Contact information
- Phone
- (979) 361-2900
- Fax
- (979) 361-2920
- Address
- 6310 STATE HWY 21 WEST, BRYAN, TX 77807
- TxDOT prequalification
- Construction qualified
774BidsSep 10, 2013 to Nov 18, 2026
215Wins (low bidder)
27.8%Win rate
$518,456,465Total won
Competitor scorecard
Last 5 years in Texas26.2%Win rate101 of 386 bids
+8.4%Average bid vs estimate
-4.1%Winning bids vs estimate
+18.6%Over the low bid when they loseAverage field: 4.8 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| TEXAS MATERIALS GROUP, INC. | 238 | 128 | 110 | 54% |
| BIG CREEK CONSTRUCTION, LTD. | 212 | 80 | 132 | 38% |
| BRAZOS PAVING, INC. | 61 | 46 | 15 | 75% |
| A. L. HELMCAMP, INC. | 45 | 30 | 15 | 67% |
| CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | 44 | 16 | 28 | 36% |
| LARRY YOUNG PAVING, INC. | 41 | 13 | 28 | 32% |
| HODGES AND SON CONSTRUCTION COMPANY, INC. | 39 | 22 | 17 | 56% |
| TOUCHSTONE RESOURCES, LLC | 33 | 11 | 22 | 33% |
| LONE STAR PAVING COMPANY | 27 | 9 | 18 | 33% |
| JAMES CONSTRUCTION GROUP, LLC | 27 | 18 | 9 | 67% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 18, 2026 | 6511-07-001 | FY27 - Leon HMA - 11Leon · Bryan | 2 of 3 | $288,000 | $283,600BIG CREEK CONSTRUCTION, LTD. | +1.6% |
| Nov 18, 2026 | 6511-08-001 | FY27 - Madison HMA - 11Madison · Bryan | 1 of 3 | $270,750 | $270,750 | Won |
| Nov 17, 2026 | 6506-95-001 | FY 2027 HOTMIX COLD-LAID-MATERIAL ONLYBell · Waco | 3 of 3 | $646,563 | $467,875LONE STAR PAVING COMPANY | +38.2% |
| Nov 17, 2026 | 6511-05-001 | FY27 - Brazos HMA - 11Brazos · Bryan | 1 of 3 | $378,400 | $378,400 | Won |
| Nov 17, 2026 | 6511-06-001 | FY27 - Freestone HMA - 11Freestone · Bryan | 2 of 3 | $481,500 | $444,000BIG CREEK CONSTRUCTION, LTD. | +8.4% |
| Nov 4, 2026 | 0212-03-058 | SH 30 NAVASOTA RIVER RELIEF #1 - BRBrazos · Bryan | 3 of 12 | $33,911,798 | $30,209,876FLUOR ENTERPRISES, INC. | +12.3% |
| Nov 4, 2026 | 0262-01-034 | FM 485 - W and E of FM 979 - FY 27Milam · Bryan | 3 of 7 | $10,424,591 | $9,787,627BIG CREEK CONSTRUCTION, LTD. | +6.5% |
| Nov 4, 2026 | 6510-36-001 | HILLSBORO AO - FY27 BASE FAILURE REPAIRHill · Waco | 3 of 3 | $1,799,220 | $1,603,275BIG CREEK CONSTRUCTION, LTD. | +12.2% |
| Nov 3, 2026 | 0917-30-068 | CR 244 (FCR 344) @ DEEP CREEK - BR FY 26Burleson · Bryan | 3 of 15 | $735,430 | $721,844C & W SOUTHERN LLC | +1.9% |
| Nov 3, 2026 | 6510-37-001 | MCLENNAN - FY27 BASE FAILURE REPAIRMcLennan · Waco | 3 of 4 | $2,340,970 | $2,172,910TEXAS MATERIALS GROUP, INC. | +7.7% |
| Nov 3, 2026 | 6510-38-001 | GATESVILLE AO - FY27 BASE FAILURE REPAIRCoryell · Waco | 3 of 4 | $1,358,179 | $1,146,275BIG CREEK CONSTRUCTION, LTD. | +18.5% |
| Oct 14, 2026 | 6505-19-001 | Rock/Riprap Materials 09 1026Ellis · Dallas | 5 of 5 | $134,000 | $105,000TOUCHSTONE RESOURCES, LLC | +27.6% |
| Oct 7, 2026 | 0014-23-041 | RER | IH 35W | IH 35E | Johnson CL SBHill · Waco | 2 of 5 | $11,124,726 | $10,903,496NORTHEASTERN PAVERS, LLC | +2.0% |
| Oct 7, 2026 | 6504-96-001 | FY27, Flexible Pavement, Erath, etc.Erath · Fort Worth | 3 of 3 | $4,172,799 | $2,461,750NORTHEASTERN PAVERS, LLC | +69.5% |
| Oct 6, 2026 | 0590-05-057 | FM 486 Downtown Streetscape - TASAMilam · Bryan | 8 of 10 | $438,544 | $257,450YOKO EXCAVATING, LLC | +70.3% |
| Sep 3, 2026 | 0917-31-036 | CR 444 AT BEDIAS CREEKMadison · Bryan | 6 of 7 | $1,276,197 | $1,143,373FUQUA CONSTRUCTION CO., INC. | +11.6% |
| Sep 2, 2026 | 0337-03-020 | FM 1331 - W of FM 619 to Milam C/LWilliamson · Austin | 4 of 4 | $3,103,126 | $2,174,856LONE STAR PAVING COMPANY | +42.7% |
| Aug 12, 2026 | 6496-74-001 | Flexible Pavement Str Repair 0826Navarro · Dallas | 3 of 4 | $1,082,879 | $955,633TEXAS MATERIALS GROUP, INC. | +13.3% |
| Aug 11, 2026 | 6505-00-001 | FY26 Walker HMA - 08Walker · Bryan | 3 of 3 | $724,400 | $636,380BIG CREEK CONSTRUCTION, LTD. | +13.8% |
| Aug 6, 2026 | 0114-10-102 | US 290WB F: FM 1155 T: Waller CL -RER 26Washington · Bryan | 2 of 6 | $4,492,337 | $4,287,440BIG CREEK CONSTRUCTION, LTD. | +4.8% |
| Aug 6, 2026 | 6503-26-001 | FY27 - Bryan AO Mill & Inlay - 08Brazos · Bryan | 3 of 4 | $1,026,287 | $987,331BIG CREEK CONSTRUCTION, LTD. | +3.9% |
| Aug 5, 2026 | 0186-03-071 | SH 36 F: S of SH 21 T: CR 122 -IOI FY 26Burleson · Bryan | 5 of 6 | $5,590,058 | $4,987,865BIG CREEK CONSTRUCTION, LTD. | +12.1% |
| Aug 5, 2026 | 0917-16-040 | CR 244 At Eads CreekLeon · Bryan | 3 of 8 | $2,595,573 | $2,572,458THK CONSTRUCTION LLC | +0.9% |
| Jul 15, 2026 | 6503-91-001 | FY26 Brenham AO TY B Gr 5 - 07Washington · Bryan | 4 of 5 | $145,000 | $115,500TOUCHSTONE RESOURCES, LLC | +25.5% |
| Jul 2, 2026 | 6498-12-001 | Hot Mix - Hill and BosqueHill · Waco | 3 of 3 | $2,062,815 | $1,864,225BIG CREEK CONSTRUCTION, LTD. | +10.7% |
| Jul 2, 2026 | 6498-13-001 | Hot Mix - McLennan and LimestoneMcLennan · Waco | 3 of 3 | $2,155,950 | $1,955,438BIG CREEK CONSTRUCTION, LTD. | +10.3% |
| Jul 2, 2026 | 6503-27-001 | FY26 - Huntsville AO Mill & Inlay - 07Walker · Bryan | 2 of 4 | $1,574,771 | $1,433,238BIG CREEK CONSTRUCTION, LTD. | +9.9% |
| Jul 2, 2026 | 0625-01-001 | Rehab EX RD | FT PARKER STATE PARK |Limestone · Waco | 3 of 6 | $2,358,241 | $1,849,328BIG CREEK CONSTRUCTION, LTD. | +27.5% |
| Jul 1, 2026 | 6498-75-001 | Hot Mix - Bell and FallsBell · Waco | 4 of 4 | $1,493,703 | $1,302,581TEXAS MATERIALS GROUP, INC. | +14.7% |
| Jul 1, 2026 | 6498-77-001 | Hot Mix - Coryell and HamiltonCoryell · Waco | 4 of 4 | $1,388,138 | $1,194,788BIG CREEK CONSTRUCTION, LTD. | +16.2% |
| Jul 1, 2026 | 6503-24-001 | FY27 - Brenham AO Mill & Inlay - 07Washington · Bryan | 3 of 5 | $1,145,375 | $1,091,717BRAZOS PAVING, INC. | +4.9% |
| Jul 1, 2026 | 0909-40-079 | BR | CR 254 @ PERRY CREEK |(MAP #82)Limestone · Waco | 4 of 8 | $2,459,292 | $2,080,558TUCAN CONTRACTING, LLC | +18.2% |
| Jul 1, 2026 | 0712-01-052 | FM 4, from 1st St. to 3rd St.Johnson · Fort Worth | 3 of 4 | $3,810,088 | $3,499,716JAY MILLS CONTRACTING, INCO… | +8.9% |
| Jul 1, 2026 | 0540-03-039 | FM 974 F: FM 2776 T: south - FY 27Brazos · Bryan | 2 of 8 | $4,272,476 | $3,771,592BIG CREEK CONSTRUCTION, LTD. | +13.3% |
| Jun 11, 2026 | 6502-34-001 | FY26 District Flowable Fill - 06Brazos · Bryan | 2 of 3 | $156,750 | $150,000TOUCHSTONE RESOURCES, LLC | +4.5% |
| Jun 10, 2026 | 6502-36-001 | FY26 Robertson Hot Mix - 06Robertson · Bryan | 2 of 5 | $348,950 | $330,664BIG CREEK CONSTRUCTION, LTD. | +5.5% |
| Jun 9, 2026 | 6502-35-001 | FY26 Burleson Hot Mix - 06Burleson · Bryan | 2 of 5 | $217,400 | $212,600BIG CREEK CONSTRUCTION, LTD. | +2.3% |
| Jun 2, 2026 | 0274-02-032 | US 183 MILLS C/L TO LOMETALampasas · Brownwood | 8 of 9 | $5,314,792 | $4,510,688BIG CREEK CONSTRUCTION, LTD. | +17.8% |
| Jun 2, 2026 | 0315-03-070 | SH 90 at FM 244 - Turn Lane FY 26Grimes · Bryan | 2 of 7 | $1,252,642 | $1,241,183LARRY YOUNG PAVING, INC. | +0.9% |
| May 7, 2026 | 6488-81-001 | FY26 - Calvert Mill & InlayRobertson · Bryan | 3 of 5 | $2,314,339 | $2,266,508LONE STAR PAVING COMPANY | +2.1% |
| May 7, 2026 | 0110-01-052 | SH 75 at FM 2296 - FY 25Walker · Bryan | 3 of 5 | $3,343,418 | $2,980,129BIG CREEK CONSTRUCTION, LTD. | +12.2% |
| May 7, 2026 | 0909-22-206 | BR | Old Robinson Rd @ DrainMcLennan · Waco | 2 of 6 | $579,658 | $578,158C & W SOUTHERN LLC | +0.3% |
| May 6, 2026 | 0209-01-076 | OV | US 77 | FM 3148 | LP 340McLennan · Waco | 3 of 4 | $7,289,805 | $5,957,588BIG CREEK CONSTRUCTION, LTD. | +22.4% |
| May 6, 2026 | 1410-01-026 | FM 1456 REHABILITATE ROADWAY HSIP 2605Austin · Yoakum | 5 of 8 | $2,971,971 | $2,587,895BIG CREEK CONSTRUCTION, LTD. | +14.8% |
| Apr 8, 2026 | 1745-01-020 | FM 1887, SH 159 to FM 359Waller · Houston | 1 of 5 | $1,140,623 | $1,140,623 | Won |
| Apr 8, 2026 | 6489-29-001 | Flexible Pvmt. Structure Repair 09 0326Ellis · Dallas | 1 of 7 | $1,143,764 | $1,143,764 | Won |
| Apr 8, 2026 | 0909-40-081 | BR | @ WILLIAMS CREEK |(MAP #2)Limestone · Waco | 8 of 10 | $2,264,806 | $1,810,423TUCAN CONTRACTING, LLC | +25.1% |
| Apr 8, 2026 | 0902-51-029 | CS; OLD GRANBURY RD OVER WALNUT CRKHood · Fort Worth | 5 of 8 | $721,367 | $632,977GARRET SHIELDS INFRASTRUCTU… | +14.0% |
| Apr 8, 2026 | 0114-10-108 | US 290 F: FM 577 T: FM 1155 - FY 26Washington · Bryan | 4 of 7 | $7,061,412 | $6,537,278DURWOOD GREENE CONSTRUCTION… | +8.0% |
| Apr 7, 2026 | 0986-03-015 | FM 619 from FM 1331 to US 79Williamson · Austin | 4 of 4 | $2,100,603 | $1,567,487LONE STAR PAVING COMPANY | +34.0% |
| Apr 7, 2026 | 0337-02-054 | SH 29 - FM 1660 to SH 95Williamson · Austin | 4 of 4 | $3,469,920 | $2,388,456LONE STAR PAVING COMPANY | +45.3% |
| Apr 7, 2026 | 0917-19-062 | CR 830 AT EAST FORK OF MILL CREEK - BRWashington · Bryan | 5 of 9 | $927,210 | $732,054GARRET SHIELDS INFRASTRUCTU… | +26.7% |
| Apr 7, 2026 | 0909-38-100 | BR | CR 325 | FCR 461 @ Hog CreekFalls · Waco | 3 of 12 | $1,137,696 | $1,047,281BLACKSMITH VENTURES LLC | +8.6% |
| Mar 5, 2026 | 6491-05-001 | FY26 - Robertson SH 6 Mill & InlayRobertson · Bryan | 4 of 7 | $2,495,421 | $2,329,117TEXAS MATERIALS GROUP, INC. | +7.1% |
| Mar 4, 2026 | 0724-02-024 | BR Repl | @ CHILDRESS CRK |(STR #014)Bosque · Waco | 1 of 4 | $14,455,829 | $14,455,829 | Won |
| Mar 4, 2026 | 0419-01-019 | RER | 2401 |SH 171 |N Second - LimestoneHill · Waco | 2 of 3 | $3,518,101 | $3,387,033BIG CREEK CONSTRUCTION, LTD. | +3.9% |
| Feb 11, 2026 | 6492-81-001 | FLEX BASE (Material Only) 06 0226Kaufman · Dallas | 3 of 6 | $153,000 | $130,360GREEN DREAM INTERNATIONAL L… | +17.4% |
| Feb 5, 2026 | 0057-05-033 | US 84 at FM 489 - Turn Lanes FY 26Freestone · Bryan | 3 of 5 | $1,807,582 | $1,716,130BIG CREEK CONSTRUCTION, LTD. | +5.3% |
| Feb 5, 2026 | 0902-49-074 | CR 351; at Bell BranchErath · Fort Worth | 8 of 12 | $751,136 | $625,625DELGADO'S CONTRACTORS, LLC | +20.1% |
| Feb 5, 2026 | 0918-18-142 | NW CR 4340 at Frost BranchNavarro · Dallas | 7 of 15 | $1,515,927 | $1,223,665TUCAN CONTRACTING, LLC | +23.9% |
| Feb 4, 2026 | 0902-49-069 | CR; CR 218 OVER DUFFAU CRKErath · Fort Worth | 3 of 9 | $1,050,910 | $976,095THK CONSTRUCTION LLC | +7.7% |
| Jan 14, 2026 | 6492-20-001 | Coryell,etc. - Base RepairCoryell · Waco | 2 of 3 | $822,137 | $555,360BIG CREEK CONSTRUCTION, LTD. | +48.0% |
| Jan 14, 2026 | 6491-79-001 | McLennan - Base RepairMcLennan · Waco | 3 of 3 | $837,595 | $669,246TEXAS MATERIALS GROUP, INC. | +25.2% |
| Jan 14, 2026 | 6491-80-001 | Hill AO - Base RepairHill · Waco | 3 of 3 | $963,527 | $734,700BIG CREEK CONSTRUCTION, LTD. | +31.1% |
| Jan 14, 2026 | 6489-61-001 | Asphalt 01 0126Navarro · Dallas | 1 of 3 | $527,900 | $527,900 | Won |
| Jan 14, 2026 | 6493-72-001 | Hot Mix - Bell and CoryellBell · Waco | 4 of 4 | $890,850 | $761,450BIG CREEK CONSTRUCTION, LTD. | +17.0% |
| Jan 14, 2026 | 6492-19-001 | BELL - BASE REPAIRBell · Waco | 3 of 3 | $861,591 | $527,000BIG CREEK CONSTRUCTION, LTD. | +63.5% |
| Jan 13, 2026 | 6494-53-001 | FY26 Freestone/Leon RipRap - 01Freestone · Bryan | 2 of 4 | $91,055 | $80,600TOUCHSTONE RESOURCES, LLC | +13.0% |
| Jan 7, 2026 | 6491-85-001 | Hot Mix - Falls and LimestoneFalls · Waco | 3 of 3 | $1,731,750 | $1,531,500BIG CREEK CONSTRUCTION, LTD. | +13.1% |
| Jan 7, 2026 | 0527-03-025 | FM 1458 BRIDGE REPLACEMENT 2110Austin · Yoakum | 7 of 11 | $987,904 | $936,878HUNTER INDUSTRIES, LTD. | +5.4% |
| Jan 6, 2026 | 1259-02-022 | FM 1097, SH 75 to Walker C/LMontgomery · Houston | 4 of 7 | $5,842,524 | $4,872,185DURWOOD GREENE CONSTRUCTION… | +19.9% |
| Jan 6, 2026 | 6491-83-001 | Hot Mix - McLennan & Hill countyMcLennan · Waco | 3 of 3 | $2,984,125 | $2,710,700BIG CREEK CONSTRUCTION, LTD. | +10.1% |
| Jan 6, 2026 | 6493-71-001 | Hot Mix - Bosque and HamiltonBosque · Waco | 3 of 4 | $1,588,250 | $1,416,100BIG CREEK CONSTRUCTION, LTD. | +12.2% |
| Dec 3, 2025 | 2682-01-024 | FM 2555 from SH 22 to West Park RowNavarro · Dallas | 2 of 7 | $1,685,000 | $1,627,075TEXAS MATERIALS GROUP, INC. | +3.6% |
| Dec 2, 2025 | 0574-02-023 | FM 636 CR 4668/Morgan Sp to SH 31(4mile)Navarro · Dallas | 3 of 7 | $6,680,552 | $6,087,367BIG CREEK CONSTRUCTION, LTD. | +9.7% |
| Dec 2, 2025 | 0833-13-014 | FM 2039 AT PORTER CREEK - BRBurleson · Bryan | 5 of 9 | $2,612,038 | $2,315,333LARRY YOUNG PAVING, INC. | +12.8% |
| Nov 13, 2025 | 6491-69-001 | FY26 Brenham AO Flexbase - 11Washington · Bryan | 6 of 7 | $140,500 | $100,000TOUCHSTONE RESOURCES, LLC | +40.5% |
| Nov 13, 2025 | 6491-71-001 | FY26 Bryan AO RipRap - 11Brazos · Bryan | 2 of 5 | $273,200 | $264,500TOUCHSTONE RESOURCES, LLC | +3.3% |
| Nov 12, 2025 | 6491-70-001 | FY26 Bryan AO Flexbase - 11Brazos · Bryan | 4 of 7 | $123,500 | $111,000TOUCHSTONE RESOURCES, LLC | +11.3% |
| Nov 12, 2025 | 6489-04-001 | Flexible Base 09 0925Ellis · Dallas | 2 of 5 | $124,000 | $120,000TOUCHSTONE RESOURCES, LLC | +3.3% |
| Nov 12, 2025 | 6488-06-001 | HOT-MIX COLD-LAID-MATERIAL ONLYBell · Waco | 3 of 3 | $746,438 | $642,838TEXAS MATERIALS GROUP, INC. | +16.1% |
| Nov 6, 2025 | 0117-05-063 | SH 21 E of IH 45 - TWLT FY 26Madison · Bryan | 4 of 8 | $2,434,664 | $2,014,433BIG CREEK CONSTRUCTION, LTD. | +20.9% |
| Nov 5, 2025 | 0334-01-048 | GTA0-FM 112 from CR438 to FM 486Williamson · Austin | 9 of 10 | $5,578,412 | $4,482,347POSILLICO CIVIL, INC. | +24.5% |
| Nov 5, 2025 | 0315-06-047 | SH 105 AT JACKSON CREEK - BRWashington · Bryan | 3 of 12 | $3,346,381 | $2,813,308LARRY YOUNG PAVING, INC. | +18.9% |
| Oct 9, 2025 | 0382-03-038 | RER | SH7 | SH14 | Robertson CLLimestone · Waco | 3 of 4 | $16,258,774 | $13,941,159BIG CREEK CONSTRUCTION, LTD. | +16.6% |
| Oct 8, 2025 | 1181-04-049 | FM 917; IH 35W to CR 616Johnson · Fort Worth | 7 of 8 | $5,974,502 | $4,574,923NORTHEASTERN PAVERS, LLC | +30.6% |
| Oct 8, 2025 | 1451-02-018 | FM 55 FROM NAVARRO COUNTY LINE-145102018Ellis · Dallas | 2 of 5 | $8,683,141 | $8,523,201TEXAS MATERIALS GROUP, INC. | +1.9% |
| Oct 8, 2025 | 0459-02-012 | FM 1580 at Mims CreekFreestone · Bryan | 3 of 7 | $2,763,112 | $2,573,940PMCO CONSTRUCTION LLC | +7.3% |
| Oct 8, 2025 | 0048-06-037 | RER | SS 579 | SH 81 | IH 35Hill · Waco | 1 of 3 | $3,553,261 | $3,553,261 | Won |
| Sep 5, 2025 | 0187-01-047 | BS 36J F: W Commerce St T: US 290 - PedWashington · Bryan | 6 of 6 | $3,982,666 | $2,318,046JFO SERVICES, LLC | +71.8% |
| Sep 5, 2025 | 0747-01-018 | FM 667 from SH 34 to Navarro County LineEllis · Dallas | 1 of 6 | $9,501,431 | $9,501,431 | Won |
| Sep 4, 2025 | 0639-02-026 | FM 39 F:US 190 T:THE GRIMES CO LINEMadison · Bryan | 1 of 5 | $18,290,693 | $18,290,693 | Won |
| Aug 13, 2025 | 6485-99-001 | Riprap (Material Only)06 0925Kaufman · Dallas | 3 of 5 | $248,045 | $234,486A. L. HELMCAMP, INC. | +5.8% |
| Aug 8, 2025 | 2264-01-012 | FM 2377 from SH342 to FM983Ellis · Dallas | 1 of 7 | $6,535,505 | $6,535,505 | Won |
| Aug 8, 2025 | 0914-05-203 | On CR 143 at Dry Berry CreekWilliamson · Austin | 6 of 11 | $1,974,942 | $1,585,425DAN WILLIAMS COMPANY | +24.6% |
| Aug 8, 2025 | 0335-01-040 | SH 7 F:SH 75 T:HOUSTON CO LINE -2Leon · Bryan | 2 of 4 | $23,414,382 | $21,287,953BIG CREEK CONSTRUCTION, LTD. | +10.0% |
| Aug 7, 2025 | 0408-02-048 | SH 159 SURFACING RESTORATION 2204Austin · Yoakum | 4 of 6 | $13,953,570 | $12,637,640BIG CREEK CONSTRUCTION, LTD. | +10.4% |
| Aug 7, 2025 | 0540-03-037 | FM 974 at SH 6 FR - TWLT FY 25Brazos · Bryan | 2 of 5 | $2,993,064 | $2,808,685LARRY YOUNG PAVING, INC. | +6.6% |
| Aug 7, 2025 | 0172-08-106 | US 287 From US 287 EB to US 287 WBEllis · Dallas | 2 of 5 | $1,229,091 | $1,120,429BIG CREEK CONSTRUCTION, LTD. | +9.7% |
| Jul 9, 2025 | 6484-99-001 | FLEX BASE (Material Only) 06 0925Kaufman · Dallas | 1 of 5 | $117,813 | $117,813 | Won |
| Jul 2, 2025 | 2134-01-031 | FM 2293 F:FM 46 T:FM 979 - Rehab FY 25Robertson · Bryan | 1 of 7 | $18,180,795 | $18,180,795 | Won |
| Jul 2, 2025 | 6479-85-001 | HOT MIX - CORYELL AND HAMILTON (FY 25)Coryell · Waco | 4 of 4 | $1,322,175 | $1,227,192TEXAS MATERIALS GROUP, INC. | +7.7% |
| Jul 2, 2025 | 6479-76-001 | Hot Mix - McLennan & Limestone FY25McLennan · Waco | 2 of 3 | $2,072,250 | $2,004,625BIG CREEK CONSTRUCTION, LTD. | +3.4% |
| Jul 2, 2025 | 0918-22-162 | On Harris Rd at Hog CreekEllis · Dallas | 4 of 10 | $2,673,956 | $2,531,308WESTFIELD INSURANCE COMPANY | +5.6% |
| Jul 2, 2025 | 1598-01-024 | FM 167; From FM 51 TO US 377Hood · Fort Worth | 2 of 4 | $14,632,771 | $14,553,382JAY MILLS CONTRACTING, INCO… | +0.5% |
| Jul 1, 2025 | 0166-07-068 | SH 75 at IH 45 Vertical Curve - FY 25Madison · Bryan | 4 of 5 | $946,908 | $820,741CORNERSTONE PAVING AND CONS… | +15.4% |
| Jul 1, 2025 | 6479-84-001 | HOT MIX - BELL & FALLS COUNTYBell · Waco | 4 of 4 | $1,452,775 | $1,367,899TEXAS MATERIALS GROUP, INC. | +6.2% |
| Jul 1, 2025 | 6479-75-001 | Hot Mix - Hill & Bosque FY25Hill · Waco | 2 of 3 | $1,967,475 | $1,959,150BIG CREEK CONSTRUCTION, LTD. | +0.4% |
| Jul 1, 2025 | 0918-22-159 | CR OLD ALMA ROAD AT DRAWEllis · Dallas | 7 of 13 | $3,327,352 | $3,124,045STX CIVIL | +6.5% |
| Jul 1, 2025 | 0267-02-043 | SH 159 Bridge Replacement 2507Fayette · Yoakum | 2 of 10 | $4,331,880 | $4,282,480ACME BRIDGE COMPANY, INC. | +1.2% |
| Jun 12, 2025 | 6484-85-001 | FY25 Brazos HMA - 06Brazos · Bryan | 1 of 2 | $192,100 | $192,100 | Won |
| Jun 12, 2025 | 6484-97-001 | FY26 - Grimes Spot Base RepairGrimes · Bryan | 3 of 4 | $390,474 | $362,890CORNERSTONE PAVING AND CONS… | +7.6% |
| Jun 11, 2025 | 6483-76-001 | FY25 Madison HMA - 06Madison · Bryan | 2 of 3 | $211,900 | $202,400BIG CREEK CONSTRUCTION, LTD. | +4.7% |
| Jun 11, 2025 | 6483-77-001 | FY25 Freestone HMA - 06Freestone · Bryan | 2 of 3 | $443,250 | $442,000BIG CREEK CONSTRUCTION, LTD. | +0.3% |
| Jun 11, 2025 | 6483-81-001 | FY25 Washington HMA - 06Washington · Bryan | 3 of 3 | $857,200 | $796,200BIG CREEK CONSTRUCTION, LTD. | +7.7% |
| Jun 11, 2025 | 6483-69-001 | Rock/Riprap Materials 01 0625Navarro · Dallas | 4 of 5 | $117,000 | $83,000TOUCHSTONE RESOURCES, LLC | +41.0% |
| Jun 11, 2025 | 6484-98-001 | FY26 - Washington Spot Base RepairWashington · Bryan | 2 of 5 | $352,803 | $230,840CORNERSTONE PAVING AND CONS… | +52.8% |
| Jun 10, 2025 | 6483-78-001 | FY25 Leon HMA - 06Leon · Bryan | 2 of 3 | $560,000 | $539,000BIG CREEK CONSTRUCTION, LTD. | +3.9% |
| Jun 10, 2025 | 6483-00-001 | FY26 - Bryan AO Spot MillBrazos · Bryan | 1 of 5 | $814,128 | $814,128 | Won |
| Jun 10, 2025 | 6484-02-001 | FY26 - Freestone Spot Base RepairFreestone · Bryan | 1 of 6 | $403,575 | $403,575 | Won |
| Jun 5, 2025 | 2399-01-085 | FM 2818 near Welsh - SUPBrazos · Bryan | 10 of 10 | $2,069,685 | $1,789,919LARRY YOUNG PAVING, INC. | +15.6% |
| Jun 5, 2025 | 0902-49-072 | CR 454 @ Bosque RiverErath · Fort Worth | 4 of 9 | $1,034,057 | $866,897STX CIVIL | +19.3% |
| Jun 5, 2025 | 0274-01-040 | US 183 0.7 MI SOUTH SH 16 to Lampasas CLMills · Brownwood | 6 of 11 | $5,561,714 | $4,457,730BIG CREEK CONSTRUCTION, LTD. | +24.8% |
| Jun 4, 2025 | 0913-28-091 | CR 222 BRIDGE REPLACEMENT 2206-3Fayette · Yoakum | 4 of 10 | $1,349,588 | $1,169,874ACME BRIDGE COMPANY, INC. | +15.4% |
| Jun 4, 2025 | 0909-29-047 | BR | @ Leon River | Map #206Hamilton · Waco | 10 of 11 | $5,644,389 | $4,196,407COPPELL CONSTRUCTION CO., I… | +34.5% |
| Jun 4, 2025 | 0858-02-026 | FM 908 at US 79 in Rockdale 1 - PED FY25Milam · Bryan | 6 of 7 | $1,168,438 | $714,789GARRET SHIELDS INFRASTRUCTU… | +63.5% |
| Jun 4, 2025 | 6477-39-001 | FY25 - Madison IH-45 NBMadison · Bryan | 2 of 5 | $3,533,505 | $3,461,710BIG CREEK CONSTRUCTION, LTD. | +2.1% |
| May 7, 2025 | 6481-37-001 | Flexible Pavement Str Repair 01 0525Navarro · Dallas | 2 of 4 | $1,028,776 | $924,038TEXAS MATERIALS GROUP, INC. | +11.3% |
| May 6, 2025 | 6482-99-001 | FY26 - Brenham AO Spot MillWashington · Bryan | 2 of 4 | $798,301 | $733,533CORNERSTONE PAVING AND CONS… | +8.8% |
| May 2, 2025 | 6483-01-001 | FY26 - Huntsville AO Spot MillWalker · Bryan | 4 of 5 | $1,538,785 | $1,349,975CORNERSTONE PAVING AND CONS… | +14.0% |
| May 2, 2025 | 0187-02-073 | REHABILITATE ROADWAY 2701-2Austin · Yoakum | 4 of 5 | $7,264,547 | $6,157,668TEXAS MATERIALS GROUP, INC. | +18.0% |
| May 2, 2025 | 2325-01-017 | FM 2432, SH 75 to FM 1484Montgomery · Houston | 5 of 5 | $5,098,111 | $4,090,557VULCAN MATERIALS ASPHALT AN… | +24.6% |
| May 2, 2025 | 6471-33-001 | Flexible Pvmt. Structure Repair 09 1024Ellis · Dallas | 2 of 5 | $1,118,645 | $1,004,908PEACHTREE CONSTRUCTION, LTD. | +11.3% |
| May 2, 2025 | 0909-38-095 | BR | CR 162 | FCR 245 @Hogpen CreekFalls · Waco | 2 of 8 | $2,426,393 | $2,238,703A. L. HELMCAMP, INC. | +8.4% |
| May 2, 2025 | 0648-01-036 | FM 50 F: US 79 T: Brazos CL - RER FY 25Robertson · Bryan | 2 of 6 | $21,354,366 | $20,558,088BIG CREEK CONSTRUCTION, LTD. | +3.9% |
| May 2, 2025 | 0114-09-099 | US 290 R-Cuts West Washington - FY 25Washington · Bryan | 5 of 7 | $1,152,504 | $965,907CORNERSTONE PAVING AND CONS… | +19.3% |
| May 1, 2025 | 0049-09-102 | BS 6-R F:N of SH 21. T:FM 158 - InterimBrazos · Bryan | 4 of 4 | $5,391,744 | $4,454,973LARRY YOUNG PAVING, INC. | +21.0% |
| May 1, 2025 | 2060-01-039 | RER | 2601 | FM 2113 | FM 2416 - FM 1695McLennan · Waco | 2 of 3 | $12,466,445 | $10,809,104BIG CREEK CONSTRUCTION, LTD. | +15.3% |
| Apr 21, 2025 | 6473-35-001 | Waco State SchoolMcLennan · Waco | 2 of 2 | $222,836 | $177,815TEXAS MATERIALS GROUP, INC. | +25.3% |
| Apr 15, 2025 | 6482-15-001 | Anderson Co. Etc - Rock Riprap AggregateAnderson · Tyler | 1 of 3 | $883,890 | $883,890 | Won |
| Apr 8, 2025 | 6481-89-001 | FY25 - Freestone/Leon RipRap - 04Freestone · Bryan | 4 of 5 | $110,600 | $80,276SOUTHERN SOURCING SOLUTIONS… | +37.8% |
| Apr 4, 2025 | 0540-05-054 | FM 159 F:S FM2154 T:SH105 - Rehab 11PESBrazos · Bryan | 4 of 5 | $7,776,380 | $6,280,471BRAZOS PAVING, INC. | +23.8% |
| Apr 3, 2025 | 0205-05-051 | US 79 F: SH 75 T:FM 1848 - TWLTL FY 25Leon · Bryan | 6 of 6 | $3,975,045 | $2,870,625LARRY YOUNG PAVING, INC. | +38.5% |
| Mar 5, 2025 | 6477-41-001 | FY25 - Washington US 290Washington · Bryan | 4 of 9 | $1,412,359 | $1,299,406CORNERSTONE PAVING AND CONS… | +8.7% |
| Mar 4, 2025 | 1159-02-035 | FM 879 IH 45 to FM 813Ellis · Dallas | 1 of 6 | $9,167,314 | $9,167,314 | Won |
| Mar 4, 2025 | 0902-49-076 | CR 270; AT TRIBUTARY TO NORTH BOSQUEErath · Fort Worth | 1 of 8 | $1,421,220 | $1,421,220 | Won |
| Feb 12, 2025 | 6479-31-001 | FY25 - Milam HMA -02Milam · Bryan | 3 of 4 | $406,800 | $390,150LONE STAR PAVING COMPANY | +4.3% |
| Feb 11, 2025 | 6479-30-001 | FY25 - Burleson HMA -02Burleson · Bryan | 2 of 4 | $411,800 | $401,000BIG CREEK CONSTRUCTION, LTD. | +2.7% |
| Feb 11, 2025 | 6479-32-001 | FY25 - Robertson HMA -02Robertson · Bryan | 2 of 3 | $506,440 | $481,500BIG CREEK CONSTRUCTION, LTD. | +5.2% |
| Feb 7, 2025 | 0049-13-010 | Rehab & Widen | FM 46 |SH 6| RoberstonCLFalls · Waco | 3 of 6 | $4,146,002 | $3,949,757BIG CREEK CONSTRUCTION, LTD. | +5.0% |
| Feb 7, 2025 | 0210-02-029 | US 77 at FM 1712 - Turn Lane FY 24Milam · Bryan | 4 of 7 | $1,446,729 | $1,382,358LARRY YOUNG PAVING, INC. | +4.7% |
| Feb 6, 2025 | 1926-01-019 | RER | FM 1829 | US 84 | FM 107Coryell · Waco | 3 of 6 | $5,342,313 | $4,787,272BIG CREEK CONSTRUCTION, LTD. | +11.6% |
| Feb 6, 2025 | 0205-01-046 | US 79 at FM 2549 - Intersection FY 25Robertson · Bryan | 5 of 7 | $1,009,199 | $897,290CORNERSTONE PAVING AND CONS… | +12.5% |
| Jan 8, 2025 | 6473-58-001 | HOT MIX - BELL & CORYELLBell · Waco | 4 of 4 | $1,375,250 | $1,283,290TEXAS MATERIALS GROUP, INC. | +7.2% |
| Jan 8, 2025 | 6473-57-001 | HOT MIX BOSQUE & HAMILTONBosque · Waco | 2 of 3 | $1,855,125 | $1,801,950BIG CREEK CONSTRUCTION, LTD. | +3.0% |
| Jan 8, 2025 | 0260-04-005 | SS 77 From US 67 to BS 287QEllis · Dallas | 3 of 5 | $4,433,631 | $3,784,310TEXAS MATERIALS GROUP, INC. | +17.2% |
| Jan 8, 2025 | 6477-42-001 | FY25 - Brazos FM 2154Brazos · Bryan | 3 of 5 | $1,069,105 | $898,734CORNERSTONE PAVING AND CONS… | +19.0% |
| Jan 7, 2025 | 6473-34-001 | Hot Mix - Falls & LimestoneFalls · Waco | 1 of 3 | $2,141,500 | $2,141,500 | Won |
| Jan 7, 2025 | 6473-32-001 | Hot Mix - McLennan & HillMcLennan · Waco | 1 of 3 | $2,455,650 | $2,455,650 | Won |
| Jan 7, 2025 | 0913-20-099 | CR 5206 REPLACE BRIDGE 2612Austin · Yoakum | 7 of 9 | $2,393,202 | $1,737,587STX CIVIL | +37.7% |
| Jan 7, 2025 | 0418-01-035 | RER | SH171 | SH22 | FM 308Hill · Waco | 3 of 5 | $9,933,550 | $8,760,907BIG CREEK CONSTRUCTION, LTD. | +13.4% |
| Dec 4, 2024 | 6473-56-001 | BASE FAILURE PAVEMENT REPAIR-CORYELLCoryell · Waco | 4 of 4 | $4,330,665 | $1,449,375BIG CREEK CONSTRUCTION, LTD. | +198.8% |
| Dec 4, 2024 | 6473-42-001 | Base Repair - Hill Area OfficeHill · Waco | 3 of 3 | $4,330,665 | $1,448,925BIG CREEK CONSTRUCTION, LTD. | +198.9% |
| Dec 3, 2024 | 0909-38-090 | BR | FCR 157 @ COPPERAS CREEK |(MAP #83)Falls · Waco | 4 of 8 | $3,142,176 | $2,820,729SKYLINE BRIDGE LLC | +11.4% |
| Nov 13, 2024 | 6473-54-001 | HOT-MIX COLD-LAID - MATERIAL ONLYBell · Waco | 2 of 3 | $735,738 | $651,375LONE STAR PAVING COMPANY | +13.0% |
| Nov 7, 2024 | 1599-05-011 | FM 2258 FROM JOHNSON C/L TO FM157Ellis · Dallas | 1 of 6 | $5,747,469 | $5,747,469 | Won |
| Nov 6, 2024 | 0752-06-024 | RER | FM 147 | SH 14 | Falls County LineLimestone · Waco | 2 of 6 | $9,595,542 | $9,559,737BIG CREEK CONSTRUCTION, LTD. | +0.4% |
| Nov 6, 2024 | 0315-04-087 | SH 105 Navasota - PED FY 25Grimes · Bryan | 8 of 8 | $1,220,969 | $782,803GARRET SHIELDS INFRASTRUCTU… | +56.0% |
| Aug 2, 2024 | 0048-04-106 | REHABILITATE EXISTING ROADWAYEllis · Dallas | 6 of 7 | $12,578,301 | $9,843,419PEACHTREE CONSTRUCTION, LTD. | +27.8% |
| Aug 2, 2024 | 0185-03-033 | INTERSECTION IMPROVEMENTS WITH TURN LANESMilam · Bryan | 3 of 4 | $3,484,222 | $3,193,317TEXAS MATERIALS GROUP, INC. | +9.1% |
| Aug 2, 2024 | 0913-09-119 | BRIDGE REPLACEMENTWharton · Yoakum | 4 of 7 | $2,302,897 | $2,156,908TREVWAY, INC. | +6.8% |
| Aug 2, 2024 | 6467-53-001 | HOT MIXBell · Waco | 3 of 4 | $1,672,600 | $1,496,929TEXAS MATERIALS GROUP, INC. | +11.7% |
| Aug 1, 2024 | 0117-05-059 | CONSTRUCT TWO-WAY LEFT TURN LANEMadison · Bryan | 2 of 4 | $940,112 | $938,332LARRY YOUNG PAVING, INC. | +0.2% |
| Aug 1, 2024 | 0909-37-068 | BRIDGE REPLACEMENTHill · Waco | 2 of 6 | $814,485 | $759,759PMCO CONSTRUCTION LLC | +7.2% |
| Aug 1, 2024 | 6467-50-001 | HOT MIXHill · Waco | 3 of 3 | $1,933,350 | $1,778,575BIG CREEK CONSTRUCTION, LTD. | +8.7% |
| Aug 1, 2024 | 6467-51-001 | HOT MIXMcLennan · Waco | 3 of 3 | $2,438,250 | $2,213,910TEXAS MATERIALS GROUP, INC. | +10.1% |
| Aug 1, 2024 | 6467-54-001 | HOT MIXCoryell · Waco | 3 of 4 | $2,076,150 | $1,892,350BIG CREEK CONSTRUCTION, LTD. | +9.7% |
| Jul 24, 2024 | 6466-10-001 | AGGREGATEWashington · Bryan | 1 of 2 | $133,375 | $133,375 | Won |
| Jul 24, 2024 | 6468-77-001 | ROCK/RIPRAPWashington · Bryan | 1 of 2 | $238,085 | $238,085 | Won |
| Jul 23, 2024 | 6466-06-001 | FLEXIBLE BASEWalker · Bryan | 2 of 4 | $316,875 | $228,000TOUCHSTONE RESOURCES, LLC | +39.0% |
| Jul 23, 2024 | 6469-67-001 | AGGREGATEWalker · Bryan | 1 of 3 | $191,625 | $191,625 | Won |
| Jul 10, 2024 | 6468-53-001 | HOT MIXBurleson · Bryan | 1 of 3 | $400,000 | $400,000 | Won |
| Jul 9, 2024 | 0612-01-046 | BRIDGE REPLACEMENTFreestone · Bryan | 3 of 7 | $3,026,666 | $2,767,000PMCO CONSTRUCTION LLC | +9.4% |
| Jul 9, 2024 | 6468-54-001 | HOT MIXMilam · Bryan | 1 of 4 | $388,200 | $388,200 | Won |
| Jul 9, 2024 | 6468-55-001 | HOT MIXRobertson · Bryan | 1 of 1 | $346,500 | $346,500 | Won |
| Jun 11, 2024 | 6465-83-001 | FLEXIBLE BASEKaufman · Dallas | 1 of 3 | $140,000 | $140,000 | Won |
| Jun 6, 2024 | 0724-02-020 | REPLACE BRIDGE AND APPROACHESBosque · Waco | 1 of 4 | $6,464,517 | $6,464,517 | Won |
| Jun 6, 2024 | 0049-08-078 | INTERSECTION IMPROVEMENTRobertson · Bryan | 3 of 4 | $1,400,432 | $1,275,457BRAZOS PAVING, INC. | +9.8% |
| Jun 6, 2024 | 6463-05-001 | FLEXIBLE PAVEMENT STRUCTURE REPAIRNavarro · Dallas | 1 of 5 | $902,836 | $902,836 | Won |
| Jun 6, 2024 | 6467-39-001 | BASE FAILURE PAVEMENT REPAIRCoryell · Waco | 1 of 4 | $2,342,225 | $2,342,225 | Won |
| Jun 6, 2024 | 6467-42-001 | BASE FAILURE PAVEMENT REPAIRHill · Waco | 1 of 4 | $1,363,883 | $1,363,883 | Won |
| Jun 6, 2024 | 6467-43-001 | BASE FAILURE PAVEMENT REPAIRMcLennan · Waco | 3 of 4 | $3,108,087 | $2,169,039BIG CREEK CONSTRUCTION, LTD. | +43.3% |
| Jun 5, 2024 | 0712-03-013 | REHABILITATE EXISTING ROADWAYEllis · Dallas | 1 of 3 | $8,833,670 | $8,833,670 | Won |
| Jun 5, 2024 | 0338-01-068 | INTERSECTION IMPROVEMENTS W/ RT AND/OR LT TRN LANEGrimes · Bryan | 1 of 6 | $10,784,375 | $10,784,375 | Won |
| Jun 5, 2024 | 0917-30-053 | BRIDGE REPLACEMENTBurleson · Bryan | 2 of 6 | $1,293,437 | $1,209,203A GREATER AUSTIN DEVELOPMEN… | +7.0% |
| Jun 5, 2024 | 0578-03-051 | HIGHWAY IMPROVEMENTWalker · Bryan | 1 of 4 | $611,096 | $611,096 | Won |
| Jun 5, 2024 | 6466-07-001 | HOT MIXWashington · Bryan | 1 of 4 | $724,325 | $724,325 | Won |
| Jun 5, 2024 | 6466-46-001 | HOT MIXBrazos · Bryan | 1 of 4 | $443,500 | $443,500 | Won |
| May 3, 2024 | 0596-01-019 | REPL BR & APPRSHill · Waco | 1 of 5 | $2,469,349 | $2,469,349 | Won |
| May 3, 2024 | 0836-02-077 | HAZARD ELIMINATION & SAFETYBell · Waco | 4 of 5 | $6,484,700 | $5,775,775JAMES CONSTRUCTION GROUP, L… | +12.3% |
| May 3, 2024 | 0917-12-088 | BRIDGE REPLACEMENTMilam · Bryan | 4 of 10 | $1,193,863 | $974,112C. E. BARKER, LTD. | +22.6% |
| May 2, 2024 | 0162-01-100 | CONSTRUCT OVERPASS, ETC.McLennan · Waco | 3 of 4 | $34,494,325 | $29,287,263BIG CREEK CONSTRUCTION, LTD. | +17.8% |
| May 2, 2024 | 1599-03-017 | REHABILITATE EXISTING ROADWAYJohnson · Fort Worth | 3 of 4 | $15,975,439 | $14,018,178JAY MILLS CONTRACTING, INCO… | +14.0% |
| May 2, 2024 | 0049-08-076 | WIDEN ROAD - ADD SHOULDERSRobertson · Bryan | 4 of 5 | $3,531,260 | $2,487,591BIG CREEK CONSTRUCTION, LTD. | +42.0% |
| May 2, 2024 | 6451-57-001 | MILL AND INLAYBrazos · Bryan | 1 of 6 | $4,330,955 | $4,330,955 | Won |
| Apr 5, 2024 | 0578-03-055 | INTERSECTION IMPROVEMENTS W/ TURN LANESWalker · Bryan | 4 of 5 | $1,684,871 | $1,514,151LARRY YOUNG PAVING, INC. | +11.3% |
| Apr 5, 2024 | 3623-01-008 | INTERCHANGE IMPROVEMENT (NEW OR UPDATE)Coryell · Waco | 1 of 3 | $1,170,677 | $1,170,677 | Won |
| Apr 5, 2024 | 0015-01-258 | CONSTRUCT RIGHT TURN LANEMcLennan · Waco | 2 of 3 | $813,648 | $787,765BIG CREEK CONSTRUCTION, LTD. | +3.3% |
| Apr 4, 2024 | 0913-28-092 | BRIDGE REPLACEMENTFayette · Yoakum | 6 of 10 | $1,212,880 | $954,925C. E. BARKER, LTD. | +27.0% |
| Mar 13, 2024 | 6464-53-001 | ROCK/RIPRAPBastrop · Austin | 2 of 5 | $154,404 | $153,500TOUCHSTONE RESOURCES, LLC | +0.6% |
| Mar 6, 2024 | 0918-18-133 | BRIDGE REPLACEMENTNavarro · Dallas | 4 of 5 | $3,733,793 | $3,379,522HODGES AND SON CONSTRUCTION… | +10.5% |
| Mar 5, 2024 | 0092-13-033 | REHABILITATE EXISTING ROADWAYNavarro · Dallas | 3 of 4 | $4,484,894 | $4,119,673TEXAS MATERIALS GROUP, INC. | +8.9% |
| Mar 5, 2024 | 2465-01-020 | RESURFACE ROADWAYJohnson · Fort Worth | 3 of 4 | $7,087,709 | $6,362,225PEACHTREE CONSTRUCTION, LTD. | +11.4% |
| Feb 2, 2024 | 0540-02-027 | BRIDGE REPLACEMENTRobertson · Bryan | 1 of 9 | $1,750,130 | $1,750,130 | Won |
| Feb 2, 2024 | 6443-78-001 | HOT MIXFalls · Waco | 3 of 3 | $1,880,850 | $1,825,100BIG CREEK CONSTRUCTION, LTD. | +3.1% |
| Feb 2, 2024 | 0049-01-095 | SURFACING/ROADWAY RESTORATIONMcLennan · Waco | 3 of 3 | $26,782,412 | $22,852,588BIG CREEK CONSTRUCTION, LTD. | +17.2% |
| Feb 2, 2024 | 0213-01-048 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LANEWalker · Bryan | 1 of 8 | $1,036,981 | $1,036,981 | Won |
| Feb 1, 2024 | 6443-84-001 | HOT MIXBell · Waco | 3 of 3 | $1,660,000 | $1,467,750BIG CREEK CONSTRUCTION, LTD. | +13.1% |
| Feb 1, 2024 | 0014-10-071 | REMOVAL AND DISPOSAL OF BRIDGEMcLennan · Waco | 1 of 4 | $1,121,181 | $1,121,181 | Won |
| Feb 1, 2024 | 0914-05-137 | BRIDGE REPLACEMENTWilliamson · Austin | 5 of 8 | $189,553 | $125,524ALBECO CONTRACTORS LLC | +51.0% |
| Feb 1, 2024 | 0913-20-092 | BRIDGE REPLACEMENTAustin · Yoakum | 6 of 6 | $6,376,763 | $4,031,921TEXAS MATERIALS GROUP, INC. | +58.2% |
| Jan 10, 2024 | 6460-41-001 | ASPHALTNavarro · Dallas | 1 of 3 | $198,200 | $198,200 | Won |
| Jan 10, 2024 | 6462-05-001 | FLEXIBLE BASEEllis · Dallas | 1 of 2 | $108,500 | $108,500 | Won |
| Jan 5, 2024 | 0418-02-035 | SURFACING/ROADWAY RESTORATIONHill · Waco | 2 of 3 | $9,288,397 | $8,755,570TEXAS MATERIALS GROUP, INC. | +6.1% |
| Jan 5, 2024 | 0054-08-027 | RESURFACE ROADWAYMills · Brownwood | 5 of 5 | $15,166,944 | $11,688,750BIG CREEK CONSTRUCTION, LTD. | +29.8% |
| Jan 5, 2024 | 3282-01-008 | CONSTRUCT PEDESTRIAN INFRASTRUCTURELeon · Bryan | 5 of 8 | $1,163,452 | $783,652GARRET SHIELDS INFRASTRUCTU… | +48.5% |
| Jan 5, 2024 | 6443-88-001 | HOT MIXBosque · Waco | 1 of 3 | $1,990,375 | $1,990,375 | Won |
| Jan 4, 2024 | 6443-80-001 | HOT MIXMcLennan · Waco | 2 of 3 | $850,975 | $829,225BIG CREEK CONSTRUCTION, LTD. | +2.6% |
| Dec 6, 2023 | 6432-72-001 | HOT MIXLeon · Bryan | 2 of 3 | $498,100 | $486,600BIG CREEK CONSTRUCTION, LTD. | +2.4% |
| Dec 5, 2023 | 0267-02-038 | SURFACING/ROADWAY RESTORATIONFayette · Yoakum | 3 of 4 | $23,169,671 | $21,356,225HUNTER INDUSTRIES, LTD. | +8.5% |
| Dec 5, 2023 | 6442-24-001 | HOT MIXWalker · Bryan | 1 of 4 | $623,600 | $623,600 | Won |
| Dec 5, 2023 | 6457-61-001 | HOT MIXFreestone · Bryan | 2 of 2 | $525,900 | $519,900BIG CREEK CONSTRUCTION, LTD. | +1.2% |
| Dec 5, 2023 | 6438-76-001 | ACP OVERLAYMontgomery · Houston | 5 of 5 | $2,343,105 | $1,704,616VULCAN MATERIALS ASPHALT AN… | +37.5% |
| Dec 5, 2023 | 6457-05-001 | HOT-MIX COLD-LAIDBell · Waco | 1 of 2 | $539,275 | $539,275 | Won |
| Nov 2, 2023 | 2311-01-042 | SURFACING/ROADWAY RESTORATIONMcLennan · Waco | 1 of 3 | $3,759,445 | $3,759,445 | Won |
| Nov 1, 2023 | 0184-01-070 | SURFACING/ROADWAY RESTORATIONCoryell · Waco | 2 of 4 | $9,596,265 | $8,907,042BIG CREEK CONSTRUCTION, LTD. | +7.7% |
| Nov 1, 2023 | 6438-55-001 | BRIDGE PREVENTATIVE MAINTENANCELeon · Bryan | 6 of 8 | $950,509 | $442,895GARRET SHIELDS INFRASTRUCTU… | +114.6% |
| Oct 6, 2023 | 0386-02-026 | SURFACING/ROADWAY RESTORATIONBosque · Waco | 3 of 4 | $4,579,855 | $4,557,803BIG CREEK CONSTRUCTION, LTD. | +0.5% |
| Oct 6, 2023 | 0506-01-123 | INSTALL TRAFFIC SIGNALBrazos · Bryan | 2 of 2 | $1,156,808 | $1,014,087TEXAS MATERIALS GROUP, INC. | +14.1% |
| Oct 6, 2023 | 0162-01-102 | HIGHWAY IMPROVEMENTMcLennan · Waco | 1 of 3 | $993,389 | $993,389 | Won |
| Oct 5, 2023 | 0909-22-190 | HAZARD ELIMINATION & SAFETYMcLennan · Waco | 7 of 8 | $866,813 | $648,860DIGG COMMERCIAL, LLC | +33.6% |
| Sep 7, 2023 | 0183-02-028 | REHAB RDWY TO ADD PASS LNSHamilton · Waco | 3 of 4 | $19,349,480 | $18,187,374BIG CREEK CONSTRUCTION, LTD. | +6.4% |
| Sep 7, 2023 | 0114-10-104 | BRIDGE MAINTENANCEWashington · Bryan | 5 of 6 | $2,991,908 | $2,162,427MAIN LANE INDUSTRIES LTD. | +38.4% |
| Aug 3, 2023 | 1597-04-012 | WIDEN ROAD - ADD SHOULDERSComanche · Brownwood | 2 of 3 | $9,768,320 | $8,679,973JAY MILLS CONTRACTING, INCO… | +12.5% |
| Aug 3, 2023 | 1129-01-028 | REHABILITATE EXISTING ROADBurleson · Bryan | 3 of 3 | $5,616,796 | $5,263,760TEXAS MATERIALS GROUP, INC. | +6.7% |
| Aug 3, 2023 | 0720-01-044 | WIDEN ROAD - ADD SHOULDERSGrimes · Bryan | 4 of 4 | $6,849,730 | $5,572,269LARRY YOUNG PAVING, INC. | +22.9% |
| Aug 3, 2023 | 6443-82-001 | HOT MIXMcLennan · Waco | 3 of 3 | $1,874,888 | $1,771,123TEXAS MATERIALS GROUP, INC. | +5.9% |
| Aug 3, 2023 | 6443-86-001 | HOT MIXHill · Waco | 3 of 3 | $1,977,920 | $1,868,470TEXAS MATERIALS GROUP, INC. | +5.9% |
| Aug 3, 2023 | 1402-03-012 | SURFACING/ROADWAY RESTORATIONMontgomery · Houston | 6 of 7 | $2,660,406 | $2,012,093TEXAS MATERIALS GROUP, INC. | +32.2% |
| Aug 3, 2023 | 1191-05-009 | PREVENTIVE MAINTENANCERobertson · Bryan | 2 of 3 | $9,956,345 | $9,087,363BIG CREEK CONSTRUCTION, LTD. | +9.6% |
| Aug 2, 2023 | 6443-76-001 | HOT MIXCoryell · Waco | 3 of 3 | $2,255,000 | $1,944,975TEXAS MATERIALS GROUP, INC. | +15.9% |
| Aug 2, 2023 | 1724-03-009 | RECONSTRUCT EXISTING ROADWAYNavarro · Dallas | 3 of 3 | $11,988,441 | $11,334,815A. L. HELMCAMP, INC. | +5.8% |
| Aug 2, 2023 | 0917-17-076 | BRIDGE REPLACEMENTGrimes · Bryan | 6 of 6 | $2,587,672 | $2,278,373FORDE CONSTRUCTION COMPANY,… | +13.6% |
| Aug 2, 2023 | 3448-02-007 | REHABILITATE AND WIDEN ROADWAYMcLennan · Waco | 1 of 3 | $2,735,686 | $2,735,686 | Won |
| Aug 2, 2023 | 1706-02-008 | SURFACING/ROADWAY RESTORATIONMontgomery · Houston | 7 of 8 | $1,322,032 | $1,006,889TEXAS MATERIALS GROUP, INC. | +31.3% |
| Aug 2, 2023 | 0917-27-047 | BRIDGE REPLACEMENTWalker · Bryan | 5 of 5 | $1,178,824 | $832,940TREVWAY, INC. | +41.5% |
| Jun 28, 2023 | 0540-05-051 | REHABILITATE EXISTING ROADWAYBrazos · Bryan | 3 of 5 | $11,203,481 | $9,980,814GLENN FUQUA, INC. | +12.3% |
| Jun 28, 2023 | 0114-10-101 | INSTALL RAISED MEDIANWashington · Bryan | 1 of 4 | $6,554,342 | $6,554,342 | Won |
| Jun 28, 2023 | 1219-02-017 | REPLACE BRIDGE AND APPROACHESCoryell · Waco | 1 of 2 | $3,507,188 | $3,507,188 | Won |
| Jun 27, 2023 | 1316-01-081 | CONSTRUCT PEDESTRIAN INFRASTRUCTUREBrazos · Bryan | 2 of 9 | $4,592,733 | $4,034,959LARRY YOUNG PAVING, INC. | +13.8% |
| Jun 27, 2023 | 6444-52-001 | INSTALLATION OF DRIVEWAY PIPEBrazos · Bryan | 5 of 5 | $1,998,240 | $949,656DIGG COMMERCIAL, LLC | +110.4% |
| Jun 7, 2023 | 6444-90-001 | ROCK/RIPRAPNavarro · Dallas | 2 of 4 | $102,000 | $93,090A. L. HELMCAMP, INC. | +9.6% |
| May 5, 2023 | 0909-29-046 | REPLACE BRIDGE AND APPROACHESHamilton · Waco | 1 of 4 | $906,656 | $906,656 | Won |
| May 5, 2023 | 0917-18-085 | BRIDGE REPLACEMENTRobertson · Bryan | 2 of 4 | $794,859 | $722,351FUQUA CONSTRUCTION CO., INC. | +10.0% |
| May 5, 2023 | 6439-32-001 | SPOT BASE REPAIRBrazos · Bryan | 3 of 4 | $1,951,400 | $1,557,750CORNERSTONE PAVING AND CONS… | +25.3% |
| May 4, 2023 | 6439-20-001 | MILL AND INLAYBrazos · Bryan | 4 of 4 | $1,471,858 | $1,293,480BRAZOS PAVING, INC. | +13.8% |
| May 4, 2023 | 6439-30-001 | SPOT BASE REPAIRWashington · Bryan | 2 of 4 | $1,624,225 | $1,067,638CORNERSTONE PAVING AND CONS… | +52.1% |
| Apr 5, 2023 | 3090-01-012 | RECONSTRUCT EXISTING ROADWAYNavarro · Dallas | 1 of 2 | $6,473,924 | $6,473,924 | Won |
| Apr 5, 2023 | 0315-04-083 | INSTALL TWO-WAY LT TURN LANEGrimes · Bryan | 2 of 5 | $2,159,755 | $2,060,026TEXAS MATERIALS GROUP, INC. | +4.8% |
| Apr 5, 2023 | 0315-07-040 | INTERSECTION IMPROVEMENTS WITH RT AND/OR LT TRN LNWashington · Bryan | 2 of 3 | $4,591,561 | $4,395,394TEXAS MATERIALS GROUP, INC. | +4.5% |
| Apr 5, 2023 | 0258-08-038 | HAZARD ELIMINATION & SAFETYMcLennan · Waco | 1 of 4 | $723,086 | $723,086 | Won |
| Apr 5, 2023 | 0909-37-065 | BRIDGE REPLACEMENTHill · Waco | 2 of 3 | $617,907 | $558,558PMCO CONSTRUCTION LLC | +10.6% |
| Apr 5, 2023 | 6432-62-001 | BASE FAILURE PAVEMENT REPAIRBosque · Waco | 2 of 5 | $912,982 | $902,943NORTHEASTERN PAVERS, LLC | +1.1% |
| Apr 5, 2023 | 6432-64-001 | BASE FAILURE PAVEMENT REPAIRHamilton · Waco | 4 of 4 | $691,579 | $592,300NORTHEASTERN PAVERS, LLC | +16.8% |
| Mar 8, 2023 | 6434-78-001 | HOT MIXHill · Waco | 1 of 3 | $874,560 | $874,560 | Won |
| Mar 8, 2023 | 6434-80-001 | HOT MIXBosque · Waco | 1 of 3 | $618,350 | $618,350 | Won |
| Mar 8, 2023 | 6432-14-001 | BASE FAILURE PAVEMENT REPAIRMcLennan · Waco | 3 of 4 | $1,233,449 | $1,115,329TEXAS MATERIALS GROUP, INC. | +10.6% |
| Mar 8, 2023 | 6432-18-001 | BASE FAILURE PAVEMENT REPAIRHill · Waco | 2 of 5 | $874,604 | $860,756TEXAS MATERIALS GROUP, INC. | +1.6% |
| Mar 8, 2023 | 6434-76-001 | HOT MIXLimestone · Waco | 1 of 3 | $840,400 | $840,400 | Won |
| Mar 7, 2023 | 6432-20-001 | BASE FAILURE PAVEMENT REPAIRLimestone · Waco | 3 of 5 | $1,131,324 | $1,015,395BIG CREEK CONSTRUCTION, LTD. | +11.4% |
| Mar 7, 2023 | 6431-38-001 | HOT MIXMcLennan · Waco | 1 of 3 | $957,300 | $957,300 | Won |
| Mar 7, 2023 | 6431-32-001 | HOT MIXCoryell · Waco | 2 of 3 | $1,011,738 | $965,375TEXAS MATERIALS GROUP, INC. | +4.8% |
| Mar 7, 2023 | 6432-16-001 | BASE FAILURE PAVEMENT REPAIRFalls · Waco | 3 of 4 | $676,166 | $597,313BIG CREEK CONSTRUCTION, LTD. | +13.2% |
| Mar 7, 2023 | 6431-34-001 | HOT MIXFalls · Waco | 1 of 3 | $490,190 | $490,190 | Won |
| Feb 2, 2023 | 0320-02-039 | BRIDGE REPLACEMENTBell · Waco | 4 of 5 | $13,183,198 | $11,989,344JAMES CONSTRUCTION GROUP, L… | +10.0% |
| Feb 2, 2023 | 0289-04-032 | REHABILITATE EXISTING ROADWAYSan Saba · Brownwood | 3 of 3 | $12,479,396 | $10,684,355CK NEWBERRY, LLC | +16.8% |
| Feb 2, 2023 | 6431-30-001 | HOT MIXBell · Waco | 4 of 4 | $910,875 | $820,000BIG CREEK CONSTRUCTION, LTD. | +11.1% |
| Feb 1, 2023 | 1416-03-018 | HOT MIX OVERLAYMontgomery · Houston | 6 of 7 | $5,171,120 | $4,541,532JAMES CONSTRUCTION GROUP, L… | +13.9% |
| Feb 1, 2023 | 1537-01-017 | BRIDGE REPLACEMENTLee · Austin | 3 of 6 | $1,844,577 | $1,524,020SB CONTRACTORS LLC | +21.0% |
| Feb 1, 2023 | 6430-77-001 | ROCK/RIPRAPBastrop · Austin | 1 of 3 | $362,650 | $362,650 | Won |
| Feb 1, 2023 | 6431-36-001 | HOT MIXHamilton · Waco | 3 of 3 | $1,207,995 | $1,071,200BIG CREEK CONSTRUCTION, LTD. | +12.8% |
| Jan 6, 2023 | 0917-30-059 | BRIDGE REPLACEMENTBurleson · Bryan | 5 of 5 | $2,145,128 | $1,827,279TEXAS MATERIALS GROUP, INC. | +17.4% |
| Jan 6, 2023 | 2311-01-044 | HIGHWAY IMPROVEMENTMcLennan · Waco | 2 of 4 | $1,295,820 | $1,210,047MB WESTERN INDUSTRIAL CONTR… | +7.1% |
| Jan 6, 2023 | 6427-92-001 | HOT MIXBurleson · Bryan | 1 of 3 | $395,600 | $395,600 | Won |
| Jan 6, 2023 | 6427-96-001 | HOT MIXRobertson · Bryan | 1 of 2 | $341,500 | $341,500 | Won |
| Jan 5, 2023 | 0917-19-053 | BRIDGE REPLACEMENTWashington · Bryan | 6 of 7 | $933,305 | $815,696FUQUA CONSTRUCTION CO., INC. | +14.4% |
| Jan 5, 2023 | 0923-17-091 | BRIDGE REPLACEMENTComanche · Brownwood | 4 of 4 | $1,366,823 | $1,187,288HODGES AND SON CONSTRUCTION… | +15.1% |
| Jan 5, 2023 | 6427-94-001 | HOT MIXMilam · Bryan | 1 of 5 | $381,000 | $381,000 | Won |
| Dec 2, 2022 | 6425-50-001 | HOT MIXMcLennan · Waco | 1 of 3 | $1,016,415 | $1,016,415 | Won |
| Dec 2, 2022 | 6425-52-001 | HOT MIXHill · Waco | 1 of 3 | $905,940 | $905,940 | Won |
Active prime contracts 13
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 6489-29-001Let Apr 8, 2026 | EllisDallas · BU0287S | MAINTENANCE | $1,142,800 | 102% | |
| 6489-61-001Let Jan 14, 2026 | NavarroDallas · SH0031 | MAINTENANCE | $863,619 | 41% | |
| 0048-06-037Let Oct 8, 2025 | HillWaco · SS 579 | REHABILITATION OF EXISTING ROAD | $3,390,412 | 93% | |
| 0747-01-018Let Sep 5, 2025 | EllisDallas · FM 667 | REHABILITATION OF EXISTING ROAD | $9,679,717 | 48% | |
| 0639-02-026Let Sep 4, 2025 | MadisonBryan · FM 39 | REHABILITATION OF EXISTING ROAD | $18,618,538 | 23% | |
| 2264-01-012Let Aug 8, 2025 | EllisDallas · FM 2377 | HAZARD ELIMINATION & SAFETY | $6,836,167 | 97% | |
| 2134-01-031Let Jul 2, 2025 | RobertsonBryan · FM 2293 | REHABILITATION OF EXISTING ROAD | $18,716,450 | 58% | |
| 6484-85-001Let Jun 12, 2025 | BrazosBryan · SH0006 | MATERIALS-ONLY CONTRACT | $607,300 | 243% | |
| 6482-15-001Let Apr 15, 2025 | AndersonTyler · US0079 | MAINTENANCE | $1,767,789 | 61% | |
| 1159-02-035Let Mar 4, 2025 | EllisDallas · FM 879 | RESTORATION | $9,432,969 | 97% | |
| 0467-02-020Let Oct 2, 2024 | ErathFort Worth · SH 220 | BRIDGE REPLACEMENT | $10,068,472 | 68% | |
| 1564-01-036Let Oct 1, 2024 | WashingtonBryan · FM 2780 | REHABILITATION OF EXISTING ROAD | $17,619,876 | 97% | |
| 2399-01-074Let Sep 4, 2020 | BrazosBryan · FM 2818 | WIDEN NON-FREEWAY | $54,020,178 | 102% |
Subcontracts on active jobs 2
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0049-12-110Let Mar 5, 2025 | FLUOR HEAVY CIVIL, LLC | BrazosBryan | WIDEN FREEWAY | 16.54% | $114,844,852 |
| 0117-03-024Let Nov 7, 2024 | JAMES CONSTRUCTION GROUP, LLC | MadisonBryan | WIDEN NON-FREEWAY | 18.19% | $33,436,950 |