| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$50,000.00 |
$35,700.00 |
$36,050.00 |
$38,150.00 |
$200,000.00 |
$150,000.00 |
$20,000.00 |
$82,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,768 | CY |
$10.00 |
$7.00 |
$5.10 |
$5.15 |
$5.45 |
$9.00 |
$10.00 |
$7.72 |
$21.25 |
| 30 | 202(B)2300 |
MUCK EXCAVATION | 1,000 | CY |
$15.00 |
$8.00 |
$10.20 |
$15.45 |
$10.90 |
$9.00 |
$12.00 |
$16.29 |
$38.67 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 39,796 | CY |
$12.00 |
$9.00 |
$8.67 |
$8.76 |
$9.25 |
$9.00 |
$9.00 |
$11.00 |
$29.12 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$7,500.00 |
$10,200.00 |
$10,300.00 |
$10,900.00 |
$38,635.31 |
$27,000.00 |
$38,000.00 |
$75,000.00 |
| 60 | 210 0100 |
OBLITERATING ABANDONED ROAD | 1,162 | LF |
$8.00 |
$5.00 |
$10.20 |
$10.30 |
$10.90 |
$10.71 |
$16.00 |
$25.00 |
$68.00 |
| 70 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,950 | LF |
$2.00 |
$2.99 |
$3.05 |
$3.08 |
$3.25 |
$5.56 |
$3.15 |
$3.18 |
$3.42 |
| 80 | 221(E)2600 |
TEMPORARY SILT DIKE | 189 | LF |
$8.00 |
$9.50 |
$9.69 |
$9.79 |
$10.40 |
$8.50 |
$10.00 |
$10.12 |
$10.86 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 38,192 | SY |
$3.00 |
$2.49 |
$2.54 |
$2.57 |
$2.70 |
$2.84 |
$3.00 |
$2.65 |
$2.85 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 9.82 | AC |
$1,200.00 |
$100.00 |
$814.98 |
$822.97 |
$871.00 |
$912.68 |
$850.00 |
$850.94 |
$913.06 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,340 | CY |
$70.00 |
$60.00 |
$66.16 |
$66.95 |
$93.70 |
$59.63 |
$72.00 |
$70.29 |
$82.09 |
| 120 | 310(B)5300 |
SUBGRADE, METHOD B | 1,120 | SY |
$3.00 |
$4.00 |
$10.20 |
$10.30 |
$10.90 |
$1.41 |
$7.00 |
$4.58 |
$3.66 |
| 130 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 8,353 | SY |
$4.00 |
$4.00 |
$4.37 |
$7.73 |
$8.20 |
$6.28 |
$7.60 |
$5.80 |
$7.89 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 318 | TON |
$40.00 |
$31.00 |
$33.58 |
$38.08 |
$37.00 |
$37.79 |
$41.00 |
$35.15 |
$44.17 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,755 | TON |
$85.00 |
$105.00 |
$107.10 |
$108.15 |
$99.80 |
$82.83 |
$110.00 |
$111.83 |
$155.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 865 | TON |
$100.00 |
$116.00 |
$118.32 |
$119.48 |
$116.50 |
$117.24 |
$122.00 |
$123.54 |
$180.00 |
| 170 | 509(D)0500 |
CLASS C CONCRETE | 20 | CY |
$400.00 |
$225.00 |
$432.12 |
$561.35 |
$667.00 |
$503.20 |
$650.00 |
$426.00 |
$525.00 |
| 180 | 613(A)5216 |
24" R.C.PIPE CLASS III | 347 | LF |
$85.00 |
$100.00 |
$60.82 |
$62.51 |
$59.40 |
$79.11 |
$85.00 |
$97.98 |
$76.05 |
| 190 | 613(EE)5968 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 125 | LF |
$39.00 |
$35.00 |
$88.56 |
$53.68 |
$53.60 |
$58.13 |
$75.00 |
$97.98 |
$49.50 |
| 200 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,500.00 |
$1,800.00 |
$1,574.92 |
$1,345.18 |
$1,376.00 |
$1,276.29 |
$2,000.00 |
$1,597.50 |
$1,777.07 |
| 210 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$2,200.00 |
$2,000.00 |
$2,418.53 |
$1,555.30 |
$1,524.00 |
$1,405.85 |
$2,300.00 |
$2,343.00 |
$2,260.19 |
| 220 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 115 | CY |
$60.00 |
$60.00 |
$45.90 |
$51.14 |
$76.80 |
$0.0100 |
$105.00 |
$41.54 |
$55.11 |
| 230 | 613(V)8000 |
TRENCH EXCAVATION | 169 | CY |
$15.00 |
$15.00 |
$10.20 |
$25.24 |
$10.90 |
$0.0100 |
$30.00 |
$19.17 |
$7.82 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$15,000.00 |
$3,570.00 |
$3,605.00 |
$3,815.00 |
$5,379.64 |
$20,000.00 |
$20,000.00 |
$28,500.00 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 750 | SY |
$4.00 |
$2.00 |
$7.40 |
$5.15 |
$5.45 |
$3.11 |
$6.50 |
$5.00 |
$18.17 |
| 260 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 450 | LF |
$22.00 |
$46.00 |
$46.92 |
$28.84 |
$33.80 |
$52.54 |
$48.25 |
$48.99 |
$52.57 |
| 270 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,400.00 |
$2,550.00 |
$2,601.00 |
$1,802.50 |
$3,488.00 |
$2,912.82 |
$2,700.00 |
$2,715.75 |
$2,914.02 |
| 280 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,800.00 |
$4,500.00 |
$4,590.00 |
$3,038.50 |
$3,651.00 |
$5,140.27 |
$4,725.00 |
$4,792.50 |
$5,142.39 |
| 290 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,510 | LF |
$24.00 |
$6.60 |
$8.67 |
$26.45 |
$10.50 |
$9.71 |
$10.00 |
$7.03 |
$10.97 |
| 300 | 624(D)3500 |
GATE, GALVANIZED STEEL | 2 | EA |
$1,000.00 |
$1,000.00 |
$1,275.00 |
$1,648.00 |
$1,253.00 |
$1,427.85 |
$1,200.00 |
$1,065.00 |
$1,314.17 |
| 310 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 34 | EA |
$12.00 |
$15.00 |
$15.30 |
$20.60 |
$27.30 |
$17.13 |
$16.00 |
$15.98 |
$17.14 |
| 320 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$20.00 |
$100.00 |
$39.42 |
$30.90 |
$26.20 |
$10.91 |
$50.00 |
$37.81 |
$29.37 |
| 330 | 501(G)1800 |
CLSM BACKFILL | 126 | CY |
$175.00 |
$300.00 |
$298.69 |
$379.58 |
$309.50 |
$267.42 |
$360.00 |
$236.56 |
$360.88 |
| 340 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,512 | LF |
$250.00 |
$249.00 |
$276.59 |
$278.21 |
$266.00 |
$260.33 |
$300.00 |
$268.00 |
$335.84 |
| 350 | 504(B)5300 |
SAW-CUT GROOVING | 1,955.1 | SY |
$10.00 |
$6.00 |
$3.88 |
$4.94 |
$4.15 |
$4.34 |
$4.00 |
$4.05 |
$4.34 |
| 360 | 504(D)5410 |
CONCRETE RAIL (TR3) | 1,341.4 | LF |
$85.00 |
$50.00 |
$75.38 |
$90.96 |
$101.50 |
$112.87 |
$67.00 |
$125.28 |
$118.27 |
| 370 | 506(A)7200 |
STRUCTURAL STEEL | 3,160 | LB |
$3.00 |
$5.00 |
$8.98 |
$3.88 |
$6.35 |
$3.51 |
$4.50 |
$3.84 |
$8.07 |
| 380 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$1,500.00 |
$1,500.00 |
$1,135.57 |
$1,436.98 |
$1,899.00 |
$1,614.20 |
$1,325.00 |
$1,800.00 |
$1,463.20 |
| 390 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 32 | EA |
$1,600.00 |
$1,500.00 |
$1,135.57 |
$1,436.98 |
$1,899.00 |
$1,614.20 |
$1,325.00 |
$1,800.00 |
$1,463.23 |
| 400 | 509 0120 |
ELASTOMERIC COATING | 1,730 | SF |
$15.00 |
$18.00 |
$11.80 |
$18.03 |
$20.80 |
$19.99 |
$18.00 |
$18.64 |
$20.00 |
| 410 | 509(A)0210 |
CLASS AA CONCRETE | 602.7 | CY |
$800.00 |
$650.00 |
$1,000.60 |
$845.89 |
$689.00 |
$874.27 |
$850.00 |
$920.00 |
$1,200.00 |
| 420 | 509(B)0320 |
CLASS A CONCRETE | 287 | CY |
$900.00 |
$650.00 |
$753.28 |
$845.89 |
$788.50 |
$902.30 |
$800.00 |
$1,040.00 |
$1,100.00 |
| 430 | 511(A)2210 |
REINFORCING STEEL | 189,370 | LB |
$1.20 |
$1.69 |
$1.33 |
$1.35 |
$1.25 |
$1.38 |
$1.70 |
$1.35 |
$1.77 |
| 440 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 188 | LF |
$40.00 |
$55.00 |
$49.73 |
$44.58 |
$63.30 |
$50.33 |
$65.00 |
$50.00 |
$63.12 |
| 450 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 729 | LF |
$50.00 |
$55.00 |
$60.40 |
$62.39 |
$69.50 |
$64.39 |
$82.00 |
$65.00 |
$82.17 |
| 460 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 188 | LF |
$20.00 |
$5.00 |
$20.97 |
$15.45 |
$23.60 |
$38.99 |
$23.00 |
$32.00 |
$34.46 |
| 470 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 729 | LF |
$25.00 |
$5.00 |
$21.63 |
$15.45 |
$23.00 |
$38.36 |
$12.00 |
$32.00 |
$28.36 |
| 480 | 514(K)6200 |
(PL)PILOT HOLES | 119 | LF |
$150.00 |
$500.00 |
$294.64 |
$142.09 |
$222.50 |
$600.00 |
$220.00 |
$250.00 |
$541.51 |
| 490 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 500 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 506 | LF |
$1,000.00 |
$900.00 |
$958.54 |
$1,120.04 |
$1,255.00 |
$1,019.62 |
$1,000.00 |
$918.37 |
$1,700.00 |
| 510 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$4,000.00 |
$10,000.00 |
$1,924.16 |
$2,678.00 |
$12,365.00 |
$1,827.65 |
$1,520.00 |
$1,597.50 |
$5,100.00 |
| 520 | 518(B)0300 |
SEALED EXPANSION JOINTS | 79.98 | LF |
$305.00 |
$150.00 |
$273.93 |
$376.80 |
$409.00 |
$324.19 |
$350.00 |
$276.22 |
$491.62 |
| 530 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,847 | TON |
$50.00 |
$47.00 |
$49.49 |
$58.78 |
$56.70 |
$47.49 |
$55.00 |
$56.50 |
$66.24 |
| 540 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 376 | TON |
$45.00 |
$35.00 |
$92.08 |
$42.53 |
$47.50 |
$32.23 |
$45.00 |
$47.27 |
$43.71 |
| 550 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$40.00 |
$75.00 |
$38.95 |
$20.60 |
$85.70 |
$23.43 |
$20.00 |
$30.00 |
$31.72 |
| 560 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$30.00 |
$75.00 |
$42.21 |
$36.05 |
$35.90 |
$24.95 |
$31.00 |
$37.00 |
$37.75 |
| 570 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$300,000.00 |
$20,000.00 |
$12,883.20 |
$39,114.25 |
$69,710.00 |
$84,283.35 |
$48,716.00 |
$240,000.00 |
$265,500.00 |
| 580 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 12,000 | LF |
$6.00 |
$0.6200 |
$0.6300 |
$0.6700 |
$0.7100 |
$0.7100 |
$0.6500 |
$0.6600 |
$0.7200 |
| 590 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 21,600 | SD |
$1.00 |
$0.2000 |
$0.2000 |
$0.5200 |
$0.5400 |
$0.2300 |
$0.2100 |
$0.2100 |
$0.2300 |
| 600 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,600 | SD |
$1.50 |
$1.00 |
$1.02 |
$1.03 |
$1.10 |
$1.14 |
$1.05 |
$1.07 |
$1.17 |
| 610 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 400 | SD |
$2.00 |
$2.00 |
$2.04 |
$2.58 |
$2.70 |
$2.28 |
$2.10 |
$2.13 |
$2.33 |
| 620 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,600 | SD |
$0.6000 |
$1.00 |
$1.02 |
$2.06 |
$2.20 |
$1.14 |
$1.05 |
$1.07 |
$1.17 |
| 630 | 880(C)6420 |
WING BARRICADES | 800 | SD |
$0.6000 |
$0.2500 |
$0.2600 |
$3.09 |
$3.25 |
$0.2900 |
$0.2600 |
$0.2700 |
$0.2900 |
| 640 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,200 | SD |
$1.00 |
$0.1000 |
$0.1000 |
$0.4600 |
$0.4900 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1200 |
| 650 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$11,000.00 |
$11,730.00 |
$10,300.00 |
$24,000.00 |
$23,422.50 |
$40,000.00 |
$15,000.00 |
$45,000.00 |
| 660 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$2,600.00 |
$2,678.00 |
$7,500.00 |
$2,855.71 |
$1,900.00 |
$5,000.00 |
$8,000.00 |
| 670 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$174,000.00 |
$225,000.00 |
$234,571.59 |
$178,199.92 |
$238,769.53 |
$204,511.55 |
$240,000.00 |
$240,810.00 |
$340,000.00 |