1.42 |
$1.50 |
$1.63 |
$1.56 |
$2.05 |
$2.00 |
$2.14 |
| 430 | 601(A)1110 |
TYPE I PLAIN RIPRAP | 50 | TON |
$85.00 |
$85.00 |
$100.00 |
$64.61 |
$72.37 |
$78.00 |
$80.00 |
$140.39 |
| 440 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$15,000.00 |
$22,500.00 |
$60,325.35 |
$72,833.20 |
$35,000.00 |
$20,000.00 |
$285,117.56 |
| 450 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,048 | SD |
$0.5000 |
$0.2600 |
$0.9100 |
$0.3100 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.2900 |
| 460 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,188 | SD |
$0.9600 |
$0.2600 |
$6.05 |
$0.3100 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.2900 |
| 470 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 792 | SD |
$1.56 |
$1.02 |
$0.2800 |
$1.23 |
$1.10 |
$1.10 |
$1.00 |
$1.15 |
| 480 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 990 | SD |
$1.56 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1200 |
| 490 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,880 | SD |
$1.66 |
$0.1000 |
$0.2800 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1200 |
| 500 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 6,300 | SD |
$0.6900 |
$0.1000 |
$0.6600 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1200 |
| 510 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 2,400 | LF |
$0.8500 |
$2.04 |
$2.70 |
$2.46 |
$2.20 |
$2.20 |
$3.00 |
$2.30 |
| 520 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$8,160.00 |
$20,000.00 |
$14,426.31 |
$20,130.00 |
$15,000.00 |
$20,000.00 |
$8,625.00 |
| 530 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$2,500.00 |
$3,075.94 |
$3,850.00 |
$2,850.00 |
$5,000.00 |
$4,357.75 |
| 540 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$190,000.00 |
$151,500.00 |
$50,000.00 |
$188,000.00 |
$212,269.72 |
$128,000.00 |
$360,000.00 |
$224,957.63 |