175Let jobs
$793,205,031Total low bids
$939,947,615Total estimates
-15.6%Low bids vs estimates
Nov 2024 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Nov 26, 2024 | 6476-35-001MMC - 647635001 | Brown Brownwood |
EMULSION (MATERIAL ONLY) NORTH 2024US0377 · Material Maintenance Project | $930,090 | $889,200 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -4.4% | 2 |
| Nov 26, 2024 | 6473-49-001RMC - 647349001 | Waller Houston |
RMC 6473-49-001 Traffic ControlUS0290 · Routine Maintenance Project - Sealed | $637,725 | $567,100 | RHINO EQUITY, LLC | -11.1% | 4 |
| Nov 26, 2024 | 6475-30-001MMC - 647530001 | Brewster El Paso |
De-Icing / Anti Icing (Material Only)SH0118 · Material Maintenance Project | $465,623 | $420,329 | NSG LOGISTICS, LLC | -9.7% | 2 |
| Nov 26, 2024 | 6473-26-001RMC - 647326001 | Taylor Abilene |
2025 Call Out TCP ABL AOIH0020 · Routine Maintenance Project - Sealed | $524,890 | $418,500 | AWP SAFETY | -20.3% | 2 |
| Nov 26, 2024 | 6473-27-001RMC - 647327001 | Howard Abilene |
2025 Call Out TCP BSP AOIH0020 · Routine Maintenance Project - Sealed | $563,595 | $410,935 | AWP SAFETY | -27.1% | 2 |
| Nov 26, 2024 | 6465-10-001RMC - 646510001 | Harris Houston |
FY 24, Full Depth Rpr & Pavement MarkingSH0249 · Routine Maintenance Project - Sealed | $571,547 | $345,227 | FORDE CONSTRUCTION COMPANY, INC. | -39.6% | 4 |
| Nov 26, 2024 | 6473-60-001RMC - 647360001 | Waller Houston |
RMC 6473-60 Cleaning & Sweeping HighwaysUS0290 · Routine Maintenance Project | $363,800 | $289,714 | T & M LAWN-FENCE SERVICE, LLC | -20.4% | 4 |
| Nov 26, 2024 | 6474-69-001RMC - 647469001 | Howard Abilene |
2025 Tree TrimmingIH0020 · Routine Maintenance Project - Sealed | $316,750 | $231,515 | S FOWLER SERVICES LLC | -26.9% | 5 |
| Nov 26, 2024 | 6474-37-001MMC - 647437001 | El Paso El Paso |
Asphaltic Patching MaterialUS0054 · Material Maintenance Project | $172,200 | $189,750 | TOUCHSTONE RESOURCES, LLC | +10.2% | 1 |
| Nov 26, 2024 | 6477-19-001MMC - 647719001 | San Saba Brownwood |
EMULSION (MATERIAL ONLY) SOUTH 2024US0190 · Material Maintenance Project | $96,120 | $79,200 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -17.6% | 1 |
| Nov 24, 2024 | 6477-96-001SUP - 647796001 | Coryell Waco |
Janitorial Services - CoryellUS0084 · State Use Project | $11,785 | $11,785 | HEART OF TEXAS GOODWILL INDUSTRIES, INC. | 0.0% | 2 |
| Nov 22, 2024 | 6476-68-001MMC - 647668001 | Shackelford Abilene |
D-GR HMA Abilene District East RegionUS0180 · Material Maintenance Project | $313,575 | $320,925 | ZACK BURKETT CO. | +2.3% | 3 |
| Nov 22, 2024 | 6476-94-001MMC - 647694001 | Jones Abilene |
Abl-District LRA DSUS0277 · Material Maintenance Project | $46,300 | $45,448 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.8% | 2 |
| Nov 21, 2024 | 6474-11-001SUP - 647411001 | Webb Laredo |
Litter Removal - Laredo Webb CountyIH0035 · State Use Project - Sealed | $883,490 | $883,490 | WORLD TECHNICAL SERVICES, INC. | 0.0% | 2 |
| Nov 21, 2024 | 6474-49-001MMC - 647449001 | Kinney Laredo |
LRA KinneyUS0277 · Material Maintenance Project - Sealed | $860,100 | $856,000 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.5% | 2 |
| Nov 21, 2024 | 6475-90-001MMC - 647590001 | Wood Tyler |
FY25 Emulsion MineolaUS0069 · Material Maintenance Project | $492,950 | $507,175 | ERGON ASPHALT & EMULSIONS, INC. | +2.9% | 1 |
| Nov 21, 2024 | 6476-13-001MMC - 647613001 | Smith Tyler |
FY25 Emulsion - TylerSH0155 · Material Maintenance Project | $478,300 | $452,820 | ERGON ASPHALT & EMULSIONS, INC. | -5.3% | 1 |
| Nov 21, 2024 | 6473-25-001RMC - 647325001 | Hopkins Paris |
Hopkins Co. FUA bridge workIH0030 · Routine Maintenance Project - Sealed | $371,078 | $427,200 | GARRET SHIELDS INFRASTRUCTURE | +15.1% | 5 |
| Nov 21, 2024 | 6474-80-001MMC - 647480001 | Maverick Laredo |
Emulsion in MaverickUS0277 · Material Maintenance Project - Sealed | $378,400 | $378,400 | ERGON ASPHALT & EMULSIONS, INC. | 0.0% | 1 |
| Nov 21, 2024 | 6467-79-001BPM - 646779001 | Red River Paris |
BPM Red River FY25 #2SH0037 · Bridge Preventative Maintenance - Sealed | $430,776 | $327,282 | BECK-REIT & SONS, LTD. | -24.0% | 6 |
| Nov 21, 2024 | 6476-77-001MMC - 647677001 | Van Zandt Tyler |
LRA Van Zandt FY25US0080 · Material Maintenance Project | $290,000 | $318,600 | MARTIN MARIETTA MATERIALS, INC. | +9.9% | 2 |
| Nov 21, 2024 | 6474-00-001RMC - 647400001 | Red River Paris |
On Call Tree Removal/Trim Red River CoUS0082 · Routine Maintenance Project - Sealed | $269,550 | $220,125 | MERCER TREE SERVICE | -18.3% | 5 |
| Nov 21, 2024 | 6473-99-001RMC - 647399001 | Lamar Paris |
On Call Tree Trimming & Removal PAOUS0082 · Routine Maintenance Project - Sealed | $275,300 | $200,825 | MERCER TREE SERVICE | -27.1% | 3 |
| Nov 21, 2024 | 6474-92-001RMC - 647492001 | Lamar Paris |
On Call Ditch and Culvert-PAO FY25US0082 · Routine Maintenance Project - Sealed | $213,750 | $162,950 | RHINO EQUITY, LLC | -23.8% | 4 |
| Nov 21, 2024 | 6473-15-001MMC - 647315001 | Lamar Paris |
Sheet Pilings - Paris HQUS0271 · Material Maintenance Project - Sealed | $117,600 | $83,468 | SOUTHERN SOURCING SOLUTIONS, LLC | -29.0% | 2 |
| Nov 20, 2024 | 6466-89-001RMC - 646689001 | Baylor Wichita Falls |
Crack Seal FY 2025US0082 · Routine Maintenance Project - Sealed | $903,861 | $1,232,490 | CRACKSEAL OF TEXAS, LLC | +36.4% | 5 |
| Nov 20, 2024 | 6474-09-001RMC - 647409001 | Nacogdoches Lufkin |
2025 Nacogdoches County Ditch CleaningSH0021 · Routine Maintenance Project | $479,000 | $398,350 | TEXAS DRAINAGE INC. | -16.8% | 5 |
| Nov 20, 2024 | 6473-64-001MMC - 647364001 | Palo Pinto Fort Worth |
FY25 Palo Pinto MMC - Hydraulic CementIH0020 · Material Maintenance Project | $312,190 | $310,000 | TOUCHSTONE RESOURCES, LLC | -0.7% | 1 |
| Nov 20, 2024 | 6475-76-001RMC - 647576001 | Harrison Atlanta |
ROW Mowing Tract 6 FY2025US0080 · Routine Maintenance Project | $322,772 | $280,302 | CEHAND SERVICES LLC | -13.2% | 4 |
| Nov 20, 2024 | 6475-77-001RMC - 647577001 | Titus Atlanta |
ROW Mowing Tract 7 FY2025US0271 · Routine Maintenance Project | $280,972 | $266,184 | RENEGADE SITE SOLUTIONS, LLC | -5.3% | 5 |
| Nov 20, 2024 | 6475-78-001RMC - 647578001 | Bowie Atlanta |
ROW Mowing Tract 8 FY2025US0259 · Routine Maintenance Project | $249,432 | $235,648 | PERRY WEST | -5.5% | 2 |
| Nov 20, 2024 | 6475-75-001RMC - 647575001 | Cass Atlanta |
ROW Mowing Tract 5 FY2025FM0251 · Routine Maintenance Project | $227,924 | $227,864 | CROSS PLUS CONSTRUCTION, LLC | 0.0% | 3 |
| Nov 20, 2024 | 6475-71-001RMC - 647571001 | Panola Atlanta |
ROW Mowing Tract 1 FY2025US0059 · Routine Maintenance Project | $206,492 | $191,983 | AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY | -7.0% | 4 |
| Nov 20, 2024 | 6472-05-001RMC - 647205001 | Titus Atlanta |
PREP ROW IH0030 FY 2025IH0030 · Routine Maintenance Project | $414,227 | $186,448 | H. H. HOWARD & SONS, INC. | -55.0% | 5 |
| Nov 20, 2024 | 6475-73-001RMC - 647573001 | Upshur Atlanta |
ROW Mowing Tract 3 FY2025FM0556 · Routine Maintenance Project | $206,616 | $177,689 | SCOUT 5 CONSTRUCTION LLC | -14.0% | 7 |
| Nov 20, 2024 | 6475-72-001RMC - 647572001 | Morris Atlanta |
ROW Mowing Tract 2 FY2025FM0161 · Routine Maintenance Project | $193,596 | $168,280 | SCOUT 5 CONSTRUCTION LLC | -13.1% | 5 |
| Nov 20, 2024 | 6475-79-001RMC - 647579001 | Bowie Atlanta |
ROW Mowing Tract 9 FY 2025IH0030 · Routine Maintenance Project | $164,880 | $155,358 | CROSS PLUS CONSTRUCTION, LLC | -5.8% | 2 |
| Nov 20, 2024 | 6475-74-001RMC - 647574001 | Marion Atlanta |
ROW Mowing Tract 4 FY2025SH0049 · Routine Maintenance Project | $166,858 | $144,903 | CEHAND SERVICES LLC | -13.2% | 5 |
| Nov 20, 2024 | 6473-00-001MMC - 647300001 | Palo Pinto Fort Worth |
FY25 MMC Flex Base Palo PintoIH0020 · Material Maintenance Project | $120,550 | $71,250 | ZACK BURKETT CO. | -40.9% | 2 |
| Nov 19, 2024 | 6470-62-001RMC - A00211148 | Kimble San Angelo |
2025 DISTRICT WIDE CRACK SEALUS0377 · Routine Maintenance Project - Sealed | $655,626 | $737,490 | E.V.G. ENTERPRISE | +12.5% | 5 |
| Nov 19, 2024 | 6475-87-001RMC - 647587001 | Nueces Corpus Christi |
6475-87-001 Illumination MaintenanceSH0358 · Routine Maintenance Project - Sealed | $749,399 | $730,498 | MALDONADO-BURKETT, LLP | -2.5% | 2 |
| Nov 19, 2024 | 6476-38-001MMC - 647638001 | Nueces Corpus Christi |
6476-38-001 Hot Mix CC Maint.SH0358 · Material Maintenance Project | $575,000 | $557,000 | ANDERSON COLUMBIA CO., INC. | -3.1% | 1 |
| Nov 19, 2024 | 6475-94-001MMC - 647594001 | Jim Wells Corpus Christi |
6475-94-001Flex Base Live Oak GW Maint.US0281 · Material Maintenance Project | $520,000 | $480,000 | TOUCHSTONE RESOURCES, LLC | -7.7% | 5 |
| Nov 19, 2024 | 6476-30-001MMC - 647630001 | San Augustine Lufkin |
2024-11 San Augustine CRS2PUS0096 · Material Maintenance Project | $468,650 | $458,950 | CLEVELAND ASPHALT PRODUCTS, INC. | -2.1% | 1 |
| Nov 19, 2024 | 6474-07-001MMC - 647407001 | Sabine Lufkin |
2024-11 Sabine CRS2PFM0083 · Material Maintenance Project | $468,650 | $457,150 | CLEVELAND ASPHALT PRODUCTS, INC. | -2.5% | 1 |
| Nov 19, 2024 | 6476-71-001MMC - 647671001 | Polk Lufkin |
2024-11 Polk CRS2PUS0059 · Material Maintenance Project | $468,650 | $452,200 | CLEVELAND ASPHALT PRODUCTS, INC. | -3.5% | 1 |
| Nov 19, 2024 | 6475-98-001MMC - 647598001 | Nueces Corpus Christi |
6475-98-001 LRA CCAOSH0358 · Material Maintenance Project | $348,000 | $348,650 | MARTIN MARIETTA MATERIALS, INC. | +0.2% | 2 |
| Nov 19, 2024 | 6475-88-001BPM - 647588001 | Kleberg Corpus Christi |
6475-88-001 Conc. Struc. RepairUS0077 · Bridge Preventative Maintenance - Sealed | $449,119 | $296,578 | BECK-REIT & SONS, LTD. | -34.0% | 8 |
| Nov 19, 2024 | 6476-27-001RMC - 647627001 | Brazos Bryan |
FY25 - Bryan AO RPM - 12SH0006 · Routine Maintenance Project | $284,800 | $270,206 | TRP INFRASTRUCTURE SERVICES, LLC | -5.1% | 3 |
| Nov 19, 2024 | 6475-95-001MMC - 647595001 | Kleberg Corpus Christi |
6475-95-001 Flex Base Kingsville MaintUS0077 · Material Maintenance Project | $291,600 | $269,784 | MARTIN MARIETTA MATERIALS, INC. | -7.5% | 5 |
| Nov 19, 2024 | 6475-96-001MMC - 647596001 | Refugio Corpus Christi |
6475-96-001 Flex Base Refugio MaintUS0077 · Material Maintenance Project | $295,000 | $258,125 | ANDERSON COLUMBIA CO., INC. | -12.5% | 5 |
| Nov 19, 2024 | 6476-39-001MMC - 647639001 | Washington Bryan |
FY25 - Brenham AO Hyd. CementSH0036 · Material Maintenance Project | $213,046 | $205,141 | TOUCHSTONE RESOURCES, LLC | -3.7% | 2 |
| Nov 19, 2024 | 6475-09-001RMC - 647509001 | Nueces Corpus Christi |
6475-09-001 State School Parking LotFM0665 · Routine Maintenance Project - Sealed | $148,471 | $192,590 | CK NEWBERRY, LLC | +29.7% | 1 |
| Nov 19, 2024 | 6475-97-001MMC - 647597001 | Nueces Corpus Christi |
6475-97-001 Emulsion CCAOSH0358 · Material Maintenance Project | $51,300 | $51,300 | ERGON ASPHALT & EMULSIONS, INC. | 0.0% | 1 |
| Nov 18, 2024 | 6477-43-001SUP - 647743001 | Travis Austin |
Travis South LP 360 ROW FY25SL0360 · State Use Project | $75,160 | $75,160 | WORKQUEST | 0.0% | 2 |
| Nov 17, 2024 | 6477-37-001SUP - 647737001 | Trinity Lufkin |
2024-11 Trinity GroundsUS0287 · State Use Project | $48,805 | $48,805 | WORKQUEST | 0.0% | 2 |
| Nov 17, 2024 | 6477-38-001SUP - 647738001 | Polk Lufkin |
2024 11 Polk GroundsUS0059 · State Use Project | $41,597 | $41,597 | OAK CREEK DAY HABILITATION/VOCATIONAL CENTER | 0.0% | 2 |
| Nov 17, 2024 | 6475-11-001SUP - 647511001 | Hopkins Paris |
Picnic Area Maint - Hopkins CoSH0019 · State Use Project | $35,462 | $35,462 | WORKQUEST | 0.0% | 2 |
| Nov 17, 2024 | 6418-62-001SUP - 641862001 | Harris Houston |
Metro Landscape 2025IH0610 · State Use Project | $16,080 | $16,080 | SECOND CHANCES - STARTING OVER AGAIN | 0.0% | 2 |
| Nov 14, 2024 | 6469-50-001BPM - 646950001 | Bexar San Antonio |
FY25 BPM FM 471 AT CULEBRA CRK TRIB NO.1FM0471 · Bridge Preventative Maintenance - Sealed | $185,057 | $174,951 | BK FIELD OPERATIONS LLC | -5.5% | 5 |
| Nov 13, 2024 | 6474-78-001RMC - 647478001 | Angelina Lufkin |
2024-10 Angelina Large DebrisUS0059 · Routine Maintenance Project | $830,603 | $740,808 | AAD CONTRACTING INC. | -10.8% | 6 |
| Nov 13, 2024 | 6473-54-001MMC - 647354001 | Bell Waco |
HOT-MIX COLD-LAID - MATERIAL ONLYUS0190 · Material Maintenance Project | $620,750 | $651,375 | LONE STAR PAVING COMPANY | +4.9% | 3 |
| Nov 13, 2024 | 6462-75-001RMC - 646275001 | Lavaca Yoakum |
Culvert Structure Improvement FY 24 #2SH0095 · Routine Maintenance Project - Sealed | $549,238 | $596,669 | B & MS CONSTRUCTION, INC. | +8.6% | 6 |
| Nov 13, 2024 | 6473-12-001RMC - 647312001 | Bell Waco |
Mowing and Litter - Bell CountyUS0190 · Routine Maintenance Project | $663,698 | $567,082 | CROSS PLUS CONSTRUCTION, LLC | -14.6% | 4 |
| Nov 13, 2024 | 6469-63-001RMC - 646963001 | Denton Dallas |
Mowing 04 2025IH0035 · Routine Maintenance Project - Sealed | $573,778 | $482,476 | ANTHONY SERVICES | -15.9% | 4 |
| Nov 13, 2024 | 6471-32-001RMC - 647132001 | Ellis Dallas |
On-Call Traffic Control Services 09 1224IH0035E · Routine Maintenance Project - Sealed | $445,845 | $428,050 | TRAFFIC HIGHWAY MAINTENANCE, LLC | -4.0% | 2 |
| Nov 13, 2024 | 6472-28-001RMC - 647228001 | Hill Waco |
Mowing - Hill FY25FM0934 · Routine Maintenance Project | $605,669 | $420,860 | CEN-TEX IRRIGATION SYSTEMS, INC. | -30.5% | 3 |
| Nov 13, 2024 | 6473-13-001RMC - 647313001 | Coryell Waco |
MOWING HIGHWAY ROW - CORYELL COUNTYUS0084 · Routine Maintenance Project | $513,517 | $408,810 | JASCO | -20.4% | 3 |
| Nov 13, 2024 | 6462-89-001RMC - 646289001 | Jefferson Beaumont |
FY 25 Beaumont Tree and Brush RemovalUS0069 · Routine Maintenance Project | $505,230 | $404,890 | CROSS PLUS CONSTRUCTION, LLC | -19.9% | 3 |
| Nov 13, 2024 | 6462-92-001RMC - 646292001 | Jasper Beaumont |
FY25 Jasper Tree and Brush RemovalUS0096 · Routine Maintenance Project | $394,450 | $362,870 | CROSS PLUS CONSTRUCTION, LLC | -8.0% | 3 |
| Nov 13, 2024 | 6473-53-001RMC - 647353001 | Bosque Waco |
MOW AND LITTER REMOVE - BOSQUE COUNTYSH0006 · Routine Maintenance Project | $462,322 | $338,780 | JASCO | -26.7% | 3 |
| Nov 13, 2024 | 6473-40-001RMC - 647340001 | Limestone Waco |
Mowing - Limestone FY25SH0171 · Routine Maintenance Project | $508,144 | $290,612 | P-VILLE, INCORPORATED | -42.8% | 4 |
| Nov 13, 2024 | 6473-52-001RMC - 647352001 | Hamilton Waco |
MOW AND LITTER REMOVE-HAMILTONFM0219 · Routine Maintenance Project | $361,711 | $230,615 | MARLANE CONSTRUCTION, LLC | -36.2% | 4 |
| Nov 13, 2024 | 6471-34-001RMC - 647134001 | Ellis Dallas |
Tree & Brush Removal & Trimming 09 1024BI0045G · Routine Maintenance Project - Sealed | $265,700 | $225,950 | RHINO EQUITY, LLC | -15.0% | 6 |
| Nov 13, 2024 | 6471-48-001RMC - 647148001 | Ellis Dallas |
Driftwood & Debris Removal 09 1024IH0045 · Routine Maintenance Project - Sealed | $263,160 | $225,042 | RHINO EQUITY, LLC | -14.5% | 8 |
| Nov 13, 2024 | 6474-32-001RMC - 647432001 | Orange Beaumont |
FY 25 District-Wide Clean and Seal JointSH0062 · Routine Maintenance Project - Sealed | $317,863 | $212,039 | 12TWELVE ROAD AND BRIDGE LLC | -33.3% | 11 |
| Nov 13, 2024 | 6469-64-001RMC - 646964001 | Denton Dallas |
Denton Roadside Mowing FY25FM0156 · Routine Maintenance Project - Sealed | $231,610 | $190,368 | ICOS MANAGEMENT, LLC | -17.8% | 7 |
| Nov 13, 2024 | 6462-90-001RMC - A00206956 | Liberty Beaumont |
FY25 Liberty Tree and Brush RemovalUS0090 · Routine Maintenance Project | $273,650 | $179,275 | USA AMTECH, INC. | -34.5% | 5 |
| Nov 13, 2024 | 6469-62-001RMC - 646962001 | Denton Dallas |
Tree/Brush Removal/Trimming 04 1124FM0156 · Routine Maintenance Project - Sealed | $196,516 | $150,125 | AZA CONSTRUCTION INC | -23.6% | 12 |
| Nov 13, 2024 | 6472-54-001RMC - 647254001 | Coryell Waco |
FY 25 - CLEANING AND SWEEPING HIGHWAYSSH0036 · Routine Maintenance Project | $115,719 | $137,522 | STINNETT SERVICES, LLC | +18.8% | 2 |
| Nov 13, 2024 | 6471-95-001RMC - 647195001 | Collin Dallas |
Removal/Disposal of Driftwood 07 1224US0075 · Routine Maintenance Project - Sealed | $86,455 | $87,000 | SHALOM SERVICES CORPORATION | +0.6% | 2 |
| Nov 13, 2024 | 6474-70-001MMC - 647470001 | Collin Dallas |
Rip/Rap Rock FY25SH0005 · Material Maintenance Project | $40,000 | $42,500 | TOUCHSTONE RESOURCES, LLC | +6.3% | 1 |
| Nov 13, 2024 | 6471-08-001MMC - 647108001 | Denton Dallas |
Rock Riprap 04 1124US0380 · Material Maintenance Project | $22,080 | $31,200 | USA AMTECH, INC. | +41.3% | 2 |
| Nov 12, 2024 | 6469-22-001BPM - 646922001 | Webb Laredo |
BPM - Webb, La Salle, & ValverdeIH0035 · Bridge Preventative Maintenance - Sealed | $936,986 | $964,255 | ROAD DOCTORS LLC | +2.9% | 4 |
| Nov 12, 2024 | 6475-59-001MMC - 647559001 | Orange Beaumont |
FY 25 OAO Hot MixFM0105 · Material Maintenance Project - Sealed | $948,000 | $910,000 | TEXAS MATERIALS GROUP, INC. | -4.0% | 1 |
| Nov 12, 2024 | 6475-57-001MMC - 647557001 | Jefferson Beaumont |
FY 25 BAO Hot MixUS0069 · Material Maintenance Project - Sealed | $928,500 | $898,000 | TEXAS MATERIALS GROUP, INC. | -3.3% | 1 |
| Nov 12, 2024 | 6474-40-001RMC - 647440001 | Brazos Bryan |
FY25 - District Rubber/Debris - 11SH0006 · Routine Maintenance Project | $806,000 | $764,400 | P-VILLE, INCORPORATED | -5.2% | 3 |
| Nov 12, 2024 | 6376-73-001RMC - 637673001 | Brazoria Houston |
FY 2025 Brazoria Tree/Brush RemovalSH0288 · Routine Maintenance Project - Sealed | $664,935 | $623,625 | BOEN LANDSCAPING & IRRIGATION, LLC | -6.2% | 4 |
| Nov 12, 2024 | 6473-85-001RMC - 647385001 | Pecos Odessa |
6473-85-001 Street SweepingIH0010 · Routine Maintenance Project | $578,370 | $558,585 | E. G. L. CONSTRUCTION, INC. | -3.4% | 3 |
| Nov 12, 2024 | 6475-24-001RMC - 647524001 | Brazos Bryan |
FY25 - Brazos Mowing - 11SH0006 · Routine Maintenance Project | $577,720 | $536,108 | ORTEGA'S LAWN AND LANDSCAPING, LLC | -7.2% | 4 |
| Nov 12, 2024 | 6475-61-001MMC - 647561001 | Liberty Beaumont |
FY 25 LAO Hot MixUS0090 · Material Maintenance Project - Sealed | $676,000 | $458,000 | VULCAN CONSTRUCTION MATERIALS, LLC | -32.2% | 2 |
| Nov 12, 2024 | 6476-31-001MMC - A00212781 | Nacogdoches Lufkin |
2024-11 Nacogdoches HMAFM0343 · Material Maintenance Project | $346,700 | $358,700 | LONGVIEW ASPHALT, INC. | +3.5% | 2 |
| Nov 12, 2024 | 6475-04-001RMC - 647504001 | Washington Bryan |
FY25 - Washington Mowing - 11US0290 · Routine Maintenance Project | $342,180 | $313,696 | WELLMANN ENTERPRISES | -8.3% | 4 |
| Nov 12, 2024 | 6473-09-001MMC - A00212123 | San Jacinto Lufkin |
2024-11 San Jacinto HMASH0150 · Material Maintenance Project | $277,104 | $299,000 | TEXAS MATERIALS GROUP, INC. | +7.9% | 1 |
| Nov 12, 2024 | 6400-48-001RMC - A00186735 | Walker Bryan |
FY 24 FM 2628 CULVERTSFM 2628 · Routine Maintenance Project - Sealed | $299,050 | $283,536 | GARRET SHIELDS INFRASTRUCTURE | -5.2% | 6 |
| Nov 12, 2024 | 6475-37-001MMC - 647537001 | Washington Bryan |
FY25 - Brenham AO LRA - 11SH0036 · Material Maintenance Project | $260,000 | $259,570 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.2% | 2 |
| Nov 12, 2024 | 6473-10-001MMC - 647310001 | Trinity Lufkin |
2024-11 Trinity HMAUS0287 · Material Maintenance Project | $246,284 | $235,450 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.4% | 2 |
| Nov 12, 2024 | 6476-18-001MMC - 647618001 | Ector Odessa |
6476-18-001 Traffic Paint-Glass BeadsBI0020E · Material Maintenance Project | $241,200 | $235,440 | ENNIS-FLINT, INC. | -2.4% | 3 |
| Nov 12, 2024 | 6475-93-001MMC - 647593001 | Nueces Corpus Christi |
6475-93-001 Brine CCAO - AAOSH0358 · Material Maintenance Project | $105,344 | $115,456 | TOUCHSTONE RESOURCES, LLC | +9.6% | 2 |
| Nov 12, 2024 | 6470-89-001RMC - A00211363 | Brazos Bryan |
FY25 - Brazos Curb RepairsBS0006R · Routine Maintenance Project | $127,280 | $114,952 | B & MS CONSTRUCTION, INC. | -9.7% | 5 |
1–100 of 175Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.