| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 30,969 | CY |
$11.00 |
$8.75 |
$11.15 |
$15.33 |
$9.00 |
$14.55 |
$10.10 |
| 20 | 202(C)2400 |
ROCK EXCAVATION | 1,549 | CY |
$30.00 |
$11.17 |
$19.75 |
$30.00 |
$16.80 |
$21.55 |
$43.30 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$28,500.00 |
$93,103.79 |
$97,000.00 |
$34,410.00 |
$80,000.00 |
$130,500.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,431 | LF |
$4.00 |
$3.50 |
$3.20 |
$3.31 |
$3.90 |
$3.45 |
$3.01 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 784 | LF |
$20.00 |
$22.00 |
$21.20 |
$22.00 |
$29.50 |
$23.00 |
$25.00 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 101,500 | SY |
$3.00 |
$2.65 |
$2.50 |
$2.60 |
$2.89 |
$2.59 |
$2.59 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 20.97 | AC |
$1,250.00 |
$880.00 |
$848.00 |
$882.00 |
$1,299.00 |
$920.00 |
$1,219.39 |
| 80 | 241 3100 |
MOWING | 20.97 | AC |
$350.00 |
$440.00 |
$424.00 |
$440.00 |
$345.00 |
$460.00 |
$301.02 |
| 90 | 307(K)4200 |
STABILIZED SUBGRADE | 43,721 | SY |
$9.00 |
$8.35 |
$8.21 |
$10.70 |
$8.22 |
$11.20 |
$7.00 |
| 95 | 325 0100 |
SEPARATOR FABRIC | 47,662 | SY |
$2.50 |
$1.54 |
$0.5500 |
$1.00 |
$1.85 |
$2.35 |
$1.33 |
| 100 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,910 | TON |
$40.00 |
$47.00 |
$39.50 |
$42.00 |
$45.20 |
$38.00 |
$50.00 |
| 110 | 407(B)7300 |
TACK COAT | 5,642 | GAL |
$4.50 |
$5.00 |
$4.70 |
$3.40 |
$5.75 |
$3.65 |
$4.00 |
| 120 | 408 8100 |
PRIME COAT | 17,394 | GAL |
$5.00 |
$0.2500 |
$5.35 |
$2.00 |
$6.00 |
$3.55 |
$4.00 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,728 | TON |
$115.00 |
$135.00 |
$116.50 |
$121.00 |
$138.55 |
$118.45 |
$127.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,190 | TON |
$125.00 |
$137.50 |
$128.20 |
$129.00 |
$148.37 |
$122.35 |
$153.00 |
| 150 | 412 3100 |
COLD MILLING PAVEMENT | 28,445 | SY |
$3.50 |
$9.00 |
$2.70 |
$2.50 |
$7.25 |
$3.35 |
$5.00 |
| 160 | 509(D)0500 |
CLASS C CONCRETE | 725 | CY |
$425.00 |
$200.00 |
$424.00 |
$470.00 |
$502.00 |
$788.00 |
$470.26 |
| 170 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 134 | TON |
$70.00 |
$73.00 |
$94.40 |
$129.00 |
$71.25 |
$65.00 |
$88.66 |
| 180 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 1,829 | LF |
$45.00 |
$50.00 |
$53.00 |
$50.00 |
$44.95 |
$34.40 |
$43.95 |
| 190 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 143 | SY |
$110.00 |
$135.00 |
$116.60 |
$130.00 |
$154.47 |
$135.00 |
$140.47 |
| 200 | 613(A)5216 |
24" R.C.PIPE CLASS III | 186 | LF |
$100.00 |
$163.50 |
$101.10 |
$95.50 |
$129.87 |
$72.00 |
$122.68 |
| 210 | 613(A)5224 |
36" R.C.PIPE CLASS III | 192 | LF |
$175.00 |
$216.75 |
$196.10 |
$130.00 |
$201.78 |
$128.00 |
$161.86 |
| 220 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 22 | EA |
$1,300.00 |
$524.18 |
$539.55 |
$400.00 |
$430.00 |
$2,850.00 |
$1,381.44 |
| 230 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 24 | EA |
$1,450.00 |
$1,163.72 |
$1,056.85 |
$1,080.00 |
$1,584.00 |
$3,000.00 |
$1,587.63 |
| 240 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$2,750.00 |
$2,981.20 |
$1,383.30 |
$1,860.00 |
$2,900.00 |
$3,400.00 |
$2,938.15 |
| 250 | 616(P)4160 |
18" HDPE PIPE | 272 | LF |
$200.00 |
$89.15 |
$75.25 |
$50.00 |
$81.00 |
$74.35 |
$111.34 |
| 260 | 616(P)4164 |
24" HDPE PIPE | 406 | LF |
$300.00 |
$114.35 |
$109.60 |
$56.00 |
$110.00 |
$84.00 |
$163.92 |
| 270 | 616(P)4176 |
36" HDPE PIPE | 86 | LF |
$500.00 |
$188.10 |
$184.85 |
$118.00 |
$178.00 |
$126.00 |
$163.92 |
| 280 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$21,100.00 |
$30,808.70 |
$40,000.00 |
$26,501.00 |
$32,000.00 |
$130,500.00 |
| 290 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 110 | SY |
$20.00 |
$31.00 |
$11.10 |
$44.00 |
$32.00 |
$26.00 |
$8.67 |
| 300 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 116 | SY |
$12.00 |
$31.00 |
$7.75 |
$40.00 |
$30.00 |
$22.00 |
$9.28 |
| 310 | 619(C)6600 |
SAWING PAVEMENT | 140 | LF |
$5.00 |
$20.00 |
$5.45 |
$14.00 |
$8.00 |
$6.00 |
$15.23 |
| 320 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$30.00 |
$30.80 |
$29.70 |
$32.00 |
$28.00 |
$32.20 |
$25.00 |
| 330 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,000.00 |
$1,925.00 |
$1,855.00 |
$1,930.00 |
$3,800.00 |
$2,012.00 |
$3,500.00 |
| 340 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$4,000.00 |
$3,025.00 |
$2,915.00 |
$3,050.00 |
$4,600.00 |
$3,162.00 |
$4,200.00 |
| 350 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$210.00 |
$165.00 |
$159.00 |
$165.00 |
$275.00 |
$172.50 |
$250.00 |
| 360 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$100.00 |
$100.00 |
$109.00 |
$50.00 |
$115.00 |
$100.00 |
$100.00 |
| 370 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 50 | SF |
$40.00 |
$27.50 |
$26.50 |
$28.00 |
$38.00 |
$28.75 |
$35.00 |
| 380 | 851(C)2415 |
2" SQUARE TUBE POST | 87 | LF |
$12.00 |
$11.00 |
$10.60 |
$11.00 |
$13.40 |
$11.50 |
$12.00 |
| 390 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 56,196 | LF |
$0.7500 |
$0.5500 |
$0.5500 |
$0.5500 |
$0.5800 |
$0.5800 |
$0.4900 |
| 400 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 60 | LF |
$10.00 |
$16.50 |
$15.90 |
$17.00 |
$17.00 |
$17.25 |
$15.00 |
| 410 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$1,500.00 |
$55.00 |
$53.00 |
$55.00 |
$540.00 |
$57.50 |
$500.00 |
| 420 | 853 5110 |
DELINEATORS(TYPE 1, CODE 3) | 4 | EA |
$40.00 |
$55.00 |
$53.00 |
$55.00 |
$54.00 |
$57.50 |
$50.00 |
| 430 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,240 | SD |
$0.5000 |
$0.2800 |
$0.3000 |
$0.2800 |
$0.1200 |
$0.2800 |
$0.1000 |
| 440 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,980 | SD |
$1.00 |
$1.10 |
$1.10 |
$1.10 |
$0.2700 |
$1.15 |
$0.2500 |
| 450 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.50 |
$4.40 |
$4.25 |
$4.50 |
$0.2700 |
$4.60 |
$1.50 |
| 460 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,260 | SD |
$2.00 |
$2.20 |
$2.15 |
$2.25 |
$1.60 |
$2.30 |
$1.50 |
| 470 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,260 | SD |
$0.7500 |
$2.20 |
$2.15 |
$2.25 |
$3.28 |
$2.30 |
$3.00 |
| 480 | 880(I)7000 |
FLAGGER | 180 | SD |
$125.00 |
$100.00 |
$136.25 |
$50.00 |
$275.00 |
$125.00 |
$2.00 |
| 490 | 880(W)7700 |
PILOT CAR | 1 | LSUM |
$25,000.00 |
$25,000.00 |
$10,900.00 |
$40,000.00 |
$29,000.00 |
$25,000.00 |
$125,000.00 |
| 500 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$25.00 |
$16.50 |
$15.90 |
$17.00 |
$14.00 |
$17.25 |
$10.00 |
| 510 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$25,000.00 |
$47,700.00 |
$75,000.00 |
$72,000.00 |
$50,000.00 |
$100,000.00 |
| 520 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$2,180.00 |
$20,000.00 |
$4,000.00 |
$2,500.00 |
$100,000.00 |
| 530 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$240,000.00 |
$250,000.00 |
$474,516.25 |
$235,000.00 |
$260,000.00 |
$269,890.00 |
$257,136.89 |