Bid tab 260174

Let Jul 9, 2026 · Division 2 · Pushmataha

‹ Jul 2026 results

Grade, Drain And Surface

Let date
Thursday, July 9, 2026
Contract
260174 · job page
J/P numbers
31282(04)
District
Division 2
County
Pushmataha
Highway
COUNTY ROAD (GREENWOOD ROAD, NS-418)
Limits
COUNTY ROAD (GREENWOOD ROAD/NS-418): FROM 0.16 MILES SOUTH OF SH-3, EXTEND SOUTH NEAR ANTLERS.
Classification
Grade, Drain And Surface ·
Project number
CIRB-264D(110)RB
Working days
180

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,688,374
1 C-GAWF CONSTRUCTION, INC. Low bidder $4,497,216 -4.1%
2 THE CUMMINS CONSTRUCTION CO., INC. $4,591,720 -2.1% +2.1%
3 APAC-CENTRAL, INC. $4,699,103 +0.2% +4.5%
4 BRIDGECO CONTRACTORS, INC. $5,009,094 +6.8% +11.4%
5 Robinson Construction, LLC $5,012,792 +6.9% +11.5%
6 OVERLAND CORPORATION $5,142,738 +9.7% +14.4%

Bid tab: unit prices 54 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 C-GAWF CONSTRUC…#2 THE CUMMINS CON…#3 APAC-CENTRAL, I…#4 BRIDGECO CONTRA…#5 Robinson Constr…#6 OVERLAND CORPOR…
10202(A)2200 UNCLASSIFIED EXCAVATION30,969CY $11.00 $8.75 $11.15 $15.33 $9.00 $14.55 $10.10
20202(C)2400 ROCK EXCAVATION1,549CY $30.00 $11.17 $19.75 $30.00 $16.80 $21.55 $43.30
30205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $50,000.00 $28,500.00 $93,103.79 $97,000.00 $34,410.00 $80,000.00 $130,500.00
40221(B)2300 TEMPORARY SILT FENCE5,431LF $4.00 $3.50 $3.20 $3.31 $3.90 $3.45 $3.01
50221(E)2600 TEMPORARY SILT DIKE784LF $20.00 $22.00 $21.20 $22.00 $29.50 $23.00 $25.00
60230(A)7200 SOLID SLAB SODDING101,500SY $3.00 $2.65 $2.50 $2.60 $2.89 $2.59 $2.59
70233(A)0200 VEGETATIVE MULCHING20.97AC $1,250.00 $880.00 $848.00 $882.00 $1,299.00 $920.00 $1,219.39
80241 3100 MOWING20.97AC $350.00 $440.00 $424.00 $440.00 $345.00 $460.00 $301.02
90307(K)4200 STABILIZED SUBGRADE43,721SY $9.00 $8.35 $8.21 $10.70 $8.22 $11.20 $7.00
95325 0100 SEPARATOR FABRIC47,662SY $2.50 $1.54 $0.5500 $1.00 $1.85 $2.35 $1.33
100402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E3,910TON $40.00 $47.00 $39.50 $42.00 $45.20 $38.00 $50.00
110407(B)7300 TACK COAT5,642GAL $4.50 $5.00 $4.70 $3.40 $5.75 $3.65 $4.00
120408 8100 PRIME COAT17,394GAL $5.00 $0.2500 $5.35 $2.00 $6.00 $3.55 $4.00
130411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)10,728TON $115.00 $135.00 $116.50 $121.00 $138.55 $118.45 $127.00
140411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)4,190TON $125.00 $137.50 $128.20 $129.00 $148.37 $122.35 $153.00
150412 3100 COLD MILLING PAVEMENT28,445SY $3.50 $9.00 $2.70 $2.50 $7.25 $3.35 $5.00
160509(D)0500 CLASS C CONCRETE725CY $425.00 $200.00 $424.00 $470.00 $502.00 $788.00 $470.26
170601(A)1100 TYPE I PLAIN RIPRAP134TON $70.00 $73.00 $94.40 $129.00 $71.25 $65.00 $88.66
180609(B)4360 2'-8" COMB.CRB.& GUT.(6" BARRIER)1,829LF $45.00 $50.00 $53.00 $50.00 $44.95 $34.40 $43.95
190610(B)5310 6" CONCRETE DRIVEWAY143SY $110.00 $135.00 $116.60 $130.00 $154.47 $135.00 $140.47
200613(A)5216 24" R.C.PIPE CLASS III186LF $100.00 $163.50 $101.10 $95.50 $129.87 $72.00 $122.68
210613(A)5224 36" R.C.PIPE CLASS III192LF $175.00 $216.75 $196.10 $130.00 $201.78 $128.00 $161.86
220613(L)6708 18" PREFAB. CULVERT END SEC., ROUND22EA $1,300.00 $524.18 $539.55 $400.00 $430.00 $2,850.00 $1,381.44
230613(L)6716 24" PREFAB. CULVERT END SEC., ROUND24EA $1,450.00 $1,163.72 $1,056.85 $1,080.00 $1,584.00 $3,000.00 $1,587.63
240613(L)6728 36" PREFAB. CULVERT END SEC., ROUND6EA $2,750.00 $2,981.20 $1,383.30 $1,860.00 $2,900.00 $3,400.00 $2,938.15
250616(P)4160 18" HDPE PIPE272LF $200.00 $89.15 $75.25 $50.00 $81.00 $74.35 $111.34
260616(P)4164 24" HDPE PIPE406LF $300.00 $114.35 $109.60 $56.00 $110.00 $84.00 $163.92
270616(P)4176 36" HDPE PIPE86LF $500.00 $188.10 $184.85 $118.00 $178.00 $126.00 $163.92
280619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $21,100.00 $30,808.70 $40,000.00 $26,501.00 $32,000.00 $130,500.00
290619(B)6380 REMOVAL OF CONCRETE DRIVEWAY110SY $20.00 $31.00 $11.10 $44.00 $32.00 $26.00 $8.67
300619(B)6384 REMOVAL OF ASPHALT DRIVEWAY116SY $12.00 $31.00 $7.75 $40.00 $30.00 $22.00 $9.28
310619(C)6600 SAWING PAVEMENT140LF $5.00 $20.00 $5.45 $14.00 $8.00 $6.00 $15.23
320623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE100LF $30.00 $30.80 $29.70 $32.00 $28.00 $32.20 $25.00
330623(F)1724 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $3,000.00 $1,925.00 $1,855.00 $1,930.00 $3,800.00 $2,012.00 $3,500.00
340623(G)1800 GUARDRAIL END TREATMENT (GET)4EA $4,000.00 $3,025.00 $2,915.00 $3,050.00 $4,600.00 $3,162.00 $4,200.00
350629(A)7200 MAILBOX INSTALLATION-SINGLE5EA $210.00 $165.00 $159.00 $165.00 $275.00 $172.50 $250.00
360629(C)7400 REMOVAL OF MAILBOX INSTALLATION5EA $100.00 $100.00 $109.00 $50.00 $115.00 $100.00 $100.00
370850(A)1200 SHEET ALUMINUM SIGNS50SF $40.00 $27.50 $26.50 $28.00 $38.00 $28.75 $35.00
380851(C)2415 2" SQUARE TUBE POST87LF $12.00 $11.00 $10.60 $11.00 $13.40 $11.50 $12.00
390856(A)8203 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE)56,196LF $0.7500 $0.5500 $0.5500 $0.5500 $0.5800 $0.5800 $0.4900
400856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)60LF $10.00 $16.50 $15.90 $17.00 $17.00 $17.25 $15.00
410805(A)3252 (PL)REMOVAL OF EXISTING SIGNS1EA $1,500.00 $55.00 $53.00 $55.00 $540.00 $57.50 $500.00
420853 5110 DELINEATORS(TYPE 1, CODE 3)4EA $40.00 $55.00 $53.00 $55.00 $54.00 $57.50 $50.00
430880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF3,240SD $0.5000 $0.2800 $0.3000 $0.2800 $0.1200 $0.2800 $0.1000
440880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,980SD $1.00 $1.10 $1.10 $1.10 $0.2700 $1.15 $0.2500
450880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,440SD $1.50 $4.40 $4.25 $4.50 $0.2700 $4.60 $1.50
460880(C)6410 CONSTRUCTION BARRICADES(TYPE III)1,260SD $2.00 $2.20 $2.15 $2.25 $1.60 $2.30 $1.50
470880(E)6600 WARNING LIGHTS(TYPE A)1,260SD $0.7500 $2.20 $2.15 $2.25 $3.28 $2.30 $3.00
480880(I)7000 FLAGGER180SD $125.00 $100.00 $136.25 $50.00 $275.00 $125.00 $2.00
490880(W)7700 PILOT CAR1LSUM $25,000.00 $25,000.00 $10,900.00 $40,000.00 $29,000.00 $25,000.00 $125,000.00
500882(A)8210 PORT.CHANGEABLE MESSAGE SIGN180SD $25.00 $16.50 $15.90 $17.00 $14.00 $17.25 $10.00
510642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $55,000.00 $25,000.00 $47,700.00 $75,000.00 $72,000.00 $50,000.00 $100,000.00
520220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $5,000.00 $2,180.00 $20,000.00 $4,000.00 $2,500.00 $100,000.00
530641 2110 MOBILIZATION1LSUM $240,000.00 $250,000.00 $474,516.25 $235,000.00 $260,000.00 $269,890.00 $257,136.89