| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$9,115.19 |
$8,800.00 |
$12,500.00 |
$13,935.00 |
$40,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 14,691 | CY |
$8.00 |
$7.00 |
$7.61 |
$6.00 |
$7.39 |
$7.80 |
$12.50 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,500.00 |
$12,231.96 |
$30,000.00 |
$46,500.00 |
$14,290.00 |
$15,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,806 | LF |
$2.50 |
$2.00 |
$2.04 |
$2.00 |
$4.50 |
$4.20 |
$1.94 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 210 | LF |
$13.00 |
$14.00 |
$14.18 |
$13.50 |
$17.50 |
$16.80 |
$13.53 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 41,271 | SY |
$3.50 |
$2.25 |
$2.26 |
$2.25 |
$2.75 |
$2.60 |
$2.15 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 8.52 | AC |
$1,700.00 |
$850.00 |
$874.50 |
$500.00 |
$1,675.00 |
$1,575.00 |
$834.75 |
| 80 | 241 3100 |
MOWING | 17.04 | AC |
$220.00 |
$200.00 |
$192.50 |
$100.00 |
$225.00 |
$210.00 |
$183.75 |
| 90 | 307(K)4200 |
STABILIZED SUBGRADE | 11,000 | SY |
$8.00 |
$6.50 |
$6.75 |
$7.00 |
$8.22 |
$7.80 |
$8.25 |
| 100 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 200 | TON |
$50.00 |
$32.00 |
$51.96 |
$34.20 |
$35.00 |
$48.80 |
$55.00 |
| 110 | 407(B)7300 |
TACK COAT | 1,520 | GAL |
$5.00 |
$4.20 |
$4.53 |
$3.10 |
$4.75 |
$3.25 |
$3.26 |
| 120 | 408 8100 |
PRIME COAT | 3,921 | GAL |
$5.00 |
$5.25 |
$4.79 |
$9.29 |
$5.30 |
$9.75 |
$9.75 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,979 | TON |
$90.00 |
$95.00 |
$99.93 |
$85.85 |
$97.00 |
$82.00 |
$81.95 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,122 | TON |
$100.00 |
$96.00 |
$102.20 |
$97.96 |
$97.90 |
$93.50 |
$93.51 |
| 150 | 412 3100 |
COLD MILLING PAVEMENT | 7,227 | SY |
$2.50 |
$3.70 |
$2.60 |
$7.50 |
$7.50 |
$5.70 |
$13.13 |
| 160 | 509(D)0500 |
CLASS C CONCRETE | 270 | CY |
$350.00 |
$380.00 |
$335.36 |
$425.00 |
$340.00 |
$323.00 |
$450.00 |
| 170 | 611(G)0362 |
INLET (SMD-TYPE 2B) | 1 | EA |
$3,500.00 |
$3,000.00 |
$6,395.24 |
$5,200.00 |
$3,750.00 |
$9,141.00 |
$1,450.00 |
| 180 | 613(A)5224 |
36" R.C.PIPE CLASS III | 24 | LF |
$145.00 |
$262.00 |
$182.67 |
$220.00 |
$209.36 |
$237.00 |
$115.00 |
| 190 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 224 | LF |
$45.00 |
$67.00 |
$99.43 |
$68.50 |
$72.50 |
$43.90 |
$55.00 |
| 200 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,500.00 |
$4,000.00 |
$2,099.82 |
$2,700.00 |
$3,800.00 |
$6,580.00 |
$850.00 |
| 210 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$2,200.00 |
$1,848.07 |
$2,275.00 |
$1,850.00 |
$1,533.00 |
$2,200.00 |
| 220 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 1 | EA |
$2,500.00 |
$3,500.00 |
$3,357.34 |
$3,700.00 |
$2,600.00 |
$2,213.00 |
$3,000.00 |
| 230 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$2,700.00 |
$2,133.33 |
$3,200.00 |
$1,450.00 |
$2,068.00 |
$2,500.00 |
| 240 | 613(M)7028 |
TYPE BB6 CULVERT END TREATMENT | 1 | EA |
$3,200.00 |
$4,200.00 |
$3,919.99 |
$5,300.00 |
$2,750.00 |
$3,081.00 |
$3,250.00 |
| 250 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$4,400.00 |
$10,114.44 |
$6,000.00 |
$14,500.00 |
$18,815.00 |
$15,000.00 |
| 260 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 88 | LF |
$7.00 |
$5.00 |
$7.92 |
$15.00 |
$5.00 |
$44.80 |
$8.00 |
| 270 | 619(C)6600 |
SAWING PAVEMENT | 58 | LF |
$5.00 |
$5.00 |
$9.16 |
$15.00 |
$14.00 |
$19.30 |
$15.00 |
| 280 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,653 | LF |
$7.50 |
$6.85 |
$8.58 |
$7.00 |
$7.75 |
$8.20 |
$9.45 |
| 290 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 1,260 | CY |
$25.00 |
$7.00 |
$11.95 |
$7.50 |
$8.50 |
$10.50 |
$9.00 |
| 300 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 184 | CY |
$35.00 |
$10.00 |
$26.71 |
$15.00 |
$16.00 |
$35.60 |
$30.00 |
| 310 | 509(A)0210 |
CLASS AA CONCRETE | 432.5 | CY |
$550.00 |
$400.00 |
$413.22 |
$510.00 |
$565.00 |
$668.50 |
$495.00 |
| 320 | 511(A)2210 |
REINFORCING STEEL | 69,960 | LB |
$1.00 |
$1.10 |
$1.21 |
$1.27 |
$1.22 |
$1.75 |
$1.40 |
| 330 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 500 | TON |
$55.00 |
$46.00 |
$60.03 |
$47.40 |
$46.00 |
$52.60 |
$55.00 |
| 340 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 95 | TON |
$45.00 |
$34.00 |
$62.90 |
$34.85 |
$42.00 |
$42.70 |
$45.00 |
| 350 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$15,000.00 |
$21,282.69 |
$23,500.00 |
$30,500.00 |
$25,655.00 |
$30,000.00 |
| 360 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,120 | SD |
$0.3500 |
$0.0400 |
$0.0200 |
$0.0300 |
$0.1300 |
$0.3700 |
$0.0200 |
| 370 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$0.7000 |
$1.80 |
$1.92 |
$1.85 |
$0.1300 |
$2.10 |
$1.84 |
| 380 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,320 | SD |
$1.50 |
$5.10 |
$5.50 |
$7.00 |
$0.1300 |
$2.10 |
$5.25 |
| 390 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,680 | SD |
$1.00 |
$0.5200 |
$0.5500 |
$0.5500 |
$0.1300 |
$0.3700 |
$0.5300 |
| 400 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,840 | SD |
$0.3000 |
$0.7400 |
$0.7900 |
$0.7900 |
$0.1300 |
$0.3700 |
$0.7600 |
| 410 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 228 | SD |
$12.00 |
$9.00 |
$8.80 |
$8.80 |
$26.50 |
$36.80 |
$8.40 |
| 420 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 0.38 | SF |
$23.00 |
$1.45 |
$154.00 |
$137.50 |
$115.00 |
$18.90 |
$147.00 |
| 430 | 851(C)2415 |
2" SQUARE TUBE POST | 4 | LF |
$9.75 |
$13.00 |
$13.20 |
$20.00 |
$28.00 |
$10.50 |
$12.60 |
| 440 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 7,160 | LF |
$0.7000 |
$1.15 |
$1.06 |
$1.05 |
$2.40 |
$0.6800 |
$1.01 |
| 450 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,075.44 |
$2,900.00 |
$3,500.00 |
$4,124.00 |
$6,150.00 |
| 460 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$102,000.00 |
$75,000.00 |
$89,894.18 |
$102,000.00 |
$69,000.00 |
$104,775.99 |
$111,000.00 |
| 470 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$6,500.00 |
$8,982.71 |
$7,000.00 |
$9,500.00 |
$14,500.00 |
$6,195.00 |