| 1 | 104-7005 |
REMOV CONC (MOWSTRIP) | 263 | LF |
|
$8.80 |
$8.81 |
$12.00 |
$10.45 |
$10.00 |
$13.50 |
$5.30 |
$100.00 |
| 2 | 104-7008 |
REMOV CONC (MEDIANS) | 319 | SY |
$40.00 |
$20.40 |
$32.40 |
$15.00 |
$37.20 |
$36.00 |
$16.00 |
$30.00 |
$50.00 |
| 3 | 104-7017 |
REMOV CONC (CURB & GUTTER) | 693 | LF |
$20.00 |
$10.70 |
$11.74 |
$6.00 |
$13.50 |
$12.00 |
$12.00 |
$11.00 |
$20.00 |
| 4 | 105-7002 |
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 20,997 | SY |
$10.43 |
$6.80 |
$7.21 |
$15.00 |
$17.05 |
$8.00 |
$11.50 |
$9.00 |
$20.00 |
| 5 | 160-7004 |
FURN & PLACE TOPSOIL (6") | 1,052 | SY |
$25.00 |
$29.00 |
$11.05 |
$13.00 |
$20.45 |
$30.00 |
$20.00 |
$67.00 |
$10.00 |
| 6 | 162-7002 |
BLOCK SODDING | 1,052 | SY |
$8.50 |
$15.50 |
$6.85 |
$8.00 |
$14.25 |
$25.00 |
$7.50 |
$11.00 |
$10.00 |
| 7 | 166-7001 |
FERTILIZER | 0.22 | AC |
$2,000.00 |
$500.00 |
$3,000.00 |
$5,000.00 |
$2,700.00 |
$5,000.00 |
$3,200.00 |
$5,600.00 |
$5,000.00 |
| 8 | 168-7001 |
VEGETATIVE WATERING | 22 | TGL |
$30.00 |
$355.00 |
$175.00 |
$220.00 |
$530.00 |
$225.00 |
$195.00 |
$85.00 |
$50.00 |
| 9 | 316-7007 |
ASPH (AC-20-5TR) | 65,518 | GAL |
|
$5.00 |
$5.00 |
$4.00 |
$5.70 |
$3.15 |
$7.60 |
$7.25 |
$6.00 |
| 10 | 316-7173 |
AGGR (TY-B, GR-4)(SAC-B) | 1,567 | CY |
|
$175.00 |
$175.00 |
$150.00 |
$366.00 |
$50.00 |
$377.00 |
$488.00 |
$250.00 |
| 11 | 341-7046 |
D-GR HMA TY-D PG64-22 (LEVEL-UP) | 500 | TON |
$125.00 |
$154.00 |
$169.05 |
$200.00 |
$296.90 |
$175.00 |
$222.00 |
$185.00 |
$200.00 |
| 12 | 344-7023 |
SP MIXES SP-C PG70-28 | 1,734 | TON |
$185.00 |
$165.30 |
$230.00 |
$115.00 |
$315.50 |
$325.00 |
$255.00 |
$250.00 |
$165.00 |
| 13 | 344-7024 |
SP MIXES SP-C SAC-A PG70-28 | 20,423 | TON |
|
$146.80 |
$150.42 |
$115.00 |
$156.50 |
$195.00 |
$160.00 |
$191.00 |
$170.00 |
| 14 | 346-7028 |
TACK COAT | 1,014 | GAL |
$5.00 |
$50.00 |
$4.00 |
$6.00 |
$10.40 |
$4.00 |
$11.00 |
$4.80 |
$6.00 |
| 15 | 351-7012 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") | 695 | SY |
|
$120.00 |
$180.00 |
$300.00 |
$161.75 |
$140.00 |
$185.00 |
$125.00 |
$150.00 |
| 16 | 354-7081 |
PLANE ASPH CONC PAV (2" TO 4 1/2") | 172,416 | SY |
|
$2.00 |
$2.20 |
$3.50 |
$4.20 |
$3.75 |
$4.20 |
$4.22 |
$5.00 |
| 17 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 72 | CY |
|
$657.00 |
$567.22 |
$1,400.00 |
$671.00 |
$800.00 |
$1,300.00 |
$700.00 |
$550.00 |
| 18 | 438-7009 |
RESIZING AND SEALING JOINTS | 210 | LF |
|
$46.00 |
$46.00 |
$1,000.00 |
$71.00 |
$160.00 |
$40.00 |
$95.00 |
$50.00 |
| 19 | 500-7001 |
MOBILIZATION | 1 | LS |
$1,028,507.92 |
$990,000.00 |
$1,133,262.75 |
$1,175,000.00 |
$515,000.00 |
$1,500,000.00 |
$1,200,000.00 |
$1,297,991.00 |
$1,100,000.00 |
| 20 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 23 | MO |
$10,000.00 |
$58,000.00 |
$45,000.00 |
$15,000.00 |
$15,200.00 |
$10,000.00 |
$27,100.00 |
$33,209.00 |
$12,500.00 |
| 21 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$12,000.00 |
$16,600.00 |
$15,000.00 |
$20,000.00 |
$21,750.00 |
$15,000.00 |
$15,000.00 |
$29,000.00 |
$20,000.00 |
| 22 | 505-7001 |
TMA (STATIONARY) | 550 | DAY |
$200.00 |
$346.00 |
$316.25 |
$350.00 |
$217.00 |
$0.0100 |
$200.00 |
$1,305.00 |
$250.00 |
| 23 | 505-7003 |
TMA (MOBILE OPERATION) | 45 | DAY |
$310.00 |
$675.00 |
$10.00 |
$350.00 |
$1,010.00 |
$0.0100 |
$780.00 |
$1.00 |
$550.00 |
| 24 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 2,495 | LF |
$7.50 |
$4.75 |
$3.95 |
$4.75 |
$4.75 |
$6.00 |
$4.50 |
$9.00 |
$12.00 |
| 25 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,495 | LF |
$3.00 |
$1.10 |
$1.65 |
$2.00 |
$3.00 |
$1.50 |
$1.75 |
$1.70 |
$5.00 |
| 26 | 527-7001 |
COLORED TEXTURED CONC (4") | 6,031 | SY |
$150.00 |
$81.00 |
$158.70 |
$185.00 |
$170.65 |
$180.00 |
$130.00 |
$165.00 |
$150.00 |
| 27 | 529-7009 |
CONC CURB & GUTTER (TY II) | 14,702 | LF |
$60.00 |
$22.00 |
$21.88 |
$35.00 |
$29.50 |
$35.00 |
$45.00 |
$21.70 |
$65.00 |
| 28 | 529-7014 |
CONC CURB (DOWEL) | 275 | LF |
$55.00 |
$47.00 |
$23.36 |
$80.00 |
$27.65 |
$19.00 |
$26.00 |
$17.00 |
$100.00 |
| 29 | 530-7012 |
DRIVEWAYS (ACP) (TY 2) | 354 | SY |
|
$86.00 |
$60.23 |
$25.00 |
$125.00 |
$75.00 |
$133.00 |
$68.00 |
$50.00 |
| 30 | 536-7002 |
CONC MEDIAN | 4,925 | SY |
$200.00 |
$250.00 |
$244.67 |
$350.00 |
$308.00 |
$285.00 |
$475.00 |
$265.00 |
$500.00 |
| 31 | 540-7001 |
MTL W-BEAM GD FEN (TIM POST) | 2,050 | LF |
|
$20.25 |
$20.25 |
$25.00 |
$29.50 |
$35.00 |
$22.00 |
$26.00 |
$28.00 |
| 32 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
|
$2,275.00 |
$1,525.00 |
$3,000.00 |
$2,190.00 |
$2,700.00 |
$2,550.00 |
$2,500.00 |
$1,850.00 |
| 33 | 540-7013 |
SHORT RADIUS (28") | 75 | LF |
|
$36.00 |
$36.00 |
$50.00 |
$29.60 |
$75.00 |
$38.00 |
$29.00 |
$30.00 |
| 34 | 540-7015 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 12 | EA |
|
$1,300.00 |
$1,300.00 |
$1,500.00 |
$1,420.00 |
$2,100.00 |
$1,375.00 |
$1,400.00 |
$1,850.00 |
| 35 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 1,725 | LF |
|
$3.00 |
$3.00 |
$3.00 |
$3.00 |
$4.00 |
$3.00 |
$3.00 |
$3.00 |
| 36 | 542-7002 |
REMOVE TERMINAL ANCHOR SECTION | 5 | EA |
|
$300.00 |
$300.00 |
$300.00 |
$180.00 |
$400.00 |
$320.00 |
$173.00 |
$1,500.00 |
| 37 | 542-7003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 2 | EA |
|
$300.00 |
$300.00 |
$300.00 |
$180.00 |
$400.00 |
$320.00 |
$173.00 |
$1,500.00 |
| 38 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 2 | EA |
|
$300.00 |
$300.00 |
$300.00 |
$240.00 |
$400.00 |
$320.00 |
$230.00 |
$1,500.00 |
| 39 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
|
$2,875.00 |
$2,875.00 |
$5,000.00 |
$3,500.00 |
$4,200.00 |
$3,100.00 |
$3,400.00 |
$3,250.00 |
| 40 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 7 | EA |
|
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$400.00 |
$320.00 |
$288.00 |
$1,500.00 |
| 41 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 6 | EA |
$1,000.00 |
$850.00 |
$750.00 |
$900.00 |
$1,500.00 |
$1,000.00 |
$1,000.00 |
$1,155.00 |
$1,150.00 |
| 42 | 658-7078 |
REMOVE DELIN & OBJECT MARKER ASSMS | 347 | EA |
$25.00 |
$40.00 |
$23.00 |
$40.00 |
$31.35 |
$300.00 |
$21.00 |
$40.00 |
$100.00 |
| 43 | 662-7082 |
WK ZN PAV MRK REMOV (W)(ARROW) | 94 | EA |
|
$29.00 |
$29.00 |
$170.00 |
$37.00 |
$300.00 |
$35.00 |
$32.00 |
$250.00 |
| 44 | 662-7092 |
WK ZN PAV MRK REMOV (W)(WORD) | 94 | EA |
|
$29.00 |
$29.00 |
$200.00 |
$37.00 |
$150.00 |
$35.00 |
$32.00 |
$550.00 |
| 45 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 6,048 | EA |
|
$2.00 |
$0.5000 |
$4.00 |
$2.00 |
$2.00 |
$1.40 |
$1.25 |
$6.00 |
| 46 | 666-7018 |
REFL PAV MRK TY I (W)8"(DOT)(100MIL) | 190 | LF |
$5.00 |
$0.7500 |
$0.7500 |
$2.25 |
$0.9500 |
$1.75 |
$0.9000 |
$0.8200 |
$6.00 |
| 47 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 34,281 | LF |
$2.00 |
$0.7500 |
$0.7500 |
$1.25 |
$0.9500 |
$0.8700 |
$0.9000 |
$0.8200 |
$4.00 |
| 48 | 666-7036 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 1,689 | LF |
|
$5.50 |
$5.50 |
$9.00 |
$7.00 |
$6.55 |
$6.75 |
$6.00 |
$20.00 |
| 49 | 666-7042 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 209 | EA |
$230.00 |
$119.00 |
$119.00 |
$170.00 |
$150.50 |
$125.00 |
$150.00 |
$130.00 |
$250.00 |
| 50 | 666-7066 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 209 | EA |
$250.00 |
$128.00 |
$128.00 |
$200.00 |
$162.00 |
$150.00 |
$160.00 |
$140.00 |
$250.00 |
| 51 | 666-7290 |
TY I HIGH PERF PM (W)6"(BRK)(100MIL) | 20,162 | LF |
|
$0.5000 |
$0.5000 |
$0.8000 |
$0.6500 |
$0.6000 |
$0.6000 |
$0.5500 |
$0.6500 |
| 52 | 666-7293 |
TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 37,741 | LF |
|
$0.5000 |
$0.5000 |
$0.8000 |
$0.6500 |
$0.6000 |
$0.6000 |
$0.5500 |
$0.6500 |
| 53 | 666-7305 |
TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 58,580 | LF |
$1.00 |
$0.4800 |
$0.4800 |
$0.8000 |
$0.6500 |
$0.6000 |
$0.6000 |
$0.5500 |
$0.6500 |
| 54 | 666-7347 |
PAVEMENT SLER 6" | 96,321 | LF |
$0.5000 |
$0.0900 |
$0.0900 |
$0.1500 |
$0.1500 |
$0.1700 |
$0.1100 |
$0.1000 |
$0.6500 |
| 55 | 666-7348 |
PAVEMENT SLER 8" | 34,281 | LF |
$1.70 |
$0.1200 |
$0.1200 |
$0.2000 |
$0.1500 |
$0.2500 |
$0.2000 |
$0.1300 |
$2.00 |
| 56 | 666-7352 |
PAVEMENT SLER 24" | 1,689 | LF |
|
$0.4000 |
$0.4000 |
$1.00 |
$0.5000 |
$1.35 |
$0.7000 |
$0.4300 |
$8.00 |
| 57 | 666-7353 |
PAVEMENT SLER (ARROW) | 209 | EA |
$50.00 |
$10.00 |
$10.00 |
$25.00 |
$12.65 |
$25.00 |
$12.00 |
$11.00 |
$250.00 |
| 58 | 666-7354 |
PAVEMENT SLER (WORD) | 209 | EA |
$60.00 |
$10.00 |
$10.00 |
$30.00 |
$12.65 |
$30.00 |
$12.00 |
$11.00 |
$250.00 |
| 59 | 672-7002 |
REFL PAV MRKR TY I-C | 657 | EA |
$6.00 |
$3.38 |
$3.38 |
$6.00 |
$4.30 |
$4.25 |
$5.00 |
$3.65 |
$6.00 |
| 60 | 677-7001 |
ELIM EXT PM & MRKS (4") | 19,277 | LF |
$1.25 |
$0.4500 |
$0.4500 |
$0.2000 |
$0.6000 |
$0.3300 |
$0.6000 |
$0.4800 |
$0.6500 |
| 61 | 677-7002 |
ELIM EXT PM & MRKS (6") | 4,389 | LF |
$1.25 |
$0.4900 |
$0.4900 |
$0.2000 |
$0.6500 |
$0.3300 |
$0.6000 |
$0.5300 |
$0.6500 |
| 62 | 677-7008 |
ELIM EXT PM & MRKS (24") | 302 | LF |
$7.00 |
$1.90 |
$1.90 |
$2.00 |
$2.40 |
$2.60 |
$2.50 |
$2.07 |
$12.00 |
| 63 | 677-7009 |
ELIM EXT PM & MRKS (ARROW) | 51 | EA |
$90.00 |
$38.00 |
$38.00 |
$35.00 |
$48.10 |
$37.00 |
$50.00 |
$41.00 |
$250.00 |
| 64 | 677-7015 |
ELIM EXT PM & MRKS (WORD) | 32 | EA |
$90.00 |
$38.00 |
$38.00 |
$35.00 |
$48.10 |
$43.00 |
$50.00 |
$41.00 |
$250.00 |
| 65 | 678-7002 |
PAV SURF PREP FOR MRK (6") | 58,580 | LF |
$1.00 |
$0.1000 |
$0.1000 |
$0.0100 |
$0.1500 |
$0.0200 |
$0.1500 |
$0.1100 |
$0.6500 |
| 66 | 678-7004 |
PAV SURF PREP FOR MRK (8") | 19,627 | LF |
$1.70 |
$0.1500 |
$0.1500 |
$0.0500 |
$0.2000 |
$0.0600 |
$0.2000 |
$0.1600 |
$2.00 |
| 67 | 678-7009 |
PAV SURF PREP FOR MRK (ARROW) | 79 | EA |
$60.00 |
$8.00 |
$8.00 |
$10.00 |
$10.15 |
$11.25 |
$10.50 |
$8.70 |
$250.00 |
| 68 | 678-7016 |
PAV SURF PREP FOR MRK (WORD) | 79 | EA |
$80.00 |
$8.00 |
$8.00 |
$10.00 |
$10.15 |
$13.00 |
$10.50 |
$8.70 |
$250.00 |
| 69 | 785-7004 |
BRIDGE JOINT REPAIR (ARMOR) | 210 | LF |
|
$110.00 |
$96.00 |
$120.00 |
$125.00 |
$70.00 |
$62.00 |
$97.00 |
$1,000.00 |
| 2 | 104-7008 |
REMOV CONC (MEDIANS) | 11 | SY |
$40.00 |
|
|
|
|
|
|
|
|
| 3 | 104-7017 |
REMOV CONC (CURB & GUTTER) | 36 | LF |
$20.00 |
|
|
|
|
|
|
|
|
| 4 | 105-7002 |
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 13,261 | SY |
$10.43 |
|
|
|
|
|
|
|
|
| 12 | 344-7023 |
SP MIXES SP-C PG70-28 | 556 | TON |
$185.00 |
|
|
|
|
|
|
|
|
| 14 | 346-7028 |
TACK COAT | 326 | GAL |
$5.00 |
|
|
|
|
|
|
|
|
| 21 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$12,000.00 |
|
|
|
|
|
|
|
|
| 22 | 505-7001 |
TMA (STATIONARY) | 200 | DAY |
$200.00 |
|
|
|
|
|
|
|
|
| 23 | 505-7003 |
TMA (MOBILE OPERATION) | 15 | DAY |
$310.00 |
|
|
|
|
|
|
|
|
| 24 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,105 | LF |
$7.50 |
|
|
|
|
|
|
|
|
| 25 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,105 | LF |
$3.00 |
|
|
|
|
|
|
|
|
| 26 | 527-7001 |
COLORED TEXTURED CONC (4") | 3,756 | SY |
$150.00 |
|
|
|
|
|
|
|
|
| 27 | 529-7009 |
CONC CURB & GUTTER (TY II) | 7,654 | LF |
$60.00 |
|
|
|
|
|
|
|
|
| 30 | 536-7002 |
CONC MEDIAN | 1,597 | SY |
$200.00 |
|
|
|
|
|
|
|
|
| 41 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 5 | EA |
$1,000.00 |
|
|
|
|
|
|
|
|
| 47 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 6,601 | LF |
$2.00 |
|
|
|
|
|
|
|
|
| 49 | 666-7042 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 36 | EA |
$230.00 |
|
|
|
|
|
|
|
|
| 50 | 666-7066 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 36 | EA |
$250.00 |
|
|
|
|
|
|
|
|
| 53 | 666-7305 |
TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 21,681 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 54 | 666-7347 |
PAVEMENT SLER 6" | 21,681 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 55 | 666-7348 |
PAVEMENT SLER 8" | 6,601 | LF |
$1.70 |
|
|
|
|
|
|
|
|
| 57 | 666-7353 |
PAVEMENT SLER (ARROW) | 36 | EA |
$50.00 |
|
|
|
|
|
|
|
|
| 58 | 666-7354 |
PAVEMENT SLER (WORD) | 36 | EA |
$60.00 |
|
|
|
|
|
|
|
|
| 59 | 672-7002 |
REFL PAV MRKR TY I-C | 335 | EA |
$6.00 |
|
|
|
|
|
|
|
|
| 60 | 677-7001 |
ELIM EXT PM & MRKS (4") | 6,969 | LF |
$1.25 |
|
|
|
|
|
|
|
|
| 61 | 677-7002 |
ELIM EXT PM & MRKS (6") | 1,586 | LF |
$1.25 |
|
|
|
|
|
|
|
|
| 62 | 677-7008 |
ELIM EXT PM & MRKS (24") | 208 | LF |
$7.00 |
|
|
|
|
|
|
|
|
| 63 | 677-7009 |
ELIM EXT PM & MRKS (ARROW) | 17 | EA |
$90.00 |
|
|
|
|
|
|
|
|
| 64 | 677-7015 |
ELIM EXT PM & MRKS (WORD) | 10 | EA |
$90.00 |
|
|
|
|
|
|
|
|
| 65 | 678-7002 |
PAV SURF PREP FOR MRK (6") | 21,681 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 66 | 678-7004 |
PAV SURF PREP FOR MRK (8") | 6,601 | LF |
$1.70 |
|
|
|
|
|
|
|
|
| 67 | 678-7009 |
PAV SURF PREP FOR MRK (ARROW) | 36 | EA |
$60.00 |
|
|
|
|
|
|
|
|
| 68 | 678-7016 |
PAV SURF PREP FOR MRK (WORD) | 36 | EA |
$80.00 |
|
|
|
|
|
|
|
|
| 1 | 104-7005 |
REMOV CONC (MOWSTRIP) | 263 | LF |
$22.00 |
|
|
|
|
|
|
|
|
| 9 | 316-7007 |
ASPH (AC-20-5TR) | 65,518 | GAL |
$4.24 |
|
|
|
|
|
|
|
|
| 10 | 316-7173 |
AGGR (TY-B, GR-4)(SAC-B) | 1,567 | CY |
$250.00 |
|
|
|
|
|
|
|
|
| 13 | 344-7024 |
SP MIXES SP-C SAC-A PG70-28 | 20,423 | TON |
$195.00 |
|
|
|
|
|
|
|
|
| 15 | 351-7012 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") | 695 | SY |
$145.00 |
|
|
|
|
|
|
|
|
| 16 | 354-7081 |
PLANE ASPH CONC PAV (2" TO 4 1/2") | 172,416 | SY |
$3.25 |
|
|
|
|
|
|
|
|
| 17 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 72 | CY |
$891.25 |
|
|
|
|
|
|
|
|
| 18 | 438-7009 |
RESIZING AND SEALING JOINTS | 210 | LF |
$55.00 |
|
|
|
|
|
|
|
|
| 21 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$12,000.00 |
|
|
|
|
|
|
|
|
| 22 | 505-7001 |
TMA (STATIONARY) | 150 | DAY |
$200.00 |
|
|
|
|
|
|
|
|
| 23 | 505-7003 |
TMA (MOBILE OPERATION) | 10 | DAY |
$310.00 |
|
|
|
|
|
|
|
|
| 29 | 530-7012 |
DRIVEWAYS (ACP) (TY 2) | 354 | SY |
$100.00 |
|
|
|
|
|
|
|
|
| 31 | 540-7001 |
MTL W-BEAM GD FEN (TIM POST) | 2,050 | LF |
$32.00 |
|
|
|
|
|
|
|
|
| 32 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,541.56 |
|
|
|
|
|
|
|
|
| 33 | 540-7013 |
SHORT RADIUS (28") | 75 | LF |
$37.70 |
|
|
|
|
|
|
|
|
| 34 | 540-7015 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 12 | EA |
$1,535.00 |
|
|
|
|
|
|
|
|
| 35 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 1,725 | LF |
$4.80 |
|
|
|
|
|
|
|
|
| 36 | 542-7002 |
REMOVE TERMINAL ANCHOR SECTION | 5 | EA |
$495.00 |
|
|
|
|
|
|
|
|
| 37 | 542-7003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 2 | EA |
$304.38 |
|
|
|
|
|
|
|
|
| 38 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 2 | EA |
$330.94 |
|
|
|
|
|
|
|
|
| 39 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$3,505.00 |
|
|
|
|
|
|
|
|
| 40 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 7 | EA |
$396.67 |
|
|
|
|
|
|
|
|
| 43 | 662-7082 |
WK ZN PAV MRK REMOV (W)(ARROW) | 94 | EA |
$307.50 |
|
|
|
|
|
|
|
|
| 44 | 662-7092 |
WK ZN PAV MRK REMOV (W)(WORD) | 94 | EA |
$432.50 |
|
|
|
|
|
|
|
|
| 45 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 6,048 | EA |
$1.63 |
|
|
|
|
|
|
|
|
| 47 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 14,654 | LF |
$2.00 |
|
|
|
|
|
|
|
|
| 48 | 666-7036 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 1,689 | LF |
$9.80 |
|
|
|
|
|
|
|
|
| 49 | 666-7042 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 94 | EA |
$230.00 |
|
|
|
|
|
|
|
|
| 50 | 666-7066 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 94 | EA |
$250.00 |
|
|
|
|
|
|
|
|
| 51 | 666-7290 |
TY I HIGH PERF PM (W)6"(BRK)(100MIL) | 20,162 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 52 | 666-7293 |
TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 37,741 | LF |
$1.00 |
|
|
|
|
|
|
|
|
| 54 | 666-7347 |
PAVEMENT SLER 6" | 37,741 | LF |
$0.5000 |
|
|
|
|
|
|
|
|
| 55 | 666-7348 |
PAVEMENT SLER 8" | 14,654 | LF |
$1.70 |
|
|
|
|
|
|
|
|
| 56 | 666-7352 |
PAVEMENT SLER 24" | 1,689 | LF |
$2.70 |
|
|
|
|
|
|
|
|
| 57 | 666-7353 |
PAVEMENT SLER (ARROW) | 94 | EA |
$50.00 |
|
|
|
|
|
|
|
|
| 58 | 666-7354 |
PAVEMENT SLER (WORD) | 94 | EA |
$60.00 |
|
|
|
|
|
|
|
|
| 59 | 672-7002 |
REFL PAV MRKR TY I-C | 1,740 | EA |
$6.00 |
|
|
|
|
|
|
|
|
| 69 | 785-7004 |
BRIDGE JOINT REPAIR (ARMOR) | 210 | LF |
$300.00 |
|
|
|
|
|
|
|
|