Let dateCCSJCounty / DistrictProject EstimateLow bidLow bidder% vs est.Bidders
Jul 31, 2026 6494-09-001BPM - A00218500 Lavaca
Yoakum
BPM Concrete Repairs FY 26 #3US0077 · Bridge Preventative Maintenance - Sealed $177,860 $118,350 MACIAS SPECIALTY CONTRACTING LLC -33.5% 4
Jul 30, 2026 6500-82-001RMC - A00220953 Parker
Fort Worth
FY27, Crack Seal, Parker, Palo PintoIH0020 · Routine Maintenance Project - Sealed $771,547 $725,924 D & M CONTRACTORS, LLC -5.9% 4
Jul 30, 2026 6500-79-001RMC - A00220947 Wise
Fort Worth
FY27 Crack Seal, Jack & WiseUS0081 · Routine Maintenance Project - Sealed $669,139 $678,879 D & M CONTRACTORS, LLC +1.5% 3
Jul 30, 2026 6500-83-001RMC - A00220954 Erath
Fort Worth
FY27, Crack Seal, HESUS0067 · Routine Maintenance Project - Sealed $611,308 $474,636 D & M CONTRACTORS, LLC -22.4% 2
Jul 30, 2026 6500-81-001RMC - A00220952 Tarrant
Fort Worth
FY27, Crack Seal, S TarrantUS0287 · Routine Maintenance Project - Sealed $316,967 $371,857 D & M CONTRACTORS, LLC +17.3% 4
Jul 30, 2026 6500-84-001RMC - A00220956 Johnson
Fort Worth
FY27, Crack Seal, JohnsonUS0287 · Routine Maintenance Project - Sealed $184,437 $172,508 D & M CONTRACTORS, LLC -6.5% 2
Jul 30, 2026 6500-80-001RMC - A00220950 Tarrant
Fort Worth
FY27Crack Seal North TarrantUS0081 · Routine Maintenance Project - Sealed $115,081 $148,858 BUYME TX LLC +29.4% 4
Jul 30, 2026 6501-77-001RMC - A00221566 Erath
Fort Worth
FY27, Sweeping and Debris, HESUS0377 · Routine Maintenance Project - Sealed $83,862 $81,748 SWEEPING CORPORATION OF AMERICA, LLC -2.5% 1
Jul 30, 2026 6507-66-001SUP - A00223632 San Saba
Brownwood
SU JAN SAN SABA 2027US0190 · State Use Project $29,977 — 0
Jul 30, 2026 6507-86-001SUP - A00223662 Stephens
Brownwood
STATE USE PICNIC AREA MAINT-STEPHENSUS0183 · State Use Project $101,241 — 0
Jul 29, 2026 6505-04-001MMC - A00222994 Randall
Amarillo
FY 27 Amarillo Area HMACIH0027 · Material Maintenance Project $625,000 $625,000 RK HALL, LLC 0.0% 2
Jul 29, 2026 6505-13-001MMC - A00223006 Hansford
Amarillo
FY 27 Hydraulic CementSH0136 · Material Maintenance Project $472,200 $518,079 AKA-MATERIALS +9.7% 1
Jul 29, 2026 6498-55-001BPM - A00220022 Potter
Amarillo
FY 27 BPM Joint Clean & SealIH0040 · Bridge Preventative Maintenance - Sealed $745,014 $434,096 REAR CONTRACTORS LLC -41.7% 7
Jul 29, 2026 6501-68-001RMC - A00221529 Comal
San Antonio
CRACK SEAL FOR NEW BRAUNFELS A.O. FY27FM0306 · Routine Maintenance Project - Sealed $281,258 $314,293 CRACKSEAL OF TEXAS, LLC +11.7% 3
Jul 29, 2026 6501-67-001RMC - A00221528 Medina
San Antonio
CRACK SEAL FOR HONDO A.O. FOR FY27FM0471 · Routine Maintenance Project - Sealed $294,739 $271,090 SCOUT 5 CONSTRUCTION LLC -8.0% 5
Jul 29, 2026 6501-69-001RMC - A00221530 Bexar
San Antonio
CRACK SEAL FOR B.M.A.O FOR FY27FM1976 · Routine Maintenance Project - Sealed $267,986 $267,968 CRACKSEAL OF TEXAS, LLC 0.0% 3
Jul 29, 2026 6501-66-001RMC - A00221527 Kerr
San Antonio
CRACK SEAL FOR KERRVILLE A.O. FY27FM1338 · Routine Maintenance Project - Sealed $244,319 $257,244 SCOUT 5 CONSTRUCTION LLC +5.3% 4
Jul 29, 2026 6501-70-001RMC - A00221531 Bexar
San Antonio
CRACK SEAL FOR NORTH BEXAR AO FOR FY 27IH0410 · Routine Maintenance Project - Sealed $156,005 $153,491 CRACKSEAL OF TEXAS, LLC -1.6% 3
Jul 28, 2026 6499-27-001RMC - A00220200 Real
San Angelo
REAL/EDWARDS COUNTY MOWING FY 27US0083 · Routine Maintenance Project $290,431 $348,532 R&M INCORPORATED +20.0% 2
Jul 28, 2026 6507-53-001EMC - A00223591 Uvalde
San Antonio
RM 481 Bridge Emergency July 2026 FloodFM0481 · Emergency Maintenance Project - Sealed $3,057,574 — 0
Jul 27, 2026 6496-14-001SUP - A00219103 Montgomery
Houston
Litter Pick-up & Removal SUP 6496-14-001IH0045 · State Use Project $890,292 — 0
Jul 25, 2026 6507-20-001SUP - A00223509 Sabine
Lufkin
2026-07 Sabine Picnic and GroundsFM0083 · State Use Project $61,146 — 0
Jul 23, 2026 6499-95-001BPM - A00220543 Sabine
Lufkin
2026-07 North BPMUS0096 · Bridge Preventative Maintenance - Sealed $999,980 $807,680 ACE CONTRACTORS, INC. -19.2% 5
Jul 23, 2026 6499-44-001RMC - A00220327 Houston
Lufkin
2026-07 Houston Crack Seal (South)US0287 · Routine Maintenance Project - Sealed $733,810 $597,887 GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY -18.5% 5
Jul 23, 2026 6505-21-001MMC - A00223026 Hopkins
Paris
LRA Hopkins/Franklin FY27IH0030 · Material Maintenance Project - Sealed $544,650 $524,880 MARTIN MARIETTA MATERIALS, INC. -3.6% 2
Jul 23, 2026 6488-50-001RMC - A00217123 Reagan
San Angelo
Mowing Reagan/Irion FY 27US0067 · Routine Maintenance Project - Sealed $193,459 $183,407 LUKEDA SANDBLASTING & SERVICES LLC -5.2% 4
Jul 23, 2026 6485-05-001RMC - A00215785 Coke
San Angelo
COKE COUNTY MOWING FY 27SH0158 · Routine Maintenance Project - Sealed $166,686 $167,400 BOEN LANDSCAPING & IRRIGATION, LLC +0.4% 5
Jul 23, 2026 6490-75-001RMC - A00217692 Angelina
Lufkin
2026-07 Angelina Tree and Brush RemovalUS0059 · Routine Maintenance Project - Sealed $150,500 $133,175 Harden Enterprise Services LLC -11.5% 7
Jul 23, 2026 6508-02-001SUP - A00223680 Travis
Austin
District HQ Window Washing FY27IH0035 · State Use Project $4,920 — 0
Jul 22, 2026 6499-39-001RMC - A00220284 Nacogdoches
Lufkin
2026-07 Nacogdoches Crack Seal (North)US0059 · Routine Maintenance Project $585,324 $532,857 SCOUT 5 CONSTRUCTION LLC -9.0% 5
Jul 22, 2026 6499-94-001BPM - A00220542 Angelina
Lufkin
2026-07 Angelina Clean and Seal JointsUS0059 · Bridge Preventative Maintenance - Sealed $380,860 $225,584 12TWELVE ROAD AND BRIDGE LLC -40.8% 8
Jul 22, 2026 6497-32-001BPM - A00219576 Guadalupe
San Antonio
FY27 US90A at Darst CreekUA0090 · Bridge Preventative Maintenance - Sealed $218,299 $175,688 TAYLOR BRIDGE LLC -19.5% 4
Jul 22, 2026 6498-58-001BPM - A00220027 Comal
San Antonio
FY26 FM 2673 at DrawFM2673 · Bridge Preventative Maintenance - Sealed $74,026 $58,369 TAYLOR BRIDGE LLC -21.2% 4
Jul 22, 2026 6497-74-001BPM - A00219780 Wilson
San Antonio
FY27 US 181 AT KICASTER CREEKUS0181 · Bridge Preventative Maintenance - Sealed $63,239 $51,322 TAYLOR BRIDGE LLC -18.8% 2
Jul 21, 2026 6502-52-001RMC - A00221844 Nueces
Corpus Christi
6502-52-001 Mill and OverlayFM0665 · Routine Maintenance Project - Sealed $682,013 $609,237 TEXAS MATERIALS GROUP, INC. -10.7% 4
Jul 21, 2026 6503-71-001BPM - A00222462 Smith
Tyler
FY 27 BPM Site Specific CentralIH0020 · Bridge Preventative Maintenance - Sealed $621,455 $553,299 RED BARON BUILDING COMPANY MUNICIPAL PROJECTS DIVISION LLC -11.0% 5
Jul 21, 2026 6497-39-001RMC - A00219602 Jefferson
Beaumont
FY27 MBGFIH0010 · Routine Maintenance Project - Sealed $665,155 $473,882 T&L CLEANING SERVICES LLC -28.8% 5
Jul 21, 2026 6500-33-001BPM - A00220735 Gregg
Tyler
FY 27 BPM - Site Specific - EastIH0020 · Bridge Preventative Maintenance - Sealed $628,992 $473,835 GHB EQUIPMENT COMPANY, L.L.C. -24.7% 3
Jul 21, 2026 6500-34-001BPM - A00220736 Anderson
Tyler
FY27 BPM - Site Specific - WestUS0287 · Bridge Preventative Maintenance - Sealed $425,485 $411,597 ICOS MANAGEMENT, LLC -3.3% 4
Jul 21, 2026 6486-95-001RMC - A00216493 Jasper
Beaumont
2027 OA MBGFUS0096 · Routine Maintenance Project - Sealed $532,482 $313,007 T&L CLEANING SERVICES LLC -41.2% 4
Jul 21, 2026 6506-56-001SUP - A00223381 Rains
Paris
Grounds Rains 27US0069 · State Use Project $12,940 — 0
Jul 21, 2026 6506-59-001SUP - A00223391 Red River
Paris
Grounds Maint Red River 27US0082 · State Use Project $10,620 — 0
Jul 21, 2026 6507-46-001SUP - A00223552 Randall
Amarillo
Janitorial Canyon Maint. Office FY 27US0060 · State Use Project $15,073 — 0
Jul 20, 2026 6506-53-001SUP - A00223378 Franklin
Paris
Janitorial - Franklin 27SH0037 · State Use Project $18,719 — 0
Jul 16, 2026 6502-30-001RMC - A00221766 Wichita
Wichita Falls
Crack Seal FY2027US0287 · Routine Maintenance Project - Sealed $643,947 $765,828 ANTHONY SERVICES +18.9% 4
Jul 16, 2026 6499-22-001RMC - A00220181 Concho
San Angelo
CONCHO/MENARD COUNTY MOWING FY 27US0087 · Routine Maintenance Project $266,010 $270,356 TRIPLE T MAINTENANCE INC. +1.6% 3
Jul 16, 2026 6499-24-001RMC - A00220183 Sterling
San Angelo
STERLING/GLASSCOCK COUNTY MOWING FY 27US0087 · Routine Maintenance Project $227,949 $237,103 DESERT LUXURY TRANSPORTATION, LLC +4.0% 4
Jul 15, 2026 6501-25-001RMC - A00221392 Midland
Odessa
6501-25-001 Callout Traffic ControlIH0020 · Routine Maintenance Project - Sealed $860,500 $1,686,750 FC TRAFFIC CONTROL, LLC +96.0% 1
Jul 15, 2026 6501-26-001RMC - A00221393 Pecos
Odessa
6501-26-001 Callout Traffic ControlIH0010 · Routine Maintenance Project - Sealed $592,900 $1,187,750 FC TRAFFIC CONTROL, LLC +100.3% 2
Jul 15, 2026 6501-19-001RMC - A00221362 Wichita
Wichita Falls
On-Call MBGF FY27US0287 · Routine Maintenance Project - Sealed $890,600 $779,554 AUSTIN BARRICADE COMPANY, L.L.C. -12.5% 4
Jul 15, 2026 6504-23-001RMC - A00222667 Mills
Brownwood
TREE TRIMMING AND BRUSH REMOVAL MILLSUS0084 · Routine Maintenance Project $985,810 $680,182 MARLANE CONSTRUCTION, LLC -31.0% 6
Jul 15, 2026 6502-09-001RMC - A00221696 Cass
Atlanta
Tree & Stump Removal/Trimming (N) FY '27SH0008 · Routine Maintenance Project $955,847 $673,520 CATOCON, INC. -29.5% 3
Jul 15, 2026 6494-89-001RMC - A00218662 McCulloch
Brownwood
TREE TRIMMING AND BRUSH REMOVAL MCCULLOCUS0377 · Routine Maintenance Project $996,443 $651,000 ALLIES LAND CLEARING -34.7% 5
Jul 15, 2026 6504-22-001RMC - A00222666 Eastland
Brownwood
TREE TRIMMING AND BRUSH REMOVAL EASTLANDSH0036 · Routine Maintenance Project $899,896 $615,708 MARLANE CONSTRUCTION, LLC -31.6% 7
Jul 15, 2026 6501-20-001RMC - A00221365 Wichita
Wichita Falls
On-Call Cable Barrier Repair FY27US0287 · Routine Maintenance Project - Sealed $619,618 $600,844 AUSTIN BARRICADE COMPANY, L.L.C. -3.0% 4
Jul 15, 2026 6502-11-001RMC - A00221699 Panola
Atlanta
Tree & Stump Removal/Trimming - PanolaUS0059 · Routine Maintenance Project $641,988 $479,269 RHINO EQUITY, LLC -25.3% 4
Jul 15, 2026 6503-83-001MMC - A00222518 Walker
Bryan
FY26 Huntsville AO Hydraulic Cement - 07IH0045 · Material Maintenance Project $467,520 $424,640 TOUCHSTONE RESOURCES, LLC -9.2% 3
Jul 15, 2026 6502-13-001RMC - A00221701 Harrison
Atlanta
Tree & Stump Removal/Trimming - HarrisonUS0059 · Routine Maintenance Project $482,105 $354,692 RHINO EQUITY, LLC -26.4% 4
Jul 15, 2026 6502-12-001RMC - A00221700 Marion
Atlanta
Tree & Stump Removal/Trimming - MarionSH0049 · Routine Maintenance Project $468,924 $338,876 CEHAND SERVICES LLC -27.7% 6
Jul 15, 2026 6503-53-001MMC - A00222415 Palo Pinto
Fort Worth
FY '27 Palo Pinto MMC Sodium ChlorideIH0020 · Material Maintenance Project $309,874 $306,104 NSG LOGISTICS, LLC -1.2% 2
Jul 15, 2026 6503-86-001MMC - A00222521 Walker
Bryan
FY26 Huntsville AO Bulk Salt - 07IH0045 · Material Maintenance Project $292,160 $292,075 NSG LOGISTICS, LLC 0.0% 1
Jul 15, 2026 6503-89-001MMC - A00222524 Brazos
Bryan
FY26 Bryan AO Complex Chloride - 07SH0006 · Material Maintenance Project $224,640 $220,227 NSG LOGISTICS, LLC -2.0% 1
Jul 15, 2026 6503-52-001MMC - A00222414 Palo Pinto
Fort Worth
FY '27 Palo Pinto MMC Brine SaltIH0020 · Material Maintenance Project $187,830 $200,934 NSG LOGISTICS, LLC +7.0% 2
Jul 15, 2026 6505-27-001MMC - A00223039 San Saba
Brownwood
HOT-MIX (MAT ONLY) SAN SABA COUNTYUS0190 · Material Maintenance Project $222,000 $178,980 BIG CREEK CONSTRUCTION, LTD. -19.4% 4
Jul 15, 2026 6503-51-001MMC - A00222399 Palo Pinto
Fort Worth
FY '27 Palo Pinto MMC Brine SolutionIH0020 · Material Maintenance Project $175,000 $170,000 NSG LOGISTICS, LLC -2.9% 2
Jul 15, 2026 6503-91-001MMC - A00222526 Washington
Bryan
FY26 Brenham AO TY B Gr 5 - 07SH0036 · Material Maintenance Project $120,000 $115,500 TOUCHSTONE RESOURCES, LLC -3.8% 5
Jul 15, 2026 6506-70-001SUP - A00223405 Fayette
Yoakum
Rubber Pickup IH 10 (2026)IH0010 · State Use Project $752,122 — 0
Jul 14, 2026 6495-91-001RMC - A00218978 Harris
Houston
FY 26, Sign Maint & Rpr, N Harris CountySH0249 · Routine Maintenance Project - Sealed $659,077 $952,987 RHINO EQUITY, LLC +44.6% 3
Jul 14, 2026 6499-81-001RMC - A00220501 Ector
Odessa
6499-81-001 Callout Traffic ControlIH0020 · Routine Maintenance Project $771,550 $770,900 FC TRAFFIC CONTROL, LLC -0.1% 1
Jul 14, 2026 6498-57-001RMC - A00220026 Galveston
Houston
FY 2026 FULL DEPTH CONCRETE REPAIRFM0518 · Routine Maintenance Project - Sealed $921,114 $757,739 ISI CONTRACTING, INC. -17.7% 4
Jul 14, 2026 6500-97-001BPM - A00221196 Waller
Houston
BPM 6500-97-001US0290 · Bridge Preventative Maintenance - Sealed $721,750 $716,400 ISI CONTRACTING, INC. -0.7% 5
Jul 14, 2026 6496-99-001BPM - A00219512 Harris
Houston
IH 10 at Wayside Dr and McCarty StIH 10 · Bridge Preventative Maintenance - Sealed $666,280 $488,125 ISI CONTRACTING, INC. -26.7% 8
Jul 14, 2026 6499-37-001BPM - A00220258 Grimes
Bryan
FY27 - Grimes Co BPM - 07FM2620 · Bridge Preventative Maintenance $523,545 $487,782 ODUM SERVICES, LLC -6.8% 4
Jul 14, 2026 6438-94-001BPM - A00195227 Brazoria
Houston
BAO Bridge Repair at RailRoads FY27SH0288 · Bridge Preventative Maintenance - Sealed $560,454 $378,060 SCR CIVIL CONSTRUCTION, LLC -32.5% 9
Jul 14, 2026 6503-82-001MMC - A00222517 Milam
Bryan
FY26 Milam HMA - 07SH0036 · Material Maintenance Project $438,000 $372,300 LONE STAR PAVING COMPANY -15.0% 3
Jul 14, 2026 6499-83-001RMC - A00220506 Waller
Houston
RMC 6499-83-001US0290 · Routine Maintenance Project - Sealed $525,410 $327,294 T&L CLEANING SERVICES LLC -37.7% 4
Jul 14, 2026 6495-75-001RMC - A00218945 Brazoria
Houston
FY 26 Ditch Cleaning & ReshapingSH0288 · Routine Maintenance Project - Sealed $409,931 $320,088 RELIANT SAND AND CONSTRUCTION, INC. -21.9% 4
Jul 14, 2026 6504-31-001RMC - A00222690 Pecos
Odessa
6504-31-001 Cleaning & Sealing CracksIH0010 · Routine Maintenance Project - Sealed $280,079 $236,501 SCOUT 5 CONSTRUCTION LLC -15.6% 5
Jul 14, 2026 6503-85-001MMC - A00222520 Washington
Bryan
FY26 Brenham AO Riprap - 07SH0036 · Material Maintenance Project $225,000 $231,200 TOUCHSTONE RESOURCES, LLC +2.8% 2
Jul 14, 2026 6503-90-001MMC - A00222525 Walker
Bryan
FY26 Huntsville AO Complex Chloride - 07IH0045 · Material Maintenance Project $224,640 $217,640 NSG LOGISTICS, LLC -3.1% 2
Jul 14, 2026 6503-88-001MMC - A00222523 Washington
Bryan
FY26 Brenham AO Complex Chloride - 07SH0036 · Material Maintenance Project $168,480 $162,023 NSG LOGISTICS, LLC -3.8% 2
Jul 14, 2026 6497-09-001SUP - A00219533 Hidalgo
Pharr
FY 27-28 Janitorial MNT (02/06/08)IH0002 · State Use Project $33,354 — 0
Jul 10, 2026 6502-45-001RMC - A00221802 Jones
Abilene
Skid Restoration FY26US0277 · Routine Maintenance Project $776,197 $741,614 SKIDABRADER GROUP LLC -4.5% 1
Jul 10, 2026 6504-39-001RMC - A00222747 Cameron
Pharr
Cameron County Expressway SweepingIH0069E · Routine Maintenance Project - Sealed $561,751 $469,494 DIGG COMMERCIAL, LLC -16.4% 2
Jul 10, 2026 6497-15-001SUP - A00219546 Cameron
Pharr
FY27 JANITORIAL CAMERONUS0077 · State Use Project $61,000 — 0
Jul 10, 2026 6503-49-001SUP - A00222390 Victoria
Yoakum
PAM - Victoria, Jackson, DeWitt, FayetteUS0059 · State Use Project $83,707 — 0
Jul 9, 2026 6498-87-001RMC - A00220082 El Paso
El Paso
EAO Storm Sewer & Culvert CleaningIH0010 · Routine Maintenance Project $558,600 $478,000 DIGG COMMERCIAL, LLC -14.4% 3
Jul 9, 2026 6500-67-001RMC - A00220883 El Paso
El Paso
Cleaning & Sweeping EAOIH0010 · Routine Maintenance Project $530,600 $426,250 BLACK STALLION CONTRACTORS INC. -19.7% 4
Jul 9, 2026 6500-71-001RMC - A00220889 El Paso
El Paso
WAO - Culvert CleaningIH0010 · Routine Maintenance Project $428,700 $381,500 BLACK STALLION CONTRACTORS INC. -11.0% 4
Jul 9, 2026 6499-25-001RMC - A00220198 Kimble
San Angelo
KIMBLE COUNTY MOWING FY 27US0377 · Routine Maintenance Project $209,489 $237,736 R&M INCORPORATED +13.5% 3
Jul 9, 2026 6499-26-001RMC - A00220199 Runnels
San Angelo
RUNNELS COUNTY MOWING FY 27FM2887 · Routine Maintenance Project $194,600 $204,319 R&M INCORPORATED +5.0% 5
Jul 9, 2026 6502-71-001SUP - A00221934 Anderson
Tyler
Palestine Lawn Mtce (New Building)SH0019 · State Use Project $37,760 — 0
Jul 9, 2026 6506-79-001SUP - A00223422 Harrison
Atlanta
Janitorial - Marshall FY 26SL0390 · State Use Project $31,013 — 0
Jul 8, 2026 6478-82-001RMC - A00213646 Rockwall
Dallas
FY 26 Flex Pave RepairFM0551 · Routine Maintenance Project - Sealed $990,799 $1,174,732 TEXAS MATERIALS GROUP, INC. +18.6% 4
Jul 8, 2026 6483-48-001MMC - A00215112 Travis
Austin
FY26 Snow and Ice MaterialsIH0035 · Material Maintenance Project $854,590 $824,227 NSG LOGISTICS, LLC -3.6% 2
Jul 8, 2026 6502-74-001RMC - A00221952 Ellis
Dallas
Cable Barrier Repair 09 0726IH0045 · Routine Maintenance Project - Sealed $657,100 $740,750 AUSTIN BARRICADE COMPANY, L.L.C. +12.7% 3
Jul 8, 2026 6499-04-001RMC - A00220147 Kaufman
Dallas
Kaufman - Ditch Cleaning and ReshapingIH0020 · Routine Maintenance Project $985,300 $712,000 RHINO EQUITY, LLC -27.7% 4
Jul 8, 2026 6498-28-001RMC - A00219977 Collin
Dallas
FPSR 07 08.26FM0006 · Routine Maintenance Project - Sealed $738,371 $710,406 JAGOE-PUBLIC COMPANY -3.8% 4
Jul 8, 2026 6493-99-001RMC - A00218468 Bell
Waco
Signal Maintenance UpgradeUS0190 · Routine Maintenance Project - Sealed $615,079 $640,640 FLORIDA TRAFFIC CONTROL DEVICES, INC. +4.2% 4
Jul 8, 2026 6503-44-001RMC - A00222374 Collin
Dallas
On Call Traffic Control Services 07 1026US0075 · Routine Maintenance Project - Sealed $248,347 $545,700 FC TRAFFIC CONTROL, LLC +119.7% 2
1–100 of 233Next ›

Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.