TxDOT Bid Results

Jul 2025 · 220 let jobs
220Let jobs
$674,826,945Total low bids
$780,793,194Total estimates
-13.6%Low bids vs estimates

Jul 2025 results

Bid tabs (Excel) ExcelCSV
Let dateCCSJCounty / DistrictProject EstimateLow bidLow bidder% vs est.Bidders
Jul 31, 2025 6484-64-001RMC - A00215508 Dallas
Dallas
Opaque Sealer Finish IH0035E WestIH0035E · Routine Maintenance Project - Sealed $980,959 $1,066,861 ICOS MANAGEMENT, LLC +8.8% 2
Jul 31, 2025 6484-63-001RMC - A00215507 Dallas
Dallas
Opaque Sealer Finish IH0035E - EastIH0035E · Routine Maintenance Project - Sealed $848,587 $930,156 ICOS MANAGEMENT, LLC +9.6% 2
Jul 31, 2025 6488-17-001SUP - A00217059 Travis
Austin
District HQ Window Washing FY26IH0035 · State Use Project $4,920 — 0
Jul 31, 2025 6488-56-001EMC - A00217140 Kerr
San Antonio
FM 394 & FM 1338 Kerr Flood 2025FM0394 · Emergency Maintenance Project - Sealed $1,284,271 — 0
Jul 30, 2025 6486-34-001RMC - A00216253 Angelina
Lufkin
2025-07 Crack Seal (North Counties)US0069 · Routine Maintenance Project $713,567 $830,189 D & M CONTRACTORS, LLC +16.3% 4
Jul 30, 2025 6480-14-001BPM - A00214051 Houston
Lufkin
2025-06 BPM SouthSL0304 · Bridge Preventative Maintenance $377,120 $230,695 SHALOM SERVICES CORPORATION -38.8% 8
Jul 30, 2025 6486-94-001RMC - A00216492 Shelby
Lufkin
2025-7 Shelby MBGFUS0096 · Routine Maintenance Project $161,949 $138,118 AUSTIN BARRICADE COMPANY, L.L.C. -14.7% 4
Jul 29, 2025 6484-46-001RMC - A00215466 Lubbock
Lubbock
50th St and FM835 Decel Lane WideningFM 835 · Routine Maintenance Project - Sealed $158,058 $589,341 LONE STAR DIRT & PAVING, LTD. +272.9% 1
Jul 29, 2025 6478-47-001MMC - A00213359 Waller
Houston
MMC 6478-47 EmulsionFM1488 · Material Maintenance Project $255,600 $258,420 ERGON ASPHALT & EMULSIONS, INC. +1.1% 2
Jul 29, 2025 6487-63-001SUP - A00216748 Wichita
Wichita Falls
ELECTRA Janitorial & Grounds FY25-27US0287 · State Use Project $77,302 — 0
Jul 28, 2025 6489-21-001SUP - A00217328 San Saba
Brownwood
SU LITTER- SAN SABA 2025US0190 · State Use Project $45,718 — 0
Jul 28, 2025 6488-28-001SUP - A00217088 Henderson
Tyler
SUP - Henderson County Litter RemovalSH0019 · State Use Project $211,499 — 0
Jul 25, 2025 6478-03-001RMC - A00213189 Cooke
Wichita Falls
FY25 Re-Stripe & RPM'sUS0082 · Routine Maintenance Project - Sealed $958,755 $577,562 FLAT LINE, INC. -39.8% 7
Jul 25, 2025 6480-74-001SUP - A00214271 Montgomery
Houston
SUP 6480-74-001 Litter RemovalIH0045 · State Use Project $894,774 — 0
Jul 25, 2025 6488-61-001SUP - A00217155 Sabine
Lufkin
2025-07 Sabine Grounds and PicnicFM0083 · State Use Project $55,291 — 0
Jul 24, 2025 6477-67-001RMC - A00213097 Taylor
Abilene
Callout Thermoplastic StripingIH0020 · Routine Maintenance Project $961,985 $677,415 FLAT LINE, INC. -29.6% 4
Jul 24, 2025 6461-92-001RMC - A00206162 Grayson
Paris
Full Depth Concrete US75 FY26US0075 · Routine Maintenance Project - Sealed $751,000 $496,711 WINDING ROAD CONSTRUCTION, INC. -33.9% 4
Jul 24, 2025 6486-03-001MMC - A00216185 Brown
Brownwood
WINTER WEATHER (MAT ONLY) DISTRICT WIDEUS0183 · Material Maintenance Project $372,726 $461,525 TOUCHSTONE RESOURCES, LLC +23.8% 1
Jul 24, 2025 6470-92-001RMC - A00211370 Johnson
Fort Worth
FY25 Tree Trimming and Brush RemovalFM0004 · Routine Maintenance Project - Sealed $538,934 $240,334 AUSTIN BARRICADE COMPANY, L.L.C. -55.4% 8
Jul 24, 2025 6487-58-001MMC - A00216735 Brown
Brownwood
HOT-MIX COLD-LAID BROWN 2025 (MAT ONLY)US0377 · Material Maintenance Project $233,600 $240,000 VALUE DRILLING COMPANY INC +2.7% 5
Jul 24, 2025 6481-22-001BPM - A00214349 Lamar
Paris
BPM Lamar FY26FM0137 · Bridge Preventative Maintenance - Sealed $335,183 $224,665 BK FIELD OPERATIONS LLC -33.0% 4
Jul 24, 2025 6484-13-001RMC - A00215396 Lamar
Paris
Culvert ReplacementFM1500 · Routine Maintenance Project - Sealed $258,093 $223,063 GARRET SHIELDS INFRASTRUCTURE -13.6% 1
Jul 24, 2025 6481-21-001BPM - A00214348 Hunt
Paris
BPM Hunt FY26IH0030 · Bridge Preventative Maintenance - Sealed $325,575 $209,178 BK FIELD OPERATIONS LLC -35.8% 7
Jul 24, 2025 6482-42-001RMC - A00214742 Kimble
San Angelo
Non-Site Tree Trimming South FY 25US0377 · Routine Maintenance Project - Sealed $350,388 $126,660 AUSTIN BARRICADE COMPANY, L.L.C. -63.9% 9
Jul 23, 2025 6486-01-001MMC - A00216181 Randall
Amarillo
FY 26 Amarillo Area HMACIH0027 · Material Maintenance Project $625,000 $625,000 RK HALL, LLC 0.0% 2
Jul 23, 2025 6486-39-001RMC - A00216260 San Jacinto
Lufkin
2026-07 San Jacinto Crack Seal (South)US0059 · Routine Maintenance Project - Sealed $425,778 $427,929 D & M CONTRACTORS, LLC +0.5% 4
Jul 23, 2025 6484-43-001RMC - A00215461 Potter
Amarillo
Traffic Control FY 26IH0040 · Routine Maintenance Project - Sealed $556,680 $388,185 BARRICADES UNLIMITED -30.3% 2
Jul 23, 2025 6487-09-001MMC - A00216518 Potter
Amarillo
FY 26 AMA Hydraulic CementIH0040 · Material Maintenance Project $392,900 $358,401 AKA-MATERIALS -8.8% 2
Jul 23, 2025 6486-25-001RMC - A00216240 Angelina
Lufkin
2025-08 ANGELINA MBGFUS0059 · Routine Maintenance Project - Sealed $282,300 $293,167 RHINO EQUITY, LLC +3.8% 3
Jul 23, 2025 6462-73-001RMC - A00206740 Bexar
San Antonio
FY2026 CULVERT REPLACEMENT SASHMR0681 · Routine Maintenance Project - Sealed $100,507 $98,815 GARRET SHIELDS INFRASTRUCTURE -1.7% 3
Jul 23, 2025 6481-09-001BPM - A00214336 Bexar
San Antonio
FY2026 IH 410 WBFR AT DRAINIH0410 · Bridge Preventative Maintenance - Sealed $44,120 $35,566 BK FIELD OPERATIONS LLC -19.4% 3
Jul 23, 2025 6489-27-001SUP - A00217345 Washington
Bryan
FY25 Washington Picnic Area MaintenanceSH0105 · State Use Project $84,700 — 0
Jul 23, 2025 6479-93-001SUP - A00213971 Hidalgo
Pharr
6479-93-001 Grounds MaintenanceIH0069C · State Use Project $69,396 — 0
Jul 23, 2025 6479-88-001SUP - A00213965 Starr
Pharr
6479-88-001 Janitorial MNT (Roma/Hebb)US0083 · State Use Project $94,620 — 0
Jul 23, 2025 6488-67-001SUP - A00217172 Randall
Amarillo
Janitorial Canyon Maintenance Office FYUS0060 · State Use Project $15,073 — 0
Jul 22, 2025 6483-51-001RMC - A00215117 Chambers
Beaumont
FY 26 FDCRIH0010 · Routine Maintenance Project - Sealed $776,468 $1,042,037 GARRET SHIELDS INFRASTRUCTURE +34.2% 2
Jul 22, 2025 6484-77-001RMC - A00215571 Hidalgo
Pharr
6484-77-001 FM Mowing (Hidalgo)SH0495 · Routine Maintenance Project - Sealed $895,298 $817,470 R&M INCORPORATED -8.7% 4
Jul 22, 2025 6468-61-001RMC - A00210170 Tom Green
San Angelo
Tree Trimming North FY 25SH0208 · Routine Maintenance Project - Sealed $246,591 $101,768 AUSTIN BARRICADE COMPANY, L.L.C. -58.7% 9
Jul 21, 2025 6488-76-001EMC - A00217190 Kerr
San Antonio
SL 98 and FM 1350 Kerr Flood 2025FM1350 · Emergency Maintenance Project - Sealed $444,840 — 0
Jul 21, 2025 6488-77-001SUP - A00217195 Hardin
Beaumont
KOUNTZE HIKE AND BIKE TRAIL MAINTENANCEUS0069 · State Use Project $16,508 — 0
Jul 21, 2025 6488-78-001SUP - A00217196 Orange
Beaumont
ORANGE LITTER BARREL MAINTENANCESH0012 · State Use Project $10,544 — 0
Jul 21, 2025 6488-79-001SUP - A00217198 Jefferson
Beaumont
BMT DISTRICT JANITORIALUS0069 · State Use Project $101,113 — 0
Jul 21, 2025 6488-80-001SUP - A00217201 Newton
Beaumont
NEWTON LITTER MNTSH0087 · State Use Project $104,249 — 0
Jul 21, 2025 6488-82-001SUP - A00217204 Liberty
Beaumont
LIBERTY MO/AO JANITORIAL MAINT.US0090 · State Use Project $27,171 — 0
Jul 21, 2025 6488-83-001SUP - A00217205 Orange
Beaumont
ORANGE LITTER MAINTENANCESH0062 · State Use Project $176,606 — 0
Jul 21, 2025 6488-65-001SUP - A00217167 Newton
Beaumont
DEWEYVILLE PARKS MAINTENANCESH0012 · State Use Project $20,301 — 0
Jul 18, 2025 6476-50-001RMC - A00212820 Jackson
Yoakum
Ditch Cleaning FY 25US0059 · Routine Maintenance Project $121,915 $96,926 AUSTIN BARRICADE COMPANY, L.L.C. -20.5% 5
Jul 18, 2025 6488-15-001ER 2B25(193) Travis
Austin
FY25 EMC at Cow Creek CrossingRM1431 · Emergency Maintenance Project - Sealed $4,030,543 — 0
Jul 17, 2025 6487-79-001EMC - A00216781 Tarrant
Fort Worth
Emergency Bridge Repair - Tarrant CountyIH0030 · Emergency Maintenance Project - Sealed $1,199,133 — 0
Jul 17, 2025 6488-55-001EMC - A00217139 Kerr
San Antonio
SH 39 Kerr Flood 2025SH0039 · Emergency Maintenance Project - Sealed $10,455,604 — 0
Jul 17, 2025 6486-86-001SUP - A00216467 Red River
Paris
Grounds Maintenance - Red River FY25US0082 · State Use Project $7,845 — 0
Jul 15, 2025 6483-36-001RMC - A00215084 Fort Bend
Houston
RMC 6483-36-001US0059 · Routine Maintenance Project $652,800 $1,130,160 ISI CONTRACTING, INC. +73.1% 2
Jul 15, 2025 6486-60-001RMC - A00216384 San Patricio
Corpus Christi
6486-60-001 Mowing (San Patricio)IH0037 · Routine Maintenance Project - Sealed $577,427 $503,440 R&M INCORPORATED -12.8% 4
Jul 15, 2025 6485-78-001MMC - A00216076 Karnes
Corpus Christi
6485-78-001 Aggregate Karnes AreaUS0181 · Material Maintenance Project $488,000 $480,500 BRAUNTEX MATERIALS, INC. -1.5% 4
Jul 15, 2025 6481-41-001RMC - A00214396 Waller
Houston
RMC 6481-41-001US0290 · Routine Maintenance Project - Sealed $640,460 $480,471 THE CONFIDENCE GROUP, INC -25.0% 4
Jul 15, 2025 6485-80-001MMC - A00216078 San Patricio
Corpus Christi
6485-80-001 Flex Base Sinton MaintUS0181 · Material Maintenance Project $450,500 $337,195 MARTIN MARIETTA MATERIALS, INC. -25.2% 4
Jul 15, 2025 6481-58-001RMC - A00214429 Karnes
Corpus Christi
FY2026 KAO Crack SealSH0123 · Routine Maintenance Project - Sealed $272,463 $333,539 D & M CONTRACTORS, LLC +22.4% 3
Jul 15, 2025 6481-56-001RMC - A00214427 Live Oak
Corpus Christi
FY2026 AAO Crack SealUS0281 · Routine Maintenance Project - Sealed $284,513 $312,800 FYL ENTERPRISES, LLC +9.9% 3
Jul 15, 2025 6485-79-001MMC - A00216077 Karnes
Corpus Christi
6485-79-001 HMCL Karnes Maint.US0181 · Material Maintenance Project $277,800 $279,000 BRAUNTEX MATERIALS, INC. +0.4% 3
Jul 15, 2025 6485-81-001MMC - A00216088 Karnes
Corpus Christi
6485-81-001 Flex Base Karnes MaintUS0181 · Material Maintenance Project $165,000 $154,300 COLORADO MATERIALS, LTD. -6.5% 5
Jul 15, 2025 6488-25-001EMC - A00217072 Kerr
San Antonio
FM 1340 Kerr Flood 2025FM1340 · Emergency Maintenance Project - Sealed $865,020 — 0
Jul 14, 2025 6485-11-001RMC - A00215824 Freestone
Bryan
FY26 - Freestone/Leon Tree RemovalSH0075 · Routine Maintenance Project $237,900 $183,754 RHINO EQUITY, LLC -22.8% 7
Jul 14, 2025 6485-55-001SUP - A00215980 Calhoun
Yoakum
Janitorial Calhoun CountySH0035 · State Use Project $37,131 — 0
Jul 14, 2025 6486-72-001SUP - A00216400 Franklin
Paris
Janitorial - Franklin FY2025SH0037 · State Use Project $18,174 — 0
Jul 14, 2025 6486-85-001SUP - A00216464 Rains
Paris
Grounds Maintenance - Rains FY25US0069 · State Use Project $12,940 — 0
Jul 11, 2025 6487-13-001SUP - A00216522 Parker
Fort Worth
FY2026 - Parker/Palo Pinto PicnicsIH0020 · State Use Project $253,683 — 0
Jul 11, 2025 6486-27-001SUP - A00216244 Montgomery
Houston
Janitorial Maintenance 6486-27-001FM3083 · State Use Project $76,510 — 0
Jul 10, 2025 6485-88-001RMC - A00216138 Webb
Laredo
Webb County Concrete TurnaroundIH0035 · Routine Maintenance Project - Sealed $949,675 $1,340,905 J. CARROLL WEAVER, INC. +41.2% 1
Jul 9, 2025 6481-81-001RMC - A00214576 Denton
Dallas
Attenuators Denton Co FY 26IH0035W · Routine Maintenance Project - Sealed $717,750 $506,220 FIREMAN EXCAVATING, INC. -29.5% 6
Jul 9, 2025 6479-05-001RMC - A00213803 Denton
Dallas
MBGF Repairs Denton FY 26IH0035W · Routine Maintenance Project - Sealed $926,030 $488,902 ROSS SA ENTERPRISE LLC -47.2% 6
Jul 9, 2025 6483-80-001RMC - A00215292 Dallas
Dallas
Lrg Guide Sign IH30 2025IH0030 · Routine Maintenance Project - Sealed $663,421 $485,525 SYNERGY SIGNS & SERVICES LLC -26.8% 6
Jul 9, 2025 6484-68-001RMC - A00215529 Dallas
Dallas
Large Sign Replace 63 0725IH0030 · Routine Maintenance Project - Sealed $600,319 $450,404 SYNERGY SIGNS & SERVICES LLC -25.0% 6
Jul 9, 2025 6482-04-001RMC - A00214635 Collin
Dallas
FPSR 07 0725FM0545 · Routine Maintenance Project - Sealed $474,864 $441,920 JAGOE-PUBLIC COMPANY -6.9% 3
Jul 9, 2025 6480-13-001BPM - A00214050 San Augustine
Lufkin
2025-06 BPM NorthSH0021 · Bridge Preventative Maintenance $518,760 $425,610 ACE CONTRACTORS, INC. -18.0% 2
Jul 9, 2025 6486-09-001MMC - A00216197 Robertson
Bryan
FY25 Robertson HMA - 07SH0006 · Material Maintenance Project $435,000 $411,000 BIG CREEK CONSTRUCTION, LTD. -5.5% 4
Jul 9, 2025 6480-37-001BPM - A00214129 Freestone
Bryan
FY25 - Freestone IH45 SouthIH0045 · Bridge Preventative Maintenance - Sealed $451,815 $405,447 CROSS PLUS CONSTRUCTION, LLC -10.3% 6
Jul 9, 2025 6478-73-001RMC - A00213487 Collin
Dallas
Crash Cushion Attenuator Repair 07 0425US0075 · Routine Maintenance Project - Sealed $596,500 $353,325 FIREMAN EXCAVATING, INC. -40.8% 5
Jul 9, 2025 6486-35-001RMC - A00216255 Brown
Brownwood
ROADSIDE MOWING (CALL-OUT) BROWN 2025US0183 · Routine Maintenance Project $408,600 $340,500 T&L CLEANING SERVICES LLC -16.7% 2
Jul 9, 2025 6482-01-001RMC - A00214632 Kaufman
Dallas
Attenuator Repair FY '25IH0020 · Routine Maintenance Project - Sealed $923,560 $306,115 FIREMAN EXCAVATING, INC. -66.9% 3
Jul 9, 2025 6485-85-001MMC - A00216117 Brazos
Bryan
FY25 Bulk Salt Bryan AO - 07SH0006 · Material Maintenance Project $303,920 $284,179 NSG LOGISTICS, LLC -6.5% 1
Jul 9, 2025 6468-32-001RMC - A00210116 Williamson
Austin
FY25 Georgetown Crack SealUS0079 · Routine Maintenance Project - Sealed $255,169 $265,381 FYL ENTERPRISES, LLC +4.0% 3
Jul 9, 2025 6468-34-001RMC - A00210118 Burnet
Austin
FY 25 Burnet Crack SealUS0281 · Routine Maintenance Project - Sealed $317,756 $235,391 FYL ENTERPRISES, LLC -25.9% 4
Jul 9, 2025 6468-33-001RMC - A00210117 Bastrop
Austin
FY 25 Bastrop Crack SealUS0290 · Routine Maintenance Project - Sealed $209,706 $214,797 FYL ENTERPRISES, LLC +2.4% 3
Jul 9, 2025 6471-92-001BPM - A00211700 Collin
Dallas
Bridge Joint Cleaning Sealing 07 0725US0075 · Bridge Preventative Maintenance - Sealed $227,906 $199,431 ROAD DOCTORS LLC -12.5% 6
Jul 9, 2025 6468-38-001RMC - A00210122 Hays
Austin
FY25 Hays Crack SealFM2001 · Routine Maintenance Project - Sealed $174,787 $176,920 FYL ENTERPRISES, LLC +1.2% 3
Jul 9, 2025 6483-26-001RMC - A00215040 Orange
Beaumont
FY 25 Culvert CleaningIH0010 · Routine Maintenance Project $269,350 $161,120 XTREME PRO CLEANING LLC -40.2% 4
Jul 9, 2025 6484-99-001MMC - A00215735 Kaufman
Dallas
FLEX BASE (Material Only) 06 0925FM2728 · Material Maintenance Project $108,750 $117,813 KNIFE RIVER CORPORATION - SOUTH +8.3% 5
Jul 9, 2025 6480-92-001RMC - A00214300 Navarro
Dallas
Tree Trimming and Brush Removal 01 0709FM0667 · Routine Maintenance Project - Sealed $151,676 $103,008 AUSTIN BARRICADE COMPANY, L.L.C. -32.1% 11
Jul 9, 2025 6481-20-001RMC - A00214347 Williamson
Austin
FY 25 Georgetown Tree and Brush RemovalFM0112 · Routine Maintenance Project - Sealed $186,862 $93,836 LOOKS GREAT SERVICES OF MS, INC. -49.8% 7
Jul 9, 2025 6479-06-001RMC - A00213804 Denton
Dallas
Tree/Brush Removal/Trimming 04 0725FM0156 · Routine Maintenance Project - Sealed $99,400 $76,625 ALLIES LAND CLEARING -22.9% 11
Jul 9, 2025 6485-00-001MMC - A00215736 Kaufman
Dallas
Lime (Material Only) 06 0725FM2728 · Material Maintenance Project $13,500 $17,000 TOUCHSTONE RESOURCES, LLC +25.9% 1
Jul 8, 2025 6485-92-001RMC - A00216167 Henderson
Tyler
Henderson & Anderson Guardrail CalloutSH0019 · Routine Maintenance Project - Sealed $683,580 $573,272 BK FIELD OPERATIONS LLC -16.1% 3
Jul 8, 2025 6486-12-001MMC - A00216200 Burleson
Bryan
FY25 Burleson HMA - 07SH0036 · Material Maintenance Project $317,000 $292,200 BRAZOS PAVING, INC. -7.8% 3
Jul 8, 2025 6480-64-001RMC - A00214225 Tom Green
San Angelo
Mowing - Tom Green (Urban) FY 26SH0208 · Routine Maintenance Project - Sealed $283,019 $241,395 SKYLINE CONSTRUCTION PAVING & STRIPING -14.7% 4
Jul 8, 2025 6485-84-001MMC - A00216116 Brazos
Bryan
FY25 Hydraulic Cement Bryan AO - 07SH0006 · Material Maintenance Project $245,508 $238,320 TOUCHSTONE RESOURCES, LLC -2.9% 2
Jul 8, 2025 6479-83-001BPM - A00213950 Freestone
Bryan
FY25 - Freestone US84 - 07US0084 · Bridge Preventative Maintenance - Sealed $279,223 $194,064 BK FIELD OPERATIONS LLC -30.5% 7
Jul 8, 2025 6485-25-001MMC - A00215846 Midland
Odessa
6485-25-001 AggregateIH0020 · Material Maintenance Project $52,500 $41,795 SOUTHERN SOURCING SOLUTIONS, LLC -20.4% 5
Jul 8, 2025 6486-18-001MMC - A00216223 Pecos
Odessa
6486-18-001 AggregateBI0010G · Material Maintenance Project $40,250 $23,967 SOUTHERN SOURCING SOLUTIONS, LLC -40.5% 5
Jul 8, 2025 6486-17-001MMC - A00216222 Ector
Odessa
6486-17-001 AggregateSL0338 · Material Maintenance Project $35,000 $21,645 SOUTHERN SOURCING SOLUTIONS, LLC -38.2% 5
Jul 3, 2025 6481-43-001RMC - A00214399 El Paso
El Paso
Cleaning & SweepingIH0010 · Routine Maintenance Project - Sealed $439,940 $355,000 AIMS COMPANIES -19.3% 2
1–100 of 220Next ›

Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.