‹ All TxDOT jobs My Jobs
Rehabilitation of Existing Road
OfficialUS 377 to BUS 377H
- Let date
- Tuesday, December 1, 2026
- Bids open
- Dec 1, 2026 1:00 PM
- District
- Fort Worth
- County
- Hood
- Highway
- SL 567
- Type of work
- Rehabilitate Existing Roadway
- Project number
- F 2027(175)
- Design standard
- 3R - Non-Freeway Rehabilitation
- Let type
- Statewide Let
- Bid type
- Low Bid
- Length
- 0 mi
- MPO
- North Central Texas Council of Governments
- Project ID
- A00129804
- Added
- Nov 6, 2026
Bid items 61
Notice Averages Review estimate Draft from history Excel HCSS HeavyBid CSV| Seq | Bid code | Description | Quantity | Unit |
|---|---|---|---|---|
| 3 | ||||
| 3 | ||||
| 3 | ||||
| 1 | 104-7011 | REMOV CONC (DRIVEWAYS)REMOVING CONCRETE | 2,362 | SY |
| 2 | 104-7046 | REMOV CONC (MISC)REMOVING CONCRETE | 236 | SY |
| 3 | 134-7001 | BACKFILL (TY A)BACKFILLING PAVEMENT EDGES | 278 | STA |
| 4 | 150-7002 | BLADING | 4 | HR |
| 5 | 216-7001 | PROOF ROLLING | 4 | HR |
| 6 | 291-7001 | CEMENTFOAMED ASPHALT TREATMENT (ROAD-MIXED) | 1,188 | TON |
| 7 | 291-7002 | ASPHALT BINDER (PG 64-22)FOAMED ASPHALT TREATMENT (ROAD-MIXED) | 554,610 | GAL |
| 8 | 291-7010 | FOAM ASPH TRT (EXIST MATL) (10")FOAMED ASPHALT TREATMENT (ROAD-MIXED) | 158,460 | SY |
| 9 | 315-7001 | FOG SEAL (SS-1)FOG SEAL | 7,923 | GAL |
| 10 | 316-7016 | ASPH (RC-250)SEAL COAT | 34,861 | GAL |
| 11 | 316-7175 | AGGR (TY-B, GR-5)(SAC-B)SEAL COAT | 1,174 | CY |
| 12 | 341-7002 | D-GR HMA TY-B SAC-B PG64-22DENSE-GRADED HOT-MIX ASPHALT | 41,972 | TON |
| 13 | 341-7082 | TACK COATDENSE-GRADED HOT-MIX ASPHALT | 29,273 | GAL |
| 14 | 344-7024 | SP MIXES SP-C SAC-A PG70-28SUPERPAVE MIXTURES | 22,368 | TON |
| 15 | 344-7077 | TACK COATSUPERPAVE MIXTURES | 29,176 | GAL |
| 16 | 354-7002 | PLANE & TEXT ASPH CONC PAV(0" TO 2")PLANING AND TEXTURING PAVEMENT | 11,127 | SY |
| 17 | 354-7003 | PLANE & TEXT ASPH CONC PAV(0" TO 3")PLANING AND TEXTURING PAVEMENT | 14,865 | SY |
| 18 | 354-7059 | PLANE ASPH CONC PAV(10")PLANING AND TEXTURING PAVEMENT | 21,833 | SY |
| 19 | 428-7001 | PENETRATING CONCRETE SURFACE TREATMENT | 1,946 | SY |
| 20 | 438-7004 | CLEANING AND SEALING EXIST JOINTS (CL3)CLEANING AND SEALING JOINTS | 46 | LF |
| 21 | 438-7007 | CLEANING AND SEALING EXIST JOINTS (CL7)CLEANING AND SEALING JOINTS | 182 | LF |
| 22 | 438-7009 | RESIZING AND SEALING JOINTSCLEANING AND SEALING JOINTS | 90 | LF |
| 23 | 454-7009 | HEADER TYPE EXPANSION JOINTBRIDGE EXPANSION JOINTS | 13 | CF |
| 24 | 500-7001 | MOBILIZATION | 1 | LS |
| 25 | 502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING | 11 | MO |
| 26 | 503-7002 | PORTABLE CHANGEABLE MESSAGE SIGN | 6 | EA |
| 27 | 505-7003 | TMA (MOBILE OPERATION)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) | 160 | DAY |
| 28 | 506-7039 | TEMP SEDMT CONT FENCE (INSTALL)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 1,000 | LF |
| 29 | 506-7041 | TEMP SEDMT CONT FENCE (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 1,000 | LF |
| 30 | 506-7044 | BIODEG EROSN CONT LOGS (INSTL) (12")TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 1,000 | LF |
| 31 | 506-7046 | BIODEG EROSN CONT LOGS (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 1,000 | LF |
| 32 | 530-7006 | DRIVEWAYS (CONC)INTERSECTIONS, DRIVEWAYS, AND TURNOUTS | 2,362 | SY |
| 33 | 530-7010 | DRIVEWAYS (ACP)INTERSECTIONS, DRIVEWAYS, AND TURNOUTS | 5,310 | SY |
| 34 | 530-7016 | DRIVEWAYS (SURF TREAT)INTERSECTIONS, DRIVEWAYS, AND TURNOUTS | 2,108 | SY |
| 35 | 560-7012 | RELOCATE EXISTING MAILBOXMAILBOX ASSEMBLIES | 10 | EA |
| 36 | 644-7001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P)SMALL ROADSIDE SIGN ASSEMBLIES | 73 | EA |
| 37 | 644-7004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T)SMALL ROADSIDE SIGN ASSEMBLIES | 30 | EA |
| 38 | 644-7007 | IN SM RD SN SUP&AM TY10BWG(1)SA(U)SMALL ROADSIDE SIGN ASSEMBLIES | 8 | EA |
| 39 | 644-7027 | IN SM RD SN SUP&AM TYS80(1)SA(P-EXAL)SMALL ROADSIDE SIGN ASSEMBLIES | 2 | EA |
| 40 | 644-7028 | IN SM RD SN SUP&AM TYS80(1)SA(T)SMALL ROADSIDE SIGN ASSEMBLIES | 1 | EA |
| 41 | 644-7031 | IN SM RD SN SUP&AM TYS80(1)SA(U)SMALL ROADSIDE SIGN ASSEMBLIES | 10 | EA |
| 42 | 662-7008 | WK ZN PAV MRK NON-REMOV (W)6"(SLD)WORK ZONE PAVEMENT MARKINGS | 141,916 | LF |
| 43 | 662-7036 | WK ZN PAV MRK NON-REMOV (Y)6"(BRK)WORK ZONE PAVEMENT MARKINGS | 4,420 | LF |
| 44 | 662-7038 | WK ZN PAV MRK NON-REMOV (Y)6"(SLD)WORK ZONE PAVEMENT MARKINGS | 150,482 | LF |
| 45 | 662-7112 | WK ZN PAV MRK SHT TERM (TAB)TY WWORK ZONE PAVEMENT MARKINGS | 1,359 | EA |
| 46 | 662-7114 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2WORK ZONE PAVEMENT MARKINGS | 12,522 | EA |
| 47 | 666-7018 | REFL PAV MRK TY I (W)8"(DOT)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 76 | LF |
| 48 | 666-7024 | REFL PAV MRK TY I (W)8"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 9,051 | LF |
| 49 | 666-7030 | REFL PAV MRK TY I (W)12"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 109 | LF |
| 50 | 666-7036 | REFL PAV MRK TY I (W)24"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 1,357 | LF |
| 51 | 666-7042 | REFL PAV MRK TY I (W)(ARROW)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 70 | EA |
| 52 | 666-7066 | REFL PAV MRK TY I (W)(WORD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 64 | EA |
| 53 | 666-7411 | REFL PAV MRK TY I (W)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 70,958 | LF |
| 54 | 666-7420 | REFL PAV MRK TY I (Y)6"(BRK)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 2,210 | LF |
| 55 | 666-7423 | REFL PAV MRK TY I (Y)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 75,241 | LF |
| 56 | 672-7011 | PLOWABLE REFL PAV MRKR TY I-CRAISED PAVEMENT MARKERS | 453 | EA |
| 57 | 672-7013 | PLOWABLE REFL PAV MRKR TY II-A-ARAISED PAVEMENT MARKERS | 2,276 | EA |
| 58 | 785-7005 | BRIDGE JOINT REPAIR (SEJ)BRIDGE JOINT REPAIR OR REPLACEMENT | 138 | LF |
Pre-bid questions 3
Misc. Files Nov 18, 2026
Q: Can you please provide the time determination schedule and any available geotechnical reports/pavement design files?
A: Please see the uploaded CTD. Also, please note that this CTD is for informational purposes only. Regarding the geotechnical and pavement design files -- there are none available to be shared. Thank you. · Christopher Neal
TMA Stationary Nov 19, 2026
Q: There does not appear to be a pay item for TMA (Stationary). Will stationary TMA's be required when crews are present?
A: Thank you for your question. A minor error in the plans exists. The total quantity needed is
correct, but this should be split between the existing item (30 days) and ITEM 0505 7001 TMA (STATIONARY) (130 days). This will be addressed in accordance with Item 4,
“Scope of Work”. Thank you. · Christopher Neal
CTD Schedule Nov 20, 2026
Q: Can we get CTD schedule Please
A: This has now been posted. Thank you. · Christopher Neal
From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.