| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$10,000.00 |
$12,000.00 |
$11,640.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 38 | CY |
$15.00 |
$26.33 |
$68.50 |
$16.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 50 | CY |
$20.00 |
$17.99 |
$94.00 |
$22.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,500.00 |
$8,000.00 |
$11,000.00 |
$2,752.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,044 | LF |
$2.00 |
$2.15 |
$2.25 |
$1.95 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 30 | LF |
$10.00 |
$35.00 |
$40.00 |
$36.20 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 500 | SY |
$2.00 |
$8.39 |
$12.00 |
$8.65 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.5 | AC |
$300.00 |
$3,100.00 |
$3,000.00 |
$3,192.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 2,369 | SY |
$2.75 |
$9.25 |
$7.20 |
$16.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 765 | SY |
$2.50 |
$1.50 |
$5.25 |
$5.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 341 | TON |
$35.00 |
$36.62 |
$53.60 |
$46.90 |
| 12 | 407(B) 0250 |
TACK COAT | 1,210 | GAL |
$3.50 |
$3.99 |
$4.40 |
$3.85 |
| 13 | 408 5774 |
PRIME COAT | 827 | GAL |
$4.75 |
$6.34 |
$6.70 |
$7.65 |
| 14 | 409(A) 4242 |
FABRIC REINFORCEMENT | 739 | SY |
$3.00 |
$3.45 |
$4.10 |
$9.05 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 456 | TON |
$75.00 |
$92.23 |
$108.00 |
$96.50 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,313 | TON |
$80.00 |
$88.02 |
$108.00 |
$90.30 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 888 | SY |
$3.50 |
$9.59 |
$16.00 |
$11.70 |
| 18 | 501(G) 6315 |
CLSM BACKFILL | 68 | CY |
$200.00 |
$201.65 |
$420.00 |
$392.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$240.29 |
$415.00 |
$400.00 |
| 20 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 2,477 | TON |
$40.00 |
$43.02 |
$51.90 |
$30.80 |
| 21 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 100 | LF |
$50.00 |
$37.35 |
$38.00 |
$34.40 |
| 22 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$800.00 |
$494.80 |
$314.00 |
$1,055.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,500.00 |
$1,500.00 |
$7,250.00 |
$9,640.00 |
| 24 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 366 | SY |
$5.00 |
$8.11 |
$20.00 |
$33.20 |
| 25 | 619(C) 0924 |
SAWING PAVEMENT | 1,710 | LF |
$5.00 |
$4.25 |
$6.00 |
$4.15 |
| 26 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$25.00 |
$27.28 |
$31.00 |
$26.60 |
| 27 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 30 | CY |
$25.00 |
$84.46 |
$40.00 |
$123.00 |
| 28 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$185.00 |
$189.85 |
$268.00 |
$259.50 |
| 29 | 502(A) 6173 |
ENGINEERED FALSEWORK | 1 | LSUM |
$10,000.00 |
$40,000.00 |
$81,000.00 |
$166,010.00 |
| 30 | 504(B) 1305 |
SAW-CUT GROOVING | 129.1 | SY |
$6.00 |
$20.30 |
$25.00 |
$21.20 |
| 31 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 135 | LF |
$95.00 |
$176.69 |
$255.00 |
$301.00 |
| 32 | 506(A) 1322 |
STRUCTURAL STEEL | 2,850 | LB |
$3.00 |
$7.27 |
$9.00 |
$5.65 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 148.9 | CY |
$650.00 |
$726.66 |
$1,000.00 |
$667.50 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 51 | CY |
$650.00 |
$815.95 |
$1,137.50 |
$1,282.00 |
| 35 | 510(C) 6137 |
SLOPE WALL (4") | 26.5 | SY |
$125.00 |
$271.49 |
$390.00 |
$595.50 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 26,090 | LB |
$1.00 |
$1.23 |
$1.08 |
$1.85 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,288 | LF |
$30.00 |
$36.82 |
$37.10 |
$34.80 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,288 | LF |
$20.00 |
$35.48 |
$15.90 |
$16.90 |
| 39 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 40 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$25,000.00 |
$22,000.00 |
$59,015.00 |
| 41 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,381.25 | LF |
$30.00 |
$14.70 |
$20.00 |
$15.40 |
| 42 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,700.00 |
$2,940.00 |
$3,277.50 |
$3,082.00 |
| 43 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,250.00 |
$2,782.50 |
$3,000.00 |
$2,917.00 |
| 44 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$500.00 |
$1,575.00 |
$1,700.00 |
$1,651.00 |
| 45 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 95 | SF |
$23.00 |
$27.30 |
$28.75 |
$28.60 |
| 46 | 851(C) 8324 |
2" SQUARE TUBE POST | 228 | LF |
$8.00 |
$12.60 |
$14.00 |
$13.20 |
| 47 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 35 | EA |
$15.00 |
$13.88 |
$16.00 |
$14.50 |
| 48 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,432 | LF |
$0.5000 |
$0.8300 |
$0.9500 |
$0.8700 |
| 49 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 50 | LF |
$2.50 |
$3.23 |
$3.60 |
$3.30 |
| 50 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$7,000.00 |
$8,900.00 |
$13,245.00 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$9,000.00 |
$15,490.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$2,500.00 |
$3,700.00 |
$3,852.00 |
| 53 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,500.00 |
$50,000.00 |
$61,000.00 |
$133,983.36 |