| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$275,000.00 |
$69,000.00 |
$458,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 126,793 | CY |
$10.00 |
$8.90 |
$9.80 |
$12.25 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 14,930 | CY |
$12.00 |
$8.00 |
$1.00 |
$14.75 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$195,000.00 |
$215,000.00 |
$123,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,269 | LF |
$3.45 |
$2.50 |
$4.00 |
$1.50 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 13 | EA |
$500.00 |
$313.50 |
$335.00 |
$100.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 762 | LF |
$12.00 |
$9.75 |
$18.00 |
$11.50 |
| 80 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 210 | CY |
$150.00 |
$375.00 |
$240.00 |
$110.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 335,290 | SY |
$3.00 |
$2.55 |
$2.40 |
$2.90 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 69.27 | AC |
$800.00 |
$918.50 |
$950.00 |
$1,010.00 |
| 110 | 241 3100 |
MOWING | 69.27 | AC |
$225.00 |
$148.50 |
$150.00 |
$170.00 |
| 115 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,300.00 |
$5,000.00 |
$3,500.00 |
$3,500.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 77,123 | SY |
$8.00 |
$10.70 |
$6.15 |
$8.20 |
| 125 | 325 0100 |
SEPARATOR FABRIC | 700 | SY |
$2.00 |
$4.45 |
$4.50 |
$5.00 |
| 130 | 402(A)2200 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 2,152 | TON |
$40.00 |
$44.70 |
$51.00 |
$55.00 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,234 | TON |
$45.00 |
$35.50 |
$74.00 |
$55.00 |
| 150 | 407(B)7300 |
TACK COAT | 26,726 | GAL |
$3.00 |
$3.00 |
$3.00 |
$4.50 |
| 160 | 408 8100 |
PRIME COAT | 32,897 | GAL |
$6.00 |
$3.00 |
$3.00 |
$5.00 |
| 170 | 409(A)9200 |
FABRIC REINFORCEMENT | 13,495 | SY |
$4.00 |
$4.85 |
$3.00 |
$7.00 |
| 175 | 409(B)9300 |
BITUMINOUS BINDER | 3,015 | GAL |
$6.00 |
$8.50 |
$3.00 |
$6.00 |
| 180 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 8,472 | TON |
$120.00 |
$107.50 |
$121.00 |
$100.35 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 31,147 | TON |
$120.00 |
$102.00 |
$115.00 |
$94.50 |
| 200 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 5,832 | TON |
$140.00 |
$122.00 |
$132.00 |
$121.50 |
| 210 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,647 | TON |
$130.00 |
$115.00 |
$126.00 |
$115.50 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 42,127 | SY |
$2.75 |
$3.75 |
$3.25 |
$2.45 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 376 | CY |
$21.00 |
$41.60 |
$29.00 |
$30.50 |
| 240 | 509(A)0200 |
CLASS AA CONCRETE | 1,386 | CY |
$700.00 |
$650.00 |
$550.00 |
$1,620.00 |
| 250 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 6 | CY |
$1,000.00 |
$838.00 |
$1,150.00 |
$2,120.00 |
| 260 | 509(D)0500 |
CLASS C CONCRETE | 3,288 | CY |
$300.00 |
$351.50 |
$325.00 |
$321.00 |
| 270 | 511(A)2200 |
REINFORCING STEEL | 326,504 | LB |
$1.50 |
$1.65 |
$1.91 |
$2.10 |
| 280 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 637 | TON |
$60.00 |
$72.30 |
$82.00 |
$75.00 |
| 290 | 609(B)4355 |
2'-8" COMB.CRB.& GUT.(4" MNTBLE) | 372 | LF |
$22.00 |
$32.60 |
$48.00 |
$38.75 |
| 300 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 65 | SY |
$90.00 |
$93.30 |
$165.00 |
$103.00 |
| 310 | 611(G)7930 |
INLET GPI TYPE 1 (DES. 1) | 10 | EA |
$3,800.00 |
$4,673.00 |
$7,125.00 |
$6,925.00 |
| 320 | 611(G)7938 |
INLET GPI TYPE 1 (DES. 3) | 1 | EA |
$4,000.00 |
$5,009.00 |
$7,125.00 |
$10,400.00 |
| 330 | 611(G)8004 |
INLET CDI RCB DES. 2 | 2 | EA |
$4,000.00 |
$6,591.00 |
$5,900.00 |
$11,150.00 |
| 340 | 611(G)8028 |
INLET CDI RCB DES. 8 | 1 | EA |
$5,500.00 |
$8,707.00 |
$8,300.00 |
$13,250.00 |
| 350 | 611(G)8098 |
INLET CDI 30SK RCB DES. 8 | 1 | EA |
$6,000.00 |
$10,195.00 |
$8,300.00 |
$13,250.00 |
| 360 | 611(H)0470 |
ADD'L DEPTH IN INLET GPI TYPE 1 | 40 | VF |
$500.00 |
$786.00 |
$400.00 |
$1,330.00 |
| 370 | 611(H)0524 |
ADD'L DEPTH IN INLET CDI RCB DES. 2 | 11 | VF |
$500.00 |
$615.00 |
$400.00 |
$505.00 |
| 380 | 611(H)0548 |
ADD'L DEPTH IN INLET CDI RCB DES. 8 | 7 | VF |
$550.00 |
$682.00 |
$675.00 |
$720.00 |
| 390 | 611(H)0608 |
ADD'L DEPTH IN INLET CDI RCB 30SK DES. 8 | 5 | VF |
$500.00 |
$1,087.00 |
$780.00 |
$958.00 |
| 400 | 613(A)5208 |
18" R.C.PIPE CLASS III | 286 | LF |
$72.00 |
$96.40 |
$78.00 |
$165.00 |
| 410 | 613(A)5216 |
24" R.C.PIPE CLASS III | 3,066 | LF |
$80.75 |
$113.00 |
$118.00 |
$170.60 |
| 420 | 613(A)5224 |
36" R.C.PIPE CLASS III | 178 | LF |
$175.00 |
$186.00 |
$262.00 |
$244.50 |
| 430 | 613(A)5232 |
48" R.C.PIPE CLASS III | 150 | LF |
$160.00 |
$224.00 |
$415.00 |
$306.50 |
| 440 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 600 | LF |
$100.00 |
$113.00 |
$178.00 |
$175.00 |
| 450 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 3,106 | LF |
$40.00 |
$46.70 |
$48.00 |
$83.50 |
| 460 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 44 | LF |
$38.50 |
$168.50 |
$59.00 |
$190.00 |
| 470 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 96 | LF |
$52.00 |
$70.60 |
$71.00 |
$161.50 |
| 480 | 613(B)5532 |
42" CORR. GALV. STEEL PIPE | 26 | LF |
$75.00 |
$102.00 |
$118.00 |
$293.50 |
| 490 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,790 | LF |
$11.00 |
$44.80 |
$12.00 |
$49.50 |
| 500 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 448 | LF |
$13.00 |
$24.60 |
$12.00 |
$56.25 |
| 510 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 42 | EA |
$1,300.00 |
$2,407.00 |
$1,180.00 |
$2,995.00 |
| 520 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 96 | EA |
$1,200.00 |
$3,063.00 |
$1,750.00 |
$3,100.00 |
| 530 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$33,000.00 |
$75,000.00 |
$185,000.00 |
$148,000.00 |
| 540 | 619(B)6300 |
REMOVAL OF HEADWALL | 29 | EA |
$1,200.00 |
$850.00 |
$1,100.00 |
$1,090.00 |
| 550 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 24,461 | SY |
$8.00 |
$6.25 |
$6.00 |
$10.25 |
| 560 | 619(C)6600 |
SAWING PAVEMENT | 33,108 | LF |
$3.50 |
$1.85 |
$3.10 |
$5.35 |
| 570 | 624(A)3200 |
FENCE-STYLE WWF | 6,157 | LF |
$10.00 |
$10.50 |
$10.00 |
$13.30 |
| 580 | 624(B)3370 |
GATES-STYLE WWF (4.5'HIGH X 18' LONG) | 2 | EA |
$1,200.00 |
$1,760.00 |
$1,900.00 |
$870.00 |
| 590 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 12,343 | LF |
$5.50 |
$7.55 |
$8.00 |
$8.75 |
| 600 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 543 | LF |
$7.50 |
$8.15 |
$8.00 |
$10.00 |
| 610 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 22 | EA |
$100.00 |
$247.50 |
$255.00 |
$320.00 |
| 620 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 21 | EA |
$200.00 |
$302.50 |
$300.00 |
$380.00 |
| 630 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 80 | EA |
$20.00 |
$71.50 |
$85.00 |
$100.00 |
| 640 | 629(E)7600 |
MAILBOX | 81 | EA |
$44.50 |
$44.00 |
$50.00 |
$60.00 |
| 650 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$105,000.00 |
$50,000.00 |
$35,000.00 |
$21,660.00 |
| 660 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 21,860 | LF |
$0.2000 |
$0.3200 |
$0.3500 |
$0.4500 |
| 670 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 4,640 | LF |
$0.3000 |
$1.25 |
$1.30 |
$1.60 |
| 680 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 800 | EA |
$7.00 |
$8.25 |
$8.00 |
$11.00 |
| 690 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 800 | EA |
$6.80 |
$8.25 |
$8.00 |
$11.00 |
| 700 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 365 | SD |
$16.50 |
$55.00 |
$88.00 |
$64.00 |
| 710 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 365 | SD |
$31.80 |
$19.80 |
$25.00 |
$25.00 |
| 720 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,350 | LF |
$25.00 |
$15.60 |
$30.00 |
$21.25 |
| 730 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 350 | LF |
$5.00 |
$3.85 |
$15.00 |
$6.50 |
| 740 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,410 | SD |
$0.4500 |
$0.0300 |
$0.0200 |
$0.1500 |
| 750 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 33,750 | SD |
$0.8000 |
$0.0300 |
$0.0200 |
$0.1000 |
| 760 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,495 | SD |
$1.60 |
$3.30 |
$3.65 |
$4.25 |
| 770 | 880(B)6340 |
VARIABLE SPEED LIMIT SIGN | 730 | SD |
$11.50 |
$17.60 |
$18.00 |
$22.50 |
| 780 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 21,690 | SD |
$1.35 |
$0.0600 |
$0.0600 |
$0.1500 |
| 790 | 880(D)6500 |
VERTICAL PANELS | 8,250 | SD |
$0.2000 |
$0.3900 |
$0.4000 |
$0.5500 |
| 800 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 158,035 | SD |
$0.3000 |
$0.0600 |
$0.0600 |
$0.1000 |
| 810 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 99,055 | SD |
$0.2500 |
$0.0600 |
$0.0600 |
$0.1600 |
| 820 | 880(F)6700 |
DRUMS | 105,080 | SD |
$0.3000 |
$0.0300 |
$0.0200 |
$0.0700 |
| 830 | 880(G)6805 |
CHANNELIZER CONES | 90,805 | SD |
$0.4000 |
$0.7200 |
$0.8500 |
$0.3200 |
| 840 | 880(I)7000 |
FLAGGER | 730 | SD |
$135.00 |
$472.50 |
$40.00 |
$176.00 |
| 850 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 758 | SD |
$16.00 |
$27.50 |
$30.00 |
$37.00 |
| 860 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 58,653 | LF |
$0.4000 |
$0.5300 |
$0.2100 |
$0.7500 |
| 870 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 48 | EA |
$135.00 |
$104.50 |
$105.00 |
$140.00 |
| 880 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$410.00 |
$4,162.00 |
$3,700.00 |
$4,705.00 |
| 890 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 516.08 | SF |
$32.20 |
$36.30 |
$36.00 |
$42.85 |
| 900 | 851(C)2415 |
2" SQUARE TUBE POST | 127 | LF |
$12.00 |
$9.90 |
$10.00 |
$15.75 |
| 910 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 505 | LF |
$14.00 |
$11.00 |
$11.00 |
$14.75 |
| 920 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 4,253 | LF |
$0.5500 |
$0.4700 |
$0.4800 |
$0.7000 |
| 930 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 64,504 | LF |
$0.7500 |
$0.7400 |
$0.8500 |
$0.9000 |
| 940 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 112 | LF |
$9.20 |
$5.50 |
$5.00 |
$12.50 |
| 950 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$140,000.00 |
$185,000.00 |
$122,000.00 |
$181,600.00 |
| 960 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,250.00 |
$15,000.00 |
$22,000.00 |
$39,250.00 |
| 970 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$14,000.00 |
$11,000.00 |
$21,000.00 |
$60,000.00 |
| 980 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$935,000.00 |
$284,999.79 |
$622,001.51 |
$810,000.00 |