216Let jobs
$856,919,714Total low bids
$950,013,523Total estimates
-9.8%Low bids vs estimates
Apr 2026 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 30, 2026 | 6500-05-001RMC - A00220590 | Tarrant Fort Worth |
FY26 Sweeping and DebrisIH0020 · Routine Maintenance Project - Sealed | $968,570 | $944,757 | SWEEPING CORPORATION OF AMERICA, LLC | -2.5% | 1 |
| Apr 30, 2026 | 6477-40-001RMC - A00213019 | Victoria Yoakum |
On Call Flagging - VAOUS0059 · Routine Maintenance Project - Sealed | $587,500 | $582,000 | BLUE CHIP SERVICES, LLC | -0.9% | 3 |
| Apr 30, 2026 | 6500-68-001MMC - A00220884 | Childress Childress |
FY 26-27 Flexible BaseUS0287 · Material Maintenance Project | $300,000 | $293,205 | GREEN DREAM INTERNATIONAL LLC | -2.3% | 4 |
| Apr 30, 2026 | 6500-86-001MMC - A00221038 | Childress Childress |
FY 26-27 Ty D hot mixUS0287 · Material Maintenance Project | $85,000 | $125,000 | RK HALL, LLC | +47.1% | 1 |
| Apr 30, 2026 | 6500-93-001SUP - A00221152 | Van Zandt Tyler |
Janitorial Maintenance- Canton MOUS0080 · State Use Project | $35,932 | — | 0 | ||
| Apr 29, 2026 | 6493-32-001RMC - A00218306 | Hill Waco |
Tree Trimming Hill FY26FM2114 · Routine Maintenance Project | $564,713 | $486,600 | SHALOM SERVICES CORPORATION | -13.8% | 6 |
| Apr 29, 2026 | 6499-49-001RMC - A00220334 | Haskell Abilene |
2026 ROW Mowing Haskell CountyUS0380 · Routine Maintenance Project - Sealed | $319,694 | $375,662 | TRIPLE T MAINTENANCE INC. | +17.5% | 3 |
| Apr 29, 2026 | 6499-52-001RMC - A00220337 | Scurry Abilene |
2026 ROW Mowing Scurry CountyUS0084 · Routine Maintenance Project - Sealed | $306,107 | $324,157 | DESERT LUXURY TRANSPORTATION, LLC | +5.9% | 2 |
| Apr 29, 2026 | 6499-51-001RMC - A00220336 | Fisher Abilene |
2026 ROW Mowing Fisher CountyUS0180 · Routine Maintenance Project - Sealed | $239,112 | $270,892 | TEXAS BLACKTOPS LLC | +13.3% | 2 |
| Apr 29, 2026 | 6493-31-001RMC - A00218305 | McLennan Waco |
Tree Trimming McLennan FY26US0084 · Routine Maintenance Project | $368,460 | $186,570 | BUSHWACKERS CONTRACTING, LLC | -49.4% | 4 |
| Apr 29, 2026 | 6501-98-001SUP - A00221635 | Nacogdoches Lufkin |
2026-04 Nacogdoches JanitorialFM0343 · State Use Project | $9,773 | — | 0 | ||
| Apr 28, 2026 | 6498-51-001MMC - A00220018 | Nacogdoches Lufkin |
2026-04 Nacogdoches HMAFM0343 · Material Maintenance Project | $850,000 | $880,050 | LONGVIEW ASPHALT, INC. | +3.5% | 2 |
| Apr 28, 2026 | 6500-77-001RMC - A00220918 | Wood Tyler |
FY 27 Wood County MowingUS0069 · Routine Maintenance Project | $866,275 | $843,577 | CEHAND SERVICES LLC | -2.6% | 4 |
| Apr 28, 2026 | 6498-50-001MMC - A00220017 | San Jacinto Lufkin |
2026-04 San Jacinto HMASH0150 · Material Maintenance Project | $705,750 | $636,750 | TEXAS MATERIALS GROUP, INC. | -9.8% | 2 |
| Apr 28, 2026 | 6499-50-001RMC - A00220335 | Borden Abilene |
2026 ROW Mowing Borden, etc.US0180 · Routine Maintenance Project - Sealed | $518,748 | $547,064 | LIGHT & FOLIAGE SUPPLY, LLC | +5.5% | 1 |
| Apr 28, 2026 | 6500-98-001RMC - A00221197 | Lubbock Lubbock |
FY26 Lubbock TCPIH0027 · Routine Maintenance Project - Sealed | $630,075 | $359,220 | BARRICADES UNLIMITED | -43.0% | 3 |
| Apr 28, 2026 | 6499-53-001RMC - A00220338 | Nolan Abilene |
2026 ROW Mowing Nolan CountyIH0020 · Routine Maintenance Project - Sealed | $320,860 | $324,395 | LIGHT & FOLIAGE SUPPLY, LLC | +1.1% | 2 |
| Apr 28, 2026 | 6499-48-001RMC - A00220333 | Mitchell Abilene |
2026 ROW Mowing Mitchell CountyIH0020 · Routine Maintenance Project - Sealed | $295,784 | $297,115 | LIGHT & FOLIAGE SUPPLY, LLC | +0.5% | 1 |
| Apr 28, 2026 | 6501-36-001MMC - A00221436 | Pecos Odessa |
6501-36-001 LRABI0010G · Material Maintenance Project | $219,100 | $190,989 | VULCAN CONSTRUCTION MATERIALS, LLC | -12.8% | 2 |
| Apr 28, 2026 | 6501-37-001MMC - A00221437 | Midland Odessa |
6501-37-001 LRAIH0020 · Material Maintenance Project | $185,600 | $167,752 | VULCAN CONSTRUCTION MATERIALS, LLC | -9.6% | 2 |
| Apr 28, 2026 | 6501-99-001SUP - A00221636 | Shelby Lufkin |
2026-04 Shelby JanitorialSH0007 · State Use Project | $18,299 | — | 0 | ||
| Apr 28, 2026 | 6502-00-001SUP - A00221637 | San Jacinto Lufkin |
2026-04 San Jacinto JanitorialSH0150 · State Use Project | $17,277 | — | 0 | ||
| Apr 27, 2026 | 6498-47-001MMC - A00220014 | Sabine Lufkin |
2026-04 Sabine CRS2PFM0083 · Material Maintenance Project | $826,250 | $956,320 | CLEVELAND ASPHALT PRODUCTS, INC. | +15.7% | 1 |
| Apr 27, 2026 | 6498-49-001MMC - A00220016 | Polk Lufkin |
2026-04 Polk CRS2PUS0059 · Material Maintenance Project | $820,600 | $950,450 | CLEVELAND ASPHALT PRODUCTS, INC. | +15.8% | 1 |
| Apr 27, 2026 | 6498-48-001MMC - A00220015 | San Augustine Lufkin |
2026-04 San Augustine CRS2PUS0096 · Material Maintenance Project | $720,800 | $833,620 | CLEVELAND ASPHALT PRODUCTS, INC. | +15.7% | 1 |
| Apr 27, 2026 | 6499-47-001RMC - A00220331 | Howard Abilene |
2026 ROW Mowing Howard CountyIH0020 · Routine Maintenance Project - Sealed | $491,744 | $539,211 | LIGHT & FOLIAGE SUPPLY, LLC | +9.7% | 1 |
| Apr 27, 2026 | 6499-46-001RMC - A00220330 | Callahan Abilene |
2026 ROW Mowing Callahan CountyIH0020 · Routine Maintenance Project - Sealed | $395,786 | $419,502 | JASCO | +6.0% | 3 |
| Apr 27, 2026 | 6499-45-001RMC - A00220329 | Jones Abilene |
2026 ROW Mowing Jones CountyUS0180 · Routine Maintenance Project - Sealed | $409,376 | $372,413 | TEXAS BLACKTOPS LLC | -9.0% | 3 |
| Apr 23, 2026 | 6498-98-001MMC - A00220135 | Duval Laredo |
Duval County LRA(TY II CR CS)SH0016 · Material Maintenance Project - Sealed | $800,000 | $903,920 | VULCAN CONSTRUCTION MATERIALS, LLC | +13.0% | 2 |
| Apr 23, 2026 | 6500-73-001MMC - A00220893 | Archer Wichita Falls |
ARCHER HOT MIX 2026SH0079 · Material Maintenance Project | $826,447 | $891,854 | ZACK BURKETT CO. | +7.9% | 2 |
| Apr 23, 2026 | 6500-74-001MMC - A00220894 | Baylor Wichita Falls |
Baylor Hot Mix 2026US0082 · Material Maintenance Project | $805,841 | $726,664 | ZACK BURKETT CO. | -9.8% | 1 |
| Apr 22, 2026 | 6500-53-001MMC - A00220800 | Dimmit Laredo |
Limestone Rock Asphalt Dimmit CountyUS0277 · Material Maintenance Project - Sealed | $999,200 | $1,088,300 | VULCAN CONSTRUCTION MATERIALS, LLC | +8.9% | 2 |
| Apr 22, 2026 | 6495-12-001MMC - A00218691 | Victoria Yoakum |
Hot Mix - Victoria (Materials Only)US0059 · Material Maintenance Project | $990,000 | $1,045,000 | BRAUNTEX MATERIALS, INC. | +5.6% | 3 |
| Apr 22, 2026 | 6495-16-001MMC - A00218695 | Calhoun Yoakum |
Hot Mix - Calhoun (Materials Only)SH0035 · Material Maintenance Project | $980,000 | $1,010,000 | QUALITY HOT MIX, INC. | +3.1% | 3 |
| Apr 22, 2026 | 6495-14-001MMC - A00218693 | Jackson Yoakum |
Hot Mix - Jackson (Materials Only)SH0111 · Material Maintenance Project | $997,500 | $1,008,000 | QUALITY HOT MIX, INC. | +1.1% | 3 |
| Apr 22, 2026 | 6494-95-001MMC - A00218669 | Victoria Yoakum |
LRA - VAO (Materials Only)US0059 · Material Maintenance Project | $738,000 | $777,670 | MARTIN MARIETTA MATERIALS, INC. | +5.4% | 2 |
| Apr 22, 2026 | 6498-56-001MMC - A00220025 | Hansford Amarillo |
FY 27 Dumas Area HMAC Pickup & DeliverySH0136 · Material Maintenance Project | $593,750 | $625,000 | BIG CREEK SAND & GRAVEL, INC. | +5.3% | 1 |
| Apr 22, 2026 | 6500-94-001MMC - A00221171 | Brown Brownwood |
PAINT AND BEADS (MATERIAL ONLY)US0183 · Material Maintenance Project | $690,000 | $600,000 | TOUCHSTONE RESOURCES, LLC | -13.0% | 1 |
| Apr 22, 2026 | 6495-10-001MMC - A00218689 | Victoria Yoakum |
Aggregate - VAO (Materials Only)US0059 · Material Maintenance Project | $479,400 | $512,400 | QUALITY HOT MIX, INC. | +6.9% | 4 |
| Apr 22, 2026 | 6495-17-001MMC - A00218696 | Calhoun Yoakum |
Hot Mix CL - Calhoun (Materials Only)SH0035 · Material Maintenance Project | $500,000 | $502,500 | BRAUNTEX MATERIALS, INC. | +0.5% | 3 |
| Apr 22, 2026 | 6495-13-001MMC - A00218692 | Victoria Yoakum |
Hot Mix CL - Victoria (Materials Only)US0059 · Material Maintenance Project | $475,000 | $477,500 | BRAUNTEX MATERIALS, INC. | +0.5% | 3 |
| Apr 22, 2026 | 6500-21-001RMC - A00220702 | Randall Amarillo |
Mowing Randall and Armstrong FY 27IH0027 · Routine Maintenance Project | $486,960 | $418,533 | GORMAN OUTDOOR, INC. | -14.1% | 5 |
| Apr 22, 2026 | 6494-91-001MMC - A00218664 | Victoria Yoakum |
Asphalts/Oils/Emul-VAO (Materials Only)US0059 · Material Maintenance Project | $324,750 | $365,700 | ERGON ASPHALT & EMULSIONS, INC. | +12.6% | 3 |
| Apr 22, 2026 | 6495-11-001MMC - A00218690 | Victoria Yoakum |
Flexbase - VAO (Materials Only)US0059 · Material Maintenance Project | $298,500 | $300,375 | QUALITY HOT MIX, INC. | +0.6% | 3 |
| Apr 22, 2026 | 6495-15-001MMC - A00218694 | Jackson Yoakum |
Hot Mix CL - Jackson (Materials Only)SH0111 · Material Maintenance Project | $285,000 | $297,000 | BRAUNTEX MATERIALS, INC. | +4.2% | 3 |
| Apr 22, 2026 | 6489-07-001RMC - A00217295 | Sabine Lufkin |
2025-10 Sabine Tree and Brush RemovalSH0021 · Routine Maintenance Project - Sealed | $298,350 | $292,558 | ACE CONTRACTORS, INC. | -1.9% | 4 |
| Apr 22, 2026 | 6491-46-001BPM - A00217860 | Guadalupe San Antonio |
FY26 US90A @ Walnut BranchUA0090 · Bridge Preventative Maintenance - Sealed | $124,897 | $247,629 | TAYLOR BRIDGE LLC | +98.3% | 1 |
| Apr 22, 2026 | 6495-09-001MMC - A00218687 | Victoria Yoakum |
Hydraulic Cement - VAO (Materials Only)US0059 · Material Maintenance Project | $240,899 | $229,373 | TOUCHSTONE RESOURCES, LLC | -4.8% | 2 |
| Apr 22, 2026 | 6499-92-001MMC - A00220540 | Brown Brownwood |
HOT-MIX (MAT-ONLY) BROWN 2026US0377 · Material Maintenance Project | $276,048 | $202,600 | BIG CREEK CONSTRUCTION, LTD. | -26.6% | 3 |
| Apr 22, 2026 | 6496-28-001RMC - A00219211 | San Augustine Lufkin |
2026-04 San Augustine MowingUS0096 · Routine Maintenance Project | $183,906 | $173,442 | P-VILLE, INCORPORATED | -5.7% | 4 |
| Apr 22, 2026 | 6496-35-001RMC - A00219264 | Trinity Lufkin |
2026-04 Trinity MowingSH0094 · Routine Maintenance Project | $159,554 | $146,011 | P-VILLE, INCORPORATED | -8.5% | 3 |
| Apr 22, 2026 | 6496-49-001MMC - A00219439 | Eastland Brownwood |
GRADE 4 MODIFIED UNCOATED ROCKSH0006 · Material Maintenance Project | $152,500 | $143,000 | GREEN DREAM INTERNATIONAL LLC | -6.2% | 3 |
| Apr 22, 2026 | 6496-50-001MMC - A00219440 | Eastland Brownwood |
PORTLAND CEMENTSH0006 · Material Maintenance Project | $189,000 | $136,800 | AKA-MATERIALS | -27.6% | 3 |
| Apr 22, 2026 | 6494-90-001MMC - A00218663 | Victoria Yoakum |
Rock/Riprap - VAO (Materials Only)US0059 · Material Maintenance Project | $89,250 | $87,850 | TOUCHSTONE RESOURCES, LLC | -1.6% | 3 |
| Apr 22, 2026 | 6498-79-001MMC - A00220062 | Randall Amarillo |
FY 26 Hydrated LimeIH0027 · Material Maintenance Project | $44,460 | $48,600 | TEXAS LIME COMPANY | +9.3% | 2 |
| Apr 22, 2026 | 6495-89-001MMC - A00218973 | Victoria Yoakum |
Lime - VAO (Materials Only)US0059 · Material Maintenance Project | $19,688 | $20,475 | TEXAS LIME COMPANY | +4.0% | 2 |
| Apr 22, 2026 | 6500-08-001SUP - A00220597 | Midland Odessa |
6500-08-001 Landscape BI-20BI0020E · State Use Project | $271,742 | — | 0 | ||
| Apr 22, 2026 | 6500-09-001SUP - A00220607 | Midland Odessa |
6500-09-001 Landscape LP-250SL0250 · State Use Project | $286,414 | — | 0 | ||
| Apr 22, 2026 | 6501-93-001SUP - A00221600 | Potter Amarillo |
Litter Pickup E-Way FY 26IH0040 · State Use Project | $270,785 | — | 0 | ||
| Apr 22, 2026 | 6501-94-001SUP - A00221601 | Potter Amarillo |
Picnic Area Oldham and Potter FY 26IH0040 · State Use Project | $125,058 | — | 0 | ||
| Apr 22, 2026 | 6501-95-001SUP - A00221602 | Oldham Amarillo |
Spot Litter Pickup Oldham FY 26IH0040 · State Use Project | $18,000 | — | 0 | ||
| Apr 22, 2026 | 6502-05-001SUP - A00221653 | Howard Abilene |
Howard, Mitchell, and Scurry Litter 26IH0020 · State Use Project | $212,940 | — | 0 | ||
| Apr 21, 2026 | 6499-12-001MMC - A00220170 | Lamb Lubbock |
FY26 Littlefield LRAUS0084 · Material Maintenance Project | $775,000 | $836,930 | VULCAN CONSTRUCTION MATERIALS, LLC | +8.0% | 2 |
| Apr 21, 2026 | 6499-11-001MMC - A00220169 | Hale Lubbock |
FY26 Plainview LRAIH0027 · Material Maintenance Project | $775,000 | $826,770 | VULCAN CONSTRUCTION MATERIALS, LLC | +6.7% | 2 |
| Apr 21, 2026 | 6499-10-001MMC - A00220168 | Terry Lubbock |
FY26 Brownfield LRAUS0062 · Material Maintenance Project | $697,500 | $685,628 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.7% | 2 |
| Apr 21, 2026 | 6498-88-001RMC - A00220087 | Ector Odessa |
6498-88-001 Roadside MowingIH0020 · Routine Maintenance Project | $640,740 | $602,455 | LIGHT & FOLIAGE SUPPLY, LLC | -6.0% | 2 |
| Apr 21, 2026 | 6499-60-001BPM - A00220409 | Ector Odessa |
6499-60-001 BPMSL0338 · Bridge Preventative Maintenance - Sealed | $660,927 | $521,997 | ICOS MANAGEMENT, LLC | -21.0% | 7 |
| Apr 21, 2026 | 6499-14-001MMC - A00220172 | Lamb Lubbock |
FY26 Littlefield ASPPMUS0084 · Material Maintenance Project | $437,500 | $446,000 | L A FULLER & SONS CONSTRUCTION, LTD. | +1.9% | 2 |
| Apr 21, 2026 | 6499-15-001MMC - A00220173 | Hale Lubbock |
FY26 Plainview ASPPMIH0027 · Material Maintenance Project | $437,500 | $428,175 | L A FULLER & SONS CONSTRUCTION, LTD. | -2.1% | 2 |
| Apr 21, 2026 | 6498-89-001RMC - A00220088 | Pecos Odessa |
6498-89-001 MBGF (Callout)IH0010 · Routine Maintenance Project | $349,050 | $401,860 | HJC FARMS, INC. | +15.1% | 1 |
| Apr 21, 2026 | 6498-21-001RMC - A00219951 | Midland Odessa |
6498-21-001 MBGF (Callout)IH0020 · Routine Maintenance Project | $334,350 | $398,390 | HJC FARMS, INC. | +19.2% | 2 |
| Apr 21, 2026 | 6499-13-001MMC - A00220171 | Lubbock Lubbock |
FY26 Lubbock LRAIH0027 · Material Maintenance Project | $310,000 | $318,990 | VULCAN CONSTRUCTION MATERIALS, LLC | +2.9% | 2 |
| Apr 21, 2026 | 6499-76-001MMC - A00220493 | Van Zandt Tyler |
VAN ZANDT COUNTY FLEX BASEUS0080 · Material Maintenance Project | $255,000 | $244,000 | TOUCHSTONE RESOURCES, LLC | -4.3% | 1 |
| Apr 21, 2026 | 6497-99-001RMC - A00219871 | Midland Odessa |
6497-99-001 Striping CalloutIH0020 · Routine Maintenance Project | $229,138 | $207,027 | PMI PAVEMENT MARKING, LLC | -9.6% | 6 |
| Apr 21, 2026 | 6499-41-001RMC - A00220287 | Winkler Odessa |
6499-41-001 Roadside MowingSH0302 · Routine Maintenance Project | $201,460 | $206,065 | LUKEDA SANDBLASTING & SERVICES LLC | +2.3% | 3 |
| Apr 21, 2026 | 6499-16-001MMC - A00220174 | Lubbock Lubbock |
FY26 Lubbock ASPPMIH0027 · Material Maintenance Project | $175,000 | $179,250 | L A FULLER & SONS CONSTRUCTION, LTD. | +2.4% | 2 |
| Apr 21, 2026 | 6499-42-001RMC - A00220296 | Smith Tyler |
LARGE GUIDE SIGN REPAIR FY 26IH0020 · Routine Maintenance Project - Sealed | $151,550 | $160,265 | STRIPING TECHNOLOGY, L.P. | +5.8% | 4 |
| Apr 21, 2026 | 6498-09-001MMC - A00219890 | Pecos Odessa |
6498-09-001 Flex BaseBI0010G · Material Maintenance Project | $45,500 | $35,000 | TOUCHSTONE RESOURCES, LLC | -23.1% | 4 |
| Apr 21, 2026 | 6498-11-001MMC - A00219892 | Midland Odessa |
6498-11-001 Flex BaseIH0020 · Material Maintenance Project | $35,750 | $24,750 | TOUCHSTONE RESOURCES, LLC | -30.8% | 3 |
| Apr 21, 2026 | 6498-14-001MMC - A00219898 | Ector Odessa |
6498-14-001 Flex BaseSL0338 · Material Maintenance Project | $35,750 | $24,750 | TOUCHSTONE RESOURCES, LLC | -30.8% | 3 |
| Apr 21, 2026 | 6500-35-001MMC - A00220746 | Ector Odessa |
6500-35-001 AggregateSL0338 · Material Maintenance Project | $25,500 | $19,000 | TOUCHSTONE RESOURCES, LLC | -25.5% | 2 |
| Apr 20, 2026 | 6493-37-001RMC - A00218313 | Coryell Waco |
CORYELL, BOSQUE AND HAMILTON TREE TRIMFM0932 · Routine Maintenance Project | $574,009 | $496,680 | JCW CONSTRUCTION, LLC | -13.5% | 5 |
| Apr 20, 2026 | 6493-36-001RMC - A00218312 | Bell Waco |
BELL TREE TRIMMING FY 26FM1670 · Routine Maintenance Project | $255,448 | $204,805 | ALLIES LAND CLEARING | -19.8% | 5 |
| Apr 20, 2026 | 6497-41-001SUP - A00219618 | Kaufman Dallas |
Kaufman-Rockwall Litter 042026IH0020 · State Use Project | $222,634 | — | 0 | ||
| Apr 20, 2026 | 6501-61-001SUP - A00221517 | Franklin Paris |
Grounds Maintenance - FranklinIH0030 · State Use Project | $7,900 | — | 0 | ||
| Apr 20, 2026 | 6501-64-001SUP - A00221523 | Grayson Paris |
Grounds Maintenance - Grayson 26US0075 · State Use Project | $83,760 | — | 0 | ||
| Apr 20, 2026 | 6501-65-001SUP - A00221526 | Hopkins Paris |
Grounds Maintenance - Hopkins 26IH0030 · State Use Project | $13,610 | — | 0 | ||
| Apr 20, 2026 | 6501-72-001SUP - A00221535 | Hunt Paris |
Grounds Maintenance - Hunt 26IH0030 · State Use Project | $16,770 | — | 0 | ||
| Apr 20, 2026 | 6501-73-001SUP - A00221543 | Rains Paris |
PICNIC AREA MAINTENANCE - RAINS FY26US0069 · State Use Project | $34,460 | — | 0 | ||
| Apr 16, 2026 | 6487-86-001RMC - A00216847 | Tom Green San Angelo |
RM 584 TRANSITION SLABSRM0584 · Routine Maintenance Project - Sealed | $588,345 | $762,302 | O. TREVINO CONSTRUCTION, LLC | +29.6% | 2 |
| Apr 16, 2026 | 6499-97-001MMC - A00220558 | Fannin Paris |
Hot Mix - Fannin COUS0069 · Material Maintenance Project - Sealed | $747,200 | $697,240 | RK HALL, LLC | -6.7% | 5 |
| Apr 16, 2026 | 6500-00-001MMC - A00220583 | Franklin Paris |
Hot Mix - Franklin CO FY26US0067 · Material Maintenance Project - Sealed | $792,000 | $689,440 | RK HALL, LLC | -12.9% | 3 |
| Apr 16, 2026 | 6500-12-001MMC - A00220620 | Hopkins Paris |
Hot Mix - Hopkins CO FY26IH0030 · Material Maintenance Project - Sealed | $742,500 | $627,760 | RK HALL, LLC | -15.5% | 4 |
| Apr 16, 2026 | 6500-13-001MMC - A00220625 | Hunt Paris |
Hot Mix - Hunt 26IH0030 · Material Maintenance Project - Sealed | $649,750 | $617,190 | RK HALL, LLC | -5.0% | 6 |
| Apr 16, 2026 | 6499-98-001MMC - A00220566 | Rains Paris |
Hot Mix - Rains CO FY26US0069 · Material Maintenance Project - Sealed | $637,000 | $609,315 | RK HALL, LLC | -4.3% | 4 |
| Apr 16, 2026 | 6500-03-001MMC - A00220588 | Lamar Paris |
Hot Mix - Lamar CO FY26US0082 · Material Maintenance Project - Sealed | $720,500 | $603,160 | RK HALL, LLC | -16.3% | 2 |
| Apr 16, 2026 | 6500-11-001MMC - A00220619 | Delta Paris |
Asphalt Oil & Emulsion - Delta 26SH0154 · Material Maintenance Project - Sealed | $720,500 | $603,160 | RK HALL, LLC | -16.3% | 3 |
| Apr 16, 2026 | 6500-01-001MMC - A00220585 | Red River Paris |
Hot Mix - Red River CO FY26SH0037 · Material Maintenance Project - Sealed | $659,500 | $550,240 | RK HALL, LLC | -16.6% | 2 |
| Apr 16, 2026 | 6497-30-001RMC - A00219572 | Lamar Paris |
Signal Maint. FY26US0082 · Routine Maintenance Project - Sealed | $659,279 | $549,355 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -16.7% | 3 |
| Apr 16, 2026 | 6499-73-001MMC - A00220458 | Franklin Paris |
Hydraulic Cement - Franklin DW FY26IH0030 · Material Maintenance Project - Sealed | $549,128 | $538,931 | AKA-MATERIALS | -1.9% | 3 |
1–100 of 216Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.