| 1 | 100-7002 |
PREPARING ROW | 19 | STA |
$1,600.00 |
$2,614.00 |
$700.00 |
$1,300.00 |
| 2 | 134-7004 |
BACKFILL (TY A OR B) | 82.77 | STA |
$158.00 |
$209.25 |
$225.00 |
$470.00 |
| 3 | 164-7072 |
HYDRO MULCH SEED (PERM_RURAL_CLAY_HEL) | 9,195 | SY |
$0.6000 |
$0.4000 |
$0.5000 |
$0.6200 |
| 4 | 168-7001 |
VEGETATIVE WATERING | 12.9 | TGL |
$29.00 |
$95.75 |
$75.00 |
$528.00 |
| 5 | 341-7043 |
D-GR HMA TY-D PG64-22 | 3,338 | TON |
$120.00 |
$130.00 |
$132.00 |
$146.00 |
| 6 | 341-7082 |
TACK COAT | 2,428 | GAL |
$5.00 |
$4.25 |
$4.00 |
$4.50 |
| 7 | 344-7030 |
SP MIXES SP-C SAC-A PG76-22 | 4,451 | TON |
$130.00 |
$150.25 |
$177.00 |
$179.00 |
| 8 | 344-7077 |
TACK COAT | 2,428 | GAL |
$4.00 |
$4.25 |
$4.00 |
$4.50 |
| 9 | 351-7009 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 600 | SY |
$100.00 |
$91.00 |
$110.00 |
$127.00 |
| 10 | 354-7080 |
PLAN ASPH CONC PAV (3.5") | 2,029 | SY |
$5.00 |
$4.75 |
$10.00 |
$4.50 |
| 11 | 354-7095 |
PLANE ASPH PAV (0" TO 3.5") | 5,289 | SY |
$6.50 |
$9.75 |
$8.00 |
$2.30 |
| 12 | 361-7046 |
FULL-DEPTH REPAIR CPJR (VAR DEPTH) | 180 | CY |
$1,200.00 |
$1,481.25 |
$640.00 |
$1,020.00 |
| 13 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 9.25 | CY |
$50.00 |
$835.75 |
$1,500.00 |
$790.00 |
| 14 | 500-7001 |
MOBILIZATION | 1 | LS |
$275,000.00 |
$147,000.00 |
$85,000.00 |
$75,000.00 |
| 15 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$50,000.00 |
$883.75 |
$10,000.00 |
$2,200.00 |
| 16 | 503-7001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 60 | DAY |
$120.00 |
$130.75 |
$300.00 |
$65.00 |
| 17 | 505-7001 |
TMA (STATIONARY) | 120 | DAY |
$350.00 |
$330.00 |
$250.00 |
$330.00 |
| 18 | 505-7003 |
TMA (MOBILE OPERATION) | 10 | DAY |
$350.00 |
$760.00 |
$300.00 |
$700.00 |
| 19 | 506-7045 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,000 | LF |
$8.00 |
$7.50 |
$8.00 |
$8.95 |
| 20 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,000 | LF |
$2.20 |
$1.05 |
$2.00 |
$1.70 |
| 21 | 530-7022 |
INTRSCT, DRVWAYS, & TURNOUT (ACP) | 1,200 | SY |
$55.00 |
$20.25 |
$75.00 |
$45.00 |
| 22 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 16,600 | LF |
$0.5000 |
$0.7500 |
$0.5000 |
$0.3000 |
| 23 | 533-7002 |
MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 8,300 | LF |
$0.5000 |
$0.2900 |
$0.5000 |
$0.3000 |
| 24 | 540-7001 |
MTL W-BEAM GD FEN (TIM POST) | 575 | LF |
$10.00 |
$27.25 |
$35.00 |
$26.50 |
| 25 | 540-7003 |
MTL THRIE-BEAM GD FEN (TIM POST) | 20 | LF |
$15.00 |
$89.00 |
$140.00 |
$129.00 |
| 26 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$5,000.00 |
$3,081.25 |
$3,950.00 |
$3,510.00 |
| 27 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 62 | EA |
$60.00 |
$621.50 |
$750.00 |
$725.00 |
| 28 | 658-7318 |
INSTL OM SM RD SIGN (1-OM-PW)R | 8 | EA |
$10.00 |
$28.75 |
$35.00 |
$22.30 |
| 29 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 20 | EA |
$2.00 |
$15.75 |
$2.50 |
$0.8000 |
| 30 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,600 | EA |
$2.00 |
$1.00 |
$2.50 |
$0.8000 |
| 31 | 666-7023 |
REFL PAV MRK TY I (W)8"(SLD)(090MIL) | 1,000 | LF |
$1.60 |
$1.00 |
$1.50 |
$1.00 |
| 32 | 666-7410 |
REFL PAV MRK TY I (W)6"(SLD)(090MIL) | 16,600 | LF |
$1.00 |
$0.6000 |
$0.7000 |
$0.6200 |
| 33 | 666-7419 |
REFL PAV MRK TY I (Y)6"(BRK)(090MIL) | 6,000 | LF |
$0.6000 |
$0.6000 |
$0.7000 |
$0.7000 |
| 34 | 666-7422 |
REFL PAV MRK TY I (Y)6"(SLD)(090MIL) | 1,000 | LF |
$0.7000 |
$0.6600 |
$0.7000 |
$0.7000 |
| 35 | 668-7001 |
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE) | 320 | LF |
$11.60 |
$14.75 |
$10.00 |
$17.60 |
| 36 | 668-7089 |
PREFAB PM TY C (W)(24")(SLD) | 300 | LF |
$14.00 |
$13.50 |
$22.00 |
$15.94 |
| 37 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 10 | EA |
$370.00 |
$235.00 |
$300.00 |
$251.00 |
| 38 | 668-7111 |
PREFAB PM TY C (W)(36")(YLD TRI) | 12 | EA |
$6.50 |
$51.25 |
$110.00 |
$55.00 |
| 39 | 672-7004 |
REFL PAV MRKR TY II-A-A | 700 | EA |
$6.50 |
$4.25 |
$8.50 |
$4.40 |