Bid tab 250214

Let Jul 9, 2026 · Division 3 · Mcclain Sign up free

‹ Jul 2026 results

Grade, Drain, Bridge, And Surface

Let date
Thursday, July 9, 2026
Contract
250214 · job page
J/P numbers
35589(04)
District
Division 3
County
Mcclain
Highway
I-35
Limits
I-35: FROM 6.5 MILES SOUTH OF SH-9W, EXTEND NORTH NEAR GOLDSBY.
Classification
Grade, Drain, Bridge, And Surface
Project number
SSP-3500(182)PM
Working days
590

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Haskell Lemon Group, LLC Low bidder $59,131,104
2 SHERWOOD CONSTRUCTION CO., INC. $64,672,761 +9.4%
3 THE CUMMINS CONSTRUCTION CO., INC. $65,992,065 +11.6%
4 OVERLAND CORPORATION $67,418,179 +14.0%
5 Silver Star Construction Company, Inc. $69,498,775 +17.5%
6 ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) $70,744,680 +19.6%

Bid tab: unit prices 163 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Haskell Lemon G…#2 SHERWOOD CONSTR…#3 THE CUMMINS CON…#4 OVERLAND CORPOR…#5 Silver Star Con…#6 ALLEN CONTRACTI…
10201(A)1200 CLEARING AND GRUBBING1LSUM $70,000.00 $764,000.00 $29,128.87 $168,000.00 $256,000.00 $150,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION95,580CY $10.00 $11.80 $18.75 $10.70 $12.00 $15.00 $11.76
30202(D)2500 UNCLASSIFIED BORROW5,000CY $19.00 $15.10 $17.00 $16.80 $18.00 $0.1000 $11.76
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $100,000.00 $530,000.00 $188,151.18 $198,240.00 $127,000.00 $145,000.00 $294,429.93
50221(B)2300 TEMPORARY SILT FENCE18,354LF $4.00 $6.35 $5.31 $3.92 $3.50 $4.00 $3.83
60221(E)2600 TEMPORARY SILT DIKE4,212LF $12.00 $11.60 $17.69 $16.24 $14.50 $17.00 $15.88
70221(F)2710 TEMPORARY ROCK FILTER DAM TYPE 251CY $290.00 $487.00 $222.48 $168.00 $150.00 $300.00 $218.07
80221(H)2900 (PL)TEMPORARY INLET SEDIMENT FILTER71EA $400.00 $33.80 $609.73 $560.00 $500.00 $600.00 $547.49
90230(A)7200 SOLID SLAB SODDING144,621SY $3.50 $5.00 $3.54 $3.30 $2.90 $3.25 $3.18
100233(A)0200 VEGETATIVE MULCHING30AC $1,000.00 $4,752.00 $1,829.20 $1,680.00 $1,500.00 $1,700.00 $1,642.48
110241 3100 MOWING7AC $400.00 $1,056.00 $609.73 $560.00 $500.00 $560.00 $547.49
120242 4101 STABILIZED CONSTRUCTION EXIT4EA $6,000.00 $7,753.00 $3,389.10 $4,480.00 $5,475.12 $6,800.00 $3,707.11
130303(A)1200 AGGREGATE BASE TYPE A45,449CY $80.00 $50.00 $70.89 $65.00 $81.50 $99.00 $82.54
140307(K)4200 STABILIZED SUBGRADE225,310SY $8.00 $7.40 $6.79 $5.00 $7.00 $5.60 $6.88
150326(C)1100 (SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC129,421SY $4.00 $1.00 $4.66 $4.90 $4.25 $4.00 $4.42
160402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E30,997TON $38.00 $40.40 $41.35 $40.00 $50.00 $45.00 $49.25
170407(B)7300 TACK COAT63,685GAL $4.00 $3.00 $5.40 $5.10 $3.50 $4.00 $3.25
180408 8100 PRIME COAT130,061GAL $3.50 $0.0100 $0.6000 $3.85 $5.00 $4.00 $0.1000
190409(A)9200 FABRIC REINFORCEMENT59,005SY $3.25 $4.05 $1.74 $4.30 $3.50 $1.50 $2.49
200411(B)1300 SUPERPAVE, TYPE S3(PG 76-28 OK)35,197TON $115.00 $107.50 $111.60 $114.00 $120.00 $118.00 $119.80
210411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)101,546TON $110.00 $100.00 $90.61 $90.00 $110.00 $85.00 $104.82
220411(C)1400 SUPERPAVE, TYPE S4(PG 76-28 OK)24,262TON $130.00 $120.00 $138.01 $129.25 $120.00 $134.00 $151.75
230411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)14,126TON $125.00 $105.00 $104.41 $110.00 $115.00 $122.00 $111.51
240412 3100 COLD MILLING PAVEMENT193,571SY $3.00 $5.00 $1.92 $2.70 $4.96 $3.50 $3.70
241414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)39,621SY $12.00 $5.65 $16.93 $8.75 $6.27 $25.00 $14.42
242414(G)5800 P.C. CONCRETE FOR PAVEMENT6,604CY $245.00 $145.50 $283.02 $190.40 $201.13 $250.00 $238.05
250501(G)1810 CLSM BACKFILL136CY $295.00 $376.50 $324.42 $369.60 $330.00 $375.00 $258.67
260504(E)5520 42" F-SHAPED PARAPET33,561LF $115.00 $73.50 $82.07 $106.18 $75.00 $90.00 $105.53
270509(A)0200 CLASS AA CONCRETE13,430CY $480.00 $100.00 $406.52 $417.05 $400.00 $470.00 $465.42
280509(B)0310 CLASS A CONCRETE(LONG. BAR. DES. 1-A)118CY $300.00 $710.50 $715.33 $372.95 $400.00 $736.00 $707.16
290509(D)0500 CLASS C CONCRETE1,054CY $440.00 $418.00 $482.20 $464.80 $475.00 $470.00 $434.37
300510(C)1440 SLOPE WALL (5")6,021SY $175.00 $135.50 $156.11 $140.00 $120.00 $141.00 $135.56
310511(A)2200 REINFORCING STEEL3,025,739LB $1.80 $0.8500 $1.33 $1.60 $1.50 $1.50 $1.54
320601(A)1100 TYPE I PLAIN RIPRAP202TON $100.00 $77.50 $88.09 $75.05 $67.00 $76.00 $105.70
330610(C)5410 6" CONCRETE DIVIDING STRIP4,187SY $115.00 $84.10 $97.04 $98.55 $97.50 $100.00 $74.26
340611(A)7210 MANHOLE (4' DIA.)51EA $4,560.00 $5,379.00 $3,634.72 $5,600.00 $5,000.00 $6,700.00 $3,450.42
350611(G)0384 PRECAST INLET (SMD-TYPE 2)2EA $6,500.00 $7,746.00 $3,672.95 $6,160.00 $5,500.00 $7,330.00 $4,578.90
360611(G)7930 INLET GPI TYPE 1 (DES. 1)6EA $5,100.00 $4,304.00 $5,524.24 $5,375.00 $4,800.00 $6,400.00 $4,536.62
370611(G)7958 INLET GPI TYPE 2 (DES. 8)1EA $5,800.00 $6,670.00 $6,959.38 $6,275.00 $5,600.00 $7,500.00 $4,701.75
380611(G)8175 INLET - LONG. BARRIER - TYPE II, DES.251EA $7,000.00 $4,734.00 $8,293.74 $6,610.00 $5,900.00 $7,900.00 $8,151.06
390613(A)5208 18" R.C.PIPE CLASS III9,498LF $85.00 $76.40 $76.31 $92.95 $83.00 $110.00 $83.94
400613(A)5216 24" R.C.PIPE CLASS III5,428LF $130.00 $97.90 $92.41 $112.00 $100.00 $133.00 $110.78
410613(A)5220 30" R.C.PIPE CLASS III2,284LF $145.00 $105.50 $145.52 $145.60 $130.00 $173.00 $144.09
420613(A)5350 22" X 13" R.C.PIPE ARCH CLASS A-III96LF $120.00 $130.00 $112.73 $168.00 $150.00 $200.00 $126.12
430613(J)6400 EDGE DRAIN CONDUIT-PERFORATED52,816LF $12.00 $12.90 $9.28 $11.20 $11.00 $11.00 $14.52
440613(K)6500 EDGE DRAIN OUTLET LATERAL-NONPERFORATED364LF $22.00 $38.50 $27.89 $33.60 $30.00 $36.00 $22.92
450613(L)6708 18" PREFAB. CULVERT END SEC., ROUND3EA $450.00 $941.50 $1,393.73 $672.00 $600.00 $700.00 $1,816.22
460613(M)6960 TYPE A4 CULVERT END TREATMENT1EA $2,400.00 $2,090.00 $2,410.97 $2,464.00 $2,200.00 $2,500.00 $2,168.30
470613(M)6984 TYPE BB4 CULVERT END TREATMENT1EA $3,350.00 $3,135.00 $3,616.45 $3,360.00 $3,000.00 $3,400.00 $3,252.44
480613(M)7004 TYPE A6 CULVERT END TREATMENT1EA $2,900.00 $2,090.00 $2,410.97 $3,360.00 $3,000.00 $3,400.00 $2,168.30
490613(M)7008 TYPE B6 CULVERT END TREATMENT1EA $3,300.00 $3,135.00 $3,616.45 $4,480.00 $4,000.00 $4,500.00 $3,252.44
500613(M)7028 TYPE BB6 CULVERT END TREATMENT1EA $4,500.00 $3,658.00 $4,219.20 $5,380.00 $4,800.00 $5,400.00 $3,794.52
510613(Q)7500 OUTLET LATERAL HEADWALL20EA $810.00 $1,650.00 $1,284.89 $1,232.00 $1,100.00 $600.00 $962.62
520613(W)8115 18" JACKED CONDUIT276LF $1,000.00 $741.50 $858.03 $789.00 $797.81 $830.00 $780.22
530613(W)8120 24" JACKED CONDUIT184LF $1,000.00 $881.00 $1,033.73 $1,028.50 $930.90 $970.00 $943.38
540619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $75,000.00 $350,000.00 $57,670.09 $140,000.00 $300,000.00 $170,000.00 $154,811.16
550619(B)6352 REMOVAL OF FENCE412LF $9.00 $4.30 $2.87 $13.45 $12.00 $6.00 $11.01
551619(B)6360 REMOVAL OF CONCRETE PAVEMENT39,621SY $10.50 $0.0100 $5.23 $3.95 $6.39 $6.00 $8.27
560619(B)6364 REMOVAL OF ASPHALT PAVEMENT85,487SY $6.00 $9.50 $3.66 $6.85 $8.10 $6.00 $4.48
570619(B)6396 REMOVAL OF GUARDRAIL1,913LF $7.25 $5.45 $6.30 $5.90 $5.25 $6.00 $5.85
580619(B)6416 REMOVAL OF CONCRETE MEDIAN BARRIER365LF $25.00 $27.20 $10.80 $33.60 $30.00 $25.00 $21.50
590619(B)6544 CUT & PLUG 4" GAS LINE2EA $6,000.00 $11,830.00 $4,500.27 $6,160.00 $33,377.50 $6,000.00 $15,178.08
600619(C)6600 SAWING PAVEMENT99,405LF $1.75 $20.80 $1.61 $1.15 $1.50 $2.00 $3.82
610623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE380LF $35.00 $28.40 $32.76 $30.60 $27.30 $31.00 $30.41
620623(G)1820 GUARDRAIL END TREATMENT (31")2EA $4,200.00 $3,641.00 $4,200.26 $3,920.00 $3,500.00 $3,900.00 $3,898.54
630623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")2EA $3,600.00 $3,537.00 $4,080.25 $3,808.00 $3,400.00 $3,800.00 $3,787.15
640624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)770LF $13.00 $10.30 $21.50 $18.35 $9.86 $12.00 $10.69
650627(A)6200 CONCRETE LONGITUDINAL BARRIER, DESIGN 123,481LF $70.00 $90.40 $74.98 $93.00 $124.99 $115.00 $98.31
660627(B)6300 CONCRETE LONGITUDINAL BARRIER END SEC.1EA $2,000.00 $7,892.00 $5,283.93 $8,120.00 $3,500.00 $10,000.00 $2,187.99
670202(A)2210 UNCLASSIFIED EXCAVATION828CY $15.00 $12.50 $17.49 $16.80 $15.00 $17.00 $13.01
680501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED135CY $45.00 $52.00 $24.00 $54.40 $45.00 $51.00 $54.21
690509(A)0210 CLASS AA CONCRETE409CY $800.00 $647.00 $897.65 $644.00 $600.00 $800.00 $674.34
700511(B)2310 EPOXY COATED REINFORCING STEEL62,384LB $1.80 $1.85 $1.80 $1.60 $1.40 $1.60 $1.95
710619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $65,000.00 $85,000.00 $20,704.85 $56,000.00 $75,000.00 $17,000.00 $70,469.63
720202(A)2210 UNCLASSIFIED EXCAVATION1,392CY $15.00 $10.40 $16.67 $16.80 $15.00 $17.00 $10.84
730501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED756CY $45.00 $52.00 $24.00 $50.40 $45.00 $51.00 $54.21
740509(A)0210 CLASS AA CONCRETE1,004CY $800.00 $514.00 $704.45 $644.00 $600.00 $800.00 $555.57
750511(B)2310 EPOXY COATED REINFORCING STEEL99,188LB $1.80 $1.85 $1.80 $1.60 $1.40 $1.60 $1.95
760619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $65,000.00 $75,000.00 $20,704.85 $56,000.00 $100,000.00 $17,000.00 $32,524.44
770202(A)2210 UNCLASSIFIED EXCAVATION1,059CY $15.00 $12.50 $20.51 $16.80 $15.00 $17.00 $13.01
780501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED255CY $45.00 $52.00 $24.00 $50.40 $45.00 $51.00 $54.21
790502 3101 TEMPORARY EARTH RETAINAGE240LF $625.00 $504.50 $349.40 $616.00 $650.00 $625.00 $525.81
800509(A)0210 CLASS AA CONCRETE492CY $800.00 $650.00 $962.46 $644.00 $600.00 $800.00 $677.59
810511(B)2310 EPOXY COATED REINFORCING STEEL72,530LB $1.80 $1.85 $1.80 $1.60 $1.40 $1.60 $1.95
820619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $65,000.00 $75,000.00 $20,704.85 $72,800.00 $100,000.00 $17,000.00 $35,524.44
830413(A)4200 RUMBLE STRIP-METHOD HMA-CON46,303LF $0.5000 $0.2000 $0.2300 $0.2500 $0.3500 $0.2200 $0.2100
840516(A)8240 DRILLED SHAFTS 60" DIAMETER432LF $1,500.00 $1,209.00 $1,394.63 $1,301.60 $1,162.12 $1,300.00 $1,314.45
850619(B)6432 REMOVAL OF CABLE BARRIER24,763LF $10.00 $3.65 $7.13 $3.90 $3.50 $5.00 $3.90
860628(B)7300 HIGH-TENSION CABLE BARRIER(TL-4)600LF $40.00 $71.80 $82.80 $77.30 $69.00 $77.00 $76.86
870628(C)7400 END ANCHORS2EA $12,000.00 $8,635.00 $9,960.61 $9,296.00 $8,300.00 $10,000.00 $9,245.10
880804(A)2200 STRUCTURAL CONCRETE19.66CY $1,200.00 $520.00 $600.04 $560.00 $500.00 $600.00 $556.93
890804(B)2300 REINFORCING STEEL3,546LB $4.00 $2.35 $2.70 $2.55 $2.25 $3.00 $2.51
900805(A)3252 (PL)REMOVAL OF EXISTING SIGNS91EA $115.00 $130.00 $150.01 $140.00 $125.00 $140.00 $139.23
910805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS9EA $615.00 $260.00 $300.02 $280.00 $250.00 $280.00 $278.47
920850(A)1200 SHEET ALUMINUM SIGNS1,081.42SF $40.00 $29.10 $33.60 $31.35 $28.00 $32.00 $31.19
930850(B)1310 EXTRUDED ALUMINUM PANEL SIGNS820SF $45.00 $31.20 $36.00 $33.60 $30.00 $34.00 $33.42
940850(B)1320 EXTR.ALUM.PAN.SGN.(OVRHD SIGNS)2,928SF $50.00 $35.40 $40.80 $38.10 $34.00 $38.00 $37.87
950851(A)2210 6"@20 GALV.STL.WD.FLANGE BM.POST259.5LF $75.00 $56.20 $64.81 $60.50 $54.00 $61.00 $60.15
960851(A)2240 10"@49 GALV.STL.WD.FLANGE BM.POST55LF $120.00 $58.30 $67.20 $62.75 $56.00 $63.00 $62.38
970851(B)2320 3 1/2"@9.11 GALV.STL.PIPE POST337LF $26.50 $27.10 $31.20 $29.15 $26.00 $30.00 $28.96
980851(B)2325 4"@10.79 GALV.STL.PIPE POST18LF $50.00 $31.20 $36.00 $33.60 $30.00 $34.00 $33.42
990851(C)2420 2 1/4" SQUARE TUBE POST883LF $14.00 $7.30 $8.40 $7.85 $7.00 $8.00 $7.80
1,000851(C)2430 2 1/2" SQUARE TUBE POST524.5LF $16.00 $8.30 $9.60 $9.00 $8.00 $8.00 $8.91
1,010852(E)3600 OVHD.SN.STR., MONOTUBE TYPE C12EA $100,000.00 $81,560.00 $94,085.69 $87,808.00 $78,400.00 $88,000.00 $87,327.19
1,020853 5130 DELINEATORS(TYPE 1, CODE 1, FLEXIBLE)35EA $75.00 $77.00 $88.81 $82.90 $74.00 $83.00 $82.43
1,030853 5135 DELINEATORS(TYPE 1, CODE 2, FLEXIBLE)66EA $90.00 $77.00 $88.81 $82.90 $74.00 $83.00 $82.43
1,040853 5155 DELINEATORS(TYPE 2, CODE 3, FLEXIBLE)55EA $125.00 $77.00 $88.81 $82.90 $74.00 $83.00 $82.43
1,050853 5160 BARRIER DELINEATORS(TYPE 1, CODE 1)698EA $50.00 $26.00 $30.00 $28.00 $25.00 $28.00 $27.85
1,060853 5165 BARRIER DELINEATORS(TYPE 2, CODE 1)496EA $25.00 $26.00 $30.00 $28.00 $25.00 $28.00 $27.85
1,070853 5170 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)15EA $25.00 $18.70 $21.60 $20.15 $18.00 $21.00 $20.05
1,080856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE)137,679LF $1.50 $0.7800 $0.9000 $1.70 $0.7500 $0.8500 $0.8400
1,090856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)5,962LF $2.25 $2.85 $3.30 $3.10 $2.75 $3.10 $3.06
1,100856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)23LF $4.00 $12.50 $14.40 $13.45 $12.00 $4.00 $13.37
1,110856(B)8307 (SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS)4EA $800.00 $520.00 $600.04 $560.00 $500.00 $600.00 $556.93
1,120857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)123,911LF $0.3000 $0.2800 $0.3200 $0.3000 $0.2700 $0.3500 $0.3000
1,130857(F)9710 PAVEMENT MARKING REMOVAL(ARROWS)6EA $200.00 $52.00 $60.01 $56.00 $50.00 $56.00 $55.69
1,140858(A)0224 PAVE.MARKERS CLASS A TYPE 2-C194EA $8.60 $20.00 $23.10 $21.55 $19.25 $22.00 $21.44
1,150858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D28EA $9.25 $20.00 $23.10 $21.55 $19.25 $22.00 $21.44
1,160870(A)1100 SAND FILLED IMPACT ATTEN.MODULE76EA $500.00 $517.50 $597.21 $557.40 $497.65 $560.00 $554.32
1,170870(C)1300 SAND FILLED IMPACT ATTEN.MODULE REMOVAL1LSUM $12,000.00 $8,843.00 $10,200.62 $9,520.00 $8,500.00 $9,500.00 $9,467.87
1,180871(A)2210 (PL) IMPACT ATTENUATOR10EA $35,000.00 $30,065.00 $34,682.10 $32,370.00 $28,900.00 $32,300.00 $32,190.76
1,190871(C)2410 RELOCATION OF IMPACT ATTENUATOR1EA $2,000.00 $1,040.00 $1,200.07 $1,120.00 $1,000.00 $1,200.00 $1,113.86
1,200802(B)0320 2" PVC SCH.40 PLASTIC CONDUIT BORED435LF $50.00 $31.20 $36.00 $33.60 $30.00 $34.00 $32.85
1,210802(B)0324 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED25,300LF $20.00 $10.40 $7.20 $11.20 $6.00 $12.00 $6.57
1,220803(A)1200 PULL BOX5EA $3,000.00 $2,601.00 $2,280.14 $2,800.00 $1,900.00 $2,800.00 $2,080.48
1,230803(A)1210 PULL BOX(SIZE I)5EA $1,900.00 $2,081.00 $1,650.10 $2,240.00 $1,375.00 $2,300.00 $1,505.61
1,240804(A)2200 STRUCTURAL CONCRETE361CY $1,200.00 $1,248.00 $577.42 $1,344.00 $195.91 $610.00 $510.07
1,250804(B)2300 REINFORCING STEEL60,445LB $4.00 $3.10 $1.31 $3.40 $0.6900 $2.10 $2.12
1,260806(D)4616 40' MTG.HT.HL.PTP.(G.STL.)130EA $7,025.00 $4,265.00 $8,520.52 $4,592.00 $7,100.00 $4,700.00 $7,774.43
1,270807 5120 BREAKAWAY BASE (DES. B)3EA $1,300.00 $920.50 $1,320.08 $991.20 $1,100.00 $1,000.00 $1,204.49
1,280809(A)7200 ROADWAY LUMINAIRE260EA $2,050.00 $1,462.00 $2,184.13 $1,573.60 $1,820.00 $1,600.00 $1,992.88
1,290810(A)8200 SERVICE POLE4EA $6,500.00 $6,762.00 $9,180.56 $7,280.00 $7,650.00 $8,000.00 $8,376.67
1,300811 9110 1/C NO.2 ELECT.COND.115,100LF $1.90 $3.65 $1.98 $3.95 $1.65 $4.00 $1.81
1,310811 9160 2/C NO.12 ELECT.COND.14,300LF $2.50 $3.10 $2.40 $3.35 $2.00 $3.50 $2.19
1,320857(A)9205 CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE)414,400LF $0.3000 $0.2100 $0.2400 $0.2500 $0.2000 $0.2500 $0.2200
1,330857(E)9620 (PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-123,030EA $0.8000 $0.6800 $0.8600 $0.8500 $1.00 $0.7500 $0.7200
1,340857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)200,000LF $0.3500 $0.3400 $0.4000 $0.4000 $0.3300 $0.4000 $0.3700
1,350871(B)2300 CONST.ZONE IMPACT ATTEN.1,230SD $15.00 $15.60 $18.01 $16.80 $15.00 $17.00 $16.71
1,360876(A)3210 (PL)TRUCK MOUNTED ATTENUATOR440SD $33.00 $8.30 $9.60 $8.95 $8.00 $10.00 $8.91
1,370877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER50,300LF $23.00 $28.20 $32.68 $31.55 $26.10 $35.00 $29.07
1,380877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER3,000LF $4.60 $8.65 $10.02 $9.00 $8.00 $9.00 $8.91
1,390880(A)6220 ARROW DISPLAY(TYPE C)280SD $12.00 $15.60 $18.01 $16.80 $15.00 $17.00 $16.71
1,400880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF10,380SD $0.5000 $0.0300 $0.0200 $0.0500 $0.0200 $0.0500 $0.0200
1,410880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF6,300SD $1.10 $1.30 $1.50 $1.40 $1.25 $2.00 $1.39
1,420880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF25,080SD $1.80 $0.0300 $0.0200 $0.0500 $0.0200 $0.0500 $0.0200
1,430880(B)6340 VARIABLE SPEED LIMIT SIGN23,100SD $30.00 $3.10 $3.60 $3.40 $3.00 $4.00 $3.34
1,440880(C)6410 CONSTRUCTION BARRICADES(TYPE III)2,480SD $1.95 $5.20 $6.00 $5.60 $5.00 $6.00 $5.57
1,450880(D)6500 VERTICAL PANELS43,200SD $0.5000 $0.1000 $0.1100 $0.1000 $0.0900 $0.1500 $0.1000
1,460880(E)6607 WARNING LIGHTS(TYPE B)25,200SD $1.25 $3.10 $3.60 $3.40 $3.00 $4.00 $3.34
1,470880(F)6700 DRUMS26,190SD $0.4500 $0.1600 $0.1800 $0.2000 $0.1500 $0.2000 $0.1700
1,480880(G)6805 CHANNELIZER CONES59,400SD $0.6000 $0.0300 $0.0200 $0.0600 $0.0200 $0.0500 $0.0200
1,490880(K)7200 SURVEILLANCE TRAFFIC CONTROL525SD $575.00 $1,100.00 $1,200.07 $1,120.00 $1,000.00 $1,120.00 $1,113.87
1,500880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)2,100HOUR $77.00 $77.00 $77.00 $77.00 $77.00 $77.00 $77.00
1,510880(M)7400 (PL)SPEED MONITORING DEVICE2,100SD $21.50 $9.35 $10.80 $10.10 $9.00 $11.00 $10.02
1,520882 8100 (SP)SMART WORK ZONE SYSTEM525SD $85.00 $41.60 $48.00 $44.80 $40.00 $45.00 $44.55
1,530882 8105 (SP)SMART WK. ZONE SYS.-PORT.CHNG.MSG.SN12,600SD $23.00 $14.60 $16.80 $15.70 $14.00 $16.00 $15.59
1,540882 8110 (SP)SMART WK. ZONE SYS.-PORT.TRAF.SENSOR10,500SD $15.00 $10.40 $12.00 $11.20 $10.00 $12.00 $11.14
1,550882 8115 (SP)SMART WK ZONE SYS-PAN-TILT-ZOOM CMRA2,100SD $37.75 $18.70 $21.60 $20.15 $18.00 $21.00 $20.05
1,560882 8120 (SP)SMART WK. ZONE SYS.-WEBSITE SYSTEM525SD $74.00 $26.00 $30.00 $28.00 $25.00 $28.00 $27.85
1,570882(A)8210 PORT.CHANGEABLE MESSAGE SIGN3,234SD $16.25 $9.35 $10.80 $10.10 $9.00 $11.00 $10.02
1,580642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $125,000.00 $233,900.00 $156,055.60 $265,800.00 $300,000.00 $225,000.00 $243,754.45
1,590220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $10,405.00 $6,000.36 $15,900.00 $250,000.00 $59,000.00 $36,431.20
1,600641 2110 MOBILIZATION1LSUM $2,900,000.00