| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$45,000.00 |
$20,000.00 |
$47,250.00 |
$125,000.00 |
$56,118.56 |
$28,000.00 |
$25,000.00 |
$45,000.00 |
$24,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 90,886 | CY |
$10.00 |
$5.00 |
$9.76 |
$6.50 |
$8.06 |
$8.25 |
$12.50 |
$11.20 |
$9.60 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$10,000.00 |
$54,600.00 |
$50,000.00 |
$60,913.87 |
$25,000.00 |
$25,000.00 |
$35,000.00 |
$144,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,224 | LF |
$3.15 |
$4.00 |
$3.15 |
$2.30 |
$3.65 |
$3.00 |
$3.30 |
$2.20 |
$3.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 894 | LF |
$150.00 |
$22.00 |
$21.00 |
$18.50 |
$24.33 |
$20.00 |
$22.00 |
$9.00 |
$7.00 |
| 60 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 33 | CY |
$510.00 |
$30.00 |
$157.50 |
$280.00 |
$173.22 |
$500.00 |
$125.00 |
$125.00 |
$61.89 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 48,535 | SY |
$3.25 |
$2.50 |
$2.25 |
$3.00 |
$2.62 |
$2.15 |
$2.35 |
$3.25 |
$4.05 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 10.03 | AC |
$1,900.00 |
$1,300.00 |
$1,050.00 |
$850.00 |
$1,216.58 |
$1,000.00 |
$1,100.00 |
$900.00 |
$1,800.00 |
| 90 | 241 3100 |
MOWING | 20.06 | AC |
$350.00 |
$450.00 |
$420.00 |
$330.00 |
$486.63 |
$400.00 |
$440.00 |
$150.00 |
$137.50 |
| 100 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 1 | EA |
$5,000.00 |
$5,000.00 |
$5,473.12 |
$5,500.00 |
$4,733.80 |
$9,500.00 |
$5,000.00 |
$3,500.00 |
$5,000.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,866 | CY |
$78.00 |
$40.00 |
$79.80 |
$99.00 |
$77.15 |
$77.00 |
$80.00 |
$72.00 |
$67.95 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 19,867 | SY |
$10.50 |
$11.00 |
$9.33 |
$7.00 |
$6.79 |
$7.50 |
$9.99 |
$7.65 |
$12.15 |
| 130 | 325 0100 |
SEPARATOR FABRIC | 13,998 | SY |
$2.30 |
$3.00 |
$2.80 |
$2.10 |
$1.61 |
$2.50 |
$1.75 |
$1.65 |
$1.75 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,039 | TON |
$40.00 |
$45.00 |
$47.64 |
$50.00 |
$35.63 |
$37.00 |
$40.00 |
$37.20 |
$40.00 |
| 150 | 407(B)7300 |
TACK COAT | 517 | GAL |
$4.75 |
$6.00 |
$3.41 |
$5.10 |
$5.48 |
$3.00 |
$5.00 |
$4.10 |
$5.61 |
| 160 | 408 8100 |
PRIME COAT | 10,542 | GAL |
$4.00 |
$9.00 |
$6.30 |
$8.00 |
$5.80 |
$6.00 |
$5.00 |
$2.50 |
$8.80 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,649 | TON |
$120.00 |
$140.00 |
$123.90 |
$168.00 |
$120.96 |
$148.00 |
$165.00 |
$118.65 |
$165.00 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 429 | TON |
$180.00 |
$150.00 |
$156.45 |
$211.00 |
$139.58 |
$155.00 |
$175.00 |
$128.55 |
$200.00 |
| 190 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 2,676 | SY |
$25.00 |
$15.00 |
$26.51 |
$25.50 |
$19.18 |
$35.00 |
$25.00 |
$32.00 |
$47.23 |
| 200 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 9,728 | SY |
$33.00 |
$25.00 |
$27.82 |
$23.50 |
$29.89 |
$46.00 |
$50.00 |
$38.55 |
$65.74 |
| 210 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 3,061 | CY |
$220.00 |
$275.00 |
$237.30 |
$310.00 |
$246.30 |
$350.00 |
$250.00 |
$252.00 |
$262.50 |
| 220 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 106 | CY |
$28.00 |
$20.00 |
$47.25 |
$30.00 |
$34.73 |
$15.00 |
$25.00 |
$30.00 |
$55.00 |
| 230 | 509(A)0200 |
CLASS AA CONCRETE | 34 | CY |
$685.00 |
$1,000.00 |
$939.75 |
$1,750.00 |
$809.37 |
$1,400.00 |
$1,250.00 |
$755.00 |
$3,273.53 |
| 240 | 509(D)0500 |
CLASS C CONCRETE | 264 | CY |
$500.00 |
$650.00 |
$429.45 |
$485.00 |
$483.62 |
$500.00 |
$550.00 |
$500.00 |
$739.78 |
| 250 | 511(A)2200 |
REINFORCING STEEL | 4,334 | LB |
$1.65 |
$2.00 |
$1.57 |
$2.10 |
$2.01 |
$1.25 |
$2.50 |
$1.65 |
$3.68 |
| 260 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 54 | TON |
$75.00 |
$75.00 |
$76.20 |
$95.00 |
$67.82 |
$63.00 |
$75.00 |
$86.00 |
$61.89 |
| 270 | 613(A)5220 |
30" R.C.PIPE CLASS III | 272 | LF |
$165.00 |
$125.00 |
$159.80 |
$157.50 |
$130.34 |
$92.68 |
$133.00 |
$96.55 |
$130.00 |
| 280 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$3,500.00 |
$1,800.00 |
$3,533.62 |
$2,305.00 |
$3,441.76 |
$2,000.00 |
$1,250.00 |
$74.55 |
$1,995.00 |
| 290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$18,375.00 |
$30,000.00 |
$17,816.22 |
$15,000.00 |
$12,500.00 |
$45,000.00 |
$5,000.00 |
| 300 | 619(B)6352 |
REMOVAL OF FENCE | 2,861 | LF |
$3.50 |
$2.00 |
$1.31 |
$2.00 |
$1.22 |
$2.00 |
$2.20 |
$2.00 |
$2.50 |
| 310 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 6,239 | SY |
$8.25 |
$11.00 |
$9.45 |
$6.00 |
$7.69 |
$5.00 |
$2.25 |
$4.20 |
$2.50 |
| 320 | 619(C)6600 |
SAWING PAVEMENT | 2,434 | LF |
$5.00 |
$8.00 |
$4.72 |
$4.25 |
$5.67 |
$5.00 |
$5.00 |
$3.25 |
$31.50 |
| 330 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 75 | LF |
$50.00 |
$40.00 |
$26.25 |
$37.50 |
$30.41 |
$25.00 |
$27.50 |
$42.90 |
$42.00 |
| 340 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,000.00 |
$4,000.00 |
$3,937.50 |
$3,850.00 |
$4,562.19 |
$3,750.00 |
$4,125.00 |
$3,728.00 |
$3,700.00 |
| 350 | 623(J)2110 |
GUARDRAIL SYSTEM-PIER PROTECTION (31") | 24 | EA |
$1,000.00 |
$600.00 |
$630.00 |
$600.00 |
$729.95 |
$600.00 |
$660.00 |
$665.00 |
$605.00 |
| 360 | 624(A)3200 |
FENCE-STYLE WWF | 2,956 | LF |
$12.00 |
$14.00 |
$9.45 |
$9.25 |
$9.73 |
$10.85 |
$11.00 |
$8.65 |
$16.00 |
| 370 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 340 | LF |
$105.00 |
$125.00 |
$115.50 |
$125.00 |
$71.65 |
$100.00 |
$75.00 |
$210.00 |
$262.50 |
| 380 | 627(B)6300 |
CONCRETE LONGITUDINAL BARRIER END SEC. | 3 | EA |
$2,100.00 |
$3,500.00 |
$2,835.00 |
$1,675.00 |
$5,129.00 |
$2,500.00 |
$2,250.00 |
$2,865.00 |
$7,875.00 |
| 390 | 804(A)2200 |
STRUCTURAL CONCRETE | 31 | CY |
$1,250.00 |
$900.00 |
$551.25 |
$530.00 |
$638.71 |
$525.00 |
$577.00 |
$850.00 |
$850.00 |
| 400 | 804(B)2300 |
REINFORCING STEEL | 6,646 | LB |
$2.50 |
$3.00 |
$2.10 |
$2.10 |
$2.43 |
$2.00 |
$2.40 |
$2.88 |
$2.50 |
| 410 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 17 | EA |
$140.00 |
$500.00 |
$78.75 |
$85.00 |
$91.24 |
$75.00 |
$82.50 |
$460.00 |
$100.00 |
| 420 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$500.00 |
$400.00 |
$367.50 |
$375.00 |
$425.80 |
$350.00 |
$385.00 |
$402.00 |
$350.00 |
| 430 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 673 | SF |
$42.00 |
$45.00 |
$27.30 |
$26.25 |
$31.63 |
$26.00 |
$28.60 |
$34.50 |
$22.00 |
| 440 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,267 | SF |
$42.00 |
$45.00 |
$39.90 |
$38.50 |
$46.23 |
$38.00 |
$41.80 |
$40.25 |
$38.50 |
| 450 | 851(A)2205 |
6"@15 GALV.STL.WD.FLANGE BM.POST | 274 | LF |
$48.00 |
$47.00 |
$36.75 |
$36.00 |
$42.58 |
$35.00 |
$38.50 |
$51.75 |
$45.00 |
| 460 | 851(A)2220 |
8"@31 GALV.STL.WD.FLANGE BM.POST | 306 | LF |
$85.00 |
$90.00 |
$52.50 |
$51.00 |
$60.83 |
$50.00 |
$55.00 |
$97.75 |
$85.00 |
| 470 | 851(B)2320 |
3 1/2"@9.11 GALV.STL.PIPE POST | 512.5 | LF |
$30.00 |
$30.00 |
$26.25 |
$26.00 |
$30.41 |
$25.00 |
$27.50 |
$32.20 |
$28.00 |
| 480 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 473 | LF |
$12.00 |
$10.00 |
$11.55 |
$11.50 |
$13.38 |
$11.00 |
$12.10 |
$8.05 |
$7.00 |
| 490 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 157 | LF |
$15.00 |
$10.00 |
$12.60 |
$12.10 |
$14.60 |
$12.00 |
$13.20 |
$9.10 |
$8.00 |
| 500 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 71 | EA |
$100.00 |
$60.00 |
$52.50 |
$51.00 |
$60.83 |
$50.00 |
$55.00 |
$64.30 |
$60.00 |
| 510 | 853 5135 |
DELINEATORS(TYPE 1, CODE 2, FLEXIBLE) | 39 | EA |
$90.00 |
$60.00 |
$57.75 |
$56.00 |
$66.91 |
$55.00 |
$60.50 |
$64.50 |
$60.00 |
| 520 | 853 5155 |
DELINEATORS(TYPE 2, CODE 3, FLEXIBLE) | 16 | EA |
$85.00 |
$60.00 |
$63.00 |
$60.00 |
$73.00 |
$60.00 |
$66.00 |
$64.60 |
$60.00 |
| 530 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$25.00 |
$20.00 |
$26.25 |
$25.50 |
$30.42 |
$25.00 |
$27.50 |
$20.70 |
$20.00 |
| 540 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 36,201 | LF |
$1.00 |
$1.00 |
$0.7700 |
$0.7500 |
$0.9000 |
$0.7400 |
$0.8300 |
$0.7900 |
$1.00 |
| 550 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 4,284 | LF |
$1.90 |
$2.20 |
$1.57 |
$1.60 |
$1.82 |
$1.50 |
$1.65 |
$2.20 |
$2.00 |
| 560 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 64 | LF |
$20.00 |
$15.00 |
$21.00 |
$20.50 |
$24.33 |
$20.00 |
$22.00 |
$13.80 |
$15.00 |
| 570 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 8 | EA |
$295.00 |
$300.00 |
$162.75 |
$200.00 |
$188.57 |
$155.00 |
$171.00 |
$280.00 |
$260.00 |
| 580 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 26,884 | LF |
$0.2000 |
$0.3000 |
$0.0800 |
$0.1000 |
$0.1000 |
$0.0800 |
$0.1000 |
$0.2300 |
$25.00 |
| 590 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 158 | EA |
$15.00 |
$13.00 |
$8.40 |
$11.15 |
$9.73 |
$8.00 |
$8.80 |
$12.65 |
$13.00 |
| 600 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 85 | EA |
$20.00 |
$13.00 |
$8.40 |
$11.15 |
$9.73 |
$8.00 |
$8.80 |
$12.65 |
$13.00 |
| 610 | 871(A)2200 |
IMPACT ATTENUATOR | 2 | EA |
$36,000.00 |
$30,000.00 |
$32,077.50 |
$31,500.00 |
$37,166.61 |
$30,550.00 |
$42,500.00 |
$31,500.00 |
$31,350.00 |
| 620 | 802(A)0220 |
1 1/4" GALV.STEEL ELECT.COND. EXPOSED | 326 | LF |
$60.00 |
$58.00 |
$60.90 |
$58.70 |
$70.56 |
$58.00 |
$64.00 |
$66.80 |
$60.50 |
| 630 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 534 | LF |
$41.00 |
$45.00 |
$54.07 |
$52.10 |
$62.65 |
$51.50 |
$57.00 |
$61.20 |
$46.20 |
| 640 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 9,290 | LF |
$14.00 |
$17.00 |
$11.55 |
$11.15 |
$13.38 |
$11.00 |
$12.10 |
$12.65 |
$17.60 |
| 650 | 802(E)0600 |
JUNCTION BOX(6" X 6" X 4") | 4 | EA |
$970.00 |
$800.00 |
$1,312.50 |
$1,265.00 |
$1,520.73 |
$1,250.00 |
$1,375.00 |
$1,445.00 |
$852.50 |
| 660 | 803(A)1210 |
PULL BOX(SIZE I) | 14 | EA |
$1,300.00 |
$3,500.00 |
$3,108.00 |
$2,995.00 |
$3,601.09 |
$2,960.00 |
$3,300.00 |
$3,400.00 |
$3,531.00 |
| 670 | 804(A)2200 |
STRUCTURAL CONCRETE | 78 | CY |
$1,250.00 |
$1,150.00 |
$1,233.75 |
$1,200.00 |
$1,429.49 |
$1,175.00 |
$1,350.00 |
$1,350.00 |
$1,098.90 |
| 680 | 804(B)2300 |
REINFORCING STEEL | 13,348 | LB |
$2.50 |
$3.30 |
$2.62 |
$2.55 |
$3.04 |
$2.50 |
$2.75 |
$2.88 |
$3.41 |
| 690 | 806(C)4512 |
40' MTG & 10' HLMA(G.STL.) | 47 | EA |
$5,400.00 |
$5,500.00 |
$5,649.00 |
$5,400.00 |
$6,545.22 |
$5,380.00 |
$6,000.00 |
$6,188.00 |
$5,500.00 |
| 700 | 807 5120 |
BREAKAWAY BASE (DES. B) | 47 | EA |
$1,250.00 |
$1,300.00 |
$1,428.00 |
$1,375.00 |
$1,654.55 |
$1,360.00 |
$1,500.00 |
$1,560.00 |
$1,405.80 |
| 710 | 809(A)7200 |
ROADWAY LUMINAIRE | 47 | EA |
$1,500.00 |
$1,000.00 |
$1,417.50 |
$1,365.00 |
$1,642.39 |
$1,350.00 |
$1,500.00 |
$1,555.00 |
$891.00 |
| 720 | 809(B)7300 |
UNDERPASS LUMINAIRE | 3 | EA |
$1,150.00 |
$1,000.00 |
$2,551.50 |
$2,450.00 |
$2,956.30 |
$2,430.00 |
$2,750.00 |
$2,790.00 |
$792.00 |
| 730 | 810(A)8200 |
SERVICE POLE | 1 | EA |
$10,000.00 |
$10,000.00 |
$9,723.00 |
$9,365.00 |
$11,265.56 |
$9,260.00 |
$10,200.00 |
$10,600.00 |
$8,747.20 |
| 740 | 811 9110 |
1/C NO.2 ELECT.COND. | 31,361 | LF |
$2.70 |
$1.70 |
$1.68 |
$1.65 |
$1.95 |
$1.60 |
$1.76 |
$1.80 |
$1.55 |
| 750 | 811 9160 |
2/C NO.12 ELECT.COND. | 2,585 | LF |
$1.65 |
$2.30 |
$2.73 |
$2.65 |
$3.16 |
$2.60 |
$2.88 |
$2.95 |
$2.20 |
| 760 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$70,000.00 |
$25,000.00 |
$19,740.00 |
$25,000.00 |
$24,459.65 |
$24,000.00 |
$25,000.00 |
$110,000.00 |
$35,000.00 |
| 770 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$3,500.00 |
$5,250.00 |
$10,000.00 |
$6,082.91 |
$5,000.00 |
$2,500.00 |
$4,000.00 |
$2,500.00 |
| 780 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$18,000.00 |
$50,000.00 |
$15,750.00 |
$48,750.00 |
$7,238.67 |
$20,000.00 |
$25,000.00 |
$35,000.00 |
$25,000.00 |
| 790 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$296,600.00 |
$340,000.00 |
$290,129.02 |
$291,450.00 |
$322,339.28 |
$300,000.00 |
$250,000.00 |
$445,000.00 |
$375,000.00 |
| 800 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 226 | SY |
$7.00 |
$5.00 |
$5.77 |
$5.60 |
$6.69 |
$5.50 |
$6.05 |
$6.32 |
$6.00 |
| 810 | 517 9110 |
ELASTOMERIC COATING | 980 | SF |
$30.00 |
$27.00 |
$18.90 |
$18.25 |
$21.90 |
$18.00 |
$19.80 |
$20.70 |
$23.00 |
| 820 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 86 | LF |
$220.00 |
$135.00 |
$131.25 |
$130.00 |
$152.07 |
$125.00 |
$137.50 |
$170.00 |
$94.50 |
| 830 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 172 | LF |
$35.00 |
$40.00 |
$18.37 |
$18.00 |
$21.29 |
$17.50 |
$19.25 |
$20.15 |
$52.50 |
| 840 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 181 | LF |
$35.00 |
$30.00 |
$39.90 |
$38.50 |
$46.23 |
$38.00 |
$41.80 |
$43.70 |
$50.00 |
| 850 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 17 | GAL |
$160.00 |
$150.00 |
$105.00 |
$102.00 |
$121.66 |
$100.00 |
$110.00 |
$114.00 |
$125.00 |
| 860 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 43 | SY |
$900.00 |
$750.00 |
$787.50 |
$760.00 |
$912.44 |
$750.00 |
$825.00 |
$862.00 |
$950.00 |
| 870 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 43 | SY |
$45.00 |
$60.00 |
$44.10 |
$42.50 |
$51.10 |
$42.00 |
$46.20 |
$50.00 |
$75.00 |
| 880 | 506(A)7200 |
STRUCTURAL STEEL | 1,300 | LB |
$3.75 |
$8.00 |
$1.05 |
$1.05 |
$1.22 |
$1.00 |
$1.10 |
$1.15 |
$1.10 |
| 890 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 50 | LF |
$1,100.00 |
$1,200.00 |
$1,438.50 |
$1,390.00 |
$1,666.72 |
$1,370.00 |
$1,510.00 |
$1,575.00 |
$1,507.00 |
| 900 | 610(A)5200 |
4" CONCRETE SIDEWALK | 94 | SY |
$110.00 |
$100.00 |
$115.50 |
$112.00 |
$133.82 |
$110.00 |
$121.00 |
$126.50 |
$121.00 |
| 910 | 648 6110 |
ELECTRIC SERVICE AND SERVICE CONNECTION | 1 | LSUM |
$24,000.00 |
$15,000.00 |
$7,612.50 |
$7,500.00 |
$8,820.23 |
$7,250.00 |
$8,000.00 |
$8,300.00 |
$7,975.00 |
| 920 | 650(C)8310 |
ELECTRICAL EQUIPMENT | 1 | LSUM |
$50,000.00 |
$60,000.00 |
$50,400.00 |
$50,000.00 |
$58,395.98 |
$48,000.00 |
$53,000.00 |
$54,000.00 |
$52,800.00 |
| 930 | 802(B)0304 |
1" PVC SCH.40 PLASTIC CONDUIT BORED | 50 | LF |
$50.00 |
$50.00 |
$56.70 |
$54.75 |
$65.70 |
$54.00 |
$59.40 |
$64.00 |
$59.00 |
| 940 | 802(B)0308 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 300 | LF |
$15.00 |
$20.00 |
$14.70 |
$14.20 |
$17.03 |
$14.00 |
$15.40 |
$16.20 |
$16.00 |
| 950 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 50 | LF |
$55.00 |
$50.00 |
$57.75 |
$55.70 |
$66.91 |
$55.00 |
$60.50 |
$70.00 |
$65.00 |
| 960 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 150 | LF |
$20.00 |
$20.00 |
$23.10 |
$22.25 |
$26.76 |
$22.00 |
$24.20 |
$31.00 |
$25.00 |
| 970 | 802(B)0328 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 275 | LF |
$60.00 |
$55.00 |
$42.52 |
$41.00 |
$49.27 |
$40.50 |
$44.05 |
$46.50 |
$45.00 |
| 980 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 700 | LF |
$30.00 |
$30.00 |
$17.85 |
$17.20 |
$20.68 |
$17.00 |
$18.70 |
$19.40 |
$18.70 |
| 990 | 803(A)1210 |
PULL BOX(SIZE I) | 4 | EA |
$1,200.00 |
$1,800.00 |
$1,501.50 |
$1,450.00 |
$1,739.71 |
$1,430.00 |
$1,573.00 |
$1,650.00 |
$1,573.00 |
| 1,000 | 803(A)1220 |
PULL BOX(SIZE II) | 8 | EA |
$1,800.00 |
$2,500.00 |
$1,858.50 |
$1,790.00 |
$2,153.35 |
$1,770.00 |
$1,944.00 |
$2,035.00 |
$1,947.00 |
| 1,010 | 803(B)1330 |
GROUND BOX (GB36) | 2 | EA |
$9,500.00 |
$4,500.00 |
$3,570.00 |
$3,440.00 |
$4,136.38 |
$3,400.00 |
$3,784.00 |
$3,910.00 |
$3,400.00 |
| 1,020 | 804(A)2200 |
STRUCTURAL CONCRETE | 1.2 | CY |
$1,300.00 |
$1,350.00 |
$4,053.00 |
$4,000.00 |
$4,696.01 |
$3,860.00 |
$4,250.00 |
$4,500.00 |
$4,246.00 |
| 1,030 | 811 9165 |
3/C NO.3 ELECT.COND. | 840 | LF |
$4.50 |
$14.00 |
$16.27 |
$15.70 |
$18.86 |
$15.50 |
$17.50 |
$17.00 |
$17.05 |
| 1,040 | 824(C)7400 |
(SP)CABINET | 2 | EA |
$17,000.00 |
$12,000.00 |
$23,835.00 |
$23,000.00 |
$27,616.44 |
$22,700.00 |
$25,000.00 |
$26,000.00 |
$24,970.00 |
| 1,050 | 852(B)3340 |
GALVANIZED STEEL OVERHEAD TOLL GANTRY (CANTILEVER) | 2 | EA |
$75,000.00 |
$20,000.00 |
$90,825.00 |
$87,500.00 |
$105,234.43 |
$86,500.00 |
$135,150.00 |
$97,000.00 |
$95,150.00 |
| 1,060 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$200.00 |
$130.00 |
$157.50 |
$155.00 |
$182.49 |
$150.00 |
$165.00 |
$402.00 |
$350.00 |
| 1,070 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 22,300 | LF |
$0.4500 |
$0.6000 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1200 |
$0.4000 |
$0.4000 |
| 1,080 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 30,700 | LF |
$0.3000 |
$0.7500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.2300 |
$0.3000 |
| 1,090 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 990 | SD |
$15.00 |
$16.00 |
$8.40 |
$8.10 |
$9.73 |
$8.00 |
$8.80 |
$25.00 |
$16.50 |
| 1,100 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,200 | LF |
$28.00 |
$26.00 |
$22.05 |
$28.63 |
$21.35 |
$50.00 |
$30.00 |
$62.00 |
$54.76 |
| 1,110 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 4,725 | LF |
$7.00 |
$4.00 |
$4.20 |
$2.75 |
$7.24 |
$4.00 |
$10.00 |
$15.00 |
$2.50 |
| 1,120 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,260 | SD |
$0.6500 |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1200 |
$0.0300 |
$0.0500 |
| 1,130 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,635 | SD |
$0.9500 |
$0.2500 |
$1.57 |
$1.50 |
$1.82 |
$1.50 |
$1.65 |
$0.0300 |
$0.0500 |
| 1,140 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,435 | SD |
$1.50 |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.0100 |
$0.0500 |
| 1,150 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 720 | SD |
$4.00 |
$0.2500 |
$1.05 |
$1.00 |
$1.22 |
$1.00 |
$1.10 |
$0.0300 |
$0.0500 |
| 1,160 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 9,600 | SD |
$0.9000 |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1100 |
$0.0100 |
$0.0500 |
| 1,170 | 880(D)6500 |
VERTICAL PANELS | 13,560 | SD |
$0.3000 |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1100 |
$0.0300 |
$0.0500 |
| 1,180 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 8,925 | SD |
$0.8500 |
$1.00 |
$4.20 |
$4.00 |
$4.87 |
$4.00 |
$4.40 |
$4.00 |
$3.90 |
| 1,190 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 13,560 | SD |
$0.3500 |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0500 |
| 1,200 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 8,550 | SD |
$0.2000 |
$0.2500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.2000 |
$0.2000 |
| 1,210 | 880(F)6700 |
DRUMS | 8,550 | SD |
$0.4000 |
$1.00 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.3000 |
$0.3000 |
| 1,220 | 880(G)6805 |
CHANNELIZER CONES | 6,525 | SD |
$0.3500 |
$1.00 |
$0.5200 |
$0.5200 |
$0.6100 |
$0.5000 |
$0.1600 |
$0.2500 |
$0.2500 |
| 1,230 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 750 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,240 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,468 | SD |
$19.00 |
$12.00 |
$5.25 |
$5.25 |
$6.08 |
$5.00 |
$5.50 |
$12.00 |
$12.00 |