CCSJ 0252-01-084

Austin · Burnet Sign up free

‹ All TxDOT jobs My Jobs

Intersection & Operational Imprv

Official

AT RM 1431 to .

Let date
Tuesday, December 1, 2026
Bids open
Dec 1, 2026 1:00 PM
District
Austin
County
Burnet
Highway
US 281
Type of work
Intersection Improvement
Project number
F 2027(169)
Design standard
3R - Non-Freeway Rehabilitation
Let type
Statewide Let
Bid type
Low Bid
Length
0.18 mi
MPO
Capital Area Metropolitan Planning Organization
Project ID
A00064014
Added
Nov 6, 2026
SeqBid codeDescriptionQuantityUnitAvg low price
5
5
5
5
5
1 100-7002 PREPARING ROWPREPARING RIGHT OF WAY 17.34STA $6,072.92
2 104-7006 REMOV CONC (RIPRAP)REMOVING CONCRETE 12SY $14.32
3 104-7011 REMOV CONC (DRIVEWAYS)REMOVING CONCRETE 188SY $19.70
4 104-7013 REMOV CONC (SIDEWALK, RAMP OR SUP)REMOVING CONCRETE 496SY $17.88
5 104-7017 REMOV CONC (CURB & GUTTER)REMOVING CONCRETE 2,352LF $8.04
6 104-7023 REMOV CONC (FOUNDATIONS)REMOVING CONCRETE 695SY $17.48
7 104-7041 REMOV CONC (FLUME)REMOVING CONCRETE 6SY $18.83
8 105-7005 RMV (5"-9") TRT/UNTRT BASE & ASPH PAVREMOVING TREATED AND UNTREATED BASE AND ASPHALT PAVEMENT 2,079SY $4.05
9 105-7014 RMV (14"-18") TRT/UNTRT BASE & ASPH PAVREMOVING TREATED AND UNTREATED BASE AND ASPHALT PAVEMENT 12,473SY $9.39
10 110-7001 EXCAV (ROADWAY)EXCAVATION 2,162CY $11.68
11 132-7003 EMBANK (FNL)(OC)(TY B)EMBANKMENT 740CY $16.96
12 160-7002 FURN & PLACE TOPSOIL (4")TOPSOIL 1,923SY $1.43
13 162-7002 BLOCK SODDINGSODDING FOR EROSION CONTROL 1,923SY $4.39
14 168-7001 VEGETATIVE WATERING 34TGL $8.43
15 169-7002 SOIL RET BLKT(SL_MOD_CLAY_LONG)SOIL RETENTION BLANKETS 1,923SY $1.49
16 216-7001 PROOF ROLLING 40HR $127.71
17 276-7100 CM TRT(PT MX)(CL N)(TY A)(GR 5)(FN POS)CEMENT TREATMENT (PLANT-MIXED) 146CY $137.95
18 316-7071 ASPH (AC-15P, AC-20-5TR OR AC-20XP)SEAL COAT 52GAL $3.42
19 341-7040 D-GR HMA TY-C PG76-22 (EXEMPT)DENSE-GRADED HOT-MIX ASPHALT 208TON $158.71
20 341-7064 D-GR HMA TY-D PG 64-22 (EXEMPT)DENSE-GRADED HOT-MIX ASPHALT 44TON $152.88
21 347-7001 TOM-C PG76-22 SAC-ATHIN OVERLAY MIXTURES (TOM) 25TON $169.86
22 360-7004 CONC PVMT (CRCP) (10")CONCRETE PAVEMENT 979SY $87.39
23 360-7078 CONC PVMT (CRCP)(FAST TRK) (14")CONCRETE PAVEMENT 885SY
24 400-7008 CUT & RESTORE ASPH PAVINGEXCAVATION AND BACKFILL FOR STRUCTURES 227SY $140.13
25 402-7001 TRENCH EXCAVATION PROTECTION 716LF $5.96
26 403-7001 TEMPORARY SPL SHORINGTEMPORARY SPECIAL SHORING 1,000SF $25.56
27 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN)DRILLED SHAFT FOUNDATIONS 8LF $270.84
28 416-7044 DRILL SHAFT (TRF SIG POLE) (36 IN)DRILLED SHAFT FOUNDATIONS 13LF $440.28
29 416-7046 DRILL SHAFT (TRF SIG POLE) (48 IN)DRILLED SHAFT FOUNDATIONS 44LF $680.57
30 420-7008 CL A CONC (COLLAR)CONCRETE SUBSTRUCTURES 3EA $1,528.24
31 432-7005 RIPRAP (CONC)(CL B)RIPRAP 32CY $556.52
32 432-7007 RIPRAP (CONC) (CL B) (4 IN)RIPRAP 1CY $564.22
33 432-7038 RIPRAP (STONE COMMON)(GROUT)(12 IN)RIPRAP 30CY $270.40
34 450-7044 RAIL (TY PR11)RAILING 120LF $131.50
35 462-7085 CONC BOX CULV (9 FT X 8 FT)(EXTEND)CONCRETE BOX CULVERTS AND DRAINS 58LF $1,335.71
36 464-7003 RC PIPE (CL III)(18 IN)REINFORCED CONCRETE PIPE 662LF $83.08
37 464-7005 RC PIPE (CL III)(24 IN)REINFORCED CONCRETE PIPE 12LF $108.34
38 465-7005 JCTBOX(COMPL)(PJB)(3FTX3FT)JUNCTION BOXES, MANHOLES, AND INLETS 2EA $6,177.72
39 465-7014 INLET (COMPL)(PCO)(3FT)(LEFT)JUNCTION BOXES, MANHOLES, AND INLETS 1EA $8,573.78
40 465-7015 INLET (COMPL)(PCO)(3FT)(RIGHT)JUNCTION BOXES, MANHOLES, AND INLETS 1EA $8,346.71
41 465-7029 INLET (COMPL)(PCU)(3FT)(NONE)JUNCTION BOXES, MANHOLES, AND INLETS 1EA $7,521.98
42 465-7030 INLET (COMPL)(PCU)(3FT)(LEFT)JUNCTION BOXES, MANHOLES, AND INLETS 1EA $7,640.90
43 465-7031 INLET (COMPL)(PCU)(3FT)(RIGHT)JUNCTION BOXES, MANHOLES, AND INLETS 2EA $7,538.14
44 465-7032 INLET (COMPL)(PCU)(3FT)(BOTH)JUNCTION BOXES, MANHOLES, AND INLETS 1EA $7,587.73
45 465-7036 INLET (COMPL)(PCU)(4FT)(BOTH)JUNCTION BOXES, MANHOLES, AND INLETS 1EA $10,540.03
46 466-7181 WINGWALL (PW - 1) (HW=11 FT)HEADWALLS AND WINGWALLS 1EA $55,052.17
47 474-7021 CAST-IN-PLACE TRENCH DRAINLINEAR DRAINS 25LF $599.12
48 496-7002 REMOV STR (INLET)REMOVING STRUCTURES 1EA $1,291.45
49 496-7005 REMOV STR (WINGWALL)REMOVING STRUCTURES 1EA $1,898.40
50 496-7007 REMOV STR (PIPE)REMOVING STRUCTURES 294LF $23.96
51 500-7001 MOBILIZATION 1LS $523,850.32
52 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING 10MO $11,585.04
53 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN 306DAY $87.82
54 505-7001 TMA (STATIONARY)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) 162DAY $217.57
55 505-7003 TMA (MOBILE OPERATION)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) 3DAY $229.60
56 506-7002 ROCK FILTER DAMS (INSTALL) (TY 2)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 73LF $44.91
57 506-7011 ROCK FILTER DAMS (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 73LF $12.47
58 506-7039 TEMP SEDMT CONT FENCE (INSTALL)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 993LF $3.92
59 506-7041 TEMP SEDMT CONT FENCE (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 993LF $1.02
60 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 250LF $5.23
61 506-7046 BIODEG EROSN CONT LOGS (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 250LF $1.29
62 508-7001 CONSTRUCTING DETOURS 1,221SY $83.58
63 529-7002 CONC CURB (TY II)CONCRETE CURB, GUTTER, AND COMBINED CURB AND GUTTER 69LF $26.45
64 529-7006 CONC CURB (MONO) (TY I)CONCRETE CURB, GUTTER, AND COMBINED CURB AND GUTTER 97LF $13.85
65 529-7007 CONC CURB (MONO) (TY II)CONCRETE CURB, GUTTER, AND COMBINED CURB AND GUTTER 896LF $6.85
66 529-7008 CONC CURB & GUTTER (TY I)CONCRETE CURB, GUTTER, AND COMBINED CURB AND GUTTER 300LF $25.20
67 529-7009 CONC CURB & GUTTER (TY II)CONCRETE CURB, GUTTER, AND COMBINED CURB AND GUTTER 1,249LF $32.57
68 530-7007 DRIVEWAYS (CONC) (HES)INTERSECTIONS, DRIVEWAYS, AND TURNOUTS 1,103SY $122.10
69 531-7002 CONC SIDEWALKS (5")SIDEWALKS 1,128SY $68.80
70 531-7005 CURB RAMPS (TY 1)SIDEWALKS 5EA $2,772.62
71 531-7007 CURB RAMPS (TY 3)SIDEWALKS 1EA $3,389.47
72 531-7011 CURB RAMPS (TY 10)SIDEWALKS 3EA $2,610.01
73 531-7014 CURB RAMPS (TY 22)SIDEWALKS 1EA $4,240.88
74 536-7004 CONC DIRECTIONAL ISLANDCONCRETE MEDIANS AND DIRECTIONAL ISLANDS 54SY $111.05
75 610-7009 REMOVE RD IL ASM (TRANS-BASE)ROADWAY ILLUMINATION POLE ASSEMBLIES 3EA $733.75
76 610-7116 IN RD IL (TY SA) 40S-8 (250W EQ) LEDROADWAY ILLUMINATION POLE ASSEMBLIES 1EA $4,205.33
77 618-7030 CONDT (PVC) (SCH 40) (2")CONDUIT 396LF $13.17
78 618-7031 CONDT (PVC) (SCH 40) (2") (BORE)CONDUIT 18LF $25.51
79 618-7036 CONDT (PVC) (SCH 40) (3")CONDUIT 387LF $15.29
80 618-7037 CONDT (PVC) (SCH 40) (3") (BORE)CONDUIT 588LF $26.79
81 620-7007 ELEC CONDR (NO.8) BAREELECTRICAL CONDUCTORS 1,534LF $1.94
82 620-7008 ELEC CONDR (NO.8) INSULATEDELECTRICAL CONDUCTORS 1,700LF $2.11
83 624-7007 GROUND BOX TY D (162922)GROUND BOXES 1EA $1,420.34
84 624-7008 GROUND BOX TY D (162922)W/APRONGROUND BOXES 3EA $1,715.49
85 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P)SMALL ROADSIDE SIGN ASSEMBLIES 11EA $696.14
86 644-7004 IN SM RD SN SUP&AM TY10BWG(1)SA(T)SMALL ROADSIDE SIGN ASSEMBLIES 5EA $785.93
87 644-7009 IN SM RD SN SUP&AM TY10BWG(1)SB(P)SMALL ROADSIDE SIGN ASSEMBLIES 1EA $778.60
88 644-7012 IN SM RD SN SUP&AM TY10BWG(1)SB(T)SMALL ROADSIDE SIGN ASSEMBLIES 1EA $864.78
89 644-7073 REMOVE SM RD SN SUP&AMSMALL ROADSIDE SIGN ASSEMBLIES 13EA $108.47
90 658-7059 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)DELINEATOR AND OBJECT MARKER ASSEMBLIES 4EA $94.29
91 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY WWORK ZONE PAVEMENT MARKINGS 444EA $1.03
92 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2WORK ZONE PAVEMENT MARKINGS 1,230EA $0.5715
93 666-7018 REFL PAV MRK TY I (W)8"(DOT)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 129LF $1.23
94 666-7024 REFL PAV MRK TY I (W)8"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 1,053LF $0.9489
95 666-7030 REFL PAV MRK TY I (W)12"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 211LF $2.94
96 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 641LF $7.19
97 666-7042 REFL PAV MRK TY I (W)(ARROW)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 10EA $156.95
98 666-7066 REFL PAV MRK TY I (W)(WORD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 10EA $184.78
99 666-7087 REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 4EA $34.28
100 666-7347 PAVEMENT SLER 6"RETROREFLECTORIZED PAVEMENT MARKINGS 4,774LF $0.1841
101 666-7348 PAVEMENT SLER 8"RETROREFLECTORIZED PAVEMENT MARKINGS 1,053LF $0.3318
102 666-7350 PAVEMENT SLER 12"RETROREFLECTORIZED PAVEMENT MARKINGS 211LF $0.6885
103 666-7352 PAVEMENT SLER 24"RETROREFLECTORIZED PAVEMENT MARKINGS 641LF $1.84
104 666-7353 PAVEMENT SLER (ARROW)RETROREFLECTORIZED PAVEMENT MARKINGS 10EA $30.62
105 666-7354 PAVEMENT SLER (WORD)RETROREFLECTORIZED PAVEMENT MARKINGS 10EA $35.94
106 666-7365 PAVEMENT SLER (YLD TRI)RETROREFLECTORIZED PAVEMENT MARKINGS 4EA $11.20
107 666-7408 REFL PAV MRK TY I (W)6"(BRK)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 710LF $0.5627
108 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 602LF $0.4757
109 666-7420 REFL PAV MRK TY I (Y)6"(BRK)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 90LF $0.4829
110 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS 3,294LF $0.4986
111 672-7002 REFL PAV MRKR TY I-CRAISED PAVEMENT MARKERS 90EA $4.04
112 672-7004 REFL PAV MRKR TY II-A-ARAISED PAVEMENT MARKERS 160EA $3.97
113 678-7002 PAV SURF PREP FOR MRK (6")PAVEMENT SURFACE PREPARATION FOR MARKINGS 4,774LF $0.0662
114 678-7004 PAV SURF PREP FOR MRK (8")PAVEMENT SURFACE PREPARATION FOR MARKINGS 1,053LF $0.1162
115 678-7008 PAV SURF PREP FOR MRK (24")PAVEMENT SURFACE PREPARATION FOR MARKINGS 641LF $0.9416
116 678-7009 PAV SURF PREP FOR MRK (ARROW)PAVEMENT SURFACE PREPARATION FOR MARKINGS 10EA $16.69
117 678-7016 PAV SURF PREP FOR MRK (WORD)PAVEMENT SURFACE PREPARATION FOR MARKINGS 10EA $21.20
118 678-7022 PAV SURF PREP FOR MRK (18")(YLD TRI)PAVEMENT SURFACE PREPARATION FOR MARKINGS 4EA $9.74
119 680-7004 REMOVING TRAFFIC SIGNALSHIGHWAY TRAFFIC SIGNALS 1EA $5,086.47
120 682-7001 VEH SIG SEC (12")LED(GRN)VEHICLE AND PEDESTRIAN SIGNAL HEADS 6EA $326.91
121 682-7002 VEH SIG SEC (12")LED(GRN ARW)VEHICLE AND PEDESTRIAN SIGNAL HEADS 6EA $340.77
122 682-7003 VEH SIG SEC (12")LED(YEL)VEHICLE AND PEDESTRIAN SIGNAL HEADS 6EA $325.21
123 682-7004 VEH SIG SEC (12")LED(YEL ARW)VEHICLE AND PEDESTRIAN SIGNAL HEADS 8EA $341.71
124 682-7005 VEH SIG SEC (12")LED(RED)VEHICLE AND PEDESTRIAN SIGNAL HEADS 6EA $328.74
125 682-7006 VEH SIG SEC (12")LED(RED ARW)VEHICLE AND PEDESTRIAN SIGNAL HEADS 6EA $346.18
126 682-7018 PED SIG SEC (LED)(COUNTDOWN)VEHICLE AND PEDESTRIAN SIGNAL HEADS 8EA $800.00
127 682-7039 BACKPLATE W/REFL BRDR(3 SEC)ALUMVEHICLE AND PEDESTRIAN SIGNAL HEADS 10EA $197.13
128 682-7040 BACKPLATE W/REFL BRDR(4 SEC)ALUMVEHICLE AND PEDESTRIAN SIGNAL HEADS 2EA $274.03
129 684-7007 TRF SIG CBL (TY A)(12 AWG)(2 CONDR)TRAFFIC SIGNAL CABLES 1,011LF $2.17
130 684-7031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR)TRAFFIC SIGNAL CABLES 1,892LF $2.96
131 684-7033 TRF SIG CBL (TY A)(14 AWG)(7 CONDR)TRAFFIC SIGNAL CABLES 842LF $3.51
132 686-7043 INS TRF SIG PL AM(S)1 ARM(40')LUMTRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 1EA $16,409.63
133 686-7055 INS TRF SIG PL AM(S)1 ARM(50')LUMTRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 1EA $36,603.13
134 686-7059 INS TRF SIG PL AM(S)1 ARM(55')LUMTRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 1EA $37,709.54
135 687-7001 PED POLE ASSEMBLYPEDESTAL POLE ASSEMBLIES 5EA $2,930.76
136 688-7001 PED DETECT PUSH BUTTON (APS)PEDESTRIAN DETECTORS AND VEHICLE LOOP DETECTORS 8EA $1,056.39
137 688-7003 PED DETECTOR CONTROLLER UNITPEDESTRIAN DETECTORS AND VEHICLE LOOP DETECTORS 1EA $4,184.02
138 690-7001 REMOVAL OF CONDUITMAINTENANCE OF TRAFFIC SIGNALS AND ILLUMINATION 355LF $4.72
139 2003-7001 DECOMPOSED GRANITE 152SY
140 3007-7001 BONDING COURSE 87GAL $3.32
141 4070-7001 PRECAST CONCRETE PAVEMENT PANELS 11,405SY
142 4071-7001 LEAN CONCRETE BASE (LCB) 2,068CY
143 5061-7001 SUBSURFACE UTIL LOCATE (NON-PAVED AREA)SUBSURFACE UTILITY LOCATE 10EA $920.62
144 6005-7001 ITS COM CBL (ETHERNET)NETWORKING INTELLIGENT TRANSPORTATION SYSTEM (ITS) COMMUNICATION CABLE 105LF $2.79
145 6007-7001 BBU SYSTEM (EXTERNAL BATTERY CABINET)BATTERY BACK-UP SYSTEM FOR SIGNAL CABINETS 1EA $9,205.72
146 6017-7001 VDS PROSR SYSMULTI-SENSOR VEHICLE DETECTION SYSTEM FOR SIGNALIZED INTERSECTION 1EA $13,134.89
147 6017-7004 VIVDS CAM ASSY 360MULTI-SENSOR VEHICLE DETECTION SYSTEM FOR SIGNALIZED INTERSECTION 4EA $3,500.00
148 6017-7012 VDS CABLINGMULTI-SENSOR VEHICLE DETECTION SYSTEM FOR SIGNALIZED INTERSECTION 885LF $3.27

Pre-bid questions 3

4070-7001 Precast Conc Panels Nov 16, 2026

Q: The proposed pavement structure is using preccast concrete panels and lean concrete base.
Because of the time limits on working hours, overhead utility lines, and weight of panels this will be very difficult to build. By using preccast panels it will require the contractor to find an off-site yard to create casting beds and storage. Trucking of all panels is required.

Because the placement lean concrete base and setting of panels are two separate operations, what method is advised to ensure there is a solid connection between the two and point loading doesn't occur with the potential for premature cracking.

If the purpose of the project is to save time and money, it appears this will not solve the problem.

The existing pavement structure appears to be sound. Would TXDOT consider providing an alternate design using full depth hotmix to compare both duration and cost if this is the purpose.

A: The overhead utility lines, working hours, should be considered in the contractors means and methods. Given the traffic volumes in this intersection TxDOT has defined hours of operations which we believe will be acceptable during construction. Proposed adjustments may always be proposed based on field conditions but should not be a basis of bid. TxDOT understands Storage Sites and PSLs will be needed and the department is open to allowing use of state right of way where available and can safely be used.

There are very strict tolerances for placement of the lean concrete base to minimize voids and point loading. Underslab grouting is required after the panels are installed to help ensure full contact between the panels and base.

Thank you for sharing your concerns. Please bid as shown in the contract. · William Brudnick

Pavement Structure Nov 16, 2026

Q: Would the engineer reconsider the current pavement structure design of using 10" concrete panels to an alternative pavement design such as the one shown on plan sheet 10 "RM 1431W Proposed Typical Section: 10+75 to 10+82."

A: TxDOT is not considering an alternative pavement design. Please bid the project as shown in the plans. · William Brudnick

Letting Nov 23, 2026

Q: Will the letting of this project be postponed?

A: The Austin District would like to share that we plan to postpone letting for the FM 1431 at US 281 project (CSJ 0252-01-084) currently scheduled for the December letting. Teams are actively working thru various process to finalize this effort.



We hope all of our industry partners have a happy thanksgiving! · William Brudnick

From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.