| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$22,000.00 |
$130,000.00 |
$100,000.00 |
$50,000.00 |
$175,832.00 |
$155,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 46,922 | CY |
$10.00 |
$15.50 |
$13.00 |
$13.50 |
$12.62 |
$15.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$80,000.00 |
$89,000.00 |
$120,000.00 |
$50,000.00 |
$109,544.00 |
$160,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,440 | LF |
$4.00 |
$3.10 |
$3.24 |
$5.55 |
$3.82 |
$5.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,939 | LF |
$15.00 |
$15.25 |
$15.95 |
$20.00 |
$17.50 |
$22.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 98,904 | SY |
$3.00 |
$3.10 |
$3.24 |
$3.25 |
$3.35 |
$5.94 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 21 | AC |
$1,000.00 |
$1,760.00 |
$1,925.00 |
$200.00 |
$1,870.00 |
$2,200.00 |
| 90 | 241 3100 |
MOWING | 42 | AC |
$380.00 |
$480.00 |
$522.50 |
$100.00 |
$510.00 |
$500.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 311 | CY |
$90.00 |
$95.00 |
$85.00 |
$100.00 |
$87.85 |
$110.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 69,696 | SY |
$7.00 |
$8.88 |
$8.85 |
$9.00 |
$6.60 |
$12.00 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 463 | TON |
$50.00 |
$61.00 |
$55.00 |
$55.00 |
$47.04 |
$65.00 |
| 130 | 407(B)7300 |
TACK COAT | 5,034 | GAL |
$4.00 |
$3.20 |
$3.10 |
$5.00 |
$3.28 |
$6.00 |
| 140 | 408 8100 |
PRIME COAT | 24,395 | GAL |
$4.00 |
$2.00 |
$2.80 |
$0.2500 |
$5.40 |
$7.00 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,244 | TON |
$120.00 |
$109.00 |
$128.00 |
$125.00 |
$128.35 |
$166.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,451 | TON |
$130.00 |
$127.00 |
$132.00 |
$133.00 |
$138.68 |
$200.00 |
| 170 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 103 | CY |
$38.00 |
$34.50 |
$20.00 |
$114.50 |
$35.00 |
$30.00 |
| 180 | 509(A)0200 |
CLASS AA CONCRETE | 339 | CY |
$700.00 |
$726.00 |
$885.00 |
$777.00 |
$712.80 |
$1,000.00 |
| 190 | 509(D)0500 |
CLASS C CONCRETE | 2,090 | CY |
$500.00 |
$403.00 |
$475.00 |
$555.00 |
$398.19 |
$800.00 |
| 200 | 511(A)2200 |
REINFORCING STEEL | 28,862 | LB |
$1.50 |
$1.56 |
$1.65 |
$1.75 |
$1.66 |
$2.00 |
| 210 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 4,887 | TON |
$50.00 |
$70.00 |
$55.00 |
$88.00 |
$67.50 |
$90.00 |
| 220 | 613(A)5208 |
18" R.C.PIPE CLASS III | 170 | LF |
$110.00 |
$73.00 |
$73.70 |
$95.00 |
$85.58 |
$110.00 |
| 230 | 613(A)5216 |
24" R.C.PIPE CLASS III | 146 | LF |
$130.00 |
$133.00 |
$91.50 |
$125.00 |
$109.39 |
$150.00 |
| 240 | 613(A)5224 |
36" R.C.PIPE CLASS III | 58 | LF |
$150.00 |
$230.00 |
$125.38 |
$200.00 |
$218.25 |
$275.00 |
| 250 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 128 | LF |
$160.00 |
$160.00 |
$101.00 |
$200.00 |
$198.00 |
$205.00 |
| 260 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 1,834 | LF |
$60.00 |
$48.00 |
$47.96 |
$55.00 |
$74.92 |
$67.00 |
| 270 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 46 | LF |
$70.00 |
$103.00 |
$64.96 |
$80.00 |
$83.96 |
$88.00 |
| 280 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,216 | LF |
$70.00 |
$56.00 |
$52.97 |
$70.00 |
$81.60 |
$70.00 |
| 290 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 66 | LF |
$85.00 |
$82.00 |
$70.95 |
$90.00 |
$88.03 |
$72.00 |
| 300 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,300.00 |
$1,900.00 |
$1,445.00 |
$1,750.00 |
$1,963.00 |
$2,100.00 |
| 310 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,700.00 |
$2,800.00 |
$2,580.70 |
$4,000.00 |
$4,179.95 |
$3,850.00 |
| 320 | 613(M)6900 |
TYPE A3 CULVERT END TREATMENT | 107 | EA |
$1,800.00 |
$1,880.00 |
$1,880.00 |
$1,950.00 |
$1,890.00 |
$2,500.00 |
| 330 | 613(M)6904 |
TYPE B3 CULVERT END TREATMENT | 4 | EA |
$2,500.00 |
$2,360.00 |
$2,200.00 |
$2,500.00 |
$2,950.00 |
$2,500.00 |
| 340 | 613(M)6924 |
TYPE BB3 CULVERT END TREATMENT | 2 | EA |
$4,000.00 |
$3,500.00 |
$3,200.00 |
$4,000.00 |
$4,750.00 |
$4,500.00 |
| 350 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$90,000.00 |
$85,000.00 |
$35,000.00 |
$25,000.00 |
$87,520.00 |
$42,000.00 |
| 360 | 619(B)6352 |
REMOVAL OF FENCE | 26,120 | LF |
$1.75 |
$1.25 |
$1.50 |
$1.80 |
$1.50 |
$2.25 |
| 370 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 50,376 | SY |
$7.50 |
$3.75 |
$2.00 |
$2.25 |
$5.88 |
$8.50 |
| 380 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 424 | LF |
$7.00 |
$4.30 |
$4.40 |
$12.00 |
$9.00 |
$9.00 |
| 390 | 619(C)6600 |
SAWING PAVEMENT | 1,221 | LF |
$6.00 |
$7.00 |
$3.00 |
$5.00 |
$6.00 |
$10.00 |
| 400 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 75 | LF |
$32.00 |
$30.00 |
$30.80 |
$33.00 |
$33.00 |
$32.00 |
| 410 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 12 | EA |
$4,000.00 |
$3,100.00 |
$3,245.00 |
$3,750.00 |
$3,780.00 |
$4,000.00 |
| 420 | 624(A)3200 |
FENCE-STYLE WWF | 4,886 | LF |
$12.00 |
$8.50 |
$8.25 |
$10.37 |
$8.90 |
$16.00 |
| 430 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 18,253 | LF |
$10.00 |
$7.20 |
$6.60 |
$7.48 |
$7.70 |
$14.00 |
| 440 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,683 | LF |
$12.00 |
$7.40 |
$7.15 |
$9.48 |
$7.20 |
$11.00 |
| 450 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 17 | EA |
$200.00 |
$132.00 |
$137.50 |
$750.00 |
$181.00 |
$375.00 |
| 460 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 5 | EA |
$350.00 |
$200.00 |
$203.50 |
$500.00 |
$271.00 |
$450.00 |
| 470 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 31 | EA |
$75.00 |
$116.00 |
$55.00 |
$25.00 |
$54.00 |
$80.00 |
| 480 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$350.00 |
$200.00 |
$550.00 |
$500.00 |
$542.00 |
$400.00 |
| 490 | 629(E)7600 |
MAILBOX | 31 | EA |
$90.00 |
$55.00 |
$55.00 |
$150.00 |
$107.00 |
$50.00 |
| 500 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$170.00 |
$55.00 |
$55.00 |
$1,500.00 |
$115.00 |
$425.00 |
| 510 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$370.00 |
$55.00 |
$55.00 |
$600.00 |
$575.00 |
$425.00 |
| 520 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 66.26 | SF |
$40.00 |
$16.00 |
$16.50 |
$11.00 |
$12.00 |
$90.00 |
| 530 | 851(C)2415 |
2" SQUARE TUBE POST | 84 | LF |
$11.00 |
$26.50 |
$27.50 |
$22.50 |
$21.90 |
$11.00 |
| 540 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 87,908 | LF |
$0.7500 |
$0.5300 |
$0.5200 |
$0.4900 |
$0.4900 |
$0.5500 |
| 550 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 120 | LF |
$16.00 |
$13.00 |
$13.00 |
$5.55 |
$5.70 |
$21.00 |
| 560 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,400 | SD |
$0.5000 |
$0.5300 |
$0.5500 |
$0.1100 |
$0.1200 |
$0.0500 |
| 570 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 600 | SD |
$1.00 |
$2.20 |
$2.20 |
$4.00 |
$3.77 |
$2.90 |
| 580 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,400 | SD |
$1.25 |
$2.20 |
$2.20 |
$0.1100 |
$0.1100 |
$0.2000 |
| 590 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$1.10 |
$0.6000 |
$0.5500 |
$4.00 |
$3.77 |
$0.9000 |
| 600 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,600 | SD |
$0.7500 |
$0.4000 |
$0.3500 |
$1.10 |
$1.09 |
$0.9500 |
| 610 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$56,000.00 |
$70,000.00 |
$68,000.00 |
$50,000.00 |
$97,000.00 |
$65,000.00 |
| 620 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$15,001.95 |
$3,500.00 |
$15,000.00 |
$4,950.00 |
$3,500.00 |
| 630 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$365,000.00 |
$315,000.00 |
$325,000.00 |
$175,000.00 |
$448,812.00 |
$384,000.00 |