138Let jobs
$877,769,309Total low bids
$915,327,268Total estimates
-4.1%Low bids vs estimates
Nov 2026 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Nov 24, 2026 | 6509-54-001MMC - A00224028 | Maverick Laredo |
Emulsions - Maverick CountyUS0277 · Material Maintenance Project - Sealed | $402,300 | $400,400 | ERGON ASPHALT & EMULSIONS, INC. | -0.5% | 1 |
| Nov 23, 2026 | 6512-29-001MMC - A00224833 | Zapata Pharr |
6512-29-001 Hot MixSH0016 · Material Maintenance Project - Sealed | $714,400 | $861,764 | IOC COMPANY LLC | +20.6% | 1 |
| Nov 23, 2026 | 6512-28-001MMC - A00224832 | Cameron Pharr |
6512-28-001 Hot MixSH0048 · Material Maintenance Project - Sealed | $714,400 | $831,060 | IOC COMPANY LLC | +16.3% | 1 |
| Nov 23, 2026 | 6511-88-001MMC - A00224587 | Hidalgo Pharr |
6511-88-001 Hot MixSH0495 · Material Maintenance Project - Sealed | $714,400 | $662,226 | IOC COMPANY LLC | -7.3% | 2 |
| Nov 19, 2026 | 6510-75-001BPM - A00224304 | Ector Odessa |
6510-75-001 Bridge Repair CalloutIH0020 · Bridge Preventative Maintenance - Sealed | $969,250 | $669,750 | RELMCO, INC. | -30.9% | 4 |
| Nov 19, 2026 | 6509-66-001RMC - A00224046 | Dimmit Laredo |
Mowing of highways ROW - DimmitUS0277 · Routine Maintenance Project - Sealed | $470,814 | $428,848 | BOEN LANDSCAPING & IRRIGATION, LLC | -8.9% | 4 |
| Nov 19, 2026 | 6510-23-001RMC - A00224139 | Lamar Paris |
On Call MBGF-PAO FY27US0082 · Routine Maintenance Project - Sealed | $317,490 | $328,899 | AUSTIN BARRICADE COMPANY, L.L.C. | +3.6% | 2 |
| Nov 19, 2026 | 6508-67-001MMC - A00223862 | El Paso El Paso |
MMC- Asphaltic Patching MaterialUS0054 · Material Maintenance Project | $225,750 | $212,269 | HALL BROTHERS, INC. | -6.0% | 2 |
| Nov 19, 2026 | 6512-46-001RMC - A00224894 | Kimble San Angelo |
TREE TRIMMING SOUTH FY 27US0377 · Routine Maintenance Project - Sealed | $202,250 | $159,400 | ALLIES LAND CLEARING | -21.2% | 8 |
| Nov 19, 2026 | 6510-26-001SUP - A00224149 | Travis Austin |
LP 360 Scenic Overlook Picnic AreaSL0360 · State Use Project | $75,160 | — | 0 | ||
| Nov 18, 2026 | 6511-39-001MMC - A00224461 | Brazos Bryan |
FY27 - Bryan AO LRA - 11SH0006 · Material Maintenance Project | $315,000 | $325,253 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.3% | 2 |
| Nov 18, 2026 | 6510-96-001RMC - A00224390 | Brazos Bryan |
FY27 - Bryan AO RPM - 11SH0006 · Routine Maintenance Project | $386,400 | $294,248 | ANTHONY SERVICES | -23.8% | 2 |
| Nov 18, 2026 | 6511-07-001MMC - A00224407 | Leon Bryan |
FY27 - Leon HMA - 11IH0045 · Material Maintenance Project | $335,000 | $283,600 | BIG CREEK CONSTRUCTION, LTD. | -15.3% | 3 |
| Nov 18, 2026 | 6511-08-001MMC - A00224408 | Madison Bryan |
FY27 - Madison HMA - 11IH0045 · Material Maintenance Project | $310,000 | $270,750 | KNIFE RIVER CORPORATION - SOUTH | -12.7% | 3 |
| Nov 17, 2026 | 6511-02-001RMC - A00224399 | Brazos Bryan |
FY27 - District Rubber/Debris - 11SH0006 · Routine Maintenance Project | $881,400 | $759,200 | BOEN LANDSCAPING & IRRIGATION, LLC | -13.9% | 7 |
| Nov 17, 2026 | 6506-96-001MMC - A00223458 | Hill Waco |
FY 2027 LRA - MATERIAL ONLYSH0081 · Material Maintenance Project | $594,384 | $614,800 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.4% | 2 |
| Nov 17, 2026 | 6511-71-001MMC - A00224558 | Kleberg Corpus Christi |
6511-71-001 HMCL Kingsville/AliceUS0077 · Material Maintenance Project | $515,000 | $563,000 | BRAUNTEX MATERIALS, INC. | +9.3% | 5 |
| Nov 17, 2026 | 6510-61-001RMC - A00224263 | Brazos Bryan |
FY27 - Brazos Mowing - 11SH0006 · Routine Maintenance Project | $570,783 | $476,081 | ORTEGA'S LAWN AND LANDSCAPING, LLC | -16.6% | 9 |
| Nov 17, 2026 | 6506-95-001MMC - A00223456 | Bell Waco |
FY 2027 HOTMIX COLD-LAID-MATERIAL ONLYSL0121 · Material Maintenance Project | $484,930 | $467,875 | LONE STAR PAVING COMPANY | -3.5% | 3 |
| Nov 17, 2026 | 6511-06-001MMC - A00224406 | Freestone Bryan |
FY27 - Freestone HMA - 11IH0045 · Material Maintenance Project | $510,000 | $444,000 | BIG CREEK CONSTRUCTION, LTD. | -12.9% | 3 |
| Nov 17, 2026 | 6509-21-001MMC - A00223978 | Jim Wells Corpus Christi |
6509-21-001 Hot Mix Alice Maint.US0281 · Material Maintenance Project | $498,200 | $427,000 | CK NEWBERRY, LLC | -14.3% | 4 |
| Nov 17, 2026 | 6511-05-001MMC - A00224405 | Brazos Bryan |
FY27 - Brazos HMA - 11SH0006 · Material Maintenance Project | $476,000 | $378,400 | KNIFE RIVER CORPORATION - SOUTH | -20.5% | 3 |
| Nov 17, 2026 | 6509-22-001MMC - A00223979 | Live Oak Corpus Christi |
6509-22-001 Hot Mix George WestUS0281 · Material Maintenance Project | $370,000 | $370,000 | CK NEWBERRY, LLC | 0.0% | 3 |
| Nov 17, 2026 | 6508-25-001RMC - A00223761 | Jefferson Beaumont |
FY27 Beaumont Tree and Brush RemovalUS0069 · Routine Maintenance Project | $430,050 | $360,270 | ACE CONTRACTORS, INC. | -16.2% | 7 |
| Nov 17, 2026 | 6508-79-001RMC - A00223897 | Jasper Beaumont |
FY27 Jasper Tree and Brush RemovalUS0096 · Routine Maintenance Project | $417,800 | $319,025 | ACE CONTRACTORS, INC. | -23.6% | 8 |
| Nov 17, 2026 | 6506-50-001RMC - A00223372 | Bosque Waco |
MOWING AND LITTER P/U - BOSQUE COUNTYSH0022 · Routine Maintenance Project | $318,167 | $261,287 | JASCO | -17.9% | 7 |
| Nov 17, 2026 | 6506-52-001RMC - A00223374 | Coryell Waco |
MOWING AND LITTER P/U - CORYELL COUNTYUS0084 · Routine Maintenance Project | $295,251 | $254,153 | JASCO | -13.9% | 8 |
| Nov 17, 2026 | 6511-73-001MMC - A00224561 | Nueces Corpus Christi |
6511-73-001 Cement CCAO/AAOSH0357 · Material Maintenance Project | $237,958 | $222,080 | AKA-MATERIALS | -6.7% | 2 |
| Nov 17, 2026 | 6511-40-001MMC - A00224462 | Walker Bryan |
FY27 - Walker/Madison LRA - 11IH0045 · Material Maintenance Project | $210,000 | $221,348 | MARTIN MARIETTA MATERIALS, INC. | +5.4% | 2 |
| Nov 17, 2026 | 6509-99-001MMC - A00224111 | Bexar San Antonio |
Districtwide RiprapIH0010 · Material Maintenance Project | $256,331 | $207,100 | RELMCO, INC. | -19.2% | 2 |
| Nov 17, 2026 | 6508-77-001RMC - A00223887 | Liberty Beaumont |
FY27 Liberty Tree and Brush RemovalUS0090 · Routine Maintenance Project | $271,375 | $191,770 | L & M MOWING CONTRACTORS, LLC | -29.3% | 9 |
| Nov 17, 2026 | 6511-74-001MMC - A00224568 | Karnes Corpus Christi |
6511-74-001 Emulsion KAOUS0181 · Material Maintenance Project | $160,200 | $172,800 | ERGON ASPHALT & EMULSIONS, INC. | +7.9% | 1 |
| Nov 17, 2026 | 6511-75-001MMC - A00224569 | Nueces Corpus Christi |
6511-75-001 Brine CCAO-AAOSH0357 · Material Maintenance Project | $147,200 | $154,800 | TOUCHSTONE RESOURCES, LLC | +5.2% | 2 |
| Nov 17, 2026 | 6511-72-001MMC - A00224560 | Nueces Corpus Christi |
6511-72-001 Emulsion Robstown MaintUS0181 · Material Maintenance Project | $115,210 | $110,850 | ERGON ASPHALT & EMULSIONS, INC. | -3.8% | 1 |
| Nov 17, 2026 | 6511-87-001MMC - A00224586 | Hidalgo Pharr |
FY27 BrineSH0495 · Material Maintenance Project | $59,600 | $77,000 | TOUCHSTONE RESOURCES, LLC | +29.2% | 1 |
| Nov 17, 2026 | 6511-38-001MMC - A00224459 | Brazos Bryan |
FY27 - Bryan AO TY B Gr 5 - 11SH0006 · Material Maintenance Project | $42,000 | $47,904 | COLORADO MATERIALS, LTD. | +14.1% | 4 |
| Nov 16, 2026 | 6511-67-001SUP - A00224543 | Collin Dallas |
Collin Litter 07 1126SH0005 · State Use Project | $267,622 | — | 0 | ||
| Nov 16, 2026 | 6512-13-001SUP - A00224635 | Collin Dallas |
Collin Janitorial Grounds FY27SH0005 · State Use Project | $86,867 | — | 0 | ||
| Nov 13, 2026 | 6513-32-001SUP - A00225436 | Cass Atlanta |
Atlanta DHQ Grounds FY 27FM0249 · State Use Project | $40,500 | — | 0 | ||
| Nov 12, 2026 | 6504-57-001RMC - A00222829 | Dallas Dallas |
Illumination Maint DAL FY27IH0030 · Routine Maintenance Project | $946,370 | $792,536 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -16.3% | 5 |
| Nov 12, 2026 | 6504-61-001BPM - A00222854 | Potter Amarillo |
BPM FY 2027 IIIBI0040D · Bridge Preventative Maintenance - Sealed | $811,416 | $734,629 | TI-ZACK CONCRETE, LLC | -9.5% | 7 |
| Nov 12, 2026 | 6509-36-001RMC - A00223997 | Collin Dallas |
Concrete Spall Repair 07 11.26US0075 · Routine Maintenance Project - Sealed | $925,400 | $615,350 | STRUCTURAL INTEGRITY GROUP LLC | -33.5% | 6 |
| Nov 12, 2026 | 6506-44-001MMC - A00223366 | Collin Dallas |
Hot Mix FY2027SH0005 · Material Maintenance Project | $566,650 | $530,400 | AUSTIN ASPHALT, INC. | -6.4% | 4 |
| Nov 12, 2026 | 6497-55-001BPM - A00219681 | Denton Dallas |
BPM Scouring RepairIH0035W · Bridge Preventative Maintenance - Sealed | $528,413 | $493,320 | ROAD DOCTORS LLC | -6.6% | 6 |
| Nov 12, 2026 | 6502-62-001RMC - A00221878 | Denton Dallas |
Mowing 04 2027IH0035 · Routine Maintenance Project - Sealed | $475,020 | $368,626 | ORTEGA'S LAWN AND LANDSCAPING, LLC | -22.4% | 8 |
| Nov 12, 2026 | 6507-50-001MMC - A00223571 | El Paso El Paso |
WAO Winter Weather MaterialSL0375 · Material Maintenance Project | $474,900 | $346,860 | DIGG COMMERCIAL, LLC | -27.0% | 2 |
| Nov 12, 2026 | 6505-31-001MMC - A00223045 | Ellis Dallas |
Aggregate Materials 09 1126IH0035E · Material Maintenance Project | $329,037 | $336,078 | GREEN DREAM INTERNATIONAL LLC | +2.1% | 3 |
| Nov 12, 2026 | 6508-80-001BPM - A00223898 | Potter Amarillo |
Cyclical Bridge Joint Clean/Seal FY27IH0040 · Bridge Preventative Maintenance - Sealed | $613,278 | $306,731 | INFRATEX CONSTRUCTION LLC | -50.0% | 14 |
| Nov 12, 2026 | 6506-91-001RMC - A00223438 | Navarro Dallas |
Repair/Replace CTB 1226IH0045 · Routine Maintenance Project - Sealed | $319,240 | $252,894 | FIREMAN EXCAVATING, INC. | -20.8% | 6 |
| Nov 12, 2026 | 6504-77-001BPM - A00222903 | Dallas Dallas |
BPM - IH35E @ SS 366 Conn. BIH0035E · Bridge Preventative Maintenance | $374,570 | $237,780 | GARRET SHIELDS INFRASTRUCTURE | -36.5% | 6 |
| Nov 12, 2026 | 6510-59-001RMC - A00224261 | Hemphill Amarillo |
Tree Removal Pampa AE FY 27US0060 · Routine Maintenance Project | $303,900 | $226,590 | ALLIES LAND CLEARING | -25.4% | 8 |
| Nov 12, 2026 | 6512-85-001SUP - A00225124 | Dallas Dallas |
East Dallas Litter FY27IH0020 · State Use Project | $274,929 | — | 0 | ||
| Nov 10, 2026 | 6504-71-001MMC - A00222881 | Wood Tyler |
Emulsion Wood & Van Zandt Co. FY 27US0069 · Material Maintenance Project | $730,200 | $905,160 | ERGON ASPHALT & EMULSIONS, INC. | +24.0% | 1 |
| Nov 10, 2026 | 6506-72-001RMC - A00223410 | Harris Houston |
Traffic Control FY27US0290 · Routine Maintenance Project - Sealed | $580,828 | $765,790 | PROFESSIONAL TRAFFIC CONTROL LLC | +31.8% | 3 |
| Nov 10, 2026 | 6504-49-001MMC - A00222816 | Smith Tyler |
Emulsion Smith & Cherokee Co. FY 27SH0155 · Material Maintenance Project | $569,350 | $635,290 | ERGON ASPHALT & EMULSIONS, INC. | +11.6% | 1 |
| Nov 10, 2026 | 6508-45-001MMC - A00223828 | Childress Childress |
FY 27 CAT 8A-R Road SaltUS0287 · Material Maintenance Project | $598,700 | $597,202 | NSG LOGISTICS, LLC | -0.3% | 3 |
| Nov 10, 2026 | 6507-15-001RMC - A00223501 | Brazoria Houston |
FY27 Brazoria CCA RepairSH0288 · Routine Maintenance Project - Sealed | $565,057 | $539,652 | RHINO EQUITY, LLC | -4.5% | 4 |
| Nov 10, 2026 | 6510-94-001RMC - A00224386 | Pecos Odessa |
6510-94-001 Street SweepingIH0010 · Routine Maintenance Project | $334,427 | $299,937 | SWEEPING CORPORATION OF AMERICA, LLC | -10.3% | 1 |
| Nov 10, 2026 | 6496-11-001RMC - A00219095 | Ector Odessa |
6496-11-001 Miscellaneous ConcreteIH0020 · Routine Maintenance Project | $304,962 | $274,692 | SCR CIVIL CONSTRUCTION, LLC | -9.9% | 3 |
| Nov 10, 2026 | 6508-49-001RMC - A00223833 | Wheeler Childress |
FY27 Cable BarrierIH0040 · Routine Maintenance Project - Sealed | $118,800 | $117,300 | BOEN LANDSCAPING & IRRIGATION, LLC | -1.3% | 5 |
| Nov 10, 2026 | 6511-98-001MMC - A00224604 | Childress Childress |
FY27 ASPPMUS0287 · Material Maintenance Project | $112,500 | $109,174 | ZACK BURKETT CO. | -3.0% | 3 |
| Nov 10, 2026 | 6512-40-001SUP - A00224855 | Tom Green San Angelo |
JANITORIAL-DISTRICT HQ FY 27RM0584 · State Use Project - Sealed | $97,943 | — | 0 | ||
| Nov 10, 2026 | 6512-41-001SUP - A00224856 | Tom Green San Angelo |
JANITORIAL-SAAO FY 27SH0208 · State Use Project - Sealed | $41,281 | — | 0 | ||
| Nov 8, 2026 | 6512-66-001SUP - A00225035 | Harris Houston |
FY27 Landscape Regional Mesa DrIH0610 · State Use Project | $16,080 | — | 0 | ||
| Nov 6, 2026 | 6512-03-001SUP - A00224616 | Washington Bryan |
FY27 Washington Litter Removal - 12SH0036 · State Use Project | $938,569 | — | 0 | ||
| Nov 6, 2026 | 6512-04-001SUP - A00224617 | Walker Bryan |
FY27 Walker Litter Removal - 12IH0045 · State Use Project | $566,960 | — | 0 | ||
| Nov 6, 2026 | 6512-05-001SUP - A00224618 | Brazos Bryan |
FY27 Brazos Litter Removal - 12SH0006 · State Use Project | $592,986 | — | 0 | ||
| Nov 5, 2026 | 6510-79-001RMC - A00224316 | Lamb Lubbock |
FY27 Littlefield TCP Call OutUS0084 · Routine Maintenance Project - Sealed | $518,875 | $331,625 | FC TRAFFIC CONTROL, LLC | -36.1% | 3 |
| Nov 5, 2026 | 6510-78-001RMC - A00224315 | Hale Lubbock |
FY27 Plainview Call Out Cable BarrierIH0027 · Routine Maintenance Project - Sealed | $381,375 | $297,939 | AUSTIN BARRICADE COMPANY, L.L.C. | -21.9% | 4 |
| Nov 5, 2026 | 6510-80-001RMC - A00224318 | Hale Lubbock |
FY27 Plainview TCP Call OutIH0027 · Routine Maintenance Project - Sealed | $497,875 | $182,004 | FC TRAFFIC CONTROL, LLC | -63.4% | 3 |
| Nov 5, 2026 | 6510-77-001RMC - A00224313 | Hale Lubbock |
FY27 Plainview Call Out MBGF RepairIH0027 · Routine Maintenance Project - Sealed | $353,850 | $158,004 | AUSTIN BARRICADE COMPANY, L.L.C. | -55.3% | 4 |
| Nov 5, 2026 | 6511-33-001MMC - A00224443 | Lubbock Lubbock |
FY27 Districtwide Flex BaseIH0027 · Material Maintenance Project | $230,000 | $141,000 | TOUCHSTONE RESOURCES, LLC | -38.7% | 2 |
| Nov 4, 2026 | 0195-02-092CM 2027(057) | Denton Dallas |
IH35 from N of Rector to S of FM 455IH 35 · Widen Freeway | $144,352,231 | $138,145,038 | INDUS ROAD & BRIDGE, INC. | -4.3% | 6 |
| Nov 4, 2026 | 0047-04-032CM 2027(056) | Collin Dallas |
SH 5 N OF OUTER LOOP TO N OF HACKBERRYSH 5 · Widen Non-Freeway | $39,930,214 | $35,766,135 | MARIO SINACOLA & SONS EXCAVATING, INC. | -10.4% | 4 |
| Nov 4, 2026 | 0212-03-058BR 2027(084) | Brazos Bryan |
SH 30 NAVASOTA RIVER RELIEF #1 - BRSH 30 · Bridge Replacement | $31,732,117 | $30,209,876 | FLUOR ENTERPRISES, INC. | -4.8% | 12 |
| Nov 4, 2026 | 0052-04-054F 2027(080) | Lamb Lubbock |
FY 27 SC-US84-Sudan to FM37US 84 · Seal Coat | $25,702,930 | $22,298,624 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | -13.2% | 4 |
| Nov 4, 2026 | 0066-03-045F 2027(063) | Sherman Amarillo |
FY 27 DISTRICT WIDE SEALCOAT - 084US 287 · Seal Coat | $18,220,825 | $18,301,952 | BREEDON INVESTMENTS USA INC. | +0.4% | 2 |
| Nov 4, 2026 | 0027-03-077F 2027(048) | Colorado Yoakum |
UA 90 SEAL COAT 2711UA 90 · Seal Coat | $17,072,172 | $17,597,090 | RONALD R. WAGNER & CO., LP | +3.1% | 4 |
| Nov 4, 2026 | 0009-06-056F 2027(052) | Hunt Paris |
FY 27 Seal Coat SH 66SH 66 · Seal Coat | $18,835,368 | $14,216,814 | CDM HOLDINGS | -24.5% | 2 |
| Nov 4, 2026 | 0262-01-034STP 2027(083)HES | Milam Bryan |
FM 485 - W and E of FM 979 - FY 27FM 485 · Safety Improvement Projects | $10,546,131 | $9,787,627 | BIG CREEK CONSTRUCTION, LTD. | -7.2% | 7 |
| Nov 4, 2026 | 0007-05-016F 2027(071) | Eastland Brownwood |
SL0254 0.034 MI S OF IH20 N FRONTAGESL 254 · Seal Coat | $8,974,111 | $9,329,948 | NORTHEASTERN PAVERS, LLC | +4.0% | 4 |
| Nov 4, 2026 | 1017-03-040C 1017-3-40 | Hunt Paris |
FM 35 Repair and WidenFM 35 · Restoration | $6,517,921 | $6,803,596 | HIGHWAY 19 CONSTRUCTION LLC | +4.4% | 9 |
| Nov 4, 2026 | 0157-04-058C 157-4-58 | Haskell Abilene |
SB US 277 S Y IN HASKELL TO JONES COUNTYUS 277 · Overlay | $7,519,837 | $6,732,215 | LONE STAR PAVING COMPANY | -10.5% | 9 |
| Nov 4, 2026 | 6509-27-001RMC - A00223988 | Harris Houston |
Sweeping and Debris South & Metro 2027IH0610 · Routine Maintenance Project - Sealed | $3,636,811 | $4,204,328 | SWEEPING CORPORATION OF AMERICA, LLC | +15.6% | 2 |
| Nov 4, 2026 | 1052-02-098STP 2027(076)HES | Nueces Corpus Christi |
CRP_FM0665_NUECES_HSIPFM 665 · Safety Improvement Projects | $4,792,153 | $3,833,265 | J E CONSTRUCTION SERVICES, LLC | -20.0% | 5 |
| Nov 4, 2026 | 6504-98-001RMC - A00222974 | Tom Green San Angelo |
Misc Pavement Repair North FY 27SH0208 · Routine Maintenance Project - Sealed | $1,794,178 | $3,124,443 | REECE ALBERT, INC. | +74.1% | 4 |
| Nov 4, 2026 | 6510-98-001MMC - A00224395 | Gray Amarillo |
FY 27 Pampa Area Ty 4 & Ty 5 AggregateSH0070 · Material Maintenance Project | $5,284,907 | $3,073,285 | L A FULLER & SONS CONSTRUCTION, LTD. | -41.8% | 3 |
| Nov 4, 2026 | 0922-33-234BR 2025(627) | Webb Laredo |
Off-Syst Mangana Hein Rd Becerra CreekMANGANA-HEIN RD · Bridge Replacement | $2,562,657 | $2,866,785 | STX CIVIL | +11.9% | 7 |
| Nov 4, 2026 | 0016-03-125F 2027(044) | Hays Austin |
IH 35 from Comal C/L to Marshall St.IH 35 · Overlay | $3,185,148 | $2,797,454 | BOBCAT SERVICES, INC. | -12.2% | 6 |
| Nov 4, 2026 | 0947-03-034STP 2B26(012)HRR | Jasper Beaumont |
BMT_FM1004_1(2022 HSIP)PAVED SHOULDERSFM 1004 · Safety Improvement Projects | $2,281,773 | $2,431,741 | TEXAS MATERIALS GROUP, INC. | +6.6% | 2 |
| Nov 4, 2026 | 6509-56-001RMC - A00224031 | Hill Waco |
TRAFFIC CONTROL SERVICES FY 2027(EAST)SH0081 · Routine Maintenance Project | $2,162,139 | $2,308,875 | AWP SAFETY | +6.8% | 3 |
| Nov 4, 2026 | 6511-13-001RMC - A00224419 | Hidalgo Pharr |
6511-13-001 Cleaning & Sweeping of HWYSH0336 · Routine Maintenance Project - Sealed | $1,978,621 | $1,688,682 | DIGG COMMERCIAL, LLC | -14.7% | 3 |
| Nov 4, 2026 | 6510-36-001RMC - A00224201 | Hill Waco |
HILLSBORO AO - FY27 BASE FAILURE REPAIRSH0081 · Routine Maintenance Project | $1,899,845 | $1,603,275 | BIG CREEK CONSTRUCTION, LTD. | -15.6% | 3 |
| Nov 4, 2026 | 0923-06-068C 923-6-68 | Brown Brownwood |
PW within Lake Brownwood SPPW · Texas Park and Wildlife | $1,740,230 | $1,561,729 | JAY MILLS CONTRACTING, INCORPORATED | -10.3% | 6 |
| Nov 4, 2026 | 6510-39-001RMC - A00224204 | Bell Waco |
BELL - FY27 BASE FAILURE REPAIRSL0121 · Routine Maintenance Project | $1,748,410 | $1,470,225 | TEXAS MATERIALS GROUP, INC. | -15.9% | 3 |
| Nov 4, 2026 | 6502-80-001RMC - A00221989 | Ellis Dallas |
Flexible Pvmt. Structure Repair 09 1026IH0045 · Routine Maintenance Project - Sealed | $1,408,389 | $1,246,988 | AUSTIN BRIDGE & ROAD SERVICES, LP | -11.5% | 7 |
| Nov 4, 2026 | 6509-96-001RMC - A00224104 | Henderson Tyler |
FY 27 Athens AO Traffic ControlUS0175 · Routine Maintenance Project - Sealed | $1,193,200 | $1,217,140 | HIGHWAY 19 CONSTRUCTION LLC | +2.0% | 4 |
| Nov 4, 2026 | 6506-48-001RMC - A00223370 | Coryell Waco |
TRAFFIC CONTROL SERVICES FY 2027(WEST)US0084 · Routine Maintenance Project | $1,202,847 | $1,186,595 | AWP SAFETY | -1.4% | 2 |
| Nov 4, 2026 | 0285-03-066STP 2B24(555)TAPS | Hays Austin |
Downtown Ranch Road 12 SidewalksRM 12 · Pedestrian, Sidewalks & Curb Ramps | $939,603 | $950,337 | LONE STAR SITEWORK, LLC | +1.1% | 9 |
| Nov 4, 2026 | 0074-06-256C 74-6-256 | Nueces Corpus Christi |
NuecesIH37RRBridgeRemovalIH 37 · Bridge Maintenance | $1,598,349 | $849,655 | RELMCO, INC. | -46.8% | 4 |
1–100 of 138Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.