75Let jobs
$1,077,318,571Total low bids
$1,063,460,962Total estimates
+1.3%Low bids vs estimates
Dec 2024 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Dec 29, 2024 | 6478-71-001SUP - A00213479 | Galveston Houston |
FY 2025 LITTER REMOVALSH0146 · State Use Project | $359,823 | — | 0 | ||
| Dec 18, 2024 | 6478-27-001SUP - A00213245 | Reeves Odessa |
6478-27-001 Litter RemovalIH0010 · State Use Project | $297,524 | — | 0 | ||
| Dec 18, 2024 | 6477-88-001SUP - A00213141 | Childress Childress |
FY25-27 Childress District JanitorialUS0287 · State Use Project | $372,942 | — | 0 | ||
| Dec 16, 2024 | 6477-75-001SUP - A00213116 | Hardin Beaumont |
KOUNTZE GROUNDS FY25US0069 · State Use Project | $8,983 | — | 0 | ||
| Dec 16, 2024 | 6477-83-001SUP - A00213127 | Hardin Beaumont |
KOUNTZE JANITORIAL FY25US0069 · State Use Project | $6,961 | — | 0 | ||
| Dec 16, 2024 | 6477-73-001SUP - A00213114 | Hardin Beaumont |
KOUNTZE BARRELS FY25US0069 · State Use Project | $18,128 | — | 0 | ||
| Dec 11, 2024 | 6478-42-001SUP - A00213346 | Angelina Lufkin |
2024-12 District Grounds MaintenanceUS0059 · State Use Project | $25,578 | — | 0 | ||
| Dec 8, 2024 | 6474-20-001SUP - A00212336 | Fort Bend Houston |
SUP 6474-20 Janitorial MaintenanceSH0036 · State Use Project | $74,053 | — | 0 | ||
| Dec 8, 2024 | 6473-95-001SUP - A00212291 | Fort Bend Houston |
SUP 6473-95 LANDSCAPE MAINTENANCESH0036 · State Use Project | $33,405 | — | 0 | ||
| Dec 4, 2024 | 0015-13-433STP 2B24(253)MM | Travis Austin |
N/S East Drainage TunnelIH 35 · Culvert & Storm Drainage Work | $623,980,725 | $698,120,715 | SAK CONSTRUCTION, LLC | +11.9% | 5 |
| Dec 4, 2024 | 0052-05-046F 2025(306) | Lamb Lubbock |
OV-US 84 Ltlfld to HockleyUS 84 · Restoration | $30,327,627 | $25,868,924 | A. L. HELMCAMP, INC. | -14.7% | 6 |
| Dec 4, 2024 | 0191-03-089F 2025(255) | Smith Tyler |
FM2493, Toll49 - FM346FM 2493 · Seal Coat | $24,876,254 | $24,103,696 | RONALD R. WAGNER & CO., LP | -3.1% | 4 |
| Dec 4, 2024 | 0035-05-062F 2025(304) | Menard San Angelo |
0035-05-062 US 83 SEAL COATUS 83 · Seal Coat | $11,446,359 | $11,252,314 | RONALD R. WAGNER & CO., LP | -1.7% | 3 |
| Dec 4, 2024 | 0365-02-032F 2025(257) | Hood Fort Worth |
SH 171; Parker Co. Ln to US 377SH 171 · Seal Coat | $10,631,382 | $9,721,843 | RONALD R. WAGNER & CO., LP | -8.6% | 4 |
| Dec 4, 2024 | 0021-01-059C 21-1-59 | Brewster El Paso |
US90 SEAL COAT (US67/90 | S US67/90)US 90 · Seal Coat | $6,309,720 | $6,055,675 | COX PAVING OF TEXAS, INC. | -4.0% | 2 |
| Dec 4, 2024 | 0011-04-029C 11-4-29 | Shackelford Abilene |
SH 351 SHACKELFORD - JONES TO E OF 604SH 351 · Overlay | $7,330,144 | $5,659,269 | FOUTSCO PAVING COMPANY, LLC | -22.8% | 9 |
| Dec 4, 2024 | 0924-00-119F 2025(291) | El Paso El Paso |
FY 2025 STRIPING PROJ (DISTRICTWIDE)Various · Traffic Control Devices | $4,523,278 | $3,964,118 | CENTERLINE TECHNOLOGIES, LLC | -12.4% | 4 |
| Dec 4, 2024 | 0911-00-085C 911-00-85 | Angelina Lufkin |
FY2025_Profile Pave Mark_TCDVarious · Traffic Control Devices | $4,692,581 | $3,846,146 | CENTERLINE TECHNOLOGIES, LLC | -18.0% | 6 |
| Dec 4, 2024 | 0095-03-110F 2025(289) | Kaufman Dallas |
US 80 at Buffalo Creek Relief to FM 548US 80 · Safety Improvement Projects | $4,541,188 | $3,495,000 | ED BELL CONSTRUCTION COMPANY | -23.0% | 12 |
| Dec 4, 2024 | 0913-22-055BR 2B23(036) | Gonzales Yoakum |
CR 189 BRIDGE REPLACEMENT 2512COUNTY ROAD 189 · Bridge Replacement | $3,433,669 | $2,979,227 | TREVWAY, INC. | -13.2% | 7 |
| Dec 4, 2024 | 0901-00-064C 901-00-64 | Lamar Paris |
2025 Seal Coat Stripe RetraceVarious · Seal Coat | $4,234,760 | $2,803,367 | CENTERLINE TECHNOLOGIES, LLC | -33.8% | 7 |
| Dec 4, 2024 | 0904-00-227F 2025(287) | Potter Amarillo |
FY 25 Districtwide Thermo Pav MarkingsVarious · Safety Improvement Projects | $2,009,803 | $1,520,328 | CENTERLINE TECHNOLOGIES, LLC | -24.4% | 5 |
| Dec 4, 2024 | 6473-56-001RMC - 647356001 | Coryell Waco |
BASE FAILURE PAVEMENT REPAIR-CORYELLSH0036 · Routine Maintenance Project | $1,580,806 | $1,449,375 | BIG CREEK CONSTRUCTION, LTD. | -8.3% | 4 |
| Dec 4, 2024 | 6473-42-001RMC - 647342001 | Hill Waco |
Base Repair - Hill Area OfficeSH0022 · Routine Maintenance Project - Sealed | $1,580,806 | $1,448,925 | BIG CREEK CONSTRUCTION, LTD. | -8.3% | 3 |
| Dec 4, 2024 | 6473-41-001RMC - 647341001 | McLennan Waco |
Base Repair - McLennanUS0084 · Routine Maintenance Project - Sealed | $1,638,415 | $1,423,275 | BIG CREEK CONSTRUCTION, LTD. | -13.1% | 3 |
| Dec 4, 2024 | 1216-01-010C 1216-1-10 | Cass Atlanta |
FM 944 from FM 1766 to SH 77FM 994 · Rehabilitation of Existing Road | $2,240,719 | $1,327,254 | H. V. CAVER, INC. | -40.8% | 6 |
| Dec 4, 2024 | 1986-01-072STP 2B24(357)HES | Montgomery Houston |
HOU_FM 1314, SL 494-Old HoustonFM 1314 · Safety Improvement Projects | $1,712,053 | $1,308,619 | CREACOM, INC. | -23.6% | 6 |
| Dec 4, 2024 | 6472-61-001RMC - 647261001 | El Paso El Paso |
Metal Beam Guardrail Fence Repair -EAOIH0010 · Routine Maintenance Project - Sealed | $1,628,400 | $1,234,611 | ROSS SA ENTERPRISE LLC | -24.2% | 5 |
| Dec 4, 2024 | 6389-95-001MMC - 638995001 | Hill Waco |
FY2025 Limestone Rock Asphalt (Hill)US0077 · Material Maintenance Project | $1,126,000 | $1,057,040 | VULCAN CONSTRUCTION MATERIALS, LLC | -6.1% | 2 |
| Dec 4, 2024 | 0902-90-329C 902-90-329 | Tarrant Fort Worth |
VariousVarious · Bridge Maintenance | $1,446,722 | $896,116 | 12TWELVE ROAD AND BRIDGE LLC | -38.1% | 11 |
| Dec 4, 2024 | 6473-05-001RMC - 647305001 | Val Verde Maintenance Division |
Langtry TIC Site RenovationSL0025 · Routine Maintenance Project | $894,785 | $874,350 | RELMCO, INC. | -2.3% | 4 |
| Dec 4, 2024 | 6463-30-001RMC - 646330001 | Montgomery Houston |
Mowing State ROW RMC 6463-30-001IH0045 · Routine Maintenance Project - Sealed | $943,946 | $845,281 | DOMINION ENGINEERING MANAGEMENT SERVICES (DEMS), LLC | -10.5% | 4 |
| Dec 4, 2024 | 0114-01-068BR 2024(495) | Travis Austin |
US 290E at IH 35 BMIPUS 290 · Bridge Maintenance | $801,600 | $768,495 | AAD CONTRACTING INC. | -4.1% | 5 |
| Dec 4, 2024 | 0500-01-155C 500-1-155 | Galveston Houston |
IH 45, Virginia Point Rd to SH 275IH 45 · Transportation Non-Roadway | $1,360,850 | $709,917 | SICE, INC. | -47.8% | 8 |
| Dec 4, 2024 | 3256-01-129C 3256-1-129 | Harris Houston |
SL 8, SH 249 to E of Ella BlvdSL 8 · Traffic Control Devices | $511,621 | $405,811 | PROFESSIONAL TRAFFIC CONTROL LLC | -20.7% | 4 |
| Dec 4, 2024 | 6475-68-001MMC - 647568001 | Guadalupe Maintenance Division |
FY 25 Seguin RDC Bagged ASPPMSH0046 · Material Maintenance Project | $289,000 | $212,500 | WALLER COUNTY ASPHALT INC. | -26.5% | 3 |
| Dec 4, 2024 | 6475-63-001MMC - 647563001 | Garza Maintenance Division |
FY 25 Post RDC Pre-Packaged ConcreteUS0084 · Material Maintenance Project | $204,000 | $159,800 | AKA-MATERIALS | -21.7% | 7 |
| Dec 4, 2024 | 6475-64-001MMC - 647564001 | Henderson Maintenance Division |
FY 25 Athens RDC Pre-Packaged ConcreteSL0007 · Material Maintenance Project | $204,000 | $151,980 | AKA-MATERIALS | -25.5% | 6 |
| Dec 4, 2024 | 6475-67-001MMC - 647567001 | Henderson Maintenance Division |
FY 25 Athens RDC Bagged ASPPMSL0007 · Material Maintenance Project | $204,000 | $150,000 | WALLER COUNTY ASPHALT INC. | -26.5% | 5 |
| Dec 4, 2024 | 0902-20-236STP 2025(246)HES | Wise Fort Worth |
HSIP 2024 Wise Co Var LocationVarious · Safety Improvement Projects | $279,420 | $149,400 | MARCOM'S MOWING SERVICE, LLC | -46.5% | 7 |
| Dec 4, 2024 | 6475-65-001MMC - 647565001 | Guadalupe Maintenance Division |
FY 25 Seguin RDC Pre-Packaged ConcreteSH0046 · Material Maintenance Project | $180,000 | $135,000 | TOUCHSTONE RESOURCES, LLC | -25.0% | 5 |
| Dec 4, 2024 | 6475-66-001MMC - 647566001 | Garza Maintenance Division |
FY 25 Post RDC Bagged ASPPMUS0084 · Material Maintenance Project | $170,000 | $125,000 | WALLER COUNTY ASPHALT INC. | -26.5% | 5 |
| Dec 3, 2024 | 0047-05-057F 2025(482) | Collin Dallas |
SH 5 Stewart Road to Eldorado ParkwaySH 5 · Widen Non-Freeway | $188,570,915 | $157,359,015 | WEBBER, LLC | -16.6% | 4 |
| Dec 3, 2024 | 2858-02-011C 2508-2-11 | Jones Abilene |
DISTRICT SEAL COAT FY 25 2858-02FM 2834 · Seal Coat | $14,375,295 | $14,844,601 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | +3.3% | 5 |
| Dec 3, 2024 | 0009-18-021F 2025(272) | Hopkins Paris |
FY 2025 Seal Coat BU 67 VBU 67V · Seal Coat | $13,199,845 | $14,548,149 | CDM HOLDINGS | +10.2% | 2 |
| Dec 3, 2024 | 0912-00-699F 2025(341) | Harris Houston |
Various Locations - Overhead SignsVarious · Safety Improvement Projects | $17,178,800 | $12,243,838 | SELECT MAINTENANCE, L.L.C. | -28.7% | 6 |
| Dec 3, 2024 | 0069-02-031F 2025(294) | Glasscock San Angelo |
0069-02-031 US 87 A-R SEAL COATUS 87 · Seal Coat | $9,153,412 | $8,400,199 | COX PAVING OF TEXAS, INC. | -8.2% | 2 |
| Dec 3, 2024 | 0250-03-051F 2025(244) | Erath Fort Worth |
US 281; Palo Pinto Co. Line to FM 8US 281 · Seal Coat | $6,533,659 | $6,375,558 | NORTHEASTERN PAVERS, LLC | -2.4% | 3 |
| Dec 3, 2024 | 2121-02-179STP 2025(290)HES | El Paso El Paso |
ELP_IH0010_1-SYSIH 10 · Safety Improvement Projects | $6,053,315 | $6,226,703 | TRI STATE ELECTRIC, LTD. | +2.9% | 2 |
| Dec 3, 2024 | 0904-11-064C 904-11-64 | Randall Amarillo |
TP&W CANONCITA PROJECTVarious · Texas Park and Wildlife | $5,252,420 | $4,199,123 | L A FULLER & SONS CONSTRUCTION, LTD. | -20.1% | 5 |
| Dec 3, 2024 | 0902-00-382F 2025(245) | Palo Pinto Fort Worth |
Districtwide Flexible PavementFM 919 · Rehabilitation of Existing Road | $4,038,963 | $4,012,954 | A. L. HELMCAMP, INC. | -0.6% | 7 |
| Dec 3, 2024 | 0271-15-099F 2025(280) | Harris Houston |
IH 610: Market St to W of Mercury; D.C.IH 610 · Freeway Operational Improvements | $4,638,209 | $3,950,379 | MC2 CIVIL, LLC | -14.8% | 11 |
| Dec 3, 2024 | 1533-01-022C 1533-1-22 | Bastrop Austin |
FM 1704 from Lower Elgin Rd to FM 969FM 1704 · Overlay | $3,294,015 | $2,843,419 | LONE STAR PAVING COMPANY | -13.7% | 6 |
| Dec 3, 2024 | 0909-38-090BR 2023(425) | Falls Waco |
BR | FCR 157 @ COPPERAS CREEK |(MAP #83)COUNTY ROAD 256 · Bridge Replacement | $3,169,901 | $2,820,729 | SKYLINE BRIDGE LLC | -11.0% | 8 |
| Dec 3, 2024 | 0912-72-747C 912-72-747 | Harris Houston |
SEAO - Misc Bridge Repairs - FY 25Various · Bridge Widening or Rehabilitation | $2,689,406 | $2,588,189 | ISI CONTRACTING, INC. | -3.8% | 5 |
| Dec 3, 2024 | 0081-01-053BR 2025(243) | Tarrant Fort Worth |
SH 121: SH 121 WB@ IH 35W SBSS 347 · Bridge Maintenance | $1,658,356 | $2,584,708 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | +55.9% | 5 |
| Dec 3, 2024 | 0919-19-085STP 2B22(006)TAPS | Bowie Atlanta |
N Robison Rd from W 15th St to RichmondROBISON RD N · Pedestrian, Sidewalks & Curb Ramps | $2,287,179 | $1,943,602 | GARRET SHIELDS INFRASTRUCTURE | -15.0% | 8 |
| Dec 3, 2024 | 6472-29-001MMC - 647229001 | McLennan Waco |
Flex Base, Agg. & Rip Rap - DistrictwideFM0185 · Material Maintenance Project | $1,912,025 | $1,646,175 | TOUCHSTONE RESOURCES, LLC | -13.9% | 3 |
| Dec 3, 2024 | 6472-41-001RMC - 647241001 | Tarrant Fort Worth |
FY25 Mowing and Herbicide South TarrantIH0030 · Routine Maintenance Project - Sealed | $2,988,899 | $1,567,970 | CENTRAL NORTH CONSTRUCTION, LLC | -47.5% | 4 |
| Dec 3, 2024 | 6473-55-001RMC - 647355001 | Bell Waco |
BASE FAILURE PAVEMENT REPAIRFM0437 · Routine Maintenance Project | $1,638,415 | $1,547,097 | TEXAS MATERIALS GROUP, INC. | -5.6% | 3 |
| Dec 3, 2024 | 0114-12-017C 114-12-17 | Harris Houston |
US 290 Truck ParkingUS 290 · Transportation Non-Roadway | $1,925,152 | $1,523,998 | FORDE CONSTRUCTION COMPANY, INC. | -20.8% | 6 |
| Dec 3, 2024 | 6474-34-001RMC - 647434001 | Bexar San Antonio |
FY 25 Districtwide Pavement MarkingsIH0410 · Routine Maintenance Project - Sealed | $2,953,497 | $1,479,950 | TRP INFRASTRUCTURE SERVICES, LLC | -49.9% | 4 |
| Dec 3, 2024 | 0923-23-032BR 2025(133) | Mills Brownwood |
CR 508 at Draw Mills CountyCOUNTY ROAD 508 · Bridge Replacement | $1,708,452 | $1,470,000 | DELGADO'S CONTRACTORS, LLC | -14.0% | 9 |
| Dec 3, 2024 | 6469-18-001MMC - 646918001 | Gregg Tyler |
FY 25 Hot Mix Superpave Gregg CountySL0281 · Material Maintenance Project | $1,080,930 | $1,325,170 | LONGVIEW ASPHALT, INC. | +22.6% | 1 |
| Dec 3, 2024 | 0912-72-743C 912-72-743 | Harris Houston |
IH 610, Braeswood Blvd to SH 225Various · Traffic Control Devices | $1,881,969 | $1,317,622 | TRP INFRASTRUCTURE SERVICES, LLC | -30.0% | 4 |
| Dec 3, 2024 | 6475-14-001RMC - 647514001 | Bowie Atlanta |
CO Pavement Markings VariousUS0059 · Routine Maintenance Project - Sealed | $1,239,590 | $1,182,650 | STRIPE-A-ZONE, LLC | -4.6% | 3 |
| Dec 3, 2024 | 6475-42-001MMC - 647542001 | Hood Fort Worth |
FY25 MMC Flex Pave Hood/SomervellSH0144 · Material Maintenance Project | $984,000 | $1,080,000 | TOUCHSTONE RESOURCES, LLC | +9.8% | 1 |
| Dec 3, 2024 | 6472-62-001MMC - 647262001 | El Paso El Paso |
Emulsion - MMCFM3380 · Material Maintenance Project | $1,048,616 | $1,048,616 | ERGON ASPHALT & EMULSIONS, INC. | 0.0% | 1 |
| Dec 3, 2024 | 6472-00-001RMC - 647200001 | Hidalgo Pharr |
On Call Pavement Markings FY 25IH0002 · Routine Maintenance Project - Sealed | $834,095 | $767,105 | PAVEMENT MARKINGS INC. | -8.0% | 3 |
| Dec 3, 2024 | 6471-90-001RMC - A00211693 | Fort Bend Houston |
RMC 6471-90 Guardrail RepairUS0059 · Routine Maintenance Project - Sealed | $985,425 | $732,257 | BK FIELD OPERATIONS LLC | -25.7% | 8 |
| Dec 3, 2024 | 0164-03-056F 2025(247) | Henderson Tyler |
SH 31, Sawmill Rd Traffic/Ped SignalSH 31 · Traffic Control Devices | $385,333 | $341,595 | STRIPING TECHNOLOGY, L.P. | -11.4% | 2 |
| Dec 3, 2024 | 6471-04-001RMC - 647104001 | Tarrant Fort Worth |
FY25 Tree & Brush Removal South TarrantIH0030 · Routine Maintenance Project - Sealed | $349,690 | $241,177 | AUSTIN BARRICADE COMPANY, L.L.C. | -31.0% | 8 |
| Dec 3, 2024 | 6472-31-001RMC - 647231001 | Hill Waco |
Sweeping - Hill, Limestone, Fall FY25SH0022 · Routine Maintenance Project | $115,718 | $112,762 | RHINO EQUITY, LLC | -2.6% | 1 |
| Dec 3, 2024 | 0621-01-118F 2025(196) | Hidalgo Pharr |
SH 336 @ HACKNEY LAKE FLOODWAY FY 2025SH 336 · Bridge Maintenance | $52,700 | $19,151 | STRUCTURAL INTEGRITY GROUP LLC | -63.7% | 7 |
| Dec 2, 2024 | 6477-56-001EMC - 647756001 | Dallas Dallas |
EMC IH635 @ MacAuthur 05 1224IH0635 · Emergency Maintenance Project - Sealed | $750,740 | $750,740 | IBCTX, LLC | 0.0% | 1 |
1–75 of 75
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.