‹ All TxDOT jobs My Jobs
Intersection & Operational Imprv
OfficialClear Creek to FM 518
- Let date
- Wednesday, December 2, 2026
- Bids open
- Dec 2, 2026 1:00 PM
- District
- Houston
- County
- GalvestonMontgomery
- Highway
- FM 1488IH 45
- Type of work
- Install Noise Barrier
- Project number
- F 2027(003)
- CSJs
- 0500-04-145, 0523-09-024
- Design standard
- NA - Not Applicable
- Let type
- Statewide Let
- Bid type
- Low Bid
- Length
- 0.28 mi
- MPO
- Houston-Galveston Area Council of Government
- Project ID
- A00216075
- Added
- Nov 6, 2026
Bid items 36
Notice Averages Review estimate Draft from history Excel HCSS HeavyBid CSV| Seq | Bid code | Description | Quantity | Unit | |
|---|---|---|---|---|---|
| CSJ 0500-04-145 · 24 items | |||||
| 2 | |||||
| 2 | |||||
| 1 | 100-7002 | PREPARING ROWPREPARING RIGHT OF WAY | 16.1 | STA | |
| 2 | 100-7004 | PREP ROW (TREE REMOVE) (12"-24" DIA)PREPARING RIGHT OF WAY | 10 | EA | |
| 3 | 100-7005 | PREP ROW (TREE REMOVE) (24"-36" DIA)PREPARING RIGHT OF WAY | 8 | EA | |
| 4 | 100-7006 | PREP ROW (TREE REMOVE) (36"-48" DIA)PREPARING RIGHT OF WAY | 1 | EA | |
| 5 | 100-7013 | TREE PROTECTION (INSTALL)PREPARING RIGHT OF WAY | 5 | EA | |
| 6 | 100-7015 | TREE PROTECTION (REMOVE)PREPARING RIGHT OF WAY | 5 | EA | |
| 8 | 132-7004 | EMBANK (FNL)(DC)(TY B)EMBANKMENT | 50 | CY | |
| 9 | 161-7008 | EROSION CONTROL COMPOST (VEH)COMPOST | 144.9 | CY | |
| 10 | 162-7002 | BLOCK SODDINGSODDING FOR EROSION CONTROL | 2,417 | SY | |
| 11 | 168-7001 | VEGETATIVE WATERING | 66.94 | TGL | |
| 12 | 416-7005 | DRILL SHAFT (30 IN)DRILLED SHAFT FOUNDATIONS | 3,179.5 | LF | |
| 14 | 419-7007 | SOUND WALL (WAVE SCHEME)CONCRETE SOUND (NOISE) WALLS | 21,540 | SF | |
| 15 | 427-7002 | CONCRETE PAINT FINISHSURFACE FINISHES FOR CONCRETE | 43,080 | SF | |
| 16 | 432-7005 | RIPRAP (CONC)(CL B)RIPRAP | 149.7 | CY | |
| 18 | 500-7001 | MOBILIZATION | 1 | LS | |
| 19 | 502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING | 14 | MO | |
| 20 | 505-7001 | TMA (STATIONARY)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) | 4 | DAY | |
| 21 | 506-7020 | CONSTRUCTION EXITS (INSTALL) (TY 1)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 111.11 | SY | |
| 22 | 506-7024 | CONSTRUCTION EXITS (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 111.11 | SY | |
| 23 | 506-7034 | CONSTRUCTION PERIMETER FENCETEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 585 | LF | |
| 24 | 506-7039 | TEMP SEDMT CONT FENCE (INSTALL)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 730 | LF | |
| 25 | 506-7041 | TEMP SEDMT CONT FENCE (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 730 | LF | |
| CSJ 0523-09-024 · 12 items | |||||
| 1 | 100-7002 | PREPARING ROWPREPARING RIGHT OF WAY | 4.5 | STA | |
| 7 | 110-7001 | EXCAV (ROADWAY)EXCAVATION | 440 | CY | |
| 12 | 416-7005 | DRILL SHAFT (30 IN)DRILLED SHAFT FOUNDATIONS | 630 | LF | |
| 13 | 419-7006 | SOUND WALL (VERT SCHEME)CONCRETE SOUND (NOISE) WALLS | 4,000 | SF | |
| 16 | 432-7005 | RIPRAP (CONC)(CL B)RIPRAP | 96.3 | CY | |
| 17 | 479-7002 | ADJUSTING INLETSADJUSTING MANHOLES AND INLETS | 3 | EA | |
| 21 | 506-7020 | CONSTRUCTION EXITS (INSTALL) (TY 1)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 140 | SY | |
| 22 | 506-7024 | CONSTRUCTION EXITS (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 140 | SY | |
| 24 | 506-7039 | TEMP SEDMT CONT FENCE (INSTALL)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 473 | LF | |
| 25 | 506-7041 | TEMP SEDMT CONT FENCE (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 473 | LF | |
| 26 | 550-7001 | CHAIN LINK FENCE (INSTALL) (6')CHAIN LINK FENCE | 225 | LF | |
| 27 | 550-7007 | CHAIN LINK FENCE (REMOVE)CHAIN LINK FENCE | 225 | LF | |
Pre-bid questions 7
Sound Wall Panel Configuration Nov 9, 2026
Q: Would TxDOT allow the following alternate panel configurations for the 12'-0" and 14'-0" sound walls?
**12'-0" Sound Wall:**
- Bottom Panel: 4'-0" – Fractured Fin
- Middle Panel: 3'-8" – Wave
- Top Panel: 4'-0" – Smooth
- Coping: 4"
**14'-0" Sound Wall:**
- Bottom Panel: 4'-0" – Fractured Fin
- Middle Panel: 5'-8" – Wave
- Top Panel: 4'-0" – Smooth
- Coping: 4"
The proposed configurations maintain the overall specified wall heights of 12'-0" and 14'-0", respectively, including the 4" coping allowance.
Please confirm whether these alternate panel configurations are acceptable while maintaining the specified aesthetic finishes.
A: There will be no additions or revisions to the design. · Jasmine Pipkins
CTD Schedule Nov 9, 2026
Q: Please provide the CTD Schedule.
A: See Contract Time Determination Schedule attached. · Jasmine Pipkins
CTD Schedule Nov 10, 2026
Q: There is not file or link attached here. Please provide the attachment.
Thank you.
A: Please see attachment for the CTD schedule file. Use the following link: https://ftp.dot.state.tx.us/pub/txdot-info/Pre-Letting%20Responses/Houston%20District/Construction%20Projects/2026/12%20December%202026/ · Jasmine Pipkins
ROW LIMITS Nov 11, 2026
Q: Referring to Plan Sheet 107 at the FM 1488 location, no right-of-way (ROW) limits are shown. Could you please clarify the limits of the area available for construction equipment movement and access?
A: The ROW on the south side of the project is shown, just not annotated. It has the same line style (two dots and a dash _.._..) as the ROW line on the north side of the ROW. Additionally, both north and south sides of the ROW are annotated on Sheet 108 which shows the area adjacent to Sheet 107. · Jasmine Pipkins
SOUNDWALL DETAILS Nov 11, 2026
Q: Referencing soundwall details sheet 48, TYPICAL SECTION Bottom of page. 4' minimum Thickened Portion with rebar. That's a panel not concrete cast in place? Plan sheet 50 seems to show panels only. Please confirm is this the correct intent.
A: Under the "Precast Concrete Segments" in the plan notes on sheet 48, it states that the wall may be cast monolithically with the column. · Jasmine Pipkins
Permanent Fence Removal & Replacement IH-45 Location Nov 23, 2026
Q: At the IH-45 Sound Wall 2 location, there is a wooden fence that runs along the proposed location of the sound wall from Wendy's to behind Discount Tire. There is also a chain link fence that runs from the wooden fence to the pump station. The pay item for permanent fencing removal and replacement appears to only include the chain link fence at the FM 1488 location. Can you confirm whether the permanent fencing at the IH 45 location gets removed and replaced and if so, what bid item/items will it be paid under?
A: The existing wooden and chain link fences along IH 45 Sound Wall 2 will not be replaced. The removal will be covered under bid item 100-7002 (Preparing ROW). · Jasmine Pipkins
Soundwall Finish Nov 23, 2026
Q: On the Tree Trunk wall - sheet 125 Notes state "Provide bush concrete or Ashlar stone #12020 texture for residential side of the sound wall". This is also stated on sheet 127, top right section view. However on sheet 107 & 108 top right section view it shows "Ashlar Stone". Please confirm brush finish is allowed, which is typical on these walls in the past.
A: The standard states “Unless otherwise shown in plans, provide brush concrete or ashlar stone.” Since the signed sound wall plan and profile sheets specify ashlar stone, the intention is to use the ashlar stone. Thanks. · Jasmine Pipkins
From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.