| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,600.00 |
$15,000.00 |
$5,000.00 |
$15,250.00 |
$35,000.00 |
$10,000.00 |
$28,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 252 | CY |
$20.00 |
$55.00 |
$25.00 |
$14.58 |
$25.00 |
$20.00 |
$25.70 |
| 30 | 205(A)6210 |
TYPE A-SALVAGED TOPSOIL | 364 | CY |
$30.00 |
$35.00 |
$11.00 |
$26.10 |
$40.00 |
$20.00 |
$20.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 626 | LF |
$8.00 |
$7.14 |
$5.10 |
$4.65 |
$5.00 |
$4.00 |
$5.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 14 | LF |
$30.00 |
$13.25 |
$33.00 |
$30.00 |
$25.00 |
$25.00 |
$32.40 |
| 60 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 1 | EA |
$400.00 |
$35.00 |
$984.00 |
$895.00 |
$530.00 |
$200.00 |
$966.50 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 2,615 | SY |
$7.00 |
$4.59 |
$7.10 |
$7.75 |
$4.00 |
$5.00 |
$6.95 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 1 | AC |
$1,500.00 |
$4,500.00 |
$4,095.00 |
$3,795.00 |
$1,400.00 |
$1,500.00 |
$2,000.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$2,500.00 |
$500.00 |
$4,095.00 |
$3,795.00 |
$1,400.00 |
$2,200.00 |
$2,000.00 |
| 100 | 241 3100 |
MOWING | 1 | AC |
$750.00 |
$250.00 |
$2,895.00 |
$2,695.00 |
$500.00 |
$500.00 |
$1,000.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 31 | CY |
$100.00 |
$140.00 |
$96.00 |
$138.00 |
$75.00 |
$110.00 |
$85.90 |
| 120 | 325 0100 |
SEPARATOR FABRIC | 171 | SY |
$7.50 |
$5.00 |
$6.71 |
$12.95 |
$3.00 |
$4.00 |
$3.35 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 147 | TON |
$60.00 |
$75.00 |
$43.00 |
$56.50 |
$60.00 |
$85.00 |
$67.50 |
| 140 | 407(B)7300 |
TACK COAT | 249 | GAL |
$10.00 |
$6.00 |
$3.75 |
$6.00 |
$4.00 |
$7.50 |
$3.20 |
| 150 | 408 8100 |
PRIME COAT | 120 | GAL |
$12.00 |
$6.00 |
$13.20 |
$6.00 |
$4.00 |
$7.50 |
$8.40 |
| 160 | 409(A)9200 |
FABRIC REINFORCEMENT | 26 | SY |
$10.00 |
$35.00 |
$110.00 |
$35.00 |
$5.00 |
$45.00 |
$107.00 |
| 170 | 409(B)9300 |
BITUMINOUS BINDER | 5 | GAL |
$10.00 |
$250.00 |
$186.00 |
$250.00 |
$7.00 |
$300.00 |
$167.00 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 37 | TON |
$300.00 |
$410.00 |
$185.00 |
$445.00 |
$300.00 |
$500.00 |
$1,079.00 |
| 190 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 193 | TON |
$200.00 |
$199.00 |
$208.00 |
$225.00 |
$250.00 |
$245.00 |
$260.50 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 188 | TON |
$200.00 |
$176.50 |
$192.00 |
$203.00 |
$250.00 |
$220.00 |
$247.00 |
| 210 | 412 3100 |
COLD MILLING PAVEMENT | 2,733 | SY |
$11.00 |
$8.90 |
$11.50 |
$12.00 |
$20.00 |
$7.00 |
$9.90 |
| 220 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 19 | CY |
$40.00 |
$50.00 |
$25.00 |
$59.00 |
$40.00 |
$20.00 |
$195.00 |
| 230 | 509(A)0200 |
CLASS AA CONCRETE | 101 | CY |
$700.00 |
$900.00 |
$510.00 |
$951.50 |
$1,400.00 |
$1,400.00 |
$2,076.00 |
| 240 | 511(A)2200 |
REINFORCING STEEL | 22,320 | LB |
$1.60 |
$1.50 |
$1.80 |
$1.56 |
$2.00 |
$2.00 |
$3.20 |
| 250 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 65 | TON |
$90.00 |
$89.00 |
$98.00 |
$92.50 |
$125.00 |
$125.00 |
$102.50 |
| 260 | 611(G)0380 |
PRECAST INLET (SMD-TYPE 1) | 1 | EA |
$5,000.00 |
$8,205.00 |
$6,500.00 |
$4,750.00 |
$6,500.00 |
$6,500.00 |
$5,939.00 |
| 270 | 613(A)5208 |
18" R.C.PIPE CLASS III | 50 | LF |
$120.00 |
$117.00 |
$71.80 |
$122.50 |
$125.00 |
$110.00 |
$130.50 |
| 280 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 9 | CY |
$85.00 |
$65.35 |
$96.00 |
$140.00 |
$60.00 |
$100.00 |
$91.80 |
| 290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$7,900.00 |
$6,000.00 |
$32,900.00 |
$5,500.00 |
$5,000.00 |
$45,000.00 |
| 300 | 619(B)6300 |
REMOVAL OF HEADWALL | 2 | EA |
$1,500.00 |
$1,250.00 |
$6,750.00 |
$9,750.00 |
$2,500.00 |
$2,000.00 |
$8,500.00 |
| 310 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 52 | SY |
$30.00 |
$24.00 |
$14.00 |
$26.75 |
$20.00 |
$15.00 |
$202.50 |
| 320 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 566 | LF |
$8.00 |
$5.50 |
$6.40 |
$4.95 |
$8.00 |
$8.00 |
$6.25 |
| 330 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 67 | LF |
$25.00 |
$30.00 |
$30.00 |
$30.00 |
$30.00 |
$20.00 |
$13.40 |
| 340 | 619(C)6600 |
SAWING PAVEMENT | 127 | LF |
$10.00 |
$10.00 |
$3.00 |
$7.50 |
$10.00 |
$11.00 |
$5.20 |
| 350 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 2 | EA |
$300.00 |
$250.00 |
$250.00 |
$550.00 |
$600.00 |
$300.00 |
$378.00 |
| 360 | 201 1100 |
(PL)REMOVE DRIFT AND SILT | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$2,500.00 |
$11,250.00 |
$6,939.81 |
$10,000.00 |
$22,500.00 |
| 370 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 1,350 | CY |
$13.00 |
$10.00 |
$10.00 |
$15.43 |
$20.00 |
$20.00 |
$18.30 |
| 380 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 154 | CY |
$40.00 |
$50.00 |
$25.00 |
$30.00 |
$50.00 |
$20.00 |
$96.20 |
| 390 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$25,000.00 |
$86,250.00 |
$205,000.00 |
$93,000.00 |
$50,000.00 |
$87,500.00 |
$115,000.00 |
| 400 | 508 9100 |
REMOVAL OF CULVERT END | 2 | EA |
$15,000.00 |
$20,000.00 |
$9,500.00 |
$30,000.00 |
$6,500.00 |
$2,500.00 |
$31,000.00 |
| 410 | 509(A)0210 |
CLASS AA CONCRETE | 333.1 | CY |
$830.00 |
$616.50 |
$510.00 |
$966.50 |
$1,400.00 |
$1,500.00 |
$1,385.00 |
| 420 | 511(A)2210 |
REINFORCING STEEL | 63,520 | LB |
$1.50 |
$1.50 |
$1.80 |
$1.54 |
$2.00 |
$2.00 |
$2.65 |
| 430 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 92 | LF |
$40.00 |
$47.00 |
$25.00 |
$50.75 |
$125.00 |
$35.00 |
$49.70 |
| 440 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 1.4 | GAL |
$200.00 |
$127.50 |
$750.00 |
$137.50 |
$250.00 |
$325.00 |
$135.00 |
| 450 | 540 8112 |
(PL)REPAIR BRIDGE ITEMS | 1.8 | SY |
$3,000.00 |
$3,100.00 |
$550.00 |
$3,500.00 |
$2,000.00 |
$3,700.00 |
$3,240.00 |
| 460 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 1,292 | LF |
$1.00 |
$1.15 |
$1.25 |
$2.75 |
$3.00 |
$1.35 |
$1.20 |
| 470 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 646 | LF |
$0.5000 |
$1.50 |
$1.60 |
$2.75 |
$3.00 |
$1.60 |
$1.45 |
| 480 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$250.00 |
$355.00 |
$385.00 |
$500.00 |
$600.00 |
$425.00 |
$378.00 |
| 490 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 2,108 | LF |
$1.00 |
$2.00 |
$2.45 |
$2.20 |
$2.50 |
$2.25 |
$2.05 |
| 500 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 2,584 | LF |
$1.00 |
$1.25 |
$1.50 |
$0.3000 |
$0.4500 |
$1.35 |
$1.20 |
| 510 | 857(E)9600 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 88 | EA |
$2.00 |
$8.75 |
$9.35 |
$5.50 |
$5.50 |
$10.00 |
$9.20 |
| 520 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 130 | EA |
$1.00 |
$0.7500 |
$6.30 |
$1.10 |
$1.25 |
$0.0100 |
$1.10 |
| 530 | 857(F)9740 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 2,108 | LF |
$2.00 |
$1.75 |
$1.75 |
$1.65 |
$2.00 |
$1.85 |
$1.65 |
| 540 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 299 | SD |
$15.00 |
$9.15 |
$9.90 |
$11.00 |
$15.00 |
$9.00 |
$9.70 |
| 550 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 450 | LF |
$30.00 |
$45.00 |
$36.50 |
$38.25 |
$35.00 |
$40.00 |
$35.60 |
| 560 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 375 | LF |
$4.00 |
$1.00 |
$11.00 |
$9.88 |
$15.00 |
$12.00 |
$10.80 |
| 570 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,200 | SD |
$0.2000 |
$0.0300 |
$0.0500 |
$0.1100 |
$0.2500 |
$0.0200 |
$0.0300 |
| 580 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,520 | SD |
$0.5000 |
$0.0300 |
$0.0500 |
$0.1100 |
$0.2500 |
$0.0200 |
$0.0300 |
| 590 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 420 | SD |
$1.00 |
$8.00 |
$7.95 |
$10.00 |
$6.00 |
$7.85 |
$8.50 |
| 600 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 420 | SD |
$1.00 |
$2.25 |
$2.40 |
$10.00 |
$6.00 |
$2.15 |
$2.30 |
| 610 | 880(F)6700 |
DRUMS | 5,444 | SD |
$0.5000 |
$0.1500 |
$0.1500 |
$0.1100 |
$0.2500 |
$0.1000 |
$0.1100 |
| 620 | 880(I)7000 |
FLAGGER | 4 | SD |
$350.00 |
$300.00 |
$300.00 |
$1,397.50 |
$200.00 |
$5.00 |
$650.00 |
| 630 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,000.00 |
$3,500.00 |
$7,100.00 |
$15,000.00 |
$15,000.00 |
$15,000.00 |
$11,215.00 |
| 640 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$70,000.00 |
$57,900.00 |
$82,000.00 |
$75,000.00 |
$132,500.00 |
$109,300.31 |