Contact information
- info@acmebridge.com
- Phone
- (830) 620-4770
- Fax
- (830) 620-4669
- Address
- 230 ACME ROAD, NEW BRAUNFELS, TX 78130
- TxDOT prequalification
- Construction qualified
205BidsNov 3, 2016 to Jun 3, 2026
20Wins (low bidder)
9.8%Win rate
$69,921,221Total won
Competitor scorecard
Last 5 years in Texas10.1%Win rate11 of 109 bids
+11.8%Average bid vs estimate
-5.2%Winning bids vs estimate
+21.4%Over the low bid when they loseAverage field: 6.9 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| HUNTER INDUSTRIES, LTD. | 51 | 15 | 36 | 29% |
| CK NEWBERRY, LLC | 37 | 20 | 17 | 54% |
| E-Z BEL CONSTRUCTION, LLC | 33 | 15 | 18 | 45% |
| TEXAS MATERIALS GROUP, INC. | 32 | 18 | 14 | 56% |
| STX CIVIL | 29 | 15 | 14 | 52% |
| DEAN WORD COMPANY, LTD. | 25 | 16 | 9 | 64% |
| RELMCO, INC. | 21 | 3 | 18 | 14% |
| DAN WILLIAMS COMPANY | 18 | 7 | 11 | 39% |
| J. CARROLL WEAVER, INC. | 17 | 7 | 10 | 41% |
| DELGADO'S CONTRACTORS, LLC | 15 | 7 | 8 | 47% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Jun 3, 2026 | 0916-26-024 | Lazy F RD(CR101)Goliad · Corpus Christi | 2 of 10 | $969,387 | $825,295J. CARROLL WEAVER, INC. | +17.5% |
| Jun 3, 2026 | 0073-03-071 | SAT_US0281_3Atascosa · San Antonio | 10 of 10 | $1,688,983 | $1,035,228E-Z BEL CONSTRUCTION, LLC | +63.2% |
| Jun 3, 2026 | 0916-37-038 | CR 308 Bridge Replacement HBPJim Wells · Corpus Christi | 7 of 8 | $1,051,570 | $877,585CK NEWBERRY, LLC | +19.8% |
| Jun 2, 2026 | 2150-04-080 | FM1472 Concrete PVMTWebb · Laredo | 6 of 7 | $3,595,757 | $2,951,706JAMES CONSTRUCTION GROUP, L… | +21.8% |
| Jun 2, 2026 | 0216-03-034 | FM 466: 0216-03-034; IOIGuadalupe · San Antonio | 4 of 7 | $3,149,442 | $2,728,902HUNTER INDUSTRIES, LTD. | +15.4% |
| Jun 2, 2026 | 0274-02-032 | US 183 MILLS C/L TO LOMETALampasas · Brownwood | 5 of 9 | $5,040,964 | $4,510,688BIG CREEK CONSTRUCTION, LTD. | +11.8% |
| Jun 2, 2026 | 0315-03-070 | SH 90 at FM 244 - Turn Lane FY 26Grimes · Bryan | 7 of 7 | $1,708,701 | $1,241,183LARRY YOUNG PAVING, INC. | +37.7% |
| Jun 2, 2026 | 0916-36-023 | CR 230 Bridge Replacement HBPKarnes · Corpus Christi | 5 of 10 | $934,780 | $817,325C & W SOUTHERN LLC | +14.4% |
| May 7, 2026 | 1271-01-013 | FM 1107; 1271-01-013; BRWilson · San Antonio | 6 of 17 | $1,138,652 | $948,875D&S CONCRETE CONTRACTORS LLC | +20.0% |
| May 6, 2026 | 1186-02-028 | FM 969 from Utley Rd to Howard LnBastrop · Austin | 7 of 8 | $3,785,606 | $3,189,429HUNTER INDUSTRIES, LTD. | +18.7% |
| May 6, 2026 | 1410-01-026 | FM 1456 REHABILITATE ROADWAY HSIP 2605Austin · Yoakum | 8 of 8 | $3,659,350 | $2,587,895BIG CREEK CONSTRUCTION, LTD. | +41.4% |
| May 6, 2026 | 0151-02-026 | SH 29 from RM 1174 to WILLIAMSON CO LINEBurnet · Austin | 7 of 8 | $13,076,970 | $10,910,072TEXAS MATERIALS GROUP, INC. | +19.9% |
| May 6, 2026 | 0916-26-023 | PostOakRD Goliad At Manahuilla Cr BridgeGoliad · Corpus Christi | 8 of 13 | $1,334,440 | $1,135,008DELGADO'S CONTRACTORS, LLC | +17.6% |
| May 6, 2026 | 0077-07-010 | FM 72 at Spring Creek BridgeIrion · San Angelo | 9 of 10 | $7,656,518 | $4,405,521DELGADO'S CONTRACTORS, LLC | +73.8% |
| May 6, 2026 | 0142-09-049 | RM 473; 0142-09-049; SFTKendall · San Antonio | 3 of 7 | $4,250,503 | $4,095,968STX CIVIL | +3.8% |
| Apr 8, 2026 | 0683-05-017 | RM 12 - US 290 to Travis C/LHays · Austin | 5 of 6 | $12,335,104 | $10,020,820DEAN WORD COMPANY, LTD. | +23.1% |
| Apr 7, 2026 | 0922-48-004 | LA PALOMA RD AT GALLINA SLOUGHZavala · Laredo | 4 of 5 | $1,857,167 | $1,523,016ACEE CONSTRUCTION LLC. | +21.9% |
| Apr 7, 2026 | 0269-10-028 | FM 531 SAFETY IMPROVEMENT 2606Lavaca · Yoakum | 3 of 3 | $3,436,733 | $2,566,089HUNTER INDUSTRIES, LTD. | +33.9% |
| Feb 4, 2026 | 0445-02-068 | US 90A 2022 HSIPLavaca · Yoakum | 6 of 7 | $2,867,803 | $2,212,469HUNTER INDUSTRIES, LTD. | +29.6% |
| Jan 7, 2026 | 1197-01-023 | RM 150 at Onion Creek Double CrossingsHays · Austin | 4 of 10 | $1,229,050 | $999,085PROFESSIONAL TRAFFIC CONTRO… | +23.0% |
| Jan 7, 2026 | 0922-20-031 | TPW Project - Chaparral WMALa Salle · Laredo | 1 of 8 | $714,669 | $714,669 | Won |
| Jan 6, 2026 | 0211-06-068 | REHABILITATE ROADWAY 2709Fayette · Yoakum | 5 of 6 | $5,046,119 | $4,335,114HUNTER INDUSTRIES, LTD. | +16.4% |
| Jan 6, 2026 | 0913-29-067 | CR 281 BRIDGE REPLACEMENT 2609Lavaca · Yoakum | 6 of 10 | $1,387,999 | $1,153,910STX CIVIL | +20.3% |
| Dec 3, 2025 | 0943-02-012 | FM 239 BRIDGE REPLACEMENT 2307De Witt · Yoakum | 4 of 8 | $1,095,396 | $883,521E-Z BEL CONSTRUCTION, LLC | +24.0% |
| Dec 3, 2025 | 0152-03-065 | US 183 North of CR 309Caldwell · Austin | 4 of 7 | $1,798,636 | $1,543,699TEXAS MATERIALS GROUP, INC. | +16.5% |
| Dec 3, 2025 | 1262-01-016 | FM 1115 BRIDGE REPLACEMENT 2305Fayette · Yoakum | 3 of 8 | $1,514,169 | $1,375,081HUNTER INDUSTRIES, LTD. | +10.1% |
| Nov 6, 2025 | 0805-04-038 | RM 3237 at Lone Man Mountain Rd.Hays · Austin | 6 of 7 | $2,582,225 | $1,989,311DEAN WORD COMPANY, LTD. | +29.8% |
| Aug 8, 2025 | 0151-01-052 | SH 29 - W of Algerita Hill Rd to Lehne RBurnet · Austin | 3 of 8 | $11,990,879 | $10,701,288ALLEN KELLER COMPANY | +12.1% |
| Aug 7, 2025 | 0211-07-046 | US 77 at 0.1 Mi. South of N. Jaeger St.Lee · Austin | 1 of 10 | $13,219,085 | $13,219,085 | Won |
| Jul 2, 2025 | 0071-06-063 | US 87 - Barons Creek to Old Mason RdGillespie · Austin | 3 of 7 | $9,191,852 | $9,157,488TEXAS MATERIALS GROUP, INC. | +0.4% |
| Jul 2, 2025 | 0913-29-062 | CR 130 BRIDGE REPLACEMENT 2406Lavaca · Yoakum | 3 of 7 | $1,598,172 | $1,541,7293LW CIVIL LLC | +3.7% |
| Jul 2, 2025 | 0907-26-005 | 0907-26-005 CR REPLACE BRIDGE AND APPROASchleicher · San Angelo | 2 of 8 | $1,398,568 | $1,387,935TALBERT COMPANIES LLC | +0.8% |
| Jul 1, 2025 | 3388-01-005 | RM 3404 - FY 25 SSWPLlano · Austin | 4 of 5 | $1,389,353 | $1,179,800HUNTER INDUSTRIES, LTD. | +17.8% |
| Jul 1, 2025 | 0913-09-127 | CR 267 BRIDGE REPLACEMENT 2604Wharton · Yoakum | 3 of 7 | $2,871,799 | $2,789,318JOHN REED AND COMPANY, LLC | +3.0% |
| Jul 1, 2025 | 0267-02-043 | SH 159 Bridge Replacement 2507Fayette · Yoakum | 1 of 10 | $4,282,480 | $4,282,480 | Won |
| Jun 5, 2025 | 0573-03-022 | REHABILITATE ROADWAYGonzales · Yoakum | 4 of 5 | $12,900,544 | $10,569,339HUNTER INDUSTRIES, LTD. | +22.1% |
| Jun 5, 2025 | 0274-01-040 | US 183 0.7 MI SOUTH SH 16 to Lampasas CLMills · Brownwood | 5 of 11 | $5,297,613 | $4,457,730BIG CREEK CONSTRUCTION, LTD. | +18.8% |
| Jun 4, 2025 | 1149-02-033 | FM 812 from Watts Ln to Artesian DrBastrop · Austin | 3 of 7 | $8,552,546 | $7,601,604DAN WILLIAMS COMPANY | +12.5% |
| Jun 4, 2025 | 0915-14-052 | CR 241: 0915-14-052; BRWilson · San Antonio | 4 of 10 | $813,025 | $723,241DEAN WORD COMPANY, LTD. | +12.4% |
| Jun 4, 2025 | 0916-29-016 | CR 216 Live Oak Salt Creek BridgeLive Oak · Corpus Christi | 2 of 7 | $5,221,047 | $4,876,307RELMCO, INC. | +7.1% |
| Jun 4, 2025 | 0913-28-091 | CR 222 BRIDGE REPLACEMENT 2206-3Fayette · Yoakum | 1 of 10 | $1,169,874 | $1,169,874 | Won |
| May 2, 2025 | 0114-09-099 | US 290 R-Cuts West Washington - FY 25Washington · Bryan | 7 of 7 | $1,423,698 | $965,907CORNERSTONE PAVING AND CONS… | +47.4% |
| May 1, 2025 | 0913-27-097 | CR 27 BRIDGE REPLACEMENT 2702Victoria · Yoakum | 2 of 7 | $2,042,063 | $1,925,463STX CIVIL | +6.1% |
| Apr 4, 2025 | 0026-01-028 | US 90 WIDEN STRUCTURE 2512Gonzales · Yoakum | 5 of 7 | $6,434,579 | $5,381,996STX CIVIL | +19.6% |
| Apr 3, 2025 | 0142-04-052 | SH 27: 0142-04-052; CSDKerr · San Antonio | 4 of 7 | $2,185,879 | $1,403,742ACEE CONSTRUCTION LLC. | +55.7% |
| Apr 3, 2025 | 0913-28-095 | CR 320 BRIDGE REPLACEMENT 2709Fayette · Yoakum | 3 of 10 | $2,220,394 | $2,036,158TREVWAY, INC. | +9.0% |
| Mar 5, 2025 | 0515-04-034 | FM 530 SURFACING RESTORATION 2303Lavaca · Yoakum | 8 of 8 | $7,809,442 | $5,948,468HUNTER INDUSTRIES, LTD. | +31.3% |
| Mar 4, 2025 | 0511-02-028 | RM 32: 0511-02-028:SFTComal · San Antonio | 2 of 9 | $3,938,587 | $3,391,550HUNTER INDUSTRIES, LTD. | +16.1% |
| Feb 7, 2025 | 1499-01-032 | SAT_FM1581: 1499-01-032: SFTFrio · San Antonio | 4 of 7 | $826,286 | $614,054HUNTER INDUSTRIES, LTD. | +34.6% |
| Feb 6, 2025 | 0700-01-049 | SH 71 - At CR 401Burnet · Austin | 5 of 8 | $7,724,047 | $7,072,728HUNTER INDUSTRIES, LTD. | +9.2% |
| Nov 7, 2024 | 0807-03-038 | FM 153 BRIDGE REPLACEMENT 2504Fayette · Yoakum | 1 of 8 | $2,524,150 | $2,524,150 | Won |
| May 3, 2024 | 0073-13-012 | BRIDGE REPLACEMENTAtascosa · San Antonio | 3 of 7 | $5,068,912 | $4,880,363RELMCO, INC. | +3.9% |
| May 3, 2024 | 0624-01-003 | STATE PARK IMPROVEMENTSUvalde · San Antonio | 4 of 4 | $1,740,018 | $1,363,048RELMCO, INC. | +27.7% |
| May 2, 2024 | 2234-02-009 | WIDEN ROAD - ADD SHOULDERSKarnes · Corpus Christi | 4 of 8 | $8,677,943 | $8,073,873CK NEWBERRY, LLC | +7.5% |
| Apr 5, 2024 | 1133-02-030 | SURFACING/ROADWAY RESTORATIONGonzales · Yoakum | 6 of 11 | $5,252,759 | $4,879,726BIG CREEK CONSTRUCTION, LTD. | +7.6% |
| Apr 5, 2024 | 0211-04-027 | BRIDGE MAINTENANCELee · Austin | 3 of 7 | $1,500,723 | $1,282,364RELMCO, INC. | +17.0% |
| Apr 4, 2024 | 1135-03-030 | BRIDGE REPLACEMENTKerr · San Antonio | 9 of 9 | $2,145,999 | $1,193,211J3 COMPANY, LLC | +79.9% |
| Apr 4, 2024 | 0913-28-092 | BRIDGE REPLACEMENTFayette · Yoakum | 2 of 10 | $990,256 | $954,925C. E. BARKER, LTD. | +3.7% |
| Apr 4, 2024 | 0017-15-028 | HAZARD ELIMINATION & SAFETYFrio · San Antonio | 4 of 6 | $2,460,212 | $2,106,851E-Z BEL CONSTRUCTION, LLC | +16.8% |
| Mar 6, 2024 | 0252-03-054 | WIDEN ROAD - ADD LANES AND SHOULDERSBlanco · Austin | 2 of 6 | $11,401,847 | $11,189,111TEXAS MATERIALS GROUP, INC. | +1.9% |
| Mar 5, 2024 | 0805-04-033 | HAZARD ELIMINATION & SAFETYHays · Austin | 3 of 8 | $5,354,824 | $5,105,188LONE STAR SITEWORK, LLC | +4.9% |
| Mar 5, 2024 | 0024-07-069 | HAZARD ELIMINATION & SAFETYBexar · San Antonio | 6 of 6 | $9,776,188 | $6,869,482J3 COMPANY, LLC | +42.3% |
| Feb 1, 2024 | 1113-01-030 | REHABILITATE EXISTING ROADWAYDe Witt · Yoakum | 6 of 6 | $16,908,898 | $11,601,489CLARK CONSTRUCTION OF TEXAS… | +45.7% |
| Jan 5, 2024 | 0913-17-046 | BRIDGE REPLACEMENTDe Witt · Yoakum | 1 of 4 | $3,648,033 | $3,648,033 | Won |
| Jan 4, 2024 | 0906-32-050 | BRIDGE REPLACEMENTMidland · Odessa | 3 of 3 | $4,989,387 | $3,896,639DELGADO'S CONTRACTORS, LLC | +28.0% |
| Sep 7, 2023 | 0287-01-017 | BRIDGE MAINTENANCECaldwell · Austin | 6 of 7 | $1,641,980 | $1,012,429GIBSON & ASSOCIATES, INC. | +62.2% |
| Aug 3, 2023 | 0914-19-033 | BRIDGE REPLACEMENTGillespie · Austin | 4 of 6 | $1,089,922 | $1,025,365DELGADO'S CONTRACTORS, LLC | +6.3% |
| Jun 28, 2023 | 0291-06-062 | WIDEN ROAD - ADD SHOULDERSBandera · San Antonio | 1 of 5 | $5,064,945 | $5,064,945 | Won |
| Jun 28, 2023 | 0025-04-051 | HAZARD ELIMINATION & SAFETYGuadalupe · San Antonio | 2 of 5 | $2,353,335 | $2,221,434HUNTER INDUSTRIES, LTD. | +5.9% |
| Jun 27, 2023 | 1899-02-021 | HAZARD ELIMINATION & SAFETYKendall · San Antonio | 4 of 5 | $7,156,704 | $5,653,830HUNTER INDUSTRIES, LTD. | +26.6% |
| May 5, 2023 | 3212-04-009 | HAZARD ELIMINATION & SAFETYKendall · San Antonio | 2 of 4 | $6,840,176 | $6,260,529TEXAS MATERIALS GROUP, INC. | +9.3% |
| May 4, 2023 | 0265-05-089 | INTERSECTION IMPROVEMENTBastrop · Austin | 3 of 4 | $1,229,651 | $1,108,816DAN WILLIAMS COMPANY | +10.9% |
| Apr 5, 2023 | 0026-03-046 | BRIDGE REPLACEMENTFayette · Yoakum | 1 of 5 | $7,055,348 | $7,055,348 | Won |
| Apr 5, 2023 | 0914-18-107 | BRIDGE MAINTENANCEBastrop · Austin | 2 of 4 | $1,509,140 | $1,478,746RELMCO, INC. | +2.1% |
| Apr 5, 2023 | 0025-10-097 | HAZARD ELIMINATION & SAFETYGuadalupe · San Antonio | 2 of 2 | $1,413,417 | $1,371,679TEXAS MATERIALS GROUP, INC. | +3.0% |
| Apr 5, 2023 | 0054-06-105 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TBrown · Brownwood | 2 of 3 | $960,908 | $854,513JAY MILLS CONTRACTING, INCO… | +12.5% |
| Feb 2, 2023 | 0573-01-041 | WIDEN ROAD - ADD SHOULDERSBastrop · Austin | 4 of 4 | $3,270,438 | $2,515,581HUNTER INDUSTRIES, LTD. | +30.0% |
| Feb 2, 2023 | 0839-04-013 | BRIDGE REPLACEMENTDe Witt · Yoakum | 2 of 5 | $1,338,538 | $1,281,562E-Z BEL CONSTRUCTION, LLC | +4.4% |
| Feb 2, 2023 | 1060-01-012 | BRIDGE REPLACEMENTCaldwell · Austin | 4 of 8 | $2,557,813 | $2,089,053CROSS PLUS CONSTRUCTION, LLC | +22.4% |
| Feb 1, 2023 | 1553-02-008 | REHABILITATE EXISTING ROADWAYLive Oak · Corpus Christi | 5 of 5 | $10,636,512 | $7,861,814CK NEWBERRY, LLC | +35.3% |
| Feb 1, 2023 | 1537-01-017 | BRIDGE REPLACEMENTLee · Austin | 2 of 6 | $1,764,662 | $1,524,020SB CONTRACTORS LLC | +15.8% |
| Feb 1, 2023 | 0914-22-076 | BRIDGE REPLACEMENTCaldwell · Austin | 2 of 5 | $778,089 | $777,849SB CONTRACTORS LLC | +0.0% |
| Jan 5, 2023 | 0143-04-072 | BRIDGE REPLACEMENTWilson · San Antonio | 5 of 7 | $2,850,364 | $2,262,609SB CONTRACTORS LLC | +26.0% |
| Nov 3, 2022 | 0913-28-082 | BRIDGE REPLACEMENTFayette · Yoakum | 4 of 8 | $1,408,416 | $1,338,297HODGES AND SON CONSTRUCTION… | +5.2% |
| Oct 7, 2022 | 6406-67-001 | CULVERT REPLACEMENTGuadalupe · San Antonio | 5 of 9 | $533,032 | $387,639RELMCO, INC. | +37.5% |
| Sep 8, 2022 | 0289-07-021 | SURFACING/ROADWAY RESTORATIONLlano · Austin | 4 of 5 | $6,797,982 | $5,354,596BIG CREEK CONSTRUCTION, LTD. | +27.0% |
| Sep 7, 2022 | 1741-02-036 | REHABILITATE EXISTING ROADWAYBexar · San Antonio | 8 of 8 | $9,637,297 | $7,692,727CAPITAL EXCAVATION COMPANY | +25.3% |
| Sep 7, 2022 | 1028-01-030 | BRIDGE REPLACEMENTMills · Brownwood | 1 of 4 | $3,930,712 | $3,930,712 | Won |
| Sep 7, 2022 | 0691-01-044 | REHABILITATE EXISTING ROADWAYKarnes · Corpus Christi | 5 of 7 | $5,408,001 | $4,887,026RELMCO, INC. | +10.7% |
| Aug 4, 2022 | 0987-03-014 | WIDEN ROAD - ADD LANES AND SHOULDERSHays · Austin | 6 of 8 | $3,691,021 | $3,199,567JOE BLAND CONSTRUCTION, L.P. | +15.4% |
| Aug 4, 2022 | 1186-02-025 | WIDEN ROAD - ADD SHOULDERSBastrop · Austin | 4 of 5 | $2,963,513 | $2,496,797DAN WILLIAMS COMPANY | +18.7% |
| Aug 4, 2022 | 0913-28-070 | BRIDGE REPLACEMENTFayette · Yoakum | 2 of 4 | $1,146,393 | $1,089,897FUQUA CONSTRUCTION CO., INC. | +5.2% |
| Aug 3, 2022 | 0285-03-062 | WIDEN ROAD - ADD LANESHays · Austin | 4 of 7 | $5,501,267 | $5,093,343DAN WILLIAMS COMPANY | +8.0% |
| Aug 3, 2022 | 0511-03-013 | INTERSECTION IMPROVEMENTHays · Austin | 5 of 5 | $1,640,861 | $1,073,850LONE STAR SITEWORK, LLC | +52.8% |
| Aug 3, 2022 | 6379-31-001 | RIPRAP REPAIR AND BRIDGE RAILINGBlanco · Austin | 9 of 9 | $850,083 | $515,420RELMCO, INC. | +64.9% |
| Jun 30, 2022 | 0017-13-012 | WIDEN ROAD - ADD LANESAtascosa · San Antonio | 4 of 7 | $7,421,982 | $6,628,642HUNTER INDUSTRIES, LTD. | +12.0% |
| Jun 30, 2022 | 0915-17-072 | HAZARD ELIMINATION & SAFETYComal · San Antonio | 4 of 6 | $2,179,094 | $1,934,817E-Z BEL CONSTRUCTION, LLC | +12.6% |
| Jun 29, 2022 | 1437-02-016 | HAZARD ELIMINATION & SAFETYWilson · San Antonio | 4 of 5 | $1,091,381 | $853,370SALINAS CONSTRUCTION TECHNO… | +27.9% |
| Jun 29, 2022 | 0073-07-068 | TRANSPORTATION NON-ROADWAYLive Oak · Corpus Christi | 4 of 5 | $1,590,474 | $1,030,452SALINAS CONSTRUCTION TECHNO… | +54.3% |
| Mar 4, 2022 | 1780-01-009 | BRIDGE REPLACEMENTMills · Brownwood | 1 of 5 | $1,685,451 | $1,685,451 | Won |
| Feb 4, 2022 | 0142-03-031 | BRIDGE REPLACEMENTKerr · San Antonio | 2 of 3 | $1,904,720 | $1,836,910SB CONTRACTORS LLC | +3.7% |
| Feb 3, 2022 | 0915-18-033 | BRIDGE REPLACEMENTFrio · San Antonio | 4 of 6 | $593,940 | $525,525DELGADO'S CONTRACTORS, LLC | +13.0% |
| Jan 7, 2022 | 0913-28-073 | BRIDGE REPLACEMENTFayette · Yoakum | 3 of 3 | $1,716,990 | $1,498,743FUQUA CONSTRUCTION CO., INC. | +14.6% |
| Jan 6, 2022 | 0848-04-049 | BRIDGE REPLACEMENTMedina · San Antonio | 2 of 4 | $3,472,261 | $3,176,381RELMCO, INC. | +9.3% |
| Jan 6, 2022 | 0267-01-033 | BRIDGE REPAIR & UPGRADING RAILINGFayette · Yoakum | 1 of 2 | $1,212,845 | $1,212,845 | Won |
| Jan 6, 2022 | 0916-26-022 | BRIDGE REPLACEMENTGoliad · Corpus Christi | 6 of 8 | $503,032 | $459,836LISKA CONSTRUCTION COMPANY,… | +9.4% |
| Dec 2, 2021 | 1121-01-022 | BRIDGE REPLACEMENTKarnes · Corpus Christi | 6 of 8 | $1,845,957 | $1,472,197SB CONTRACTORS LLC | +25.4% |
| Dec 2, 2021 | 0913-29-052 | BRIDGE REPLACEMENTLavaca · Yoakum | 2 of 4 | $1,097,949 | $965,494SB CONTRACTORS LLC | +13.7% |
| Dec 1, 2021 | 6375-06-001 | FM 2676 CULVERT REPLACEMENTMedina · San Antonio | 7 of 7 | $750,429 | $393,371DELGADO'S CONTRACTORS, LLC | +90.8% |
| Sep 2, 2021 | 3012-01-005 | REPLACE BRIDGE AND APPROACHESDe Witt · Yoakum | 5 of 6 | $1,249,948 | $913,752CONSTAR CONSTRUCTION | +36.8% |
| Aug 5, 2021 | 1753-01-017 | BRIDGE REPLACEMENTMason · Austin | 2 of 3 | $4,605,718 | $4,178,807RELMCO, INC. | +10.2% |
| Aug 5, 2021 | 0035-05-061 | BRIDGE MAINTENANCEMenard · San Angelo | 6 of 6 | $3,599,144 | $2,146,115RELMCO, INC. | +67.7% |
| Aug 4, 2021 | 0474-01-005 | BRIDGE REPLACEMENTKimble · San Angelo | 2 of 5 | $3,068,068 | $2,649,387RELMCO, INC. | +15.8% |
| Jul 2, 2021 | 0915-14-046 | BRIDGE REPLACEMENTWilson · San Antonio | 2 of 5 | $523,401 | $522,736TASCOSA BRIDGE CO., LC | +0.1% |
| Jul 2, 2021 | 0152-03-062 | TRAFFIC SIGNAL IMPROVEMENTSCaldwell · Austin | 2 of 3 | $1,590,851 | $1,315,225ANGEL BROTHERS HOLDINGS COR… | +21.0% |
| Jul 2, 2021 | 0913-28-075 | BRIDGE REPLACEMENTFayette · Yoakum | 2 of 3 | $908,619 | $805,991TREVWAY, INC. | +12.7% |
| Jul 1, 2021 | 1730-01-043 | HAZARD ELIMINATION & SAFETYBandera · San Antonio | 5 of 5 | $3,452,270 | $2,946,881ANGEL BROTHERS HOLDINGS COR… | +17.1% |
| Jul 1, 2021 | 0113-07-075 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT THays · Austin | 5 of 9 | $1,651,632 | $1,353,925RELMCO, INC. | +22.0% |
| Jun 3, 2021 | 0907-20-005 | CONSTRUCT ACCESS ROADS AND PARKINGKimble · San Angelo | 2 of 6 | $1,373,550 | $1,196,978DIAMOND X CONTRACTING, INC | +14.8% |
| May 6, 2021 | 0511-02-026 | BRIDGE REPLACEMENTComal · San Antonio | 3 of 11 | $1,134,739 | $1,044,625SB CONTRACTORS LLC | +8.6% |
| May 5, 2021 | 0915-45-055 | BRIDGE REPLACEMENTMedina · San Antonio | 7 of 11 | $617,626 | $419,500DELGADO'S CONTRACTORS, LLC | +47.2% |
| Apr 8, 2021 | 0408-01-043 | BRIDGE REPLACEMENTFayette · Yoakum | 1 of 9 | $5,331,594 | $5,331,594 | Won |
| Apr 8, 2021 | 0913-22-052 | BRIDGE REPLACEMENTGonzales · Yoakum | 4 of 12 | $1,165,288 | $1,049,085SEFBO PIPELINE BRIDGE, INCO… | +11.1% |
| Apr 7, 2021 | 0914-25-008 | BRIDGE REPLACEMENTLlano · Austin | 5 of 8 | $2,693,792 | $1,599,440HODGES AND SON CONSTRUCTION… | +68.4% |
| Apr 7, 2021 | 0914-26-009 | REHABILITATE BRIDGEMason · Austin | 6 of 10 | $262,195 | $173,539BLACKSMITH VENTURES LLC | +51.1% |
| Feb 4, 2021 | 0113-07-075 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT THays · Austin | 5 of 9 | $1,527,353 | $1,095,555SALINAS CONSTRUCTION TECHNO… | +39.4% |
| Jan 8, 2021 | 0150-04-048 | CONSTRUCT NEW ROADWAY LANESLlano · Austin | 1 of 9 | $5,448,732 | $5,448,732 | Won |
| Jan 8, 2021 | 0915-00-231 | INTERSECTION OPERATIONAL IMPROVEMENTSBexar · San Antonio | 6 of 7 | $3,864,180 | $3,416,463SALINAS CONSTRUCTION TECHNO… | +13.1% |
| Dec 3, 2020 | 6359-53-001 | DITCH REGRADINGTravis · Austin | 1 of 11 | $312,895 | $312,895 | Won |
| Nov 4, 2020 | 0269-03-036 | REPLACE BRIDGE AND APPROACHESLavaca · Yoakum | 5 of 10 | $3,738,632 | $3,098,286HILL COUNTRY BRIDGE, INC. | +20.7% |
| Jul 9, 2020 | 0914-33-079 | PEDESTRIAN SIDEWALKS AND CURB RAMPSHays · Austin | 7 of 7 | $592,918 | $396,803A GREATER AUSTIN DEVELOPMEN… | +49.4% |
| Jun 5, 2020 | 0112-01-019 | SAFETY TREAT FIXED OBJECTSKimble · San Angelo | 4 of 4 | $5,203,343 | $4,234,053RELMCO, INC. | +22.9% |
| Jun 5, 2020 | 0322-01-051 | HAZARD ELIMINATION & SAFETYBastrop · Austin | 4 of 7 | $2,050,008 | $1,850,412AARON CONCRETE CONTRACTORS,… | +10.8% |
| Jun 4, 2020 | 0907-13-012 | BRIDGE REPLACEMENTRunnels · San Angelo | 4 of 4 | $3,241,817 | $2,384,074RELMCO, INC. | +36.0% |
| May 7, 2020 | 0150-04-049 | CONSTRUCT SUPER 2 PASSING LANESLlano · Austin | 1 of 10 | $4,653,515 | $4,653,515 | Won |
| May 7, 2020 | 0915-00-230 | INTERSECTION OPERATIONAL IMPROVEMENTSBexar · San Antonio | 1 of 6 | $3,053,201 | $3,053,201 | Won |
| May 7, 2020 | 0915-13-030 | CONSTRUCT CURB RAMPS, SIDEWALK, PED INFRASTRUCTUREAtascosa · San Antonio | 3 of 11 | $636,824 | $584,272DELGADO'S CONTRACTORS, LLC | +9.0% |
| May 7, 2020 | 1534-02-008 | SAFETY IMPROVEMENT PROJECTSGillespie · Austin | 2 of 8 | $4,345,761 | $4,041,365RAY FARIS, INC. | +7.5% |
| Apr 9, 2020 | 0913-17-039 | REPLACE BRIDGE AND APPROACHESDe Witt · Yoakum | 3 of 8 | $1,195,595 | $1,067,538SB CONTRACTORS LLC | +12.0% |
| Apr 9, 2020 | 1552-01-011 | REPLACE BRIDGE AND APPROACHESKarnes · Corpus Christi | 2 of 8 | $1,783,337 | $1,717,294VECTOR UTILITIES LLC | +3.8% |
| Apr 8, 2020 | 6349-50-001 | BRIDGE PREVENTATIVE MAINTENANCE_EROSION CONTROLWilson · San Antonio | 1 of 9 | $370,338 | $370,338 | Won |
| Mar 17, 2020 | 6357-93-001 | REPLACE CULVERTMedina · San Antonio | 3 of 7 | $182,306 | $169,840TIERRA LEASE SERVICE, LLC | +7.3% |
| Mar 5, 2020 | 1206-01-019 | REPLACE BRIDGES AND APPROACHESLive Oak · Corpus Christi | 3 of 8 | $1,475,901 | $1,425,038LISKA CONSTRUCTION COMPANY,… | +3.6% |
| Feb 6, 2020 | 1422-01-009 | REPLACE BRIDGE AND APPROACHESKarnes · Corpus Christi | 2 of 11 | $1,582,041 | $1,326,778HILL COUNTRY BRIDGE, INC. | +19.2% |
| Jan 10, 2020 | 6352-67-001 | REHAB OF VARIOUS BRIDGE FACILITIESVal Verde · Laredo | 4 of 5 | $704,645 | $508,480CHAMPION INFRASTRUCTURE, LLC | +38.6% |
| Dec 4, 2019 | 2687-01-013 | CONSTRUCT LEFT TURN LANES AND RESURFACELlano · Austin | 3 of 5 | $2,562,367 | $2,394,881ANGEL BROTHERS HOLDINGS COR… | +7.0% |
| Nov 5, 2019 | 6349-14-001 | FLOOD DAMAGEKimble · San Angelo | 6 of 6 | $1,591,563 | $1,068,115RELMCO, INC. | +49.0% |
| Oct 2, 2019 | 6339-32-001 | REMOVE AND REPLACE CULVERTAtascosa · San Antonio | 2 of 11 | $489,881 | $481,612TMES LLC | +1.7% |
| Sep 6, 2019 | 1009-02-018 | BRIDGE REPLACEMENTWilson · San Antonio | 6 of 6 | $3,112,675 | $2,029,110ANGEL BROTHERS HOLDINGS COR… | +53.4% |
| Jun 5, 2019 | 1498-01-008 | REPLACE BRIDGE AND APPROACHESFayette · Yoakum | 4 of 10 | $1,078,009 | $1,026,049SB CONTRACTORS LLC | +5.1% |
| Jun 4, 2019 | 0715-01-019 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 3 of 7 | $2,356,937 | $2,235,432HILL COUNTRY BRIDGE, INC. | +5.4% |
| Jun 4, 2019 | 0913-28-067 | REPLACE BRIDGE AND APPROACHESFayette · Yoakum | 4 of 6 | $1,048,169 | $872,850TREVWAY, INC. | +20.1% |
| May 8, 2019 | 0913-22-046 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 5 of 9 | $457,197 | $399,752TMES LLC | +14.4% |
| May 7, 2019 | 0915-13-029 | REPLACE BRIDGE AND APPROACHESAtascosa · San Antonio | 3 of 8 | $726,752 | $619,854SB CONTRACTORS LLC | +17.2% |
| Mar 6, 2019 | 0150-04-047 | GR, BASE, HMACP & PVMT MRKSLlano · Austin | 1 of 6 | $3,884,999 | $3,884,999 | Won |
| Mar 5, 2019 | 0915-13-028 | REPLACE BRIDGE AND APPROACHESAtascosa · San Antonio | 2 of 9 | $838,042 | $823,867RELMCO, INC. | +1.7% |
| Mar 5, 2019 | 0941-02-019 | REPLACE BRIDGE AND APPROACHESDe Witt · Yoakum | 1 of 6 | $1,347,305 | $1,347,305 | Won |
| Feb 5, 2019 | 0915-18-024 | REPLACE BRIDGE AND APPROACHESFrio · San Antonio | 6 of 8 | $866,606 | $572,307ENCINO LANDSCAPE, INC. | +51.4% |
| Jan 9, 2019 | 0687-01-013 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 2 of 6 | $2,085,489 | $1,928,660HILL COUNTRY BRIDGE, INC. | +8.1% |
| Jan 8, 2019 | 0915-45-053 | REPLACE BRIDGE & APPROACHESMedina · San Antonio | 2 of 9 | $511,816 | $487,791RELMCO, INC. | +4.9% |
| Nov 7, 2018 | 0715-01-014 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 2 of 8 | $2,338,579 | $1,963,663HILL COUNTRY BRIDGE, INC. | +19.1% |
| Nov 6, 2018 | 0914-18-110 | REPLACE BRIDGE AND APPROACHESBastrop · Austin | 9 of 12 | $516,807 | $399,604TREVWAY, INC. | +29.3% |
| Sep 6, 2018 | 0915-45-051 | REPLACE BRIDGE AND APPROACHESMedina · San Antonio | 3 of 9 | $341,815 | $274,730SB CONTRACTORS LLC | +24.4% |
| Sep 6, 2018 | 0839-01-014 | REPLACE BRIDGE AND APPROACHESGonzales · Yoakum | 2 of 6 | $2,547,024 | $2,535,860CAPITAL EXCAVATION COMPANY | +0.4% |
| Aug 8, 2018 | 6327-17-001 | SLOPE REPAIRTravis · Austin | 5 of 5 | $498,130 | $423,495RELMCO, INC. | +17.6% |
| Jul 10, 2018 | 0072-10-006 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHKendall · San Antonio | 4 of 8 | $896,214 | $783,135Curran Contracting Company | +14.4% |
| May 1, 2018 | 0907-26-004 | PEDESTRIAN IMPROVEMENTSSchleicher · San Angelo | 7 of 9 | $520,471 | $368,396A GREATER AUSTIN DEVELOPMEN… | +41.3% |
| Apr 4, 2018 | 0914-04-305 | REPLACE BRIDGE AND APPROACHESTravis · Austin | 7 of 11 | $425,927 | $329,781SB CONTRACTORS LLC | +29.2% |
| Apr 4, 2018 | 0253-03-072 | EXPAND 2 LANES TO 4 LANES DIVIDED RURALComal · San Antonio | 4 of 10 | $820,368 | $726,396HUNTER INDUSTRIES, LTD. | +12.9% |
| Apr 3, 2018 | 0913-22-047 | REHABILITATE EXISTING BRIDGEGonzales · Yoakum | 6 of 6 | $1,102,398 | $773,076TMES LLC | +42.6% |
| Mar 14, 2018 | 6320-97-001 | REPAIR RIPRAP SLOPE AT OVERPASSAtascosa · San Antonio | 3 of 9 | $249,860 | $235,947TREVWAY, INC. | +5.9% |
| Feb 1, 2018 | 2166-02-007 | REPLACE BRIDGE AND APPROACHESDe Witt · Yoakum | 8 of 10 | $424,836 | $338,050DALRYMPLE GRAVEL AND CONTRA… | +25.7% |
| Jan 31, 2018 | 6322-18-001 | DRAINAGE IMPROVEMENTSComal · San Antonio | 9 of 10 | $245,180 | $165,000DAN WILLIAMS COMPANY | +48.6% |
| Dec 5, 2017 | 0153-01-013 | INTERSECTION IMPROVEMENTSCaldwell · Austin | 7 of 10 | $2,144,857 | $1,769,284DEAN WORD COMPANY, LTD. | +21.2% |
| Nov 3, 2017 | 0366-02-090 | INSTALL SIGNAL & CONST INTRSCT OPER IMPROVGuadalupe · San Antonio | 4 of 7 | $741,412 | $669,005Curran Contracting Company | +10.8% |
| Nov 2, 2017 | 0114-07-080 | BRIDGE REHABLee · Austin | 6 of 9 | $1,071,609 | $844,010DAN WILLIAMS COMPANY | +27.0% |
| Oct 4, 2017 | 0913-28-064 | REPLACE BRIDGE AND APPROACHESFayette · Yoakum | 2 of 10 | $368,916 | $349,288HILL COUNTRY BRIDGE, INC. | +5.6% |
| Oct 4, 2017 | 0915-11-028 | REPLACE BRIDGE AND APPROACHESKendall · San Antonio | 5 of 11 | $555,092 | $514,523Curran Contracting Company | +7.9% |
| Oct 4, 2017 | 0150-02-039 | BRIDGE REHAB & EROSION REPAIRLlano · Austin | 6 of 6 | $1,260,120 | $890,245RESTEK, INC. | +41.5% |
| Oct 3, 2017 | 0151-01-051 | CONSTRUCTION OF CONTINUOUS LTLBurnet · Austin | 7 of 9 | $846,239 | $612,820DENBOW COMPANY INC. | +38.1% |
| Oct 3, 2017 | 0555-05-024 | REPLACE BRIDGE AND APPROACHESTom Green · San Angelo | 2 of 8 | $1,228,852 | $1,177,9303LW CIVIL LLC | +4.3% |
| Oct 3, 2017 | 0215-01-043 | GRADE, BASE, SURFACE & SAFETY TREAT, ETC.Comal · San Antonio | 6 of 9 | $869,252 | $681,930ANGEL BROTHERS HOLDINGS COR… | +27.5% |
| Sep 7, 2017 | 0396-09-021 | PEDESTRIAN TRAIL- SIDEWALKSLlano · Austin | 1 of 9 | $1,011,050 | $1,011,050 | Won |
| Aug 9, 2017 | 0913-29-050 | REPLACE BRIDGE AND APPROACHESLavaca · Yoakum | 3 of 7 | $456,619 | $451,306CONSTAR CONSTRUCTION | +1.2% |
| Aug 8, 2017 | 0141-20-009 | BRIDGE MAINTENANCEKimble · San Angelo | 3 of 6 | $1,323,754 | $1,146,309ALLEN KELLER COMPANY | +15.5% |
| Aug 8, 2017 | 0328-06-030 | WIDEN ROADWAY TO PROVIDE PASSING LANESAtascosa · San Antonio | 7 of 8 | $3,685,109 | $2,924,984HUNTER INDUSTRIES, LTD. | +26.0% |
| Jul 12, 2017 | 0914-04-227 | REPLACE BRIDGE AND APPROACHESTravis · Austin | 4 of 8 | $411,203 | $377,671CAPITAL EXCAVATION COMPANY | +8.9% |
| Jul 12, 2017 | 0915-45-052 | REPLACE BRIDGE & APPROACHESMedina · San Antonio | 6 of 10 | $495,108 | $422,407RELMCO, INC. | +17.2% |
| Jul 11, 2017 | 0914-26-007 | REPLACE BRIDGE AND APPROACHESMason · Austin | 2 of 5 | $273,533 | $264,228ALLEN KELLER COMPANY | +3.5% |
| Jul 11, 2017 | 1118-01-019 | REPLACE BRIDGE AND APPROACHESBee · Corpus Christi | 6 of 9 | $650,288 | $444,5763LW CIVIL LLC | +46.3% |
| Jul 11, 2017 | 0150-05-047 | INSTALL CONTINUOUS TURN LANEBurnet · Austin | 7 of 9 | $1,278,142 | $1,003,9253LW CIVIL LLC | +27.3% |
| Jun 7, 2017 | 0348-11-015 | REHAB AND WIDENLive Oak · Corpus Christi | 8 of 8 | $3,657,795 | $2,680,559HUNTER INDUSTRIES, LTD. | +36.5% |
| Jun 6, 2017 | 0916-37-030 | REPLACE BRIDGE AND APPROACHESJim Wells · Corpus Christi | 5 of 7 | $458,006 | $348,041CRG | +31.6% |
| Jun 6, 2017 | 0848-01-041 | REHABILITATE & WIDEN NARROW RDWY TO ADD SHOULDERSMedina · San Antonio | 10 of 11 | $3,789,978 | $2,846,963HUNTER INDUSTRIES, LTD. | +33.1% |
| Apr 5, 2017 | 2230-01-018 | CONSTRUCT 2 LANE ROADWAY ON NEW LOCATIONBexar · San Antonio | 8 of 10 | $4,369,594 | $3,419,685DAN WILLIAMS COMPANY | +27.8% |
| Apr 5, 2017 | 0035-05-057 | ASPHALT CONCRETE PAVEMENT OVERLAYMenard · San Angelo | 6 of 7 | $2,440,639 | $1,881,273LONE STAR PAVING COMPANY | +29.7% |
| Apr 4, 2017 | 0072-01-052 | INSTALL CONTINUOUS TURN LANEGillespie · Austin | 5 of 8 | $1,119,390 | $963,063RAY FARIS, INC. | +16.2% |
| Mar 7, 2017 | 0916-29-006 | REPLACE BRIDGE AND APPROACHESLive Oak · Corpus Christi | 5 of 12 | $809,280 | $649,191LISKA CONSTRUCTION COMPANY,… | +24.7% |
| Jan 5, 2017 | 0915-11-031 | REPLACE BRIDGE AND APPROACHESKendall · San Antonio | 4 of 5 | $1,892,978 | $1,522,928CAPITAL EXCAVATION COMPANY | +24.3% |
| Jan 5, 2017 | 0334-08-033 | REPLACE BRIDGE AND APPROACHESFayette · Yoakum | 6 of 6 | $824,753 | $519,5833LW MANAGEMENT, LLC | +58.7% |
| Jan 5, 2017 | 2230-01-016 | REPLACE EXISTING CULVERT WITH BRIDGEBexar · San Antonio | 7 of 10 | $1,744,491 | $1,447,520DAN WILLIAMS COMPANY | +20.5% |
| Jan 5, 2017 | 0265-03-048 | LENGTHEN LEFT TURN LANEBastrop · Austin | 3 of 6 | $323,767 | $286,525AARON CONCRETE CONTRACTORS,… | +13.0% |
| Jan 4, 2017 | 0024-08-128 | CONSTRUCT PEDESTRIAN BRIDGE OVER US 90Bexar · San Antonio | 6 of 8 | $2,905,508 | $2,331,043RELMCO, INC. | +24.6% |
| Nov 4, 2016 | 6304-98-001 | REMOVE AND REPLACE MBGFBexar · San Antonio | 8 of 9 | $815,904 | $568,940K-BAR SERVICES, INC. | +43.4% |
| Nov 3, 2016 | 0366-05-044 | INTERSECTION OPERATIONAL IMPROVEMENTSWilson · San Antonio | 7 of 7 | $782,721 | $611,560ANGEL BROTHERS HOLDINGS COR… | +28.0% |
Active prime contracts 3
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0211-07-046Let Aug 7, 2025 | LeeAustin · US 77 | BRIDGE REPLACEMENT | $13,511,601 | 55% | |
| 0267-02-043Let Jul 1, 2025 | FayetteYoakum · SH 159 | BRIDGE REPLACEMENT | $4,352,983 | 102% | |
| 0142-09-047Let Jul 10, 2024 | KendallSan Antonio · RM 473 | WIDEN NON-FREEWAY | $4,412,811 | 104% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.