MCINTOSH, MUSKOGEE WIDEN, RESURFACE , AND BRIDGE REHABILITATION I-40/US-266: I-40, OVER US-266 0.6 MILES WEST OF THE MUSKOGEE COUNTY LINE . US-266, FROM 1.4 MILES EAST OF I -40 EXTEND EAST NEAR WARNER . PROJECT LENGTH = 0.375 MILE

Let date
Thursday, April 15, 2021
Contract
210113
J/P numbers
26288(04)
District
County
Sbr-4000(107)sb
Highway
Limits
MCINTOSH, MUSKOGEE WIDEN, RESURFACE , AND BRIDGE REHABILITATION I-40/US-266: I-40, OVER US-266 0.6 MILES WEST OF THE MUSKOGEE COUNTY LINE . US-266, FROM 1.4 MILES EAST OF I -40 EXTEND EAST NEAR WARNER . PROJECT LENGTH = 0.375 MILE
Project number
SSP-251C(116)PM

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,240,975
1 Built Right Construction, LLC Low bidder $4,796,356 -23.1%
2 L & N BRIDGE, LLC $5,525,048 -11.5% +15.2%
3 OBC, INC. $5,988,638 -4.0% +24.9%
5 HASKELL LEMON CONSTRUCTION CO. $6,317,771 +1.2% +31.7%
6 MANHATTAN ROAD & BRIDGE COMPANY, LLC $6,429,000 +3.0% +34.0%

Bid tab: unit prices 161 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Built Right Con…#2 L & N BRIDGE, L…#3 OBC, INC.#5 HASKELL LEMON C…#6 MANHATTAN ROAD …
10202(A)2200 UNCLASSIFIED EXCAVATION803CY $21.58 $10.00 $7.00 $21.00 $10.60 $12.00
20202(D)2500 UNCLASSIFIED BORROW4,076CY $14.37 $10.00 $10.00 $15.00 $12.70 $17.50
30205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $13,981.81 $10,000.00 $4,000.00 $10,000.00 $23,975.00 $3,940.00
40221(B)2300 TEMPORARY SILT FENCE2,289LF $3.18 $3.00 $3.00 $2.55 $2.50 $2.00
50221(E)2600 TEMPORARY SILT DIKE50LF $17.02 $17.50 $14.00 $19.70 $19.50 $13.50
60230(A)7200 SOLID SLAB SODDING6,750SY $6.51 $3.30 $3.00 $2.92 $2.90 $2.80
70241 3100 MOWING1AC $816.32 $600.00 $600.00 $740.18 $733.00 $725.00
80303(A)1200 AGGREGATE BASE TYPE A392CY $59.38 $40.00 $50.00 $70.00 $44.50 $55.00
90310(B)5300 SUBGRADE, METHOD B2,010SY $4.43 $3.00 $1.25 $7.00 $1.85 $2.50
100326(A)1200 GEOTEXTILE REINFORCEMENT1,005SY $5.24 $5.00 $12.00 $8.00 $10.60 $9.90
110402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E266TON $36.92 $40.00 $21.00 $35.00 $23.00 $28.00
120407(B)7300 TACK COAT190GAL $5.31 $5.00 $5.00 $5.33 $5.25 $5.25
130408 8100 PRIME COAT955GAL $6.13 $6.00 $6.00 $5.33 $6.35 $5.00
140411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)303TON $129.46 $100.00 $95.00 $147.24 $100.00 $142.00
150411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)573TON $131.23 $120.00 $110.00 $142.07 $116.00 $136.00
160412 3100 COLD MILLING PAVEMENT2,820SY $6.67 $5.00 $4.75 $9.00 $10.90 $7.75
170501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED8CY $25.00 $25.00 $12.00 $53.25 $110.00 $60.00
180509(A)0200 CLASS AA CONCRETE72CY $671.63 $525.00 $700.00 $559.13 $869.50 $750.00
190509(D)0500 CLASS C CONCRETE24CY $358.07 $475.00 $650.00 $404.70 $486.00 $650.00
200511(A)2200 REINFORCING STEEL5,369LB $1.37 $1.35 $1.25 $1.60 $4.05 $1.50
210619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $10,000.00 $3,500.00 $15,000.00 $16,065.00 $1,625.00
220619(B)6396 REMOVAL OF GUARDRAIL387LF $5.55 $12.50 $2.25 $3.73 $5.25 $7.00
230619(C)6600 SAWING PAVEMENT45LF $8.41 $15.00 $8.00 $10.00 $31.70 $7.00
240623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE400LF $18.37 $21.00 $24.00 $25.56 $20.80 $25.00
250623(G)1820 GUARDRAIL END TREATMENT (31")4EA $2,940.11 $3,200.00 $2,400.00 $2,556.00 $3,086.00 $2,500.00
260623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,137.75 $3,300.00 $1,900.00 $2,023.50 $2,954.00 $3,200.00
270501(B)1300 SUBSTRUCTURE EXCAVATION COMMON60CY $24.00 $15.00 $15.00 $50.00 $29.30 $75.00
280501(G)1800 CLSM BACKFILL167CY $175.00 $130.00 $155.00 $205.00 $184.50 $155.00
290504(A)5200 APPROACH SLAB228SY $230.00 $220.00 $190.00 $300.00 $259.50 $225.00
300504(B)5300 SAW-CUT GROOVING687.8SY $4.50 $5.00 $3.80 $4.05 $4.00 $4.20
310504(D)5420 CONCRETE RAIL (TR4)386.8LF $90.00 $115.00 $100.00 $110.00 $99.40 $70.00
320506(A)7200 STRUCTURAL STEEL99,660LB $1.90 $1.80 $2.06 $2.29 $2.20 $2.35
330507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY12EA $2,000.00 $4,500.00 $1,500.00 $2,000.00 $1,738.00 $1,400.00
340507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY24EA $2,000.00 $4,500.00 $1,500.00 $2,000.00 $1,448.00 $1,400.00
350509(A)0210 CLASS AA CONCRETE117.5CY $650.00 $550.00 $750.00 $1,000.00 $900.00 $1,500.00
360509(B)0320 CLASS A CONCRETE36.6CY $800.00 $500.00 $850.00 $2,300.00 $2,520.00 $2,500.00
370511 2100 MECHANICAL SPLICES612EA $50.00 $25.00 $20.00 $40.00 $27.50 $40.00
380511(B)2310 EPOXY COATED REINFORCING STEEL30,010LB $1.25 $1.20 $1.25 $1.50 $1.40 $1.50
390514(A)5220 PILES, FURNISHED (HP 12X53)200LF $40.00 $45.00 $45.00 $55.00 $72.90 $45.00
400514(B)5320 PILES, DRIVEN (HP 12X53)128LF $20.00 $13.50 $19.30 $25.00 $66.10 $40.00
410514(K)6200 (PL)PILOT HOLES68LF $200.00 $170.00 $175.00 $200.00 $246.50 $300.00
420514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
430515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)438SY $5.00 $5.00 $4.00 $4.26 $4.20 $4.20
440516(A)8225 DRILLED SHAFTS 42" DIAMETER90LF $900.00 $500.00 $750.00 $900.00 $1,081.00 $1,000.00
450516(C)8400 CROSSHOLE SONIC LOGGING4EA $2,500.00 $2,000.00 $1,550.00 $1,597.50 $3,485.00 $2,000.00
460518(B)0300 SEALED EXPANSION JOINTS35.18LF $315.00 $275.00 $300.00 $315.00 $468.50 $310.00
470520(A)1200 PREPARATION OF CRACKS, ABOVE WATER20LF $30.00 $30.00 $15.00 $58.58 $47.50 $31.00
480520(C)1400 EPOXY RESIN, ABOVE WATER1.6GAL $100.00 $125.00 $300.00 $106.50 $132.00 $105.00
490523(A)3200 SEALER CRACK PREPARATION168LF $4.00 $4.00 $4.00 $5.33 $4.20 $4.20
500523(B)3300 SEALER RESIN1.9GAL $150.00 $150.00 $150.00 $159.75 $158.00 $155.00
510535 7100 CORROSION INHIBITOR(SURFACE APPLIED)25.3SY $50.00 $50.00 $40.00 $53.25 $42.20 $52.00
520540 8112 (PL)REPAIR BRIDGE ITEMS8.1SY $1,000.00 $750.00 $600.00 $1,693.35 $765.00 $1,250.00
530601(B)1230 TYPE I-A PLAIN RIPRAP840TON $50.00 $50.00 $32.00 $43.00 $42.60 $40.00
540601(C)1310 TYPE I-A FILTER BLANKET150TON $40.00 $40.00 $28.00 $40.00 $41.80 $33.00
550619(B)6308 REMOVAL OF BRIDGE ITEMS2EA $25,000.00 $4,000.00 $15,000.00 $35,400.00 $38,635.00 $60,000.00
560805(A)3252 (PL)REMOVAL OF EXISTING SIGNS10EA $43.75 $100.00 $20.00 $21.30 $100.00 $20.50
570850(A)1200 SHEET ALUMINUM SIGNS12SF $30.31 $75.00 $18.00 $19.17 $58.00 $18.50
580850(D)1500 SPECIAL SIGNS12SF $30.31 $75.00 $18.00 $19.17 $58.00 $18.50
590851(C)2430 2 1/2" SQUARE TUBE POST64LF $12.19 $15.00 $12.00 $12.78 $10.60 $12.50
600853 5110 DELINEATORS(TYPE 1, CODE 3)6EA $25.00 $45.00 $20.00 $21.30 $47.50 $21.00
610855(A)7200 TRAFFIC STRIPE(PLASTIC)(4" WIDE)12,897LF $0.9300 $0.7000 $0.5000 $0.5300 $0.6300 $0.5100
620857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)9,133LF $0.3900 $0.7000 $0.1000 $0.1100 $0.6900 $0.1100
630823 6100 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM240SD $114.05 $80.00 $200.00 $213.00 $84.40 $205.00
640858(A)0200 PAVE.MARKERS CLASS A TYPE 11,812EA $0.7000 $5.00 $2.50 $2.66 $4.75 $2.50
650877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER1,322LF $20.75 $20.00 $25.00 $19.00 $26.80 $50.00
660877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER1,322LF $3.97 $4.00 $2.00 $4.00 $2.10 $5.00
670880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF1,920SD $0.4900 $0.1000 $0.5000 $0.5300 $0.1100 $0.5300
680880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF240SD $1.17 $3.50 $1.00 $1.07 $3.70 $1.05
690880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,200SD $1.62 $3.50 $2.00 $2.13 $3.70 $2.10
700880(C)6420 WING BARRICADES240SD $1.96 $0.0200 $3.00 $3.20 $0.0200 $3.10
710880(E)6600 WARNING LIGHTS(TYPE A)720SD $0.5600 $0.7500 $0.5000 $0.5300 $0.7900 $0.5300
720882(A)8210 PORT.CHANGEABLE MESSAGE SIGN240SD $17.44 $20.00 $10.00 $10.65 $21.10 $10.50
730201(A)1200 CLEARING AND GRUBBING1LSUM $12,000.00 $5,000.00 $3,500.00 $15,000.00 $23,975.00 $40,000.00
740202(A)2200 UNCLASSIFIED EXCAVATION2,722CY $11.00 $10.00 $5.00 $13.50 $10.60 $12.00
750202(D)2500 UNCLASSIFIED BORROW2,229CY $16.00 $10.00 $13.00 $16.50 $12.70 $17.50
760205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $17,190.00 $5,000.00 $2,500.00 $10,000.00 $26,615.00 $3,175.00
770221(B)2300 TEMPORARY SILT FENCE1,861LF $3.00 $3.00 $3.00 $2.55 $2.50 $2.50
780221(C)2400 TEMPORARY SEDIMENT FILTER2EA $500.00 $600.00 $300.00 $420.68 $416.50 $195.00
790230(A)7200 SOLID SLAB SODDING7,134SY $6.50 $3.30 $3.00 $2.92 $2.90 $2.75
800232(A)9200 SEEDING METHOD A1.46AC $1,750.00 $2,000.00 $1,000.00 $3,141.75 $3,112.00 $2,975.00
810233(A)0200 VEGETATIVE MULCHING1.46AC $1,500.00 $1,800.00 $1,000.00 $3,141.75 $3,112.00 $2,975.00
820241 3100 MOWING2.92AC $300.00 $600.00 $600.00 $740.17 $733.00 $700.00
830242 4100 (PL)STABILIZED CONSTRUCTION EXIT2EA $5,000.00 $3,500.00 $1,800.00 $4,500.00 $6,330.00 $4,500.00
840307(K)4200 STABILIZED SUBGRADE6,056SY $5.00 $4.00 $5.00 $11.18 $11.60 $7.00
850407(B)7300 TACK COAT354GAL $3.00 $5.00 $5.00 $5.33 $5.25 $5.25
860408 8100 PRIME COAT371GAL $4.00 $6.00 $6.00 $5.33 $6.35 $5.00
870411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)517TON $135.00 $120.00 $110.00 $144.08 $116.00 $139.00
880412 3100 COLD MILLING PAVEMENT1,260SY $7.00 $5.00 $4.25 $15.00 $9.30 $8.50
890413(A)4200 RUMBLE STRIP-METHOD HMA-CON560LF $5.00 $2.00 $5.00 $2.13 $0.9500 $2.10
900413(C)4400 RUMBLE STRIP-METHOD PCC-CON2,910LF $3.00 $2.50 $4.00 $2.13 $1.40 $2.10
910414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)6,056SY $20.00 $20.00 $20.00 $20.00 $25.40 $24.00
920414(G)5800 P.C. CONCRETE FOR PAVEMENT1,434CY $150.00 $145.00 $175.00 $160.00 $183.50 $155.00
930509(D)0500 CLASS C CONCRETE11CY $550.00 $500.00 $600.00 $404.70 $510.50 $650.00
940613(A)5208 18" R.C.PIPE CLASS III583LF $80.00 $50.00 $35.00 $68.00 $35.90 $45.00
950613(L)6708 18" PREFAB. CULVERT END SEC., ROUND4EA $750.00 $500.00 $700.00 $1,250.00 $1,023.00 $975.00
960619(B)6352 REMOVAL OF FENCE110LF $8.00 $8.00 $3.00 $5.00 $10.60 $7.00
970619(B)6360 REMOVAL OF CONCRETE PAVEMENT5,014SY $12.00 $10.00 $4.00 $13.50 $3.50 $7.00
980619(B)6364 REMOVAL OF ASPHALT PAVEMENT2,776SY $7.00 $3.00 $3.00 $7.00 $16.70 $4.63
990619(B)6368 REMOVAL OF DRAINAGE INLETS4EA $750.00 $500.00 $200.00 $1,250.00 $1,055.00 $475.00
1,000619(B)6396 REMOVAL OF GUARDRAIL1,197LF $4.00 $6.00 $3.00 $3.73 $3.70 $6.00
1,010619(B)6436 REMOVAL OF CONCRETE DITCH LINER218LF $8.00 $10.00 $4.00 $23.00 $10.60 $10.00
1,020619(C)6600 SAWING PAVEMENT6,302LF $3.00 $2.00 $3.00 $4.00 $3.15 $3.00
1,030623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE1,150LF $20.00 $22.50 $24.00 $25.56 $20.60 $25.00
1,040623(G)1820 GUARDRAIL END TREATMENT (31")6EA $3,000.00 $3,500.00 $2,400.00 $2,556.00 $3,587.00 $2,500.00
1,050623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")6EA $2,200.00 $2,500.00 $1,900.00 $2,023.50 $2,321.00 $3,100.00
1,060624(A)3200 FENCE-STYLE WWF179LF $7.00 $8.00 $10.00 $13.10 $15.80 $28.50
1,070501(G)1800 CLSM BACKFILL197CY $150.00 $130.00 $160.00 $170.00 $184.50 $155.00
1,080504(A)5200 APPROACH SLAB634.8SY $180.00 $220.00 $190.00 $220.00 $245.00 $170.00
1,090504(B)5300 SAW-CUT GROOVING1,481.8SY $5.00 $5.00 $3.80 $4.05 $4.00 $4.00
1,100504(E)5520 42" F-SHAPED PARAPET757.2LF $100.00 $105.00 $95.00 $80.00 $113.00 $65.00
1,110506(A)7225 STRUCTURAL STEEL M270 GRADE 50W362,010LB $1.50 $1.65 $2.06 $1.92 $1.85 $2.35
1,120507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY5EA $2,000.00 $1,500.00 $6,000.00 $5,500.00 $5,170.00 $4,200.00
1,130507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY15EA $2,500.00 $1,500.00 $6,000.00 $5,500.00 $5,170.00 $4,200.00
1,140509(A)0210 CLASS AA CONCRETE282.7CY $600.00 $590.00 $700.00 $700.00 $823.00 $750.00
1,150511(B)2310 EPOXY COATED REINFORCING STEEL102,570LB $1.20 $1.25 $1.40 $1.20 $1.45 $1.50
1,160515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)879SY $4.00 $5.00 $4.00 $4.26 $4.20 $4.20
1,170518(B)0300 SEALED EXPANSION JOINTS171LF $250.00 $300.00 $275.00 $320.00 $305.00 $310.00
1,180523(A)3200 SEALER CRACK PREPARATION338LF $4.00 $4.00 $4.00 $4.26 $4.20 $4.20
1,190523(B)3300 SEALER RESIN2.2GAL $150.00 $150.00 $150.00 $159.75 $158.00 $155.00
1,200619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $110,000.00 $15,000.00 $38,450.00 $75,000.00 $84,635.00 $125,000.00
1,210501(G)1800 CLSM BACKFILL197CY $150.00 $130.00 $160.00 $170.00 $184.50 $155.00
1,220504(A)5200 APPROACH SLAB634.8SY $180.00 $220.00 $190.00 $220.00 $245.00 $170.00
1,230504(B)5300 SAW-CUT GROOVING1,481.8SY $5.00 $5.00 $3.80 $4.05 $4.00 $4.00
1,240504(E)5520 42" F-SHAPED PARAPET757.2LF $100.00 $105.00 $95.00 $80.00 $113.00 $65.00
1,250506(A)7225 STRUCTURAL STEEL M270 GRADE 50W362,060LB $1.50 $1.65 $2.06 $1.94 $1.85 $2.35
1,260507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY5EA $2,000.00 $1,500.00 $6,000.00 $5,500.00 $5,170.00 $4,200.00
1,270507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY15EA $2,500.00 $1,500.00 $6,000.00 $5,500.00 $5,170.00 $4,200.00
1,280509(A)0210 CLASS AA CONCRETE282.7CY $600.00 $550.00 $700.00 $700.00 $823.00 $700.00
1,290511(B)2310 EPOXY COATED REINFORCING STEEL102,570LB $1.20 $1.25 $1.40 $1.20 $1.45 $1.50
1,300515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)879SY $4.00 $5.00 $4.00 $1.92 $4.20 $4.20
1,310518(B)0300 SEALED EXPANSION JOINTS171LF $250.00 $300.00 $275.00 $320.00 $305.00 $310.00
1,320523(A)3200 SEALER CRACK PREPARATION338LF $4.00 $4.00 $4.00 $4.26 $4.20 $4.20
1,330523(B)3300 SEALER RESIN2.2GAL $150.00 $150.00 $150.00 $159.75 $158.00 $155.00
1,340619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $110,000.00 $15,000.00 $38,450.00 $75,000.00 $84,635.00 $80,000.00
1,350850(A)1200 SHEET ALUMINUM SIGNS14SF $28.00 $100.00 $18.00 $19.17 $79.10 $18.50
1,360853 5170 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)35EA $13.00 $25.00 $15.00 $15.98 $14.00 $15.50
1,370856(A)8204 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)20,240LF $1.00 $1.00 $0.5000 $0.5300 $0.7800 $0.5300
1,380857(C)9400 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)49,695LF $0.3500 $1.00 $0.2500 $0.2700 $0.8900 $0.2700
1,390857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)37,281LF $0.1500 $0.4000 $0.1000 $0.1100 $0.4100 $0.1100
1,400871(B)2300 CONST.ZONE IMPACT ATTEN.172SD $12.00 $25.00 $25.00 $26.63 $26.40 $26.00
1,410877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER3,283LF $30.00 $18.00 $38.00 $19.00 $31.00 $50.00
1,420877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER3,261LF $6.00 $3.00 $2.50 $4.00 $2.10 $3.50
1,430878(B)5300 MODULAR GLARE SCREEN (TEMPORARY)45,023SD $0.1500 $0.2000 $0.1500 $0.1600 $0.2100 $0.1700
1,440880(A)6220 ARROW DISPLAY(TYPE C)460SD $5.00 $1.00 $15.00 $15.98 $1.05 $15.50
1,450880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF9,084SD $0.2500 $0.0200 $0.5000 $0.5300 $0.0200 $0.5300
1,460880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,184SD $0.5000 $1.75 $1.00 $1.07 $1.85 $1.05
1,470880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,244SD $1.50 $1.75 $2.00 $2.13 $1.85 $2.10
1,480880(C)6410 CONSTRUCTION BARRICADES(TYPE III)1,032SD $1.00 $4.00 $3.00 $3.20 $4.20 $3.10
1,490880(C)6420 WING BARRICADES920SD $2.00 $0.0200 $3.00 $3.20 $0.0200 $3.10
1,500880(E)6600 WARNING LIGHTS(TYPE A)6,088SD $0.1500 $0.4000 $0.1000 $0.1100 $0.4200 $0.1100
1,510880(F)6700 DRUMS28,480SD $0.3000 $0.0200 $0.4500 $0.4800 $0.0200 $0.4800
1,520880(I)7000 FLAGGER8SD $200.00 $20.00 $400.00 $1,200.00 $527.50 $500.00
1,530880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)40HOUR $69.00 $69.00 $69.00 $69.00 $69.00 $69.00
1,540882(A)8210 PORT.CHANGEABLE MESSAGE SIGN1,840SD $8.00 $6.00 $10.00 $10.65 $6.35 $10.50
1,550509(A)0200 CLASS AA CONCRETE7.56CY $650.00 $1,750.00 $1,750.00 $404.70 $1,846.00 $396.00
1,560619(B)6432 REMOVAL OF CABLE BARRIER895LF $12.00 $20.00 $15.00 $9.74 $15.80 $9.50
1,570628 7100 INSTALLATION OF CABLE BARRIER SYSTEM895LF $20.00 $28.00 $25.00 $23.16 $26.40 $22.50
1,580628(C)7400 END ANCHORS1EA $4,500.00 $10,000.00 $10,000.00 $1,757.25 $10,550.00 $1,725.00
1,590642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $53,000.00 $24,000.00 $25,000.00 $22,631.25 $53,620.00 $25,566.00
1,600220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $8,000.00 $2,500.00 $3,500.00 $7,500.00 $5,275.00 $1,764.43
1,610641 2100 MOBILIZATION1LSUM $297,000.00 $100,000.00 $277,000.00 $293,500.00 $386,670.00 $321,000.00