207Let jobs
$401,354,266Total low bids
$496,229,334Total estimates
-19.1%Low bids vs estimates
Feb 2026 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 26, 2026 | 6492-56-001RMC - A00218170 | Garza Lubbock |
FY26 Garza/Lynn ROW MowingUS0084 · Routine Maintenance Project - Sealed | $774,640 | $661,840 | ABESCAPE GROUP LLC | -14.6% | 4 |
| Feb 26, 2026 | 6496-43-001RMC - A00219375 | Gaines Lubbock |
FY26 Gaines/Yoakum ROW MowingUS0062 · Routine Maintenance Project - Sealed | $753,400 | $528,456 | BERT WHITAKER | -29.9% | 4 |
| Feb 26, 2026 | 6492-57-001RMC - A00218171 | Castro Lubbock |
FY26 Castro/Parmer ROW MowingUS0060 · Routine Maintenance Project - Sealed | $745,360 | $488,944 | MDCS, LLC | -34.4% | 6 |
| Feb 26, 2026 | 6492-58-001RMC - A00218172 | Lubbock Lubbock |
FY26 Lubbock Northeast ROW MowingIH0027 · Routine Maintenance Project - Sealed | $390,737 | $334,231 | ABESCAPE GROUP LLC | -14.5% | 3 |
| Feb 26, 2026 | 6495-97-001RMC - A00219044 | Dawson Lubbock |
FY26 Dawson ROW MowingUS0087 · Routine Maintenance Project - Sealed | $419,800 | $276,820 | MDCS, LLC | -34.1% | 6 |
| Feb 26, 2026 | 6492-59-001RMC - A00218173 | Lubbock Lubbock |
FY26 Lubbock Southeast ROW MowingSL0289 · Routine Maintenance Project - Sealed | $203,520 | $174,349 | ABESCAPE GROUP LLC | -14.3% | 2 |
| Feb 25, 2026 | 6495-22-001RMC - A00218710 | Montague Wichita Falls |
MONTAGUE Mowing FY26-27US0082 · Routine Maintenance Project | $381,729 | $339,479 | ANTHONY SERVICES | -11.1% | 5 |
| Feb 25, 2026 | 6495-24-001RMC - A00218712 | Wichita Wichita Falls |
WICHITA COUNTY Mowing FY26-27US0287 · Routine Maintenance Project | $303,319 | $242,635 | BIG STATE MAINTENANCE, INC. | -20.0% | 6 |
| Feb 25, 2026 | 6495-26-001RMC - A00218714 | Young Wichita Falls |
YOUNG COUNTY Mowing FY26-27SH0016 · Routine Maintenance Project | $243,651 | $182,149 | TRIPLE T MAINTENANCE INC. | -25.2% | 3 |
| Feb 25, 2026 | 6495-18-001RMC - A00218706 | Archer Wichita Falls |
ARCHER MOWING FY26-27SH0079 · Routine Maintenance Project | $210,731 | $157,085 | BIG STATE MAINTENANCE, INC. | -25.5% | 6 |
| Feb 25, 2026 | 6490-50-001SUP - A00217640 | Wise Maintenance Division |
SRA MNT, Repair & Operation WSCUS0081 · State Use Project - Sealed | $29,258,197 | — | 0 | ||
| Feb 24, 2026 | 6494-47-001BPM - A00218605 | Reeves Odessa |
6494-47-001 BPMIH0010 · Bridge Preventative Maintenance | $549,280 | $393,560 | ROAD DOCTORS LLC | -28.3% | 12 |
| Feb 24, 2026 | 6498-93-001SUP - A00220127 | San Jacinto Lufkin |
2026-02 San Jacinto MailboxSH0150 · State Use Project | $36,950 | — | 0 | ||
| Feb 24, 2026 | 6498-94-001SUP - A00220129 | Houston Lufkin |
2026-02 Houston Grounds and PicnicSL0304 · State Use Project | $93,784 | — | 0 | ||
| Feb 24, 2026 | 6498-97-001SUP - A00220133 | San Jacinto Lufkin |
2026-02 Livingston (SAN JAC) Area LitterSH0150 · State Use Project | $180,850 | — | 0 | ||
| Feb 24, 2026 | 6497-82-001SUP - A00219821 | Bexar San Antonio |
2026 ROW Tree RemovalIH0010 · State Use Project | $265,227 | — | 0 | ||
| Feb 23, 2026 | 6498-68-001SUP - A00220041 | Taylor Abilene |
Abilene District HQ Onsite AttendantIH0020 · State Use Project | $45,843 | — | 0 | ||
| Feb 23, 2026 | 6498-76-001SUP - A00220052 | Travis Austin |
Austin District HQ Janitorial FY26IH0035 · State Use Project | $425,280 | — | 0 | ||
| Feb 22, 2026 | 6496-86-001SUP - A00219479 | Harris Houston |
SE HARRIS LITTER REMOVAL FY 27SL0008 · State Use Project | $590,745 | — | 0 | ||
| Feb 21, 2026 | 6497-52-001SUP - A00219658 | Ector Odessa |
6497-52-001 Large Debris RemovalIH0020 · State Use Project | $293,031 | — | 0 | ||
| Feb 20, 2026 | 6499-07-001SUP - A00220153 | Aransas Corpus Christi |
6499-07-001 Aransas PicnicSH0035 · State Use Project | $72,675 | — | 0 | ||
| Feb 19, 2026 | 6496-93-001MMC - A00219502 | Fannin Paris |
Asphalt Oil & Emulsion - Fannin CountySH0078 · Material Maintenance Project - Sealed | $643,000 | $628,700 | ERGON ASPHALT & EMULSIONS, INC. | -2.2% | 1 |
| Feb 19, 2026 | 6492-30-001RMC - A00218062 | Hunt Paris |
On Call MBGF-GAO/SSAO FY26IH0030 · Routine Maintenance Project - Sealed | $954,090 | $607,439 | CATOCON, INC. | -36.3% | 4 |
| Feb 19, 2026 | 6493-58-001RMC - A00218343 | Hunt Paris |
ROW Mowing Hunt Co. FY26SH0011 · Routine Maintenance Project - Sealed | $336,680 | $300,231 | CEHAND SERVICES LLC | -10.8% | 5 |
| Feb 19, 2026 | 6496-97-001MMC - A00219510 | Franklin Paris |
Asphalt Oil & Emulsion - Franklin Co.SH0011 · Material Maintenance Project - Sealed | $304,000 | $287,350 | ERGON ASPHALT & EMULSIONS, INC. | -5.5% | 1 |
| Feb 19, 2026 | 6493-59-001RMC - A00218344 | Rains Paris |
ROW Mowing Rains Co. FY26US0069 · Routine Maintenance Project - Sealed | $231,900 | $216,225 | CEHAND SERVICES LLC | -6.8% | 5 |
| Feb 19, 2026 | 6493-56-001RMC - A00218341 | Hopkins Paris |
ROW Mowing Hopkins Co. FY26SH0019 · Routine Maintenance Project - Sealed | $229,957 | $207,295 | EASTGATE SERVICES | -9.9% | 4 |
| Feb 19, 2026 | 6493-57-001RMC - A00218342 | Franklin Paris |
ROW Mowing Franklin Co. FY26SH0037 · Routine Maintenance Project - Sealed | $168,176 | $154,559 | EASTGATE SERVICES | -8.1% | 4 |
| Feb 19, 2026 | 6492-29-001RMC - A00218057 | Hunt Paris |
On Call Tree Removal FY26 HuntIH0030 · Routine Maintenance Project - Sealed | $174,297 | $89,335 | CATOCON, INC. | -48.7% | 9 |
| Feb 19, 2026 | 6494-24-001RMC - A00218561 | Hopkins Paris |
Landscape Maint - Hopkins Co. FY26IH0030 · Routine Maintenance Project - Sealed | $41,000 | $39,250 | KJRM GENERAL CONTRACTORS, LLC | -4.3% | 3 |
| Feb 19, 2026 | 6497-72-001SUP - A00219772 | Grayson Paris |
Janitorial - Grayson FY26US0075 · State Use Project | $37,225 | — | 0 | ||
| Feb 18, 2026 | 6496-18-001RMC - A00219125 | Houston Lufkin |
2026-02 Houston MowingUS0287 · Routine Maintenance Project | $262,810 | $302,550 | S G COMPANY, LLC | +15.1% | 7 |
| Feb 18, 2026 | 6488-07-001RMC - A00217008 | Trinity Lufkin |
Trinity Cable BarrierSH0019 · Routine Maintenance Project - Sealed | $250,000 | $182,920 | BK FIELD OPERATIONS LLC | -26.8% | 5 |
| Feb 17, 2026 | 6494-46-001MMC - A00218604 | Austin Yoakum |
Hot Mix - Austin Co. (Materials Only)IH0010 · Material Maintenance Project | $999,750 | $967,500 | QUALITY HOT MIX, INC. | -3.2% | 4 |
| Feb 17, 2026 | 6494-44-001MMC - A00218602 | Wharton Yoakum |
Hot Mix - Wharton Co. (Materials Only)US0059 · Material Maintenance Project | $978,250 | $962,125 | QUALITY HOT MIX, INC. | -1.6% | 4 |
| Feb 17, 2026 | 6494-49-001MMC - A00218609 | Matagorda Yoakum |
Hot Mix - Matagorda (Materials Only)SH0035 · Material Maintenance Project | $987,000 | $955,500 | QUALITY HOT MIX, INC. | -3.2% | 4 |
| Feb 17, 2026 | 6494-51-001MMC - A00218611 | Colorado Yoakum |
Hot Mix-Colorado Co (Materials Only)SH0071 · Material Maintenance Project | $990,000 | $880,000 | BRAUNTEX MATERIALS, INC. | -11.1% | 4 |
| Feb 17, 2026 | 6494-32-001MMC - A00218585 | Wharton Yoakum |
LRA - WAO (Materials Only)US0059 · Material Maintenance Project | $768,000 | $753,400 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.9% | 2 |
| Feb 17, 2026 | 6494-34-001MMC - A00218588 | Wharton Yoakum |
Hydraulic Cement - WAO (Materials Only)US0059 · Material Maintenance Project | $686,856 | $656,408 | TOUCHSTONE RESOURCES, LLC | -4.4% | 3 |
| Feb 17, 2026 | 6494-39-001MMC - A00218595 | Wharton Yoakum |
Aggregate - WAO (Materials Only)US0059 · Material Maintenance Project | $511,000 | $470,300 | BRAUNTEX MATERIALS, INC. | -8.0% | 4 |
| Feb 17, 2026 | 6497-62-001MMC - A00219693 | Jim Wells Corpus Christi |
6497-62-001 LRA Alice Maint.US0281 · Material Maintenance Project | $470,300 | $463,848 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.4% | 2 |
| Feb 17, 2026 | 6494-30-001MMC - A00218579 | Wharton Yoakum |
Asphalts/Oils/Emul-WAO (Materials Only)US0059 · Material Maintenance Project | $443,000 | $428,644 | ERGON ASPHALT & EMULSIONS, INC. | -3.2% | 3 |
| Feb 17, 2026 | 6497-63-001MMC - A00219695 | Live Oak Corpus Christi |
6497-63-001 LRA George West MaintUS0059 · Material Maintenance Project | $443,200 | $422,336 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.7% | 2 |
| Feb 17, 2026 | 6494-52-001MMC - A00218612 | Colorado Yoakum |
Hot Mix CL-Colorado Co. (Materials Only)SH0071 · Material Maintenance Project | $450,000 | $417,500 | BRAUNTEX MATERIALS, INC. | -7.2% | 5 |
| Feb 17, 2026 | 6497-58-001MMC - A00219686 | Bee Corpus Christi |
6497-58-001 LRA Beeville Maint.US0181 · Material Maintenance Project | $420,000 | $416,213 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.9% | 2 |
| Feb 17, 2026 | 6494-33-001MMC - A00218586 | Wharton Yoakum |
Flexbase - WAO (Materials Only)US0059 · Material Maintenance Project | $412,500 | $376,875 | COLORADO MATERIALS, LTD. | -8.6% | 7 |
| Feb 17, 2026 | 6497-60-001MMC - A00219688 | Nueces Corpus Christi |
6497-60-001 LRA Robstown Maint.US0077 · Material Maintenance Project | $306,200 | $315,570 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.1% | 2 |
| Feb 17, 2026 | 6497-61-001MMC - A00219692 | San Patricio Corpus Christi |
6497-61-001 Emulsion Sinton Area OfficeUS0181 · Material Maintenance Project | $305,000 | $269,450 | ERGON ASPHALT & EMULSIONS, INC. | -11.7% | 1 |
| Feb 17, 2026 | 6494-50-001MMC - A00218610 | Matagorda Yoakum |
Hot Mix CL - Matagorda (Materials Only)SH0035 · Material Maintenance Project | $247,500 | $235,000 | QUALITY HOT MIX, INC. | -5.1% | 5 |
| Feb 17, 2026 | 6497-59-001MMC - A00219687 | Bee Corpus Christi |
6497-59-001 Flex Base BeevilleUS0181 · Material Maintenance Project | $247,000 | $220,025 | COLORADO MATERIALS, LTD. | -10.9% | 5 |
| Feb 17, 2026 | 6494-45-001MMC - A00218603 | Wharton Yoakum |
Hot Mix CL-Wharton Co. (Materials Only)US0059 · Material Maintenance Project | $232,500 | $217,500 | QUALITY HOT MIX, INC. | -6.5% | 4 |
| Feb 17, 2026 | 6494-36-001MMC - A00218590 | Wharton Yoakum |
Asphaltic Patching-WAO (Materials Only)US0059 · Material Maintenance Project | $158,500 | $159,340 | WALLER COUNTY ASPHALT INC. | +0.5% | 1 |
| Feb 17, 2026 | 6494-38-001MMC - A00218593 | Wharton Yoakum |
Lime - WAO (Materials Only)US0059 · Material Maintenance Project | $96,250 | $103,888 | TEXAS LIME COMPANY | +7.9% | 2 |
| Feb 17, 2026 | 6494-37-001MMC - A00218591 | Wharton Yoakum |
Rock/Riprap - WAO (Materials Only)US0059 · Material Maintenance Project | $122,500 | $92,750 | ANDERSON COLUMBIA CO., INC. | -24.3% | 3 |
| Feb 17, 2026 | 6497-71-001SUP - A00219771 | Hopkins Paris |
Janitorial - Hopkins FY26IH0030 · State Use Project | $20,524 | — | 0 | ||
| Feb 17, 2026 | 6496-21-001SUP - A00219141 | Kaufman Dallas |
Kaufman Janitorial 06 0126FM2728 · State Use Project | $48,975 | — | 0 | ||
| Feb 15, 2026 | 6498-83-001SUP - A00220076 | Anderson Tyler |
Janitorial Maintenance- Palestine MOSH0019 · State Use Project | $57,010 | — | 0 | ||
| Feb 12, 2026 | 6494-64-001MMC - A00218631 | Howard Abilene |
Abilene District Flex baseIH0020 · Material Maintenance Project | $167,485 | $146,692 | SOUTHERN SOURCING SOLUTIONS, LLC | -12.4% | 4 |
| Feb 12, 2026 | 6498-16-001SUP - A00219914 | Midland Odessa |
6498-16-001 Litter RemovalIH0020 · State Use Project | $507,967 | — | 0 | ||
| Feb 11, 2026 | 6494-88-001RMC - A00218661 | Eastland Brownwood |
MILL AND INLAY NORTHSL0254 · Routine Maintenance Project - Sealed | $998,666 | $1,052,574 | PROFESSIONAL TRAFFIC CONTROL LLC | +5.4% | 5 |
| Feb 11, 2026 | 6494-19-001RMC - A00218554 | Taylor Abilene |
Callout IlluminationIH0020 · Routine Maintenance Project - Sealed | $992,225 | $881,525 | VACA UNDERGROUND UTILITIES INC | -11.2% | 2 |
| Feb 11, 2026 | 6484-29-001RMC - A00215427 | Travis Austin |
Districtwide Asphalt Repair FY 26FM0812 · Routine Maintenance Project - Sealed | $991,480 | $717,000 | HUNTER INDUSTRIES, LTD. | -27.7% | 2 |
| Feb 11, 2026 | 6488-34-001RMC - A00217097 | Denton Dallas |
FDCR Denton County FY 26FM0407 · Routine Maintenance Project - Sealed | $678,000 | $550,050 | PROFESSIONAL TRAFFIC CONTROL LLC | -18.9% | 5 |
| Feb 11, 2026 | 6492-77-001MMC - A00218214 | Kaufman Dallas |
Aggregate (Matls Only)06 0226FM2728 · Material Maintenance Project | $392,500 | $395,000 | ARCOSA LWS, LLC | +0.6% | 1 |
| Feb 11, 2026 | 6492-71-001MMC - A00218203 | Kaufman Dallas |
HMAC (Matls Only)06 0226FM2728 · Material Maintenance Project | $448,000 | $352,000 | TEXAS MATERIALS GROUP, INC. | -21.4% | 1 |
| Feb 11, 2026 | 6491-39-001RMC - A00217835 | Navarro Dallas |
Herbicide 01 0226IH0045 · Routine Maintenance Project - Sealed | $357,085 | $319,854 | OPTERRA SOLUTIONS, INC. | -10.4% | 2 |
| Feb 11, 2026 | 6491-76-001RMC - A00217944 | Ellis Dallas |
Culvert Ext. & Cross Drainage 09 1225FM0660 · Routine Maintenance Project - Sealed | $374,925 | $312,935 | GARRET SHIELDS INFRASTRUCTURE | -16.5% | 7 |
| Feb 11, 2026 | 6492-33-001RMC - A00218073 | Nacogdoches Lufkin |
2026-02 NACOGDOCHES MOWINGUS0059 · Routine Maintenance Project | $251,705 | $295,404 | ABESCAPE GROUP LLC | +17.4% | 3 |
| Feb 11, 2026 | 6485-65-001RMC - A00216038 | Archer Wichita Falls |
Graham Area Culvert ReplacementFM0368 · Routine Maintenance Project - Sealed | $309,368 | $288,779 | GARRET SHIELDS INFRASTRUCTURE | -6.7% | 7 |
| Feb 11, 2026 | 6466-51-001RMC - A00209147 | Collin Dallas |
On Call FDCR 07 02.26US0075 · Routine Maintenance Project - Sealed | $333,800 | $278,461 | PROFESSIONAL TRAFFIC CONTROL LLC | -16.6% | 4 |
| Feb 11, 2026 | 6493-89-001BPM - A00218411 | Ellis Dallas |
Bridge Preventative Maintenance 09 0226IH0035E · Bridge Preventative Maintenance - Sealed | $287,773 | $205,784 | 12TWELVE ROAD AND BRIDGE LLC | -28.5% | 11 |
| Feb 11, 2026 | 6492-62-001RMC - A00218180 | Denton Dallas |
Denton 2026 Spot StripingIH0035W · Routine Maintenance Project - Sealed | $244,440 | $199,700 | TRP INFRASTRUCTURE SERVICES, LLC | -18.3% | 4 |
| Feb 11, 2026 | 6492-85-001RMC - A00218226 | Collin Dallas |
On Call RPM 07 02.26US0075 · Routine Maintenance Project - Sealed | $208,015 | $184,935 | THE CONFIDENCE GROUP, INC | -11.1% | 4 |
| Feb 11, 2026 | 6491-01-001RMC - A00217726 | Nacogdoches Lufkin |
2026-02 Nacogdoches MBGFUS0059 · Routine Maintenance Project - Sealed | $148,355 | $150,750 | ABOVE ALL CONTRACTING LLC | +1.6% | 5 |
| Feb 11, 2026 | 6492-81-001MMC - A00218220 | Kaufman Dallas |
FLEX BASE (Material Only) 06 0226FM2728 · Material Maintenance Project | $160,000 | $130,360 | GREEN DREAM INTERNATIONAL LLC | -18.5% | 6 |
| Feb 11, 2026 | 6488-37-001RMC - A00217102 | Denton Dallas |
Culvert Cleaning 04 0226IH0035W · Routine Maintenance Project - Sealed | $151,310 | $114,722 | BK FIELD OPERATIONS LLC | -24.2% | 6 |
| Feb 11, 2026 | 6488-36-001RMC - A00217099 | Denton Dallas |
Misc. Concrete Repair Denton CoUS0380 · Routine Maintenance Project - Sealed | $50,183 | $76,356 | GARRET SHIELDS INFRASTRUCTURE | +52.2% | 3 |
| Feb 11, 2026 | 6491-91-001MMC - A00217963 | Denton Dallas |
04 Hot Mix Material - 02/2026US0380 · Material Maintenance Project | $85,960 | $72,200 | EUROVIA ATLANTIC COAST LLC | -16.0% | 2 |
| Feb 11, 2026 | 6491-90-001MMC - A00217962 | Denton Dallas |
04 Hydraulic Cement - 02/2026US0380 · Material Maintenance Project | $49,858 | $47,278 | AKA-MATERIALS | -5.2% | 3 |
| Feb 11, 2026 | 6491-19-001RMC - A00217779 | Navarro Dallas |
Raised Pavement Markers 01 0226IH0045 · Routine Maintenance Project - Sealed | $46,880 | $25,350 | TRP INFRASTRUCTURE SERVICES, LLC | -45.9% | 4 |
| Feb 10, 2026 | 6492-35-001RMC - A00218079 | El Paso El Paso |
Flexible Pavement Structure Repair - EAOIH0010 · Routine Maintenance Project - Sealed | $822,750 | $1,079,180 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +31.2% | 2 |
| Feb 10, 2026 | 6496-03-001MMC - A00219080 | Brazos Bryan |
FY26 District Lightweight Aggregate - 02SH0006 · Material Maintenance Project | $740,000 | $734,800 | ARCOSA LWS, LLC | -0.7% | 1 |
| Feb 10, 2026 | 6496-30-001RMC - A00219214 | Brazos Bryan |
FY26 - District Cross Drainage - 02US0190 · Routine Maintenance Project - Sealed | $425,932 | $529,711 | BK FIELD OPERATIONS LLC | +24.4% | 4 |
| Feb 10, 2026 | 6480-91-001RMC - A00214298 | Montgomery Houston |
Guardrail Repair RMC 6480-91-001IH0045 · Routine Maintenance Project - Sealed | $656,645 | $444,263 | BK FIELD OPERATIONS LLC | -32.3% | 6 |
| Feb 10, 2026 | 6496-37-001RMC - A00219269 | Brazos Bryan |
FY26 - District Shortline -02SH0006 · Routine Maintenance Project | $512,819 | $432,178 | STRIPE LINES, INC. | -15.7% | 7 |
| Feb 10, 2026 | 6496-91-001RMC - A00219495 | Freestone Bryan |
FY26 - Huntsville AO Sweeping - 02US0084 · Routine Maintenance Project | $124,640 | $397,142 | SWEEPING CORPORATION OF AMERICA, LLC | +218.6% | 1 |
| Feb 10, 2026 | 6496-90-001RMC - A00219491 | Gregg Tyler |
GREGG COUNTY ROW MOWING FY26US0080 · Routine Maintenance Project | $281,253 | $347,635 | SERNA CONTRACTORS, LLC | +23.6% | 4 |
| Feb 10, 2026 | 6487-26-001RMC - A00216549 | Chambers Beaumont |
FY 26 MBGFIH0010 · Routine Maintenance Project - Sealed | $484,870 | $342,306 | RHINO EQUITY, LLC | -29.4% | 6 |
| Feb 10, 2026 | 6497-42-001RMC - A00219622 | Pecos Odessa |
6497-42-001 Roadside MowingIH0010 · Routine Maintenance Project | $422,520 | $302,806 | LUKEDA SANDBLASTING & SERVICES LLC | -28.3% | 3 |
| Feb 10, 2026 | 6493-84-001RMC - A00218406 | Andrews Odessa |
6493-84-001 Roadside MowingUS0385 · Routine Maintenance Project | $335,370 | $261,399 | L&L COMPANY | -22.1% | 5 |
| Feb 10, 2026 | 6496-36-001RMC - A00219266 | Freestone Bryan |
FY26 - Freestone Mowing -02SH0075 · Routine Maintenance Project | $242,906 | $239,012 | SERNA CONTRACTORS, LLC | -1.6% | 4 |
| Feb 10, 2026 | 6496-33-001RMC - A00219243 | Brazos Bryan |
FY26 - District Illumination -02SH0006 · Routine Maintenance Project - Sealed | $264,890 | $216,800 | PROFESSIONAL TRAFFIC CONTROL LLC | -18.2% | 5 |
| Feb 10, 2026 | 6493-81-001RMC - A00218403 | Reeves Odessa |
6493-81-001 Roadside MowingIH0010 · Routine Maintenance Project | $319,680 | $201,576 | LUKEDA SANDBLASTING & SERVICES LLC | -36.9% | 4 |
| Feb 10, 2026 | 6492-82-001RMC - A00218221 | Fort Bend Houston |
RMC 6492-82-001US 59 · Routine Maintenance Project - Sealed | $333,150 | $200,387 | RELIANT SAND AND CONSTRUCTION, INC. | -39.9% | 8 |
| Feb 10, 2026 | 6485-41-001RMC - A00215948 | Liberty Beaumont |
FY 26 Liberty Tree and Brush RemovalUS0090 · Routine Maintenance Project | $275,545 | $171,570 | AUSTIN BARRICADE COMPANY, L.L.C. | -37.7% | 12 |
| Feb 10, 2026 | 6484-45-001RMC - A00215463 | Fort Bend Houston |
RMC 6484-45-001US0059 · Routine Maintenance Project - Sealed | $286,100 | $171,415 | XTREME PRO CLEANING LLC | -40.1% | 4 |
| Feb 10, 2026 | 6492-70-001RMC - A00218202 | Harris Houston |
6492-70-001 Drainage System CleaningSL0008 · Routine Maintenance Project - Sealed | $325,008 | $160,741 | PRO-PIPE SERVICES, LLC | -50.5% | 4 |
| Feb 10, 2026 | 6496-45-001RMC - A00219414 | Milam Bryan |
FY26 - Milam Tree Removal -02US0079 · Routine Maintenance Project | $85,500 | $64,878 | RHINO EQUITY, LLC | -24.1% | 9 |
| Feb 10, 2026 | 6494-76-001RMC - A00218646 | Walker Bryan |
FY26 - SH 19 SB Bridge RepairSH0019 · Routine Maintenance Project - Sealed | $101,567 | $57,501 | GARRET SHIELDS INFRASTRUCTURE | -43.4% | 7 |
| Feb 9, 2026 | 6495-96-001SUP - A00219014 | Harris Houston |
FY 26, Litter Removal, Harris CountySH0249 · State Use Project | $969,417 | — | 0 |
1–100 of 207Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.