273BidsNov 5, 2025 to Nov 18, 2026
55Wins (low bidder)
20.1%Win rate
$121,894,623Total won
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 18, 2026 | 6511-07-001 | FY27 - Leon HMA - 11Leon · Bryan | 3 of 3 | $325,935 | $283,600BIG CREEK CONSTRUCTION, LTD. | +14.9% |
| Nov 17, 2026 | 6509-21-001 | 6509-21-001 Hot Mix Alice Maint.Jim Wells · Corpus Christi | 2 of 4 | $491,800 | $427,000CK NEWBERRY, LLC | +15.2% |
| Nov 17, 2026 | 6509-22-001 | 6509-22-001 Hot Mix George WestLive Oak · Corpus Christi | 2 of 3 | $380,000 | $370,000CK NEWBERRY, LLC | +2.7% |
| Nov 17, 2026 | 6511-71-001 | 6511-71-001 HMCL Kingsville/AliceKleberg · Corpus Christi | 2 of 5 | $605,000 | $563,000BRAUNTEX MATERIALS, INC. | +7.5% |
| Nov 17, 2026 | 6506-95-001 | FY 2027 HOTMIX COLD-LAID-MATERIAL ONLYBell · Waco | 2 of 3 | $495,250 | $467,875LONE STAR PAVING COMPANY | +5.9% |
| Nov 4, 2026 | 6510-36-001 | HILLSBORO AO - FY27 BASE FAILURE REPAIRHill · Waco | 2 of 3 | $1,745,058 | $1,603,275BIG CREEK CONSTRUCTION, LTD. | +8.8% |
| Nov 4, 2026 | 6510-39-001 | BELL - FY27 BASE FAILURE REPAIRBell · Waco | 1 of 3 | $1,470,225 | $1,470,225 | Won |
| Nov 4, 2026 | 1052-02-098 | CRP_FM0665_NUECES_HSIPNueces · Corpus Christi | 5 of 5 | $4,943,316 | $3,833,265J E CONSTRUCTION SERVICES, … | +29.0% |
| Nov 4, 2026 | 0947-03-034 | BMT_FM1004_1(2022 HSIP)PAVED SHOULDERSJasper · Beaumont | 1 of 2 | $2,431,741 | $2,431,741 | Won |
| Nov 4, 2026 | 0923-06-068 | PW within Lake Brownwood SPBrown · Brownwood | 5 of 6 | $2,220,638 | $1,561,729JAY MILLS CONTRACTING, INCO… | +42.2% |
| Nov 4, 2026 | 0212-03-058 | SH 30 NAVASOTA RIVER RELIEF #1 - BRBrazos · Bryan | 6 of 12 | $39,562,405 | $30,209,876FLUOR ENTERPRISES, INC. | +31.0% |
| Nov 4, 2026 | 0262-01-034 | FM 485 - W and E of FM 979 - FY 27Milam · Bryan | 4 of 7 | $12,020,138 | $9,787,627BIG CREEK CONSTRUCTION, LTD. | +22.8% |
| Nov 4, 2026 | 1017-03-040 | FM 35 Repair and WidenHunt · Paris | 7 of 9 | $7,795,159 | $6,803,596HIGHWAY 19 CONSTRUCTION LLC | +14.6% |
| Nov 4, 2026 | 0016-03-125 | IH 35 from Comal C/L to Marshall St.Hays · Austin | 4 of 6 | $3,586,449 | $2,797,454BOBCAT SERVICES, INC. | +28.2% |
| Nov 4, 2026 | 0157-04-058 | SB US 277 S Y IN HASKELL TO JONES COUNTYHaskell · Abilene | 8 of 9 | $8,617,318 | $6,732,215LONE STAR PAVING COMPANY | +28.0% |
| Nov 4, 2026 | 0074-06-256 | NuecesIH37RRBridgeRemovalNueces · Corpus Christi | 4 of 4 | $2,604,587 | $849,655RELMCO, INC. | +206.5% |
| Nov 4, 2026 | 6502-80-001 | Flexible Pvmt. Structure Repair 09 1026Ellis · Dallas | 4 of 7 | $1,378,476 | $1,246,988AUSTIN BRIDGE & ROAD SERVIC… | +10.5% |
| Nov 3, 2026 | 6510-37-001 | MCLENNAN - FY27 BASE FAILURE REPAIRMcLennan · Waco | 1 of 4 | $2,172,910 | $2,172,910 | Won |
| Nov 3, 2026 | 6510-38-001 | GATESVILLE AO - FY27 BASE FAILURE REPAIRCoryell · Waco | 2 of 4 | $1,306,690 | $1,146,275BIG CREEK CONSTRUCTION, LTD. | +14.0% |
| Nov 3, 2026 | 0008-02-078 | US 180: AT COOL JCTParker · Fort Worth | 2 of 8 | $495,404 | $494,986JAY MILLS CONTRACTING, INCO… | +0.1% |
| Nov 3, 2026 | 0616-01-020 | TPWD Lake Corpus ChristiSan Patricio · Corpus Christi | 7 of 7 | $967,550 | $470,959LCR TOTAL TRANSPORT LLC | +105.4% |
| Oct 22, 2026 | 6509-81-001 | Carthage Hot Mix FY 27Panola · Atlanta | 2 of 2 | $443,000 | $405,480LONGVIEW ASPHALT, INC. | +9.3% |
| Oct 22, 2026 | 6510-97-001 | HMA COMANCHE 2026Comanche · Brownwood | 3 of 3 | $577,420 | $410,000BIG CREEK CONSTRUCTION, LTD. | +40.8% |
| Oct 14, 2026 | 6493-19-001 | Flexible Pavement Str Repair 771 26-27Dallas · Dallas | 1 of 7 | $622,508 | $622,508 | Won |
| Oct 7, 2026 | 0200-01-093 | US 69_N of FM 841 to W of FM 1475-IOIAngelina · Lufkin | 2 of 7 | $33,279,215 | $31,796,270LONGVIEW BRIDGE AND ROAD, L… | +4.7% |
| Oct 7, 2026 | 0014-23-041 | RER | IH 35W | IH 35E | Johnson CL SBHill · Waco | 4 of 5 | $11,377,697 | $10,903,496NORTHEASTERN PAVERS, LLC | +4.3% |
| Oct 7, 2026 | 6504-96-001 | FY27, Flexible Pavement, Erath, etc.Erath · Fort Worth | 2 of 3 | $3,196,523 | $2,461,750NORTHEASTERN PAVERS, LLC | +29.8% |
| Oct 6, 2026 | 1122-01-034 | FM791 Karnes RefMk 526 to FM887 JunctionKarnes · Corpus Christi | 4 of 7 | $19,385,747 | $17,798,655CK NEWBERRY, LLC | +8.9% |
| Oct 6, 2026 | 2502-01-024 | WNF | IH 14 | IH 35Bell · Waco | 4 of 6 | $23,644,285 | $22,052,184BIG CREEK CONSTRUCTION, LTD. | +7.2% |
| Oct 6, 2026 | 0387-01-016 | FM 75 FROM MONTE CARLO BLVD TO-38701016Collin · Dallas | 5 of 8 | $6,141,750 | $4,906,593A. K. GILLIS & SONS, LLC | +25.2% |
| Oct 6, 2026 | 0410-02-047 | US 69 3R RehabGrayson · Paris | 3 of 7 | $10,429,217 | $9,878,022HIGHWAY 19 CONSTRUCTION LLC | +5.6% |
| Oct 6, 2026 | 1414-03-043 | FM 1462 - W of Troon Dr to BS 35-CBrazoria · Houston | 2 of 2 | $1,021,617 | $974,716DURWOOD GREENE CONSTRUCTION… | +4.8% |
| Sep 30, 2026 | 6506-32-001 | Nacogdoches Callout Mill & InlayNacogdoches · Lufkin | 1 of 2 | $1,161,503 | $1,161,503 | Won |
| Sep 29, 2026 | 6509-58-001 | 6509-58-001 Hot Mix Karnes MaintKarnes · Corpus Christi | 1 of 3 | $760,500 | $760,500 | Won |
| Sep 9, 2026 | 6502-08-001 | FY'26 Pothole RepairKaufman · Dallas | 5 of 6 | $995,000 | $301,500THOMAS 11 DEVELOPMENT LLC | +230.0% |
| Sep 3, 2026 | 1479-01-028 | SL 1604: 1479-01-028: SFTBexar · San Antonio | 2 of 6 | $3,578,661 | $3,445,215HUNTER INDUSTRIES, LTD. | +3.9% |
| Sep 3, 2026 | 0573-02-008 | SH 304 from Bastrop CL to 3.2 mi S of CLCaldwell · Austin | 2 of 8 | $5,481,873 | $5,111,478HUNTER INDUSTRIES, LTD. | +7.2% |
| Sep 3, 2026 | 0902-39-050 | PW within Possum Kingdom State ParkPalo Pinto · Fort Worth | 5 of 7 | $670,589 | $411,979JAY MILLS CONTRACTING, INCO… | +62.8% |
| Sep 2, 2026 | 0549-02-038 | SH 121 Intersection Improvements 2Fannin · Paris | 3 of 4 | $2,300,327 | $1,979,905HIGHWAY 19 CONSTRUCTION LLC | +16.2% |
| Sep 2, 2026 | 0337-03-020 | FM 1331 - W of FM 619 to Milam C/LWilliamson · Austin | 3 of 4 | $2,561,546 | $2,174,856LONE STAR PAVING COMPANY | +17.8% |
| Sep 2, 2026 | 6496-52-001 | FY 27 West Hot Mix Cold-LaidBlanco · Austin | 3 of 4 | $3,242,500 | $2,803,000BRAUNTEX MATERIALS, INC. | +15.7% |
| Sep 2, 2026 | 6496-53-001 | FY 27 East Hot Mix Cold-LaidHays · Austin | 4 of 4 | $2,583,500 | $2,219,000BRAUNTEX MATERIALS, INC. | +16.4% |
| Sep 2, 2026 | 0173-04-063 | SH 34 at Abner RdKaufman · Dallas | 3 of 7 | $1,146,566 | $960,753AUSTIN BRIDGE & ROAD SERVIC… | +19.3% |
| Aug 20, 2026 | 6504-83-001 | FY27, Flexible Pavement, ParkerParker · Fort Worth | 2 of 7 | $872,845 | $718,746NORTHEASTERN PAVERS, LLC | +21.4% |
| Aug 18, 2026 | 6505-11-001 | 6505-11-001 Corpus Christi Hot MixNueces · Corpus Christi | 2 of 2 | $696,425 | $673,575ANDERSON COLUMBIA CO., INC. | +3.4% |
| Aug 12, 2026 | 6488-39-001 | Flexible Pavement Repair Denton CO FY 26Denton · Dallas | 3 of 7 | $693,844 | $662,133FOUTSCO PAVING COMPANY, LLC | +4.8% |
| Aug 12, 2026 | 6496-74-001 | Flexible Pavement Str Repair 0826Navarro · Dallas | 1 of 4 | $955,633 | $955,633 | Won |
| Aug 12, 2026 | 6499-31-001 | Flexible Pavement 2933 08.2026Collin · Dallas | 2 of 6 | $533,525 | $501,227FOUTSCO PAVING COMPANY, LLC | +6.4% |
| Aug 6, 2026 | 0252-03-056 | US 281 at PR 1Blanco · Austin | 3 of 7 | $2,985,836 | $2,419,095HUNTER INDUSTRIES, LTD. | +23.4% |
| Aug 6, 2026 | 1197-01-027 | RM 150 - SE of Darden Hill to RM 1826Hays · Austin | 4 of 7 | $3,760,934 | $3,441,590STX CIVIL | +9.3% |
| Aug 6, 2026 | 0363-03-061 | SH 121 FR from Hickory Dr. to Hickory DrTarrant · Fort Worth | 3 of 5 | $3,346,231 | $3,202,525FOUTSCO PAVING COMPANY, LLC | +4.5% |
| Aug 6, 2026 | 0500-03-664 | IH 45 FR OL: N of BNSF RR to CaninoHarris · Houston | 2 of 5 | $5,374,049 | $5,092,365MBN ENTERPRISES LLC | +5.5% |
| Aug 6, 2026 | 0364-05-043 | SH 183; SH 157 to Bear Creek BlvdTarrant · Fort Worth | 2 of 4 | $709,404 | $698,181FOUTSCO PAVING COMPANY, LLC | +1.6% |
| Aug 6, 2026 | 0114-10-102 | US 290WB F: FM 1155 T: Waller CL -RER 26Washington · Bryan | 4 of 6 | $5,033,419 | $4,287,440BIG CREEK CONSTRUCTION, LTD. | +17.4% |
| Aug 6, 2026 | 6503-26-001 | FY27 - Bryan AO Mill & Inlay - 08Brazos · Bryan | 4 of 4 | $1,119,130 | $987,331BIG CREEK CONSTRUCTION, LTD. | +13.3% |
| Aug 5, 2026 | 6505-22-001 | OVERLAY EASTLAND COUNTYEastland · Brownwood | 6 of 9 | $3,397,666 | $2,982,235BLACKSMITH VENTURES LLC | +13.9% |
| Aug 5, 2026 | 0991-02-014 | FM 81 Karnes 181 to 1144 rehabKarnes · Corpus Christi | 3 of 9 | $8,995,570 | $8,343,314CLARK CONSTRUCTION OF TEXAS… | +7.8% |
| Aug 5, 2026 | 0186-03-071 | SH 36 F: S of SH 21 T: CR 122 -IOI FY 26Burleson · Bryan | 3 of 6 | $5,449,952 | $4,987,865BIG CREEK CONSTRUCTION, LTD. | +9.3% |
| Aug 5, 2026 | 0276-07-035 | US 57:0276-07-035; OVFrio · San Antonio | 5 of 6 | $8,993,047 | $7,430,847CLARK CONSTRUCTION OF TEXAS… | +21.0% |
| Aug 5, 2026 | 0784-02-011 | FM 1131-(FM 2246-FM 105) OVERLAYJasper · Beaumont | 1 of 1 | $3,276,381 | $3,276,381 | Won |
| Aug 5, 2026 | 1023-01-039 | 2023 HSIP CURVE (FM 563) CHEVRONS, RSChambers · Beaumont | 3 of 3 | $2,903,388 | $2,499,687HAYDEN PAVING, INC. | +16.2% |
| Aug 5, 2026 | 0150-02-043 | SH 29 from SH 71 to Zula Rd.Llano · Austin | 2 of 6 | $2,482,786 | $2,462,865BIG CREEK CONSTRUCTION, LTD. | +0.8% |
| Aug 5, 2026 | 0114-02-112 | US 290 at FM 973Travis · Austin | 2 of 6 | $8,910,812 | $8,579,439JOE BLAND CONSTRUCTION LLC | +3.9% |
| Aug 5, 2026 | 0173-04-059 | SH 34 IH 20 EB to N of SH 243Kaufman · Dallas | 3 of 7 | $6,831,267 | $6,242,701BIG CREEK CONSTRUCTION, LTD. | +9.4% |
| Aug 4, 2026 | 6497-80-001 | 2026-08 Nacogdoches Mill & Inlay (North)Nacogdoches · Lufkin | 3 of 3 | $669,105 | $593,777DREWERY CONSTRUCTION COMPAN… | +12.7% |
| Aug 4, 2026 | 6499-56-001 | 2026-08 Mill & Inlay (South)Angelina · Lufkin | 1 of 3 | $845,925 | $845,925 | Won |
| Jul 21, 2026 | 6502-52-001 | 6502-52-001 Mill and OverlayNueces · Corpus Christi | 1 of 4 | $609,237 | $609,237 | Won |
| Jul 15, 2026 | 6503-91-001 | FY26 Brenham AO TY B Gr 5 - 07Washington · Bryan | 3 of 5 | $125,000 | $115,500TOUCHSTONE RESOURCES, LLC | +8.2% |
| Jul 15, 2026 | 6505-27-001 | HOT-MIX (MAT ONLY) SAN SABA COUNTYSan Saba · Brownwood | 4 of 4 | $240,700 | $178,980BIG CREEK CONSTRUCTION, LTD. | +34.5% |
| Jul 14, 2026 | 6503-82-001 | FY26 Milam HMA - 07Milam · Bryan | 3 of 3 | $403,450 | $372,300LONE STAR PAVING COMPANY | +8.4% |
| Jul 8, 2026 | 6498-28-001 | FPSR 07 08.26Collin · Dallas | 2 of 4 | $780,970 | $710,406JAGOE-PUBLIC COMPANY | +9.9% |
| Jul 8, 2026 | 6478-82-001 | FY 26 Flex Pave RepairRockwall · Dallas | 1 of 4 | $1,174,732 | $1,174,732 | Won |
| Jul 2, 2026 | 1421-01-027 | FM 1413-2020 HSIP (STFO, MILLED E/L RS)Liberty · Beaumont | 2 of 3 | $5,663,447 | $5,657,771DURWOOD GREENE CONSTRUCTION… | +0.1% |
| Jul 2, 2026 | 0265-03-054 | SH 71 from Stephen Austin Blvd to SH 21Bastrop · Austin | 3 of 5 | $1,265,101 | $1,095,804E-Z BEL CONSTRUCTION, LLC | +15.4% |
| Jul 2, 2026 | 0508-02-140 | IH 10 WB FR(SH 99-FM 565)REPAIR & OVERLAChambers · Beaumont | 3 of 3 | $3,405,302 | $3,332,075DURWOOD GREENE CONSTRUCTION… | +2.2% |
| Jul 2, 2026 | 0625-01-001 | Rehab EX RD | FT PARKER STATE PARK |Limestone · Waco | 2 of 6 | $1,878,858 | $1,849,328BIG CREEK CONSTRUCTION, LTD. | +1.6% |
| Jul 2, 2026 | 0028-04-084 | US 90 (FM 2830-FM 770 NORTH) OVERLAYLiberty · Beaumont | 1 of 3 | $1,939,953 | $1,939,953 | Won |
| Jul 2, 2026 | 0019-01-153 | SH 171; Willingham St to FM 1718Johnson · Fort Worth | 2 of 7 | $2,032,483 | $1,879,034NORTHEASTERN PAVERS, LLC | +8.2% |
| Jul 2, 2026 | 6498-12-001 | Hot Mix - Hill and BosqueHill · Waco | 2 of 3 | $1,930,746 | $1,864,225BIG CREEK CONSTRUCTION, LTD. | +3.6% |
| Jul 2, 2026 | 6498-13-001 | Hot Mix - McLennan and LimestoneMcLennan · Waco | 2 of 3 | $1,970,663 | $1,955,438BIG CREEK CONSTRUCTION, LTD. | +0.8% |
| Jul 2, 2026 | 6500-17-001 | SS136 RehabilitationJefferson · Beaumont | 1 of 2 | $3,199,771 | $3,199,771 | Won |
| Jul 2, 2026 | 0091-06-061 | SH 289 from SL 12 to IH 635Dallas · Dallas | 4 of 6 | $6,557,916 | $5,963,495FOUTSCO PAVING COMPANY, LLC | +10.0% |
| Jul 1, 2026 | 1194-02-020 | FM 943-(S/POLK C/L-FM1003)BASE REPAIR,OVHardin · Beaumont | 2 of 3 | $7,235,078 | $6,974,719DURWOOD GREENE CONSTRUCTION… | +3.7% |
| Jul 1, 2026 | 1392-03-017 | FM 1461 from CR 123 to Franklin BranchCollin · Dallas | 8 of 9 | $5,656,574 | $4,381,938JAGOE-PUBLIC COMPANY | +29.1% |
| Jul 1, 2026 | 0786-01-095 | FM 364-(IH 10-SH124)ADD CLTLJefferson · Beaumont | 4 of 4 | $7,456,711 | $6,391,809ELITE CONTRACTORS AND EQUIP… | +16.7% |
| Jul 1, 2026 | 0015-09-208 | IH 35SB FROM INNER LP TO WESTINGHOUSE RDWilliamson · Austin | 4 of 5 | $3,869,101 | $2,920,576DAN WILLIAMS COMPANY | +32.5% |
| Jul 1, 2026 | 0013-10-098 | BUS 287 Fr Bailey Boswell To Bonds RanchTarrant · Fort Worth | 3 of 7 | $9,657,482 | $8,547,147JAGOE-PUBLIC COMPANY | +13.0% |
| Jul 1, 2026 | 0540-03-039 | FM 974 F: FM 2776 T: south - FY 27Brazos · Bryan | 5 of 8 | $5,400,124 | $3,771,592BIG CREEK CONSTRUCTION, LTD. | +43.2% |
| Jul 1, 2026 | 0143-01-068 | US 87: 0143-01-068; OVBexar · San Antonio | 1 of 8 | $2,314,232 | $2,314,232 | Won |
| Jul 1, 2026 | 0088-02-063 | US 59 Goliad Fort St to SH 239 RehabGoliad · Corpus Christi | 5 of 7 | $2,719,166 | $2,132,369HUNTER INDUSTRIES, LTD. | +27.5% |
| Jul 1, 2026 | 6498-75-001 | Hot Mix - Bell and FallsBell · Waco | 1 of 4 | $1,302,581 | $1,302,581 | Won |
| Jul 1, 2026 | 6498-77-001 | Hot Mix - Coryell and HamiltonCoryell · Waco | 3 of 4 | $1,301,086 | $1,194,788BIG CREEK CONSTRUCTION, LTD. | +8.9% |
| Jul 1, 2026 | 6501-35-001 | MMC Superpave Hot Mix For Wood Co FY 27Wood · Tyler | 2 of 2 | $2,311,100 | $2,206,460LONGVIEW ASPHALT, INC. | +4.7% |
| Jul 1, 2026 | 6502-01-001 | FY27, Flexible Pavement, N. TarrantTarrant · Fort Worth | 5 of 6 | $7,065,720 | $6,134,750JAGOE-PUBLIC COMPANY | +15.2% |
| Jul 1, 2026 | 6503-24-001 | FY27 - Brenham AO Mill & Inlay - 07Washington · Bryan | 5 of 5 | $1,399,700 | $1,091,717BRAZOS PAVING, INC. | +28.2% |
| Jun 23, 2026 | 6499-85-001 | IH 10 EB FR Base Repair and OverlayChambers · Beaumont | 1 of 2 | $570,461 | $570,461 | Won |
| Jun 17, 2026 | 6500-28-001 | TSA FY2026 REHAB PARKING LOTBexar · San Antonio | 1 of 3 | $195,795 | $195,795 | Won |
| Jun 17, 2026 | 6503-31-001 | DG Hot Mix Asphalt; South Tarrant CountyTarrant · Fort Worth | 1 of 4 | $546,100 | $546,100 | Won |
| Jun 10, 2026 | 6499-84-001 | FM 2090 Base Repair and OverlayLiberty · Beaumont | 3 of 3 | $889,163 | $726,406CORNERSTONE PAVING AND CONS… | +22.4% |
| Jun 10, 2026 | 6500-04-001 | Hot Mix Material 09 0426Ellis · Dallas | 2 of 2 | $562,800 | $550,000BIG CREEK CONSTRUCTION, LTD. | +2.3% |
| Jun 10, 2026 | 6502-36-001 | FY26 Robertson Hot Mix - 06Robertson · Bryan | 5 of 5 | $422,017 | $330,664BIG CREEK CONSTRUCTION, LTD. | +27.6% |
| Jun 9, 2026 | 6502-35-001 | FY26 Burleson Hot Mix - 06Burleson · Bryan | 3 of 5 | $222,950 | $212,600BIG CREEK CONSTRUCTION, LTD. | +4.9% |
| Jun 3, 2026 | 0337-01-053 | SH 29- W of Wolf Ranch Pkwy to IH35Williamson · Austin | 4 of 6 | $8,501,704 | $7,574,102DAN WILLIAMS COMPANY | +12.2% |
| Jun 3, 2026 | 1601-02-036 | FM 1884; Fr South of Fleet St to EOSMParker · Fort Worth | 7 of 7 | $8,096,057 | $5,970,810NORTHEASTERN PAVERS, LLC | +35.6% |
| Jun 3, 2026 | 1683-01-040 | FM 1640: SS 529 to W of FM 2218Fort Bend · Houston | 5 of 5 | $3,620,628 | $3,065,936DURWOOD GREENE CONSTRUCTION… | +18.1% |
| Jun 3, 2026 | 1068-03-025 | SS 341; From Bolliger Blvd to Scott St.Tarrant · Fort Worth | 5 of 8 | $1,723,696 | $1,490,461NORTHEASTERN PAVERS, LLC | +15.6% |
| Jun 3, 2026 | 0065-08-173 | SS 380-(THREADNEEDLE-JIM GILLIG WAY)FDCRJefferson · Beaumont | 1 of 4 | $4,771,697 | $4,771,697 | Won |
| Jun 2, 2026 | 0216-03-034 | FM 466: 0216-03-034; IOIGuadalupe · San Antonio | 6 of 7 | $3,362,927 | $2,728,902HUNTER INDUSTRIES, LTD. | +23.2% |
| Jun 2, 2026 | 0274-02-032 | US 183 MILLS C/L TO LOMETALampasas · Brownwood | 7 of 9 | $5,265,485 | $4,510,688BIG CREEK CONSTRUCTION, LTD. | +16.7% |
| Jun 2, 2026 | 0261-01-053 | US 67 from Dallas CL to BUS 287QEllis · Dallas | 3 of 6 | $5,629,460 | $5,325,296FOUTSCO PAVING COMPANY, LLC | +5.7% |
| Jun 2, 2026 | 1179-02-041 | FM 920; From College St to RWMHParker · Fort Worth | 7 of 9 | $9,977,577 | $8,486,108FOUTSCO PAVING COMPANY, LLC | +17.6% |
| Jun 2, 2026 | 0581-02-162 | SL12 SS 408 to West Fork Trinity RiverDallas · Dallas | 3 of 4 | $20,590,186 | $19,588,668AUSTIN BRIDGE & ROAD SERVIC… | +5.1% |
| Jun 2, 2026 | 0019-01-146 | SH 174; Wicker Hill to Elk DrJohnson · Fort Worth | 6 of 8 | $21,835,404 | $19,812,334REYES TX, INC. | +10.2% |
| Jun 2, 2026 | 0050-12-002 | BU 290-L, Fry Rd. to US 290 OverlayHarris · Houston | 3 of 4 | $827,247 | $733,755CORNERSTONE PAVING AND CONS… | +12.7% |
| Jun 2, 2026 | 0190-05-078 | US 69, N of IH 20 & S of IH 20 FRTGSmith · Tyler | 2 of 5 | $2,421,064 | $2,362,671ICOS MANAGEMENT, LLC | +2.5% |
| Jun 2, 2026 | 6500-39-001 | MILL & INLAY SOUTH FY 27Henderson · Tyler | 2 of 5 | $1,031,348 | $977,218BIG CREEK CONSTRUCTION, LTD. | +5.5% |
| Jun 2, 2026 | 6500-40-001 | SMITH COUNTY SMA FY 27Smith · Tyler | 1 of 6 | $5,091,894 | $5,091,894 | Won |
| Jun 2, 2026 | 6500-41-001 | MILL & INLAY IH 20 FY 27Gregg · Tyler | 2 of 5 | $2,677,394 | $2,670,044DREWERY CONSTRUCTION COMPAN… | +0.3% |
| May 20, 2026 | 6500-18-001 | DG Hot Mix Asphalt; North Tarrant CountyTarrant · Fort Worth | 3 of 4 | $1,019,925 | $784,000EUROVIA ATLANTIC COAST LLC | +30.1% |
| May 19, 2026 | 6500-64-001 | 6500-64-001 Hot Mix Goliad MaintGoliad · Corpus Christi | 1 of 3 | $514,500 | $514,500 | Won |
| May 19, 2026 | 6501-16-001 | 6501-16-001 Hot Mix RefugioRefugio · Corpus Christi | 1 of 3 | $439,500 | $439,500 | Won |
| May 19, 2026 | 6501-87-001 | 6501-87-001 HMCL George West MaintJim Wells · Corpus Christi | 2 of 3 | $299,250 | $297,000BRAUNTEX MATERIALS, INC. | +0.8% |
| May 19, 2026 | 6501-88-001 | 6501-88-001 HMCL Refugio, etc.Refugio · Corpus Christi | 2 of 3 | $488,400 | $468,600BRAUNTEX MATERIALS, INC. | +4.2% |
| May 13, 2026 | 6495-92-001 | Asphalt Repair FY 26-2Hays · Austin | 2 of 3 | $1,127,750 | $890,314LONE STAR PAVING COMPANY | +26.7% |
| May 12, 2026 | 6491-33-001 | IH 10 EB FRChambers · Beaumont | 1 of 3 | $566,129 | $566,129 | Won |
| May 11, 2026 | 6495-94-001 | US 59 Hillje Truck Stop Accel/Decel LaneWharton · Yoakum | 2 of 2 | $1,028,683 | $933,297HUNTER INDUSTRIES, LTD. | +10.2% |
| May 7, 2026 | 0018-01-102 | IH35 NB/SBML Mill/InlayLa Salle · Laredo | 2 of 4 | $25,131,233 | $24,814,865HUNTER INDUSTRIES, LTD. | +1.3% |
| May 7, 2026 | 6488-81-001 | FY26 - Calvert Mill & InlayRobertson · Bryan | 4 of 5 | $2,791,424 | $2,266,508LONE STAR PAVING COMPANY | +23.2% |
| May 7, 2026 | 6497-67-001 | SH347 REHABILITATIONJefferson · Beaumont | 1 of 2 | $1,059,849 | $1,059,849 | Won |
| May 7, 2026 | 0110-01-052 | SH 75 at FM 2296 - FY 25Walker · Bryan | 4 of 5 | $3,481,776 | $2,980,129BIG CREEK CONSTRUCTION, LTD. | +16.8% |
| May 7, 2026 | 0138-06-049 | US 259_SH 204 to FM 698 - OVNacogdoches · Lufkin | 2 of 6 | $3,012,914 | $2,886,840MADDEN CONTRACTING COMPANY,… | +4.4% |
| May 7, 2026 | 0073-02-092 | SS 536: 0073-02-092: OVBexar · San Antonio | 4 of 7 | $1,383,694 | $1,105,677H. L. ZUMWALT CONSTRUCTION,… | +25.1% |
| May 7, 2026 | 3256-02-121 | SL 8(N): Hardy St to Aldine WestfieldHarris · Houston | 2 of 5 | $2,276,558 | $2,254,486ENVIRONMENTAL ALLIES, INC. | +1.0% |
| May 7, 2026 | 0176-01-116 | US 59_NAC CITY LIMITS TO ANGELINA RIVERNacogdoches · Lufkin | 1 of 3 | $5,689,159 | $5,689,159 | Won |
| May 6, 2026 | 0389-02-059 | SH 146 (@ IH10-DUAL TURN LANES NB)Chambers · Beaumont | 3 of 6 | $4,430,314 | $4,355,659R CONSTRUCTION CIVIL, LLC | +1.7% |
| May 6, 2026 | 0883-02-095 | BMT_FM0105_1(2023 HSIP)INCREASE SUPEROrange · Beaumont | 1 of 1 | $220,723 | $220,723 | Won |
| May 6, 2026 | 0151-02-026 | SH 29 from RM 1174 to WILLIAMSON CO LINEBurnet · Austin | 1 of 8 | $10,910,072 | $10,910,072 | Won |
| May 6, 2026 | 6500-78-001 | MMC HMA Henderson CoHenderson · Tyler | 2 of 2 | $1,754,300 | $1,561,000BIG CREEK CONSTRUCTION, LTD. | +12.4% |
| May 6, 2026 | 0915-00-313 | VA: 0915-00-313: SC PrepBexar · San Antonio | 2 of 5 | $4,498,593 | $4,426,974CLARK CONSTRUCTION OF TEXAS… | +1.6% |
| May 6, 2026 | 1186-02-028 | FM 969 from Utley Rd to Howard LnBastrop · Austin | 3 of 8 | $3,293,758 | $3,189,429HUNTER INDUSTRIES, LTD. | +3.3% |
| May 6, 2026 | 0177-14-038 | SL 494, Via Principale to Royal CrossingMontgomery · Houston | 3 of 6 | $5,837,449 | $5,153,278DURWOOD GREENE CONSTRUCTION… | +13.3% |
| May 6, 2026 | 0209-01-076 | OV | US 77 | FM 3148 | LP 340McLennan · Waco | 2 of 4 | $6,777,497 | $5,957,588BIG CREEK CONSTRUCTION, LTD. | +13.8% |
| May 6, 2026 | 1410-01-026 | FM 1456 REHABILITATE ROADWAY HSIP 2605Austin · Yoakum | 6 of 8 | $3,126,638 | $2,587,895BIG CREEK CONSTRUCTION, LTD. | +20.8% |
| May 6, 2026 | 0747-05-042 | FM 157; US 67 TO 8TH ST.Johnson · Fort Worth | 4 of 6 | $20,392,887 | $17,138,491ED BELL CONSTRUCTION COMPANY | +19.0% |
| May 6, 2026 | 0601-01-067 | SH 326(US 69-S/FM 1293)REHABHardin · Beaumont | 1 of 5 | $1,527,727 | $1,527,727 | Won |
| Apr 28, 2026 | 6498-50-001 | 2026-04 San Jacinto HMASan Jacinto · Lufkin | 1 of 2 | $636,750 | $636,750 | Won |
| Apr 28, 2026 | 6498-51-001 | 2026-04 Nacogdoches HMANacogdoches · Lufkin | 2 of 2 | $920,000 | $880,050LONGVIEW ASPHALT, INC. | +4.5% |
| Apr 22, 2026 | 6499-92-001 | HOT-MIX (MAT-ONLY) BROWN 2026Brown · Brownwood | 2 of 3 | $232,050 | $202,600BIG CREEK CONSTRUCTION, LTD. | +14.5% |
| Apr 16, 2026 | 6499-98-001 | Hot Mix - Rains CO FY26Rains · Paris | 4 of 4 | $798,885 | $609,315RK HALL, LLC | +31.1% |
| Apr 16, 2026 | 6500-13-001 | Hot Mix - Hunt 26Hunt · Paris | 6 of 6 | $841,770 | $617,190RK HALL, LLC | +36.4% |
| Apr 14, 2026 | 6500-30-001 | 6500-30-001 Hot Mix BeevilleBee · Corpus Christi | 2 of 4 | $609,000 | $607,250BOBCAT MATERIALS LLC | +0.3% |
| Apr 8, 2026 | 1745-01-020 | FM 1887, SH 159 to FM 359Waller · Houston | 4 of 5 | $1,475,385 | $1,140,623KNIFE RIVER CORPORATION - S… | +29.3% |
| Apr 8, 2026 | 1016-04-021 | FM 548 from SH 276 to SH 205Rockwall · Dallas | 7 of 7 | $4,080,971 | $3,381,745ICOS MANAGEMENT, LLC | +20.7% |
| Apr 8, 2026 | 6489-29-001 | Flexible Pvmt. Structure Repair 09 0326Ellis · Dallas | 5 of 7 | $1,290,938 | $1,143,764KNIFE RIVER CORPORATION - S… | +12.9% |
| Apr 8, 2026 | 0683-05-017 | RM 12 - US 290 to Travis C/LHays · Austin | 4 of 6 | $11,881,405 | $10,020,820DEAN WORD COMPANY, LTD. | +18.6% |
| Apr 8, 2026 | 0114-10-108 | US 290 F: FM 577 T: FM 1155 - FY 26Washington · Bryan | 3 of 7 | $6,985,960 | $6,537,278DURWOOD GREENE CONSTRUCTION… | +6.9% |
| Apr 8, 2026 | 0094-02-147 | SH 10 from West Park Dr to SH 183Tarrant · Fort Worth | 7 of 7 | $8,041,491 | $5,358,724EUROVIA ATLANTIC COAST LLC | +50.1% |
| Apr 8, 2026 | 0197-02-138 | US175 Malloy Bridge RD to Kaufman CoDallas · Dallas | 3 of 4 | $4,214,086 | $3,975,784AUSTIN BRIDGE & ROAD SERVIC… | +6.0% |
| Apr 7, 2026 | 1330-02-052 | FM1187: Old Hwy 1187 to Newt PattersonTarrant · Fort Worth | 5 of 7 | $5,837,015 | $5,395,974JAGOE-PUBLIC COMPANY | +8.2% |
| Apr 7, 2026 | 1062-04-063 | FM 2100: San Jacinto Canal to BU 90UHarris · Houston | 2 of 4 | $1,824,787 | $1,798,696FORDE CONSTRUCTION COMPANY,… | +1.5% |
| Apr 7, 2026 | 0337-02-054 | SH 29 - FM 1660 to SH 95Williamson · Austin | 3 of 4 | $2,689,490 | $2,388,456LONE STAR PAVING COMPANY | +12.6% |
| Apr 7, 2026 | 0016-08-049 | SL 368: 0016-08-049; OVBexar · San Antonio | 2 of 6 | $4,889,951 | $3,947,711CLARK CONSTRUCTION OF TEXAS… | +23.9% |
| Apr 7, 2026 | 6499-43-001 | SMITH CO HOT MIX ASPHALTSmith · Tyler | 1 of 2 | $3,196,200 | $3,196,200 | Won |
| Apr 7, 2026 | 0986-03-015 | FM 619 from FM 1331 to US 79Williamson · Austin | 3 of 4 | $2,033,298 | $1,567,487LONE STAR PAVING COMPANY | +29.7% |
| Mar 24, 2026 | 6494-68-001 | Hot Mix - DeWitt (Materials Only)De Witt · Yoakum | 2 of 4 | $957,000 | $936,000BRAUNTEX MATERIALS, INC. | +2.2% |
| Mar 24, 2026 | 6494-69-001 | Hot Mix - Lavaca (Materials Only)Lavaca · Yoakum | 2 of 5 | $951,625 | $943,000BRAUNTEX MATERIALS, INC. | +0.9% |
| Mar 24, 2026 | 6494-71-001 | Hot Mix CL - Lavaca (Materials Only)Lavaca · Yoakum | 1 of 5 | $430,000 | $430,000 | Won |
| Mar 24, 2026 | 6494-72-001 | Hot Mix - Gonzales (Materials Only)Gonzales · Yoakum | 2 of 4 | $885,500 | $862,500BRAUNTEX MATERIALS, INC. | +2.7% |
| Mar 24, 2026 | 6494-73-001 | Hot Mix CL - Gonzales (Materials Only)Gonzales · Yoakum | 2 of 4 | $422,500 | $405,000BRAUNTEX MATERIALS, INC. | +4.3% |
| Mar 24, 2026 | 6494-74-001 | Hot Mix - Fayette (Materials Only)Fayette · Yoakum | 1 of 5 | $1,036,750 | $1,036,750 | Won |
| Mar 24, 2026 | 6494-75-001 | Hot Mix CL - Fayette (Materials Only)Fayette · Yoakum | 1 of 5 | $436,250 | $436,250 | Won |
| Mar 24, 2026 | 6498-46-001 | HOT-MIX (MAT ONLY) LAMP COUNTYLampasas · Brownwood | 3 of 3 | $250,500 | $193,750BIG CREEK CONSTRUCTION, LTD. | +29.3% |
| Mar 24, 2026 | 6494-67-001 | Aggregate - YAO (Materials Only)Fayette · Yoakum | 4 of 5 | $680,000 | $552,000BRAUNTEX MATERIALS, INC. | +23.2% |
| Mar 5, 2026 | 3544-04-011 | SH 211: 3544-04-011: OVBexar · San Antonio | 2 of 8 | $2,535,515 | $2,498,078BOBCAT SERVICES, INC. | +1.5% |
| Mar 5, 2026 | 0932-02-059 | BMT_FM0365_1 (2022 HSIP) PAVED SHOULDERSJefferson · Beaumont | 2 of 3 | $1,317,468 | $1,134,406CORNERSTONE PAVING AND CONS… | +16.1% |
| Mar 5, 2026 | 3545-02-013 | FM 110 - IH 35 to SH 123Hays · Austin | 7 of 7 | $2,082,765 | $1,570,963DEAN WORD COMPANY, LTD. | +32.6% |
| Mar 5, 2026 | 0009-02-076 | SH 78 From Cameron/Tenison to Tenison DrDallas · Dallas | 3 of 5 | $1,195,484 | $1,098,618PALMER HALL CONSTRUCTION | +8.8% |
| Mar 5, 2026 | 6491-05-001 | FY26 - Robertson SH 6 Mill & InlayRobertson · Bryan | 1 of 7 | $2,329,117 | $2,329,117 | Won |
| Mar 4, 2026 | 0237-05-047 | 0237-05, SH44 REHABDuval · Laredo | 4 of 5 | $23,806,134 | $18,216,991HUNTER INDUSTRIES, LTD. | +30.7% |
| Mar 4, 2026 | 0253-03-078 | US 281:0253-03-078; OVComal · San Antonio | 1 of 6 | $5,825,981 | $5,825,981 | Won |
| Mar 4, 2026 | 2883-01-004 | FM 2790:2883-01-004; RERMedina · San Antonio | 5 of 9 | $13,360,412 | $11,778,114DEAN WORD COMPANY, LTD. | +13.4% |
| Mar 4, 2026 | 0978-02-084 | FM 517, SH 146 to FM 646Galveston · Houston | 5 of 7 | $3,980,762 | $3,316,075ELITE KINGS CONSTRUCTION, L… | +20.0% |
| Mar 4, 2026 | 0542-06-053 | US59LiveOakFM1359-McMullenOVLive Oak · Corpus Christi | 5 of 5 | $6,074,611 | $5,311,274HUNTER INDUSTRIES, LTD. | +14.4% |
| Mar 4, 2026 | 0724-02-024 | BR Repl | @ CHILDRESS CRK |(STR #014)Bosque · Waco | 2 of 4 | $15,106,911 | $14,455,829KNIFE RIVER CORPORATION - S… | +4.5% |
| Mar 4, 2026 | 1776-02-021 | FM 2001 - Satterwhite Rd to SH 21Hays · Austin | 6 of 7 | $2,316,972 | $1,788,338LONE STAR PAVING COMPANY | +29.6% |
| Mar 4, 2026 | 0421-02-034 | SH 173: 0421-02-034; OVMedina · San Antonio | 4 of 11 | $1,658,279 | $1,524,647CLARK CONSTRUCTION OF TEXAS… | +8.8% |
| Feb 17, 2026 | 6494-52-001 | Hot Mix CL-Colorado Co. (Materials Only)Colorado · Yoakum | 5 of 5 | $485,000 | $417,500BRAUNTEX MATERIALS, INC. | +16.2% |
| Feb 17, 2026 | 6494-44-001 | Hot Mix - Wharton Co. (Materials Only)Wharton · Yoakum | 3 of 4 | $1,058,875 | $962,125QUALITY HOT MIX, INC. | +10.1% |
| Feb 17, 2026 | 6494-46-001 | Hot Mix - Austin Co. (Materials Only)Austin · Yoakum | 4 of 4 | $1,021,250 | $967,500QUALITY HOT MIX, INC. | +5.6% |
| Feb 17, 2026 | 6494-49-001 | Hot Mix - Matagorda (Materials Only)Matagorda · Yoakum | 4 of 4 | $1,155,000 | $955,500QUALITY HOT MIX, INC. | +20.9% |
| Feb 17, 2026 | 6494-50-001 | Hot Mix CL - Matagorda (Materials Only)Matagorda · Yoakum | 5 of 5 | $287,500 | $235,000QUALITY HOT MIX, INC. | +22.3% |
| Feb 17, 2026 | 6494-51-001 | Hot Mix-Colorado Co (Materials Only)Colorado · Yoakum | 2 of 4 | $913,000 | $880,000BRAUNTEX MATERIALS, INC. | +3.8% |
| Feb 11, 2026 | 6492-71-001 | HMAC (Matls Only)06 0226Kaufman · Dallas | 1 of 1 | $352,000 | $352,000 | Won |
| Feb 5, 2026 | 1755-03-010 | FM 3405 from Ronald Reagan to GT HeightsWilliamson · Austin | 4 of 9 | $2,967,185 | $2,760,448AARON CONCRETE CONTRACTORS,… | +7.5% |
| Feb 5, 2026 | 0976-01-047 | FM 865, IH 610 to Almeda Genoa RdHarris · Houston | 3 of 5 | $4,348,846 | $4,112,543ENVIRONMENTAL ALLIES, INC. | +5.7% |
| Feb 5, 2026 | 0366-02-096 | SH 123: 0366-02-096: RERGuadalupe · San Antonio | 5 of 7 | $4,575,196 | $4,323,419CLARK CONSTRUCTION OF TEXAS… | +5.8% |
| Feb 5, 2026 | 0446-06-018 | FM 1093 BRIDGE REPLACEMENT 2610Austin · Yoakum | 10 of 12 | $6,507,892 | $4,981,962R CONSTRUCTION CIVIL, LLC | +30.6% |
| Feb 5, 2026 | 0338-12-011 | SH 105-(US 59-SH 321) FDBR, OVERLAYLiberty · Beaumont | 4 of 5 | $2,983,815 | $2,780,143CORNERSTONE PAVING AND CONS… | +7.3% |
| Feb 5, 2026 | 0048-03-099 | US 77 from US 287 to IH 35EEllis · Dallas | 3 of 7 | $5,881,236 | $5,401,081PEACHTREE CONSTRUCTION, LTD. | +8.9% |
| Feb 5, 2026 | 6494-87-001 | MILL AND INLAY (SOUTH)Brown · Brownwood | 4 of 6 | $1,262,638 | $1,025,505ALLEN KELLER COMPANY | +23.1% |
| Feb 5, 2026 | 0057-05-033 | US 84 at FM 489 - Turn Lanes FY 26Freestone · Bryan | 4 of 5 | $1,842,052 | $1,716,130BIG CREEK CONSTRUCTION, LTD. | +7.3% |
| Feb 5, 2026 | 0026-06-033 | US 90 BRIDGE REPLACEMENT 2304-1Colorado · Yoakum | 11 of 14 | $5,228,647 | $3,715,521R CONSTRUCTION CIVIL, LLC | +40.7% |
| Feb 5, 2026 | 0902-39-048 | TPWD VARIOUS; PK FISH HATCHERYPalo Pinto · Fort Worth | 2 of 7 | $373,520 | $324,932JAGOE-PUBLIC COMPANY | +15.0% |
| Feb 4, 2026 | 2921-01-010 | SS 394 From IH 35E to FM 877Ellis · Dallas | 5 of 11 | $22,915,256 | $18,932,077MARIO SINACOLA & SONS EXCAV… | +21.0% |
| Feb 4, 2026 | 3047-02-012 | FM 529, Brazos River to FM 362Waller · Houston | 3 of 7 | $3,912,977 | $3,274,774DURWOOD GREENE CONSTRUCTION… | +19.5% |
| Feb 4, 2026 | 0920-03-080 | Village Creek Park Resurfacing (PR 74)Hardin · Beaumont | 1 of 2 | $190,948 | $190,948 | Won |
| Feb 4, 2026 | 0250-02-051 | US 281; IH 20 to UPRRPalo Pinto · Fort Worth | 1 of 8 | $2,945,709 | $2,945,709 | Won |
| Feb 4, 2026 | 0176-04-088 | US 59_N of Piney Crk to Ang C/L - PFCPolk · Lufkin | 1 of 3 | $8,993,704 | $8,993,704 | Won |
| Feb 4, 2026 | 0015-11-075 | SL 275 - Braker Ln to Morrow StTravis · Austin | 4 of 5 | $2,853,777 | $2,185,903ALLEN KELLER COMPANY | +30.6% |
| Feb 4, 2026 | 0017-09-106 | IH 35: 0017-09-106; OVBexar · San Antonio | 2 of 4 | $15,980,512 | $15,028,560LONE STAR PAVING COMPANY | +6.3% |
| Feb 4, 2026 | 0495-03-068 | IH20,FM17-FM16Van Zandt · Tyler | 3 of 6 | $6,409,703 | $6,229,536AUSTIN BRIDGE & ROAD SERVIC… | +2.9% |
| Feb 4, 2026 | 0150-05-051 | SH 29 - E of PR 4 to W of RM 3509Burnet · Austin | 3 of 6 | $3,146,609 | $2,897,632LONE STAR PAVING COMPANY | +8.6% |
| Jan 14, 2026 | 6492-20-001 | Coryell,etc. - Base RepairCoryell · Waco | 3 of 3 | $822,499 | $555,360BIG CREEK CONSTRUCTION, LTD. | +48.1% |
| Jan 14, 2026 | 6491-79-001 | McLennan - Base RepairMcLennan · Waco | 1 of 3 | $669,246 | $669,246 | Won |
| Jan 14, 2026 | 6491-80-001 | Hill AO - Base RepairHill · Waco | 2 of 3 | $839,775 | $734,700BIG CREEK CONSTRUCTION, LTD. | +14.3% |
| Jan 14, 2026 | 6489-61-001 | Asphalt 01 0126Navarro · Dallas | 3 of 3 | $571,390 | $527,900KNIFE RIVER CORPORATION - S… | +8.2% |
| Jan 14, 2026 | 6493-72-001 | Hot Mix - Bell and CoryellBell · Waco | 3 of 4 | $801,432 | $761,450BIG CREEK CONSTRUCTION, LTD. | +5.3% |
| Jan 14, 2026 | 6492-19-001 | BELL - BASE REPAIRBell · Waco | 2 of 3 | $555,046 | $527,000BIG CREEK CONSTRUCTION, LTD. | +5.3% |
| Jan 7, 2026 | 0177-03-109 | US 59 NB FR(SL 573[S]-DUDLEY ST) OVERLAYLiberty · Beaumont | 4 of 4 | $1,203,609 | $859,788CORNERSTONE PAVING AND CONS… | +40.0% |
| Jan 7, 2026 | 0271-16-169 | IH 610 EBFR, IH 45 to SH 288Harris · Houston | 4 of 4 | $3,441,029 | $2,017,346ELITE KINGS CONSTRUCTION, L… | +70.6% |
| Jan 7, 2026 | 6494-27-001 | FY26 BASE REPAIR KERRVILLE AOKerr · San Antonio | 2 of 4 | $2,059,601 | $1,989,197CLARK CONSTRUCTION OF TEXAS… | +3.5% |
| Jan 7, 2026 | 6491-85-001 | Hot Mix - Falls and LimestoneFalls · Waco | 2 of 3 | $1,701,240 | $1,531,500BIG CREEK CONSTRUCTION, LTD. | +11.1% |
| Jan 7, 2026 | 0890-05-009 | FM 3309, SL 256 - SH 155Anderson · Tyler | 5 of 5 | $2,325,258 | $1,861,683BAKER & COMPANY CONSTRUCTIO… | +24.9% |
| Jan 7, 2026 | 6494-40-001 | FY2026 BASE REPAIR FOR BEXAR METRO AOBexar · San Antonio | 3 of 5 | $1,699,998 | $1,555,323CLARK CONSTRUCTION OF TEXAS… | +9.3% |
| Jan 7, 2026 | 6494-43-001 | FY2026 BASE REPAIR FOR HONDO AOFrio · San Antonio | 2 of 6 | $2,019,751 | $1,957,502CLARK CONSTRUCTION OF TEXAS… | +3.2% |
| Jan 7, 2026 | 0817-01-035 | FM 428 W FM 2931 to E FM 2931Denton · Dallas | 5 of 5 | $2,486,178 | $1,537,357QUALITY EXCAVATION, LLC | +61.7% |
| Jan 6, 2026 | 3516-01-020 | FM 3325; FROM IH 20 to FM 1886Parker · Fort Worth | 8 of 9 | $7,446,927 | $6,252,903NORTHEASTERN PAVERS, LLC | +19.1% |
| Jan 6, 2026 | 0178-02-090 | SH 35: FM 518 to BS 35C NorthBrazoria · Houston | 2 of 4 | $9,159,789 | $8,773,976DURWOOD GREENE CONSTRUCTION… | +4.4% |
| Jan 6, 2026 | 0190-03-089 | SH 37, CR 2460-CR 2302Wood · Tyler | 2 of 8 | $4,498,998 | $4,058,410BAKER & COMPANY CONSTRUCTIO… | +10.9% |
| Jan 6, 2026 | 0211-06-068 | REHABILITATE ROADWAY 2709Fayette · Yoakum | 6 of 6 | $5,081,903 | $4,335,114HUNTER INDUSTRIES, LTD. | +17.2% |
| Jan 6, 2026 | 1259-02-022 | FM 1097, SH 75 to Walker C/LMontgomery · Houston | 6 of 7 | $6,912,395 | $4,872,185DURWOOD GREENE CONSTRUCTION… | +41.9% |
| Jan 6, 2026 | 0502-01-239 | SH 225 Mainlanes: SL 8 to Miller Cut OffHarris · Houston | 1 of 6 | $22,200,382 | $22,200,382 | Won |
| Jan 6, 2026 | 6491-83-001 | Hot Mix - McLennan & Hill countyMcLennan · Waco | 2 of 3 | $2,915,908 | $2,710,700BIG CREEK CONSTRUCTION, LTD. | +7.6% |
| Jan 6, 2026 | 6494-41-001 | FY2026 BASE REPAIR FOR NORTH BEXAR AOBexar · San Antonio | 1 of 4 | $1,616,344 | $1,616,344 | Won |
| Jan 6, 2026 | 6494-42-001 | FY2026 BASE REPAIR FOR NEW BRAUNFELS AOWilson · San Antonio | 1 of 5 | $1,893,846 | $1,893,846 | Won |
| Jan 6, 2026 | 0542-01-100 | 0542-01, US59 OVWebb · Laredo | 2 of 4 | $16,699,465 | $16,415,512ANDERSON COLUMBIA CO., INC. | +1.7% |
| Jan 6, 2026 | 6493-71-001 | Hot Mix - Bosque and HamiltonBosque · Waco | 4 of 4 | $1,618,529 | $1,416,100BIG CREEK CONSTRUCTION, LTD. | +14.3% |
| Jan 6, 2026 | 0054-06-114 | US 67/377 Overlay From FM2524 to US 377Brown · Brownwood | 2 of 6 | $2,526,673 | $1,931,829BIG CREEK CONSTRUCTION, LTD. | +30.8% |
| Jan 6, 2026 | 0492-04-047 | FM 756, SL 323 - GRANDE BLVDSmith · Tyler | 4 of 4 | $4,002,219 | $3,056,756DREWERY CONSTRUCTION COMPAN… | +30.9% |
| Jan 6, 2026 | 6492-14-001 | FLEXIBLE PAV STR REPAIR - EAST DALLASDallas · Dallas | 5 of 5 | $2,435,125 | $2,016,811PEACHTREE CONSTRUCTION, LTD. | +20.7% |
| Dec 22, 2025 | 6493-90-001 | 2025-12 Trinity HMATrinity · Lufkin | 1 of 2 | $419,100 | $419,100 | Won |
| Dec 17, 2025 | 6495-27-001 | FY 26 BAO Hot MixJefferson · Beaumont | 2 of 2 | $907,800 | $856,500AMERICAN MATERIALS, INC. | +6.0% |
| Dec 17, 2025 | 6495-28-001 | FY 26 OAO Hot MixOrange · Beaumont | 1 of 1 | $919,700 | $919,700 | Won |
| Dec 17, 2025 | 6495-32-001 | FY 26 LAO Hot MixLiberty · Beaumont | 1 of 2 | $458,000 | $458,000 | Won |
| Dec 3, 2025 | 0322-01-052 | SH 95 - US 290 to S of FM 2336Bastrop · Austin | 4 of 6 | $2,346,074 | $2,047,396LONE STAR PAVING COMPANY | +14.6% |
| Dec 3, 2025 | 0508-01-400 | IH 10 FR - Waco to McCartyHarris · Houston | 2 of 3 | $3,170,869 | $2,868,252ENVIRONMENTAL ALLIES, INC. | +10.6% |
| Dec 3, 2025 | 0152-03-065 | US 183 North of CR 309Caldwell · Austin | 1 of 7 | $1,543,699 | $1,543,699 | Won |
| Dec 3, 2025 | 2682-01-024 | FM 2555 from SH 22 to West Park RowNavarro · Dallas | 1 of 7 | $1,627,075 | $1,627,075 | Won |
| Dec 3, 2025 | 1014-04-018 | FM 1777 at CR 677 to SH 66Collin · Dallas | 6 of 7 | $7,352,658 | $5,803,762D. L. LENNON INCORPORATED -… | +26.7% |
| Dec 2, 2025 | 0244-09-014 | FM 2799(FM 777-US 96)MILL,OV,SAFETY UPGRJasper · Beaumont | 1 of 2 | $1,374,926 | $1,374,926 | Won |
| Dec 2, 2025 | 1122-04-017 | FM 1344: 1122-04-017; RERWilson · San Antonio | 5 of 8 | $12,215,933 | $9,689,291HUNTER INDUSTRIES, LTD. | +26.1% |
| Dec 2, 2025 | 0574-02-023 | FM 636 CR 4668/Morgan Sp to SH 31(4mile)Navarro · Dallas | 5 of 7 | $7,442,012 | $6,087,367BIG CREEK CONSTRUCTION, LTD. | +22.3% |
| Dec 2, 2025 | 0833-13-014 | FM 2039 AT PORTER CREEK - BRBurleson · Bryan | 6 of 9 | $2,782,468 | $2,315,333LARRY YOUNG PAVING, INC. | +20.2% |
| Dec 2, 2025 | 0912-70-098 | VA, Resurface PR 138 in Sheldon Lake SPHarris · Houston | 3 of 5 | $1,820,826 | $1,740,088CORNERSTONE PAVING AND CONS… | +4.6% |
| Dec 2, 2025 | 0135-02-075 | US 380 at Baylor Scott and White DrCollin · Dallas | 4 of 6 | $2,267,381 | $1,800,680AUSTIN BRIDGE & ROAD SERVIC… | +25.9% |
| Dec 2, 2025 | 2150-04-099 | FM 1472 Right_Left_TurnLaneWebb · Laredo | 2 of 3 | $4,293,150 | $3,866,338ANDERSON COLUMBIA CO., INC. | +11.0% |
| Nov 20, 2025 | 6491-97-001 | 2025-11 San Augustine HMASan Augustine · Lufkin | 1 of 1 | $695,641 | $695,641 | Won |
| Nov 20, 2025 | 6491-99-001 | 2025-11 Shelby HMAShelby · Lufkin | 1 of 1 | $724,255 | $724,255 | Won |
| Nov 20, 2025 | 6492-00-001 | 2025-11 Polk HMAPolk · Lufkin | 1 of 1 | $583,920 | $583,920 | Won |
| Nov 20, 2025 | 6492-01-001 | 2025-11 Houston HMAHouston · Lufkin | 1 of 2 | $667,785 | $667,785 | Won |
| Nov 19, 2025 | 6489-89-001 | FY2026 - Hot Mix - JohnsonJohnson · Fort Worth | 2 of 2 | $999,900 | $910,250NORTHEASTERN PAVERS, LLC | +9.8% |
| Nov 12, 2025 | 6488-06-001 | HOT-MIX COLD-LAID-MATERIAL ONLYBell · Waco | 1 of 3 | $642,838 | $642,838 | Won |
| Nov 6, 2025 | 1978-01-058 | FM 1938; FM 1709 TO STARNES RDTarrant · Fort Worth | 7 of 9 | $12,986,232 | $9,907,252RAGLE CONSTRUCTION, INC. | +31.1% |
| Nov 6, 2025 | 0805-04-038 | RM 3237 at Lone Man Mountain Rd.Hays · Austin | 2 of 7 | $2,153,984 | $1,989,311DEAN WORD COMPANY, LTD. | +8.3% |
| Nov 6, 2025 | 0028-04-083 | US 90(TRINITY RVR BR-E /SH 146)MILL & OVLiberty · Beaumont | 3 of 4 | $4,152,068 | $4,088,177CORNERSTONE PAVING AND CONS… | +1.6% |
| Nov 6, 2025 | 0117-05-063 | SH 21 E of IH 45 - TWLT FY 26Madison · Bryan | 5 of 8 | $2,638,161 | $2,014,433BIG CREEK CONSTRUCTION, LTD. | +31.0% |
| Nov 6, 2025 | 0108-01-030 | SH19,US80-IH20,SP2Van Zandt · Tyler | 7 of 9 | $14,086,787 | $11,187,838BIG CREEK CONSTRUCTION, LTD. | +25.9% |
| Nov 5, 2025 | 0273-04-045 | US 183 from SH 138 to N of CR 254Williamson · Austin | 2 of 8 | $14,682,822 | $14,639,581JOE BLAND CONSTRUCTION LLC | +0.3% |
| Nov 5, 2025 | 0334-01-048 | GTA0-FM 112 from CR438 to FM 486Williamson · Austin | 7 of 10 | $5,213,821 | $4,482,347POSILLICO CIVIL, INC. | +16.3% |
| Nov 5, 2025 | 0315-06-047 | SH 105 AT JACKSON CREEK - BRWashington · Bryan | 5 of 12 | $3,383,936 | $2,813,308LARRY YOUNG PAVING, INC. | +20.3% |
| Nov 5, 2025 | 0495-01-082 | SS 557 from US 80 to IH 20Kaufman · Dallas | 2 of 8 | $8,577,278 | $8,281,477O. TREVINO CONSTRUCTION, LLC | +3.6% |
| Nov 5, 2025 | 0028-06-091 | US 90 EB -(FM 365-4mi EAST)FULL D REPAIRJefferson · Beaumont | 1 of 5 | $3,143,022 | $3,143,022 | Won |
| Nov 5, 2025 | 6491-57-001 | Superpave HMA - Anderson Co.Anderson · Tyler | 2 of 2 | $1,576,800 | $1,572,500BIG CREEK CONSTRUCTION, LTD. | +0.3% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.