| 1 | 100-6002 |
PREPARING ROW | 21.7 | STA |
$3,200.00 |
$2,100.00 |
$2,200.00 |
$2,450.00 |
$4,000.00 |
$7,700.00 |
| 2 | 104-6010 |
REMOVING CONC (RIPRAP) | 55 | CY |
$500.00 |
$86.00 |
$357.50 |
$148.00 |
$75.00 |
$150.00 |
| 3 | 105-6075 |
REMOV STAB BASE AND ASPH PAV (10"-18") | 5,241 | SY |
$12.00 |
$11.00 |
$4.51 |
$7.35 |
$9.50 |
$15.00 |
| 4 | 105-6128 |
REMOVING UNTREATED BASE (8") | 787 | SY |
$10.00 |
$7.50 |
$22.00 |
$10.50 |
$15.00 |
$10.00 |
| 5 | 110-6001 |
EXCAVATION (ROADWAY) | 1,742 | CY |
$23.00 |
$17.00 |
$20.90 |
$25.20 |
$23.00 |
$20.00 |
| 6 | 110-6002 |
EXCAVATION (CHANNEL) | 575 | CY |
$35.00 |
$35.00 |
$47.40 |
$28.35 |
$20.00 |
$40.00 |
| 7 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 1,590 | CY |
$25.00 |
$17.00 |
$24.83 |
$31.50 |
$32.00 |
$15.00 |
| 8 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 9,545 | SY |
$2.50 |
$1.00 |
$8.47 |
$3.15 |
$3.50 |
$4.00 |
| 9 | 164-6003 |
BROADCAST SEED (PERM) (RURAL) (CLAY) | 9,545 | SY |
$1.20 |
$0.5500 |
$0.6100 |
$0.6000 |
$1.25 |
$0.5000 |
| 10 | 164-6071 |
BROADCAST SEED (TEMP)(WARM OR COOL) | 4,772 | SY |
$1.00 |
$0.7900 |
$0.8300 |
$0.8000 |
$1.50 |
$0.7400 |
| 11 | 168-6001 |
VEGETATIVE WATERING | 155 | MG |
$37.00 |
$1.00 |
$82.50 |
$60.00 |
$1.00 |
$100.00 |
| 12 | 169-6002 |
SOIL RETENTION BLANKETS (CL 1) (TY B) | 200 | SY |
$2.00 |
$4.00 |
$9.85 |
$9.40 |
$5.00 |
$7.50 |
| 13 | 247-6392 |
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) | 2,298 | CY |
$99.00 |
$85.00 |
$110.00 |
$98.70 |
$125.00 |
$140.00 |
| 14 | 310-6027 |
PRIME COAT(MC-30 OR AE-P) | 1,442 | GAL |
$8.00 |
$7.50 |
$7.70 |
$5.90 |
$10.00 |
$7.73 |
| 15 | 316-6022 |
ASPH (CRS-2) | 2,523 | GAL |
$4.00 |
$5.50 |
$5.23 |
$4.20 |
$9.00 |
$4.40 |
| 16 | 316-6397 |
AGGR(TY-D GR-4 OR TY-L GR-4) | 53.4 | CY |
$220.00 |
$300.00 |
$390.50 |
$488.00 |
$550.00 |
$511.50 |
| 17 | 400-6005 |
CEM STABIL BKFL | 179 | CY |
$285.00 |
$280.00 |
$275.00 |
$397.00 |
$325.00 |
$400.00 |
| 18 | 416-6002 |
DRILL SHAFT (24 IN) | 664 | LF |
$250.00 |
$185.00 |
$154.00 |
$180.50 |
$275.00 |
$175.00 |
| 19 | 416-6003 |
DRILL SHAFT (30 IN) | 320 | LF |
$385.00 |
$250.00 |
$187.00 |
$224.90 |
$275.00 |
$200.00 |
| 20 | 420-6011 |
CL B CONC (FLUME) | 4.7 | CY |
$1,000.00 |
$1,250.00 |
$770.00 |
$1,965.00 |
$1,800.00 |
$1,500.00 |
| 21 | 420-6014 |
CL C CONC (ABUT)(HPC) | 46.6 | CY |
$1,750.00 |
$1,650.00 |
$1,191.82 |
$1,460.00 |
$1,400.00 |
$3,000.00 |
| 22 | 420-6030 |
CL C CONC (CAP)(HPC) | 18 | CY |
$1,750.00 |
$1,750.00 |
$1,191.30 |
$2,135.00 |
$2,000.00 |
$2,500.00 |
| 23 | 420-6038 |
CL C CONC (COLUMN)(HPC) | 11.2 | CY |
$2,000.00 |
$2,000.00 |
$1,430.04 |
$2,255.00 |
$2,000.00 |
$3,000.00 |
| 24 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 5,419 | SF |
$25.00 |
$25.00 |
$23.65 |
$29.05 |
$32.50 |
$40.00 |
| 25 | 422-6015 |
APPROACH SLAB | 110 | CY |
$675.00 |
$700.00 |
$684.13 |
$695.00 |
$900.00 |
$2,000.00 |
| 26 | 425-6010 |
PRESTR CONC SLAB BEAM (5SB12) | 689.5 | LF |
$230.00 |
$260.00 |
$192.50 |
$233.20 |
$275.00 |
$400.00 |
| 27 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 346.5 | LF |
$230.00 |
$250.00 |
$192.50 |
$240.90 |
$350.00 |
$400.00 |
| 28 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 1,792 | CY |
$195.00 |
$139.00 |
$214.50 |
$153.65 |
$200.00 |
$275.00 |
| 29 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 76 | CY |
$625.00 |
$650.00 |
$715.00 |
$816.00 |
$800.00 |
$1,000.00 |
| 30 | 450-6006 |
RAIL (TY T223) | 348 | LF |
$161.00 |
$145.00 |
$121.00 |
$190.00 |
$165.00 |
$200.00 |
| 31 | 454-6004 |
ARMOR JOINT (SEALED) | 128 | LF |
$165.00 |
$132.00 |
$165.00 |
$145.00 |
$150.00 |
$100.00 |
| 32 | 464-6003 |
RC PIPE (CL III)(18 IN) | 36 | LF |
$91.00 |
$100.00 |
$45.10 |
$126.00 |
$225.00 |
$200.00 |
| 33 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 2 | EA |
$1,500.00 |
$2,000.00 |
$1,048.30 |
$3,410.00 |
$2,500.00 |
$2,500.00 |
| 34 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 2 | EA |
$33,000.00 |
$40,000.00 |
$24,477.75 |
$54,400.00 |
$45,000.00 |
$55,000.00 |
| 35 | 496-6043 |
REMOV STR (SMALL FENCE) | 80 | LF |
$13.00 |
$10.00 |
$9.02 |
$10.00 |
$10.00 |
$15.00 |
| 36 | 500-6001 |
MOBILIZATION | 1 | LS |
$271,931.00 |
$245,000.00 |
$290,000.00 |
$276,000.00 |
$250,000.00 |
$375,000.00 |
| 37 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 | MO |
$7,500.00 |
$3,500.00 |
$4,620.00 |
$3,500.00 |
$3,500.00 |
$11,550.00 |
| 38 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 325 | LF |
$36.00 |
$30.00 |
$59.95 |
$57.25 |
$50.00 |
$88.00 |
| 39 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 325 | LF |
$11.00 |
$5.00 |
$49.50 |
$47.00 |
$10.00 |
$44.00 |
| 40 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 4,434 | LF |
$6.00 |
$4.50 |
$3.14 |
$3.00 |
$4.00 |
$3.85 |
| 41 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 4,434 | LF |
$1.60 |
$0.7500 |
$1.82 |
$1.70 |
$1.50 |
$1.65 |
| 42 | 530-6002 |
INTERSECTIONS (ACP) | 421 | SY |
$50.00 |
$50.00 |
$85.80 |
$53.55 |
$125.00 |
$80.00 |
| 43 | 530-6005 |
DRIVEWAYS (ACP) | 156 | SY |
$59.00 |
$50.00 |
$85.80 |
$78.75 |
$175.00 |
$80.00 |
| 44 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 3,504 | LF |
$0.3000 |
$1.75 |
$0.9700 |
$1.25 |
$2.00 |
$1.25 |
| 45 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 1,752 | LF |
$0.5000 |
$1.75 |
$1.94 |
$1.40 |
$2.25 |
$1.25 |
| 46 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 500 | LF |
$35.00 |
$33.00 |
$31.35 |
$28.35 |
$33.00 |
$35.20 |
| 47 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 8 | EA |
$2,650.00 |
$3,100.00 |
$2,420.00 |
$2,992.00 |
$2,500.00 |
$3,594.52 |
| 48 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$3,350.00 |
$3,300.00 |
$3,162.50 |
$3,150.00 |
$3,600.00 |
$3,575.00 |
| 49 | 552-6003 |
WIRE FENCE (TY C) | 66 | LF |
$29.00 |
$95.00 |
$41.25 |
$92.40 |
$25.00 |
$50.00 |
| 50 | 552-6008 |
WIRE FENCE (WATER GAP) | 28 | LF |
$75.00 |
$165.00 |
$182.97 |
$157.50 |
$200.00 |
$250.00 |
| 51 | 560-6004 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 2 | EA |
$350.00 |
$360.00 |
$324.50 |
$310.00 |
$500.00 |
$330.00 |
| 52 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 23 | EA |
$705.00 |
$825.00 |
$544.50 |
$520.00 |
$950.00 |
$715.00 |
| 53 | 644-6076 |
REMOVE SM RD SN SUP&AM | 13 | EA |
$110.00 |
$100.00 |
$126.50 |
$135.00 |
$200.00 |
$110.00 |
| 54 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$30.00 |
$42.00 |
$20.90 |
$19.00 |
$50.00 |
$27.50 |
| 55 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 16 | EA |
$23.00 |
$45.00 |
$16.50 |
$21.00 |
$15.00 |
$27.50 |
| 56 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 12 | EA |
$47.00 |
$42.00 |
$39.05 |
$47.25 |
$50.00 |
$44.00 |
| 57 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 33 | LF |
$15.00 |
$11.00 |
$6.60 |
$6.30 |
$10.00 |
$11.00 |
| 58 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 4,437 | LF |
$1.10 |
$2.22 |
$1.43 |
$1.40 |
$3.00 |
$2.20 |
| 59 | 666-6318 |
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | 1,261 | LF |
$1.00 |
$2.22 |
$1.49 |
$1.45 |
$1.75 |
$2.20 |
| 60 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 2,917 | LF |
$1.05 |
$2.22 |
$1.43 |
$1.40 |
$1.60 |
$2.20 |
| 61 | 672-6009 |
REFL PAV MRKR TY II-A-A | 68 | EA |
$11.00 |
$22.00 |
$8.80 |
$8.40 |
$20.00 |
$22.00 |
| 62 | 3077-6075 |
TACK COAT | 708 | GAL |
$5.00 |
$3.75 |
$3.85 |
$3.20 |
$10.00 |
$3.36 |
| 63 | 3077-6081 |
SP MIXES SP-C SAC-B PG70-22 (EXEMPT) | 1,555 | TON |
$200.00 |
$135.00 |
$163.35 |
$164.00 |
$195.00 |
$170.50 |
| 64 | 5132-6001 |
LEAD CONTAINING COATING MANAGEMENT | 120 | SF |
$105.00 |
$75.00 |
$101.20 |
$100.00 |
$100.00 |
$85.00 |
| 65 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$11,000.00 |
$1,000.00 |
$12,082.77 |
$11,000.00 |
$15,000.00 |
$9,450.00 |
| 66 | 6185-6005 |
TMA (MOBILE OPERATION) | 6 | DAY |
$390.00 |
$100.00 |
$426.20 |
$1,100.00 |
$300.00 |
$1,100.00 |