18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Mar 5, 2020 | 6340-20-001RMC - 634020001 | Montgomery Houston |
MILL AND OVERLAYIH 69 · | $593,087 | $620,838 | JAMES CONSTRUCTION GROUP, L.L.C. | +4.7% | 4 |
| Mar 5, 2020 | 6352-39-001RMC - 635239001 | Harris Houston |
REPLACE PAVEMENT MARKINGSSHNASA · | $879,667 | $580,685 | TOTAL HIGHWAY MAINTENANCE, LLC | -34.0% | 4 |
| Mar 5, 2020 | 6352-48-001RMC - 635248001 | Montgomery Houston |
REFLECTIVE PAVEMENT MARKINGS (LONGLINE)SH 105 · | $489,200 | $499,540 | PMI PAVEMENT MARKING, LLC | +2.1% | 3 |
| Mar 5, 2020 | 6352-59-001RMC - 635259001 | Midland Odessa |
EMERGENCY MBGF REPAIRIH 20 · | $532,175 | $472,225 | K-BAR SERVICES, INC. | -11.3% | 5 |
| Mar 5, 2020 | 6352-60-001RMC - 635260001 | Ector Odessa |
EMERGENCY MBGF REPAIRIH 20 · | $532,175 | $464,250 | K-BAR SERVICES, INC. | -12.8% | 5 |
| Mar 5, 2020 | 6331-09-001RMC - 633109001 | Polk Lufkin |
DRAINAGE REPAIRFM 350 · | $393,819 | $390,243 | SJ&J CONSTRUCTION, LLC | -0.9% | 1 |
| Mar 5, 2020 | 6358-25-001RMC - 635825001 | Potter Amarillo |
MOWING HIGHWAY ROW (URBAN)IH 40 · | $369,150 | $331,681 | ALL HANDS & DUKE, INC. | -10.2% | 5 |
| Mar 5, 2020 | 1061-01-033STP 2020(655)HES | Liberty Beaumont |
SFT- SAFETY IMPROVEMENT PROJECTFM 1010 · | $119,777 | $237,395 | FNH CONSTRUCTION, LLC | +98.2% | 2 |
| Mar 4, 2020 | 0076-08-027STP 2020(652) | Reagan San Angelo |
ADD PASSING LANESUS 67 · | $25,494,789 | $23,698,271 | REECE ALBERT, INC. | -7.0% | 3 |
| Mar 4, 2020 | 0006-02-121NH 2020(618) | Nolan Abilene |
OVERLAYIH 20 · | $17,602,174 | $20,032,974 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | +13.8% | 2 |
| Mar 4, 2020 | 0143-08-088BR 2020(629) | De Witt Yoakum |
CONSTRUCT ONE WAY BRIDGE AND APPROACHESUS 87 · | $16,094,405 | $15,556,721 | CAPITAL EXCAVATION COMPANY | -3.3% | 5 |
| Mar 4, 2020 | 3545-02-008CC 3545-2-8 | Hays Austin |
CONSTRUCT TWO LANES AND SHOULDERSFM 110 · | $19,750,688 | $14,699,792 | JAMES CONSTRUCTION GROUP, L.L.C. | -25.6% | 9 |
| Mar 4, 2020 | 0430-01-057CM 2020(661) | Dallas Dallas |
RECNST 4LN UNDIVIDED RUR TO 4 LN DIVIDED URBSH 352 · | $12,889,959 | $13,666,181 | ED BELL CONSTRUCTION COMPANY | +6.0% | 8 |
| Mar 4, 2020 | 0031-04-054STP 2020(667) | Collingsworth Childress |
SUPER 2 - SUBGRADE WIDENING, STRUCTURES & ACPUS 83 · | $11,075,529 | $11,250,761 | DUININCK, INC. | +1.6% | 6 |
| Mar 4, 2020 | 0073-07-062STP 2020(672)HES | Live Oak Corpus Christi |
IMPROVE GUARDRAIL TO DESIGN STANDARDSIH 37 · | $11,823,254 | $10,250,266 | ALTUS CONSTRUCTION LLC | -13.3% | 5 |
| Mar 4, 2020 | 0802-02-054NH 2020(529) | Wichita Wichita Falls |
ENCLOSE DRAINAGE DITCHFM 369 · | $6,808,995 | $5,580,883 | EARTH BUILDERS, L.P. | -18.0% | 5 |
| Mar 4, 2020 | 6356-67-001RMC - 635667001 | Bowie Atlanta |
CALLOUT CONCRETE PAVEMENT REPAIRUS 59 · | $4,619,000 | $5,399,700 | WINDING ROAD CONSTRUCTION, INC. | +16.9% | 2 |
| Mar 4, 2020 | 0668-02-020NH 2020(619) | Howard Abilene |
MILL, SPOT REPAIR AND OVERLAYFM 700 · | $3,538,755 | $4,167,074 | RK HALL, LLC | +17.8% | 2 |
| Mar 4, 2020 | 0014-07-102NH 2020(753) | Hill Waco |
OVERLAYIH 35 · | $3,850,809 | $3,699,699 | THE TRUESDELL CORPORATION | -3.9% | 4 |
| Mar 4, 2020 | 0688-02-057STP 2020(669) | Lamar Paris |
MILL AND INLAYFM 79 · | $2,614,368 | $3,050,337 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +16.7% | 3 |
| Mar 4, 2020 | 2562-01-020STP 2020(657) | Orange Beaumont |
REHABILITATE EXISTING ROADWAYFM 1442 · | $2,434,309 | $2,727,185 | RAGLE CONSTRUCTION, INC. | +12.0% | 2 |
| Mar 4, 2020 | 1004-02-017STP 2020(665) | Brazoria Houston |
PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAYFM 524 · | $2,633,017 | $2,696,289 | DURWOOD GREENE CONSTRUCTION CO. | +2.4% | 3 |
| Mar 4, 2020 | 6356-89-001MMC - 635689001 | McLennan Waco |
HOT MIX-MATERIAL ONLYUS 84 · | $2,836,080 | $2,635,350 | TEXAS MATERIALS GROUP, INC. | -7.1% | 3 |
| Mar 4, 2020 | 3212-06-020STP 2020(677) | Bexar San Antonio |
BASE REPAIR, MILL, INLAY, OVERLAY & PAV MARKSFM 3351 · | $2,719,489 | $2,608,775 | ANGEL BROTHERS HOLDINGS CORP. | -4.1% | 5 |
| Mar 4, 2020 | 6348-24-001RMC - 634824001 | Walker Bryan |
FLAGGING AND TRAFFIC CONTROLSH 75 · | $2,111,980 | $2,322,131 | AREA WIDE PROTECTIVE, INC. | +10.0% | 3 |
| Mar 4, 2020 | 1258-04-062STP 2020(666) | Harris Houston |
CONSTRUCTION OF AN OVERLAYFM 1093 · | $2,155,444 | $2,091,002 | ANGEL BROTHERS HOLDINGS CORP. | -3.0% | 3 |
| Mar 4, 2020 | 6356-87-001MMC - 635687001 | Limestone Waco |
HOT MIX-MATERIAL ONLYUS 84 · | $2,188,340 | $2,010,250 | TEXAS MATERIALS GROUP, INC. | -8.1% | 3 |
| Mar 4, 2020 | 1828-01-024BR 2020(656) | Tyler Beaumont |
BRIDGE REPLACEMENTFM 1943 · | $1,845,662 | $1,955,027 | MBN ENTERPRISES LLC | +5.9% | 3 |
| Mar 4, 2020 | 0910-36-129BR 2018(231) | Cherokee Tyler |
REPLACE BRIDGE & APPROACHESCR · | $1,673,192 | $1,943,347 | STATELINE CONSTRUCTION, LLC | +16.1% | 8 |
| Mar 4, 2020 | 0063-01-094STP 2020(439)HES | Harrison Atlanta |
SAFETY TREAT FIXED OBJECTSFM 1186 · | $2,187,578 | $1,847,140 | LONGVIEW BRIDGE AND ROAD, LTD. | -15.6% | 12 |
| Mar 4, 2020 | 0908-00-081STP 2020(521) | Taylor Abilene |
TRAFFIC CONTROL DEVICESVA · | $2,191,446 | $1,782,793 | FLAT LINE, INC. | -18.6% | 7 |
| Mar 4, 2020 | 6355-09-001RMC - 635509001 | Navarro Dallas |
GUARD FENCE & CABLE BARRIER REPAIRIH 45 · | $1,834,690 | $1,669,935 | FIREMAN EXCAVATING, INC. | -9.0% | 3 |
| Mar 4, 2020 | 6355-19-001RMC - 635519001 | Bell Waco |
DISTRICT WIDE PAVEMENT MARKINGSSH 317 · | $1,538,048 | $1,529,355 | PAVEMENT MARKINGS INC. | -0.6% | 4 |
| Mar 4, 2020 | 0910-08-076BR 2018(262) | Anderson Tyler |
REPLACE BRIDGES & APPROACHESCR · | $1,415,845 | $1,452,727 | STATELINE CONSTRUCTION, LLC | +2.6% | 8 |
| Mar 4, 2020 | 6356-88-001MMC - 635688001 | Hill Waco |
HOT MIX-MATERIAL ONLYSH 81 · | $1,315,343 | $1,393,833 | TEXAS MATERIALS GROUP, INC. | +6.0% | 3 |
| Mar 4, 2020 | 0914-00-401STP 2020(623) | Travis Austin |
CONSTRUCTION OF TRAFFIC SIGNALSVA · | $1,455,898 | $1,378,704 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -5.3% | 1 |
| Mar 4, 2020 | 0910-35-034BR 2018(115) | Wood Tyler |
REPLACE BRIDGE & APPROACHESCR · | $1,336,100 | $1,332,153 | STATELINE CONSTRUCTION, LLC | -0.3% | 7 |
| Mar 4, 2020 | 0113-13-182STP 2020(621)HES | Travis Austin |
INSTALL MEDIAN BARRIERSL 360 · | $1,251,500 | $1,310,000 | DAN WILLIAMS COMPANY | +4.7% | 6 |
| Mar 4, 2020 | 6345-61-001RMC - 634561001 | Grayson Paris |
ON CALL TY I & SPECIALTY STRIPINGUS 75 · | $1,299,924 | $1,112,788 | STRIPING TECHNOLOGY, L.P. | -14.4% | 5 |
| Mar 4, 2020 | 6356-85-001MMC - 635685001 | Falls Waco |
HOT MIX-MATERIAL ONLYSH 6 · | $1,252,330 | $1,108,250 | KNIFE RIVER CORPORATION - SOUTH | -11.5% | 3 |
| Mar 4, 2020 | 0356-02-048STP 2020(635) | Carson Amarillo |
REPLACE EXISTING LIFT STATIONSH 207 · | $1,133,460 | $1,042,468 | L A FULLER & SONS CONSTRUCTION, LTD. | -8.0% | 5 |
| Mar 4, 2020 | 2681-01-025NH 2020(812) | Denton Dallas |
FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGSFM 2499 · | $1,119,200 | $997,921 | SILVER CREEK CONSTRUCTION, INC. | -10.8% | 9 |
| Mar 4, 2020 | 0220-05-081STP 2020(626)HES | Cameron Pharr |
INSTALL TRAFFIC SIGNALSH 48 · | $901,745 | $801,029 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -11.2% | 3 |
| Mar 4, 2020 | 0912-72-565CC 912-72-565 | Harris Houston |
SIGNING AND PAVEMENT MARKINGSVA · | $1,231,687 | $776,519 | BATTERSON, LLP | -37.0% | 3 |
| Mar 4, 2020 | 0902-38-128STP 1802(499)TP | Parker Fort Worth |
BICYCLE AND PEDESTRIAN IMPROVEMENTSVA · | $860,462 | $772,789 | TI-ZACK CONCRETE, INC. | -10.2% | 13 |
| Mar 4, 2020 | 6354-01-001RMC - 635401001 | Wise Fort Worth |
ROADSIDE MOWINGUS 81 · | $581,893 | $756,946 | CROSS PLUS CONSTRUCTION, LLC | +30.1% | 2 |
| Mar 4, 2020 | 6350-95-001RMC - 635095001 | Bexar San Antonio |
INSTALL OSBIH 35 · | $398,350 | $659,594 | MICA CORPORATION | +65.6% | 2 |
| Mar 4, 2020 | 0010-19-013STP 2020(786)HES | Bowie Atlanta |
INSTALLATION OF ADVANCE WARNING SIGNS AND CHEVRONSFM 991 · | $641,365 | $659,420 | CHAMPION INFRASTRUCTURE, LLC | +2.8% | 7 |
| Mar 4, 2020 | 6354-06-001RMC - 635406001 | Harris Houston |
REPLACE PAVEMENT MARKINGSIH 69 · | $670,802 | $610,601 | BATTERSON, LLP | -9.0% | 4 |
| Mar 4, 2020 | 6353-20-001RMC - 635320001 | Uvalde San Antonio |
EROSION REPAIRSH 55 · | $574,239 | $565,930 | K-BAR SERVICES, INC. | -1.4% | 7 |
| Mar 4, 2020 | 0910-12-138BR 1902(398) | Van Zandt Tyler |
BRIDGE REPLACEMENTCR · | $499,749 | $552,443 | STATELINE CONSTRUCTION, LLC | +10.5% | 9 |
| Mar 4, 2020 | 6356-78-001MMC - 635678001 | McLennan Waco |
EMULSION-MATERIAL ONLYUS 84 · | $553,785 | $550,747 | ERGON ASPHALT & EMULSIONS, INC. | -0.5% | 2 |
| Mar 4, 2020 | 6354-04-001RMC - 635404001 | Harris Houston |
GUARDRAIL REPAIRSH 249 · | $591,010 | $532,256 | ISI CONTRACTING, INC. | -9.9% | 2 |
| Mar 4, 2020 | 6355-47-001RMC - 635547001 | Dallas Dallas |
GRAFFITI REMOVALSH 78 · | $719,500 | $521,250 | FIREMAN EXCAVATING, INC. | -27.6% | 6 |
| Mar 4, 2020 | 0906-00-191STP 2020(651) | Ector Odessa |
PAVEMENT MARKINGS (NON-IH)VA · | $2,744,765 | $440,357 | L&L COMPANY | -84.0% | 7 |
| Mar 4, 2020 | 0906-00-190NH 2020(841) | Ector Odessa |
PAVEMENT MARKINGS (IH)VA · | $1,900,874 | $404,942 | L&L COMPANY | -78.7% | 7 |
| Mar 4, 2020 | 0074-06-251NH 2020(768) | Nueces Corpus Christi |
MILLED IN RUMBLE STRIPSIH 37 · | $758,084 | $386,595 | L&L COMPANY | -49.0% | 5 |
| Mar 4, 2020 | 6351-74-001RMC - 635174001 | Denton Dallas |
RAISED PAVEMENT MARKERSIH 35 · | $413,810 | $384,828 | THOMAS 11 DEVELOPMENT LLC | -7.0% | 3 |
| Mar 4, 2020 | 6351-55-001RMC - 635155001 | Lamar Paris |
ON CALL TY-II STRIPINGUS 82 · | $299,460 | $311,250 | STRIPING TECHNOLOGY, L.P. | +3.9% | 5 |
| Mar 4, 2020 | 0388-01-060STP 2020(625)HES | Polk Lufkin |
INSTALL ADVANCE WARNING SIGNALSH 146 · | $297,092 | $298,744 | THIRD COAST SERVICES LLC | +0.6% | 4 |
| Mar 4, 2020 | 6340-83-001BPM - 634083001 | Waller Houston |
MISCELLANEOUS BRIDGE REPAIRFM 1488 · | $319,750 | $149,525 | SCR CIVIL CONSTRUCTION, LLC | -53.2% | 6 |
| Mar 2, 2020 | 6358-95-001MMC - 635895001 | Culberson El Paso |
EMULSION (MATERIAL ONLY)RM 2424 · | $282,916 | $206,529 | ERGON ASPHALT & EMULSIONS, INC. | -27.0% | 1 |
| Mar 2, 2020 | 6358-94-001MMC - 635894001 | Hudspeth El Paso |
EMULSION (MATERIAL ONLY)RM 2317 · | $202,101 | $169,187 | ERGON ASPHALT & EMULSIONS, INC. | -16.3% | 1 |
| Mar 2, 2020 | 6358-96-001MMC - 635896001 | Culberson El Paso |
EMULSION (MATERIAL ONLY)RM 1108 · | $183,552 | $131,699 | ERGON ASPHALT & EMULSIONS, INC. | -28.3% | 1 |
| Feb 19, 2020 | 6343-57-001BPM - 634357001 | Karnes Corpus Christi |
CONCRETE STRUCTURE REPAIRFM 791 · | $293,245 | $836,534 | RELMCO, INC. | +185.3% | 6 |
| Feb 19, 2020 | 6343-59-001BPM - 634359001 | Refugio Corpus Christi |
BRIDGE PREVENTATIVE MAINTENANCESH 35 · | $291,818 | $189,060 | SJ&J CONSTRUCTION, LLC | -35.2% | 7 |
| Feb 7, 2020 | 0463-06-028STP 2020(573) | Winkler Odessa |
ROADWAY REHABILITATIONSH 302 · | $59,930,087 | $63,338,505 | FNF CONSTRUCTION, INC. | +5.7% | 4 |
| Feb 7, 2020 | 6336-08-001RMC - 633608001 | Travis Austin |
PERFORMANCE BASED CONTRACTSH 130 · | $27,449,730 | $22,626,610 | ROY JORGENSEN ASSOCIATES, INC. | -17.6% | 4 |
| Feb 7, 2020 | 6344-05-001RMC - 634405001 | Liberty Beaumont |
STABILIZE BANK OF TRINITY RIVERFM 787 · | $14,810,762 | $15,552,096 | TEXAS MATERIALS GROUP, INC. | +5.0% | 6 |
| Feb 7, 2020 | 0446-03-047BR 2019(096) | Colorado Yoakum |
REPLACE BRIDGE AND APPROACHESUS 90A · | $11,245,966 | $12,487,777 | ZACHRY CONSTRUCTION CORPORATION | +11.0% | 2 |
| Feb 7, 2020 | 0005-02-118NH 2020(570) | Midland Odessa |
ROADWAY REHABILITATIONBI 20-E · | $14,628,167 | $12,018,225 | REECE ALBERT, INC. | -17.8% | 5 |
| Feb 7, 2020 | 0495-03-063NH 2020(301) | Van Zandt Tyler |
PLANING, PAVEMENT REPAIR, OCST, OV, MBGF, PV MKIH 20 · | $6,817,962 | $6,622,009 | AUSTIN BRIDGE & ROAD SERVICES, LP | -2.9% | 2 |
| Feb 7, 2020 | 0658-01-044STP 2020(557)MM | Bexar San Antonio |
EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SWFM 1535 · | $5,732,853 | $5,683,754 | J3 COMPANY, LLC | -0.9% | 7 |
| Feb 7, 2020 | 0120-05-026STP 2020(564) | Hamilton Waco |
REHAB & WIDEN ROADWAYFM 218 · | $4,906,992 | $5,387,759 | BIG CREEK CONSTRUCTION, LTD. | +9.8% | 5 |
| Feb 7, 2020 | 0902-00-167STP 2020(582) | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALVA · | $4,999,994 | $4,660,000 | DURABLE SPECIALTIES, INC. | -6.8% | 2 |
| Feb 7, 2020 | 0913-09-089BR 1702(587) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $3,424,358 | $3,985,642 | TREVWAY, INC. | +16.4% | 3 |
| Feb 7, 2020 | 2150-02-009SSW 215-2-9 | Webb Laredo |
BASE,GRADE,ACP,PAV MARKFM 1472 · | $2,458,000 | $3,148,791 | ANDERSON COLUMBIA CO., INC. | +28.1% | 6 |
| Feb 7, 2020 | 0550-02-049STP 2020(581) | Erath Fort Worth |
RESURFACE ROADWAYFM 8 · | $3,528,459 | $3,111,772 | NORTHEASTERN PAVERS, LLC | -11.8% | 3 |
| Feb 7, 2020 | 0367-01-070NH 2020(641) | Chambers Beaumont |
OV-OVERLAYSH 124 · | $2,843,823 | $2,844,750 | ANGEL BROTHERS HOLDINGS CORP. | +0.0% | 3 |
| Feb 7, 2020 | 0924-00-142STP 2020(535) | El Paso El Paso |
FY 2020 STRIPING PROJECTVA · | $2,965,381 | $2,744,921 | CENTERLINE TECHNOLOGIES, LLC | -7.4% | 4 |
| Feb 7, 2020 | 0113-02-065NH 2020(541) | Gillespie Austin |
OVERLAYUS 290 · | $3,104,717 | $2,725,725 | LONE STAR PAVING COMPANY | -12.2% | 8 |
| Feb 7, 2020 | 0101-05-036NH 2020(533) | San Patricio Corpus Christi |
OVERLAY OF EXISTING ROADWAYUS 181 · | $2,449,236 | $2,555,979 | BAY LTD. | +4.4% | 3 |
| Feb 7, 2020 | 0055-01-029STP 2020(530)HES | Mills Brownwood |
PROFILE CENTER & EDGELINE AND THERMO STRIPINGUS 84 · | $2,792,837 | $2,363,261 | DOUBLE A CONTRACTING, L.P. | -15.4% | 8 |
| Feb 7, 2020 | 0558-07-019STP 2020(645) | Glasscock San Angelo |
SEAL COATRM 33 · | $2,441,118 | $2,255,155 | BRANNAN PAVING CO., LTD. | -7.6% | 3 |
| Feb 7, 2020 | 0177-03-103NH 2020(591) | Liberty Beaumont |
OV-OVERLAYUS 59 · | $2,742,971 | $2,133,678 | SMITH & COMPANY | -22.2% | 5 |
| Feb 7, 2020 | 6353-58-001RMC - 635358001 | Fayette Yoakum |
METAL BEAM GUARDFENCE REPAIR (ON CALL)IH 10 · | $2,586,600 | $1,973,450 | ELITE CASTLE RESOURCES LLC | -23.7% | 3 |
| Feb 7, 2020 | 6353-78-001RMC - 635378001 | Hopkins Paris |
FULL DEPTH CONCRETE REPAIRIH 30 · | $2,003,692 | $1,777,711 | GHB EQUIPMENT COMPANY, L.L.C. | -11.3% | 5 |
| Feb 7, 2020 | 0543-01-065STP 2020(595) | Waller Houston |
PLANING, SEAL COAT, ACP OVERLAY AND TEXTURINGFM 359 · | $1,753,720 | $1,597,357 | ANGEL BROTHERS HOLDINGS CORP. | -8.9% | 5 |
| Feb 7, 2020 | 0520-08-068STP 2020(561) | Anderson Tyler |
PLANING, PVT REPAIR, OCST, ACP, MBGF & PV MKSH 155 · | $2,276,343 | $1,534,653 | REYNOLDS & KAY, LTD. | -32.6% | 5 |
| Feb 7, 2020 | 0918-47-179STP 2020(580)HES | Dallas Dallas |
INSTALLATION OF TRAFFIC SIGNALSCS · | $1,579,756 | $1,480,000 | DURABLE SPECIALTIES, INC. | -6.3% | 3 |
| Feb 7, 2020 | 2021-01-013STP 2020(559) | Comal San Antonio |
REHABILITATE EXISTING ROADWAYFM 1044 · | $1,669,288 | $1,447,351 | ANGEL BROTHERS HOLDINGS CORP. | -13.3% | 7 |
| Feb 7, 2020 | 0905-00-107STP 2020(569) | Lubbock Lubbock |
TRAFFIC CONTROL DEVICESVA · | $1,175,541 | $1,385,650 | BRYDL CONTRACTING, INC. | +17.9% | 3 |
| Feb 7, 2020 | 6354-20-001RMC - 635420001 | Zavala Laredo |
SPOT BASE REPAIRFM 393 · | $1,424,893 | $1,349,226 | ANDERSON COLUMBIA CO., INC. | -5.3% | 4 |
| Feb 7, 2020 | 0904-00-188STP 2020(551) | Potter Amarillo |
IMPROVE TRAFFIC SIGNALSVA · | $1,254,778 | $1,274,692 | SIEMENS MOBILITY, INC. | +1.6% | 2 |
| Feb 7, 2020 | 6315-49-001RMC - 631549001 | Tarrant Fort Worth |
MULTIPOLYMER STRIPING,RPM'S & ELIMINATIONSH 360 · | $1,693,939 | $1,246,955 | TOTAL HIGHWAY MAINTENANCE, LLC | -26.4% | 2 |
| Feb 7, 2020 | 6355-20-001RMC - 635520001 | Trinity Lufkin |
ON-CALL TRAFFIC CONTROL SERVICESSH 19 · | $1,073,055 | $1,156,905 | AREA WIDE PROTECTIVE, INC. | +7.8% | 2 |
| Feb 7, 2020 | 6353-60-001RMC - 635360001 | Wharton Yoakum |
METAL BEAM GUARDFENCE REPAIR (ON CALL)US 59 · | $1,344,400 | $1,148,040 | K-BAR SERVICES, INC. | -14.6% | 4 |
| Feb 7, 2020 | 6346-34-001RMC - 634634001 | Harris Houston |
BEARING PAD REPLACEMENT, BRIDGE JOINT REPAIR, MISCIH 69 · | $1,153,197 | $1,121,901 | RAGLE CONSTRUCTION, INC. | -2.7% | 6 |
| Feb 7, 2020 | 6349-60-001RMC - 634960001 | Harris Houston |
MNT OF ILLUMINATION SYSIH 610 · | $1,165,565 | $969,087 | LINDSEY ELECTRIC, L.P. | -16.9% | 7 |
| Feb 7, 2020 | 6349-59-001RMC - 634959001 | Harris Houston |
PREV MNT OF SGNL EQUIPIH 610 · | $1,264,010 | $935,089 | LINDSEY ELECTRIC, L.P. | -26.0% | 8 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.