| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$20,000.00 |
$15,000.00 |
$9,000.00 |
$60,300.00 |
$25,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$50,000.00 |
$37,250.00 |
$43,180.00 |
$44,860.00 |
$50,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 700 | LF |
$2.00 |
$2.75 |
$4.35 |
$2.40 |
$5.55 |
$4.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.50 |
$13.20 |
$13.60 |
$4.10 |
$12.00 |
$13.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 7,600 | SY |
$1.75 |
$2.75 |
$3.23 |
$2.86 |
$5.55 |
$3.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.58 | AC |
$421.48 |
$1,740.00 |
$1,800.00 |
$1,200.00 |
$2,666.00 |
$1,700.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 472 | CY |
$60.00 |
$75.00 |
$74.75 |
$76.50 |
$94.80 |
$100.00 |
| 8 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 746.83 | LF |
$5.50 |
$7.00 |
$18.97 |
$19.00 |
$16.40 |
$35.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
$425.00 |
$400.00 |
$877.50 |
$600.00 |
| 10 | 611(G) 5329 |
INLET GPI TYPE 1 (DES. 3) | 1 | EA |
$3,500.00 |
$4,500.00 |
$5,950.00 |
$3,750.00 |
$4,952.00 |
$4,500.00 |
| 11 | 611(G) 5330 |
INLET GPI TYPE 1 (DES. 4) | 1 | EA |
$3,750.00 |
$5,000.00 |
$6,700.00 |
$3,750.00 |
$5,303.00 |
$4,500.00 |
| 12 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 240 | LF |
$50.00 |
$55.00 |
$39.96 |
$46.00 |
$43.80 |
$150.00 |
| 13 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 50 | LF |
$60.00 |
$75.00 |
$43.98 |
$61.00 |
$58.10 |
$160.00 |
| 14 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 65 | LF |
$65.00 |
$95.00 |
$52.46 |
$75.00 |
$61.20 |
$180.00 |
| 15 | 613(M) 7152 |
TYPE C3 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$1,400.00 |
$3,850.00 |
$2,000.00 |
$2,402.00 |
$5,000.00 |
| 16 | 613(M) 7153 |
TYPE D3 CULVERT END TREATMENT | 4 | EA |
$1,250.00 |
$1,400.00 |
$3,200.00 |
$2,300.00 |
$2,402.00 |
$6,500.00 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 320 | CY |
$17.00 |
$15.00 |
$14.00 |
$15.00 |
$20.00 |
$25.00 |
| 18 | 501(F) 6352 |
GRANULAR BACKFILL | 410 | CY |
$58.00 |
$75.00 |
$82.35 |
$86.00 |
$85.90 |
$75.00 |
| 19 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 399 | LF |
$245.00 |
$235.00 |
$232.67 |
$242.50 |
$245.00 |
$230.00 |
| 20 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 206.4 | LF |
$82.00 |
$85.00 |
$84.00 |
$95.00 |
$142.00 |
$120.00 |
| 21 | 506(A) 1322 |
STRUCTURAL STEEL | 590 | LB |
$2.80 |
$4.00 |
$3.70 |
$4.00 |
$4.85 |
$5.00 |
| 22 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$800.00 |
$850.00 |
$987.00 |
$1,200.00 |
$1,499.00 |
$1,200.00 |
| 23 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$800.00 |
$850.00 |
$987.00 |
$1,200.00 |
$1,499.00 |
$1,200.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 87.7 | CY |
$675.00 |
$700.00 |
$725.00 |
$767.50 |
$764.50 |
$750.00 |
| 25 | 509(B) 1328 |
CLASS A CONCRETE | 169 | CY |
$670.00 |
$650.00 |
$750.00 |
$762.50 |
$607.50 |
$750.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 39,010 | LB |
$1.05 |
$1.00 |
$1.10 |
$1.10 |
$1.60 |
$1.80 |
| 27 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 364 | LF |
$30.00 |
$35.00 |
$32.01 |
$33.60 |
$36.00 |
$30.00 |
| 28 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,323 | LF |
$36.00 |
$35.00 |
$31.08 |
$36.40 |
$40.80 |
$40.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 364 | LF |
$18.00 |
$15.00 |
$14.00 |
$14.60 |
$26.70 |
$30.00 |
| 30 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,323 | LF |
$18.00 |
$15.00 |
$14.00 |
$15.60 |
$19.00 |
$30.00 |
| 31 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 32 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,317 | TON |
$45.00 |
$50.00 |
$53.62 |
$51.50 |
$51.10 |
$85.00 |
| 33 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 372 | TON |
$40.00 |
$40.00 |
$43.60 |
$41.00 |
$35.10 |
$50.00 |
| 34 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$26.00 |
$35.00 |
$30.00 |
$37.00 |
$70.90 |
$25.00 |
| 35 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$35.00 |
$30.00 |
$45.00 |
$50.30 |
$25.00 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$22,000.00 |
$21,000.00 |
$39,885.00 |
$35,000.00 |
| 37 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 87.5 | LF |
$26.00 |
$27.50 |
$28.75 |
$28.00 |
$27.50 |
$28.00 |
| 38 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$2,000.00 |
$2,550.00 |
$2,850.00 |
$2,565.00 |
$2,545.00 |
$2,800.00 |
| 39 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$3,000.00 |
$2,300.00 |
$2,500.00 |
$2,325.00 |
$2,281.00 |
$2,500.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,330.00 |
$4,500.00 |
$6,000.00 |
$2,584.00 |
$4,000.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$6,500.00 |
$9,650.00 |
$6,707.00 |
$7,000.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$3,500.00 |
$3,500.00 |
$3,711.00 |
$3,000.00 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$64,000.00 |
$60,000.00 |
$52,000.00 |
$57,000.00 |
$57,742.07 |
$70,000.00 |