| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$12,935.00 |
$10,000.00 |
| 20 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$5,000.00 |
$17,120.00 |
$9,000.00 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,500 | LF |
$4.00 |
$3.30 |
$2.94 |
| 40 | 221(E)2600 |
TEMPORARY SILT DIKE | 80 | LF |
$25.00 |
$16.20 |
$14.49 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 1,835 | SY |
$5.00 |
$5.25 |
$4.69 |
| 60 | 233(A)0200 |
VEGETATIVE MULCHING | 0.37 | AC |
$3,000.00 |
$4,955.00 |
$4,425.00 |
| 70 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 582 | TON |
$200.00 |
$180.50 |
$265.00 |
| 80 | 412 3100 |
COLD MILLING PAVEMENT | 4,038 | SY |
$6.45 |
$6.70 |
$4.50 |
| 90 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 1,820 | LF |
$0.5600 |
$1.30 |
$1.15 |
| 100 | 509(D)0500 |
CLASS C CONCRETE | 30 | CY |
$450.00 |
$617.50 |
$1,500.00 |
| 110 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,735.00 |
$3,000.00 |
| 120 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 845 | SY |
$9.65 |
$16.20 |
$15.00 |
| 130 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,293 | LF |
$5.00 |
$4.80 |
$4.30 |
| 140 | 619(C)6600 |
SAWING PAVEMENT | 1,653 | LF |
$4.45 |
$6.40 |
$3.00 |
| 150 | 623 1100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,383.00 |
$992.50 |
$1,500.00 |
| 160 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 525 | LF |
$35.00 |
$26.90 |
$24.00 |
| 170 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,702.00 |
$3,992.00 |
$3,600.00 |
| 180 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,134.20 |
$3,920.00 |
$3,500.00 |
| 190 | 501(G)1800 |
CLSM BACKFILL | 104.8 | CY |
$225.00 |
$202.00 |
$335.00 |
| 200 | 504(A)5200 |
APPROACH SLAB | 308 | SY |
$300.00 |
$279.50 |
$375.00 |
| 210 | 504(B)5300 |
SAW-CUT GROOVING | 1,181.4 | SY |
$5.50 |
$5.15 |
$5.00 |
| 220 | 504(D)5420 |
CONCRETE RAIL (TR4) | 483.2 | LF |
$110.00 |
$144.50 |
$175.00 |
| 230 | 505(A)6200 |
BRIDGE DECK CONCRETE OVERLAY | 913.5 | SY |
$200.00 |
$176.00 |
$155.00 |
| 240 | 505(E)6600 |
HYDRODEMOLITION | 931.5 | SY |
$200.00 |
$144.50 |
$175.00 |
| 250 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 10 | SY |
$520.00 |
$211.50 |
$225.00 |
| 260 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 10 | SY |
$900.00 |
$423.00 |
$425.00 |
| 270 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 380 | SY |
$6.00 |
$5.60 |
$9.00 |
| 280 | 518(D)0500 |
ELASTOMERIC MORTAR | 27 | CF |
$750.00 |
$465.50 |
$500.00 |
| 290 | 518(E)0600 |
PREFORMED SILICONE EXPANSION JOINTS | 184.7 | LF |
$125.00 |
$53.70 |
$30.00 |
| 300 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 135 | LF |
$35.00 |
$35.80 |
$25.00 |
| 310 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 4.8 | GAL |
$150.00 |
$140.00 |
$80.00 |
| 320 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 5.4 | SY |
$1,200.00 |
$1,344.00 |
$800.00 |
| 330 | 523(A)3200 |
SEALER CRACK PREPARATION | 241.6 | LF |
$6.50 |
$4.50 |
$5.00 |
| 340 | 523(B)3300 |
SEALER RESIN | 2.7 | GAL |
$200.00 |
$207.00 |
$50.00 |
| 350 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 8 | SY |
$55.00 |
$40.30 |
$40.00 |
| 360 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$3,500.00 |
$11,535.00 |
$55,000.00 |
| 370 | 619(B)6476 |
REMOVAL OF EXISTING PARAPET | 363.2 | LF |
$50.00 |
$72.80 |
$75.00 |
| 380 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$350.00 |
$280.00 |
$250.00 |
| 390 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$115.00 |
$107.50 |
$96.00 |
| 400 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 18 | EA |
$16.82 |
$16.00 |
$14.25 |
| 410 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 10,800 | LF |
$0.8300 |
$1.00 |
$0.8900 |
| 420 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 13,200 | LF |
$0.8800 |
$1.95 |
$1.74 |
| 430 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 9,200 | LF |
$0.7500 |
$0.7300 |
$0.6500 |
| 440 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,825 | LF |
$26.00 |
$17.40 |
$15.50 |
| 450 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,825 | LF |
$5.00 |
$1.80 |
$1.60 |
| 460 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,950 | SD |
$0.6500 |
$0.0600 |
$0.0500 |
| 470 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 900 | SD |
$2.00 |
$2.00 |
$1.80 |
| 480 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,600 | SD |
$2.50 |
$2.00 |
$1.80 |
| 490 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$3.50 |
$0.5600 |
$0.5000 |
| 500 | 880(C)6420 |
WING BARRICADES | 720 | SD |
$0.7500 |
$0.0200 |
$0.0200 |
| 510 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.6000 |
$0.9000 |
$0.8000 |
| 520 | 880(F)6700 |
DRUMS | 3,240 | SD |
$0.6500 |
$0.5600 |
$0.5000 |
| 530 | 880(G)6800 |
TUBE CHANNELIZERS | 3,600 | SD |
$0.4000 |
$0.5600 |
$0.5000 |
| 540 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 208 | SD |
$20.00 |
$44.80 |
$40.00 |
| 550 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$9,973.00 |
$3,000.00 |
| 560 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$84,029.39 |
$208,894.95 |