| 1 | 100-6002 |
PREPARING ROW | 3.5 | STA |
$5,000.00 |
$2,000.00 |
$3,510.00 |
$5,500.00 |
$5,000.00 |
$1,768.00 |
| 2 | 105-6014 |
REMOVING STAB BASE & ASPH PAV (7"-12") | 440 | SY |
$6.00 |
$12.00 |
$11.10 |
$15.00 |
$16.00 |
$13.89 |
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 113 | CY |
$15.00 |
$25.00 |
$35.60 |
$30.00 |
$30.00 |
$97.66 |
| 4 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 71 | CY |
$25.00 |
$25.00 |
$41.40 |
$25.00 |
$50.00 |
$73.44 |
| 5 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 535 | SY |
$2.50 |
$3.22 |
$1.60 |
$1.50 |
$2.00 |
$2.40 |
| 6 | 164-6029 |
CELL FBR MLCH SEED(TEMP)(WARM) | 268 | SY |
$2.50 |
$6.44 |
$3.20 |
$3.00 |
$3.50 |
$2.59 |
| 7 | 164-6031 |
CELL FBR MLCH SEED(TEMP)(COOL) | 268 | SY |
$2.50 |
$0.0100 |
$3.20 |
$3.00 |
$3.50 |
$2.59 |
| 8 | 168-6001 |
VEGETATIVE WATERING | 16.8 | MG |
$25.00 |
$97.75 |
$81.80 |
$22.00 |
$30.00 |
$162.63 |
| 9 | 169-6002 |
SOIL RETENTION BLANKETS (CL 1) (TY B) | 535 | SY |
$3.50 |
$3.50 |
$3.20 |
$1.50 |
$3.50 |
$5.70 |
| 10 | 216-6001 |
PROOF ROLLING | 2 | HR |
$75.00 |
$500.00 |
$66.70 |
$50.00 |
$50.00 |
$98.46 |
| 11 | 247-6475 |
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS | 142 | CY |
$90.00 |
$80.00 |
$123.00 |
$80.00 |
$110.00 |
$103.02 |
| 12 | 316-6029 |
ASPH (RC-250) | 128 | GAL |
$15.00 |
$14.26 |
$20.00 |
$19.00 |
$9.50 |
$14.01 |
| 13 | 316-6177 |
AGGR(TY-B GR-5 SAC-B) | 5 | CY |
$400.00 |
$1,446.18 |
$2,030.00 |
$2,000.00 |
$750.00 |
$827.91 |
| 14 | 316-6222 |
AGGR(TY-PB GR-3 SAC-B) | 12 | CY |
$450.00 |
$662.00 |
$930.00 |
$880.00 |
$375.00 |
$402.60 |
| 15 | 316-6436 |
ASPH (AC-15P OR AC-10-2TR) | 423 | GAL |
$15.00 |
$7.70 |
$10.80 |
$12.00 |
$5.50 |
$9.26 |
| 16 | 400-6005 |
CEM STABIL BKFL | 34 | CY |
$200.00 |
$200.00 |
$201.00 |
$150.00 |
$150.00 |
$230.68 |
| 17 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 46 | LF |
$10.00 |
$50.00 |
$30.80 |
$1.00 |
$23.00 |
$113.93 |
| 18 | 403-6001 |
TEMPORARY SPL SHORING | 1,300 | SF |
$25.00 |
$25.00 |
$20.00 |
$19.00 |
$23.00 |
$25.02 |
| 19 | 416-6002 |
DRILL SHAFT (24 IN) | 219 | LF |
$230.00 |
$157.28 |
$147.00 |
$155.00 |
$575.00 |
$536.41 |
| 20 | 420-6013 |
CL C CONC (ABUT) | 21.4 | CY |
$1,400.00 |
$900.00 |
$1,230.00 |
$1,750.00 |
$1,300.00 |
$1,289.65 |
| 21 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 1,300 | SF |
$27.50 |
$23.00 |
$27.00 |
$39.00 |
$21.00 |
$62.19 |
| 22 | 422-6015 |
APPROACH SLAB | 39 | CY |
$550.00 |
$550.00 |
$732.00 |
$750.00 |
$575.00 |
$668.06 |
| 23 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 247.11 | LF |
$210.00 |
$267.56 |
$250.00 |
$350.00 |
$220.00 |
$225.58 |
| 24 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 13.1 | CY |
$500.00 |
$600.00 |
$926.00 |
$585.00 |
$325.00 |
$611.54 |
| 25 | 450-6006 |
RAIL (TY T223) | 128 | LF |
$150.00 |
$115.00 |
$94.70 |
$125.00 |
$125.00 |
$248.08 |
| 26 | 454-6004 |
ARMOR JOINT (SEALED) | 57.8 | LF |
$100.00 |
$110.00 |
$135.00 |
$120.00 |
$175.00 |
$206.25 |
| 27 | 459-6001 |
GABIONS (GALV) | 251.9 | CY |
$225.00 |
$224.70 |
$202.00 |
$168.00 |
$200.00 |
$275.42 |
| 28 | 459-6007 |
GABION MATTRESSES (GALV)(12 IN) | 168 | SY |
$105.00 |
$88.55 |
$78.30 |
$67.00 |
$75.00 |
$61.13 |
| 29 | 460-6001 |
CMP (GAL STL 12 IN) | 8 | LF |
$100.00 |
$100.00 |
$96.30 |
$220.00 |
$100.00 |
$288.35 |
| 30 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$25,000.00 |
$10,500.00 |
$13,500.00 |
$35,000.00 |
$35,000.00 |
$22,754.22 |
| 31 | 496-6043 |
REMOV STR (SMALL FENCE) | 25 | LF |
$10.00 |
$25.00 |
$6.00 |
$16.00 |
$15.00 |
$15.62 |
| 32 | 500-6001 |
MOBILIZATION | 1 | LS |
$53,000.00 |
$72,500.00 |
$41,000.00 |
$41,000.00 |
$65,000.00 |
$147,276.21 |
| 33 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$4,000.00 |
$1,536.63 |
$3,220.00 |
$1,750.00 |
$1,000.00 |
$1,388.14 |
| 34 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 160 | SY |
$20.00 |
$20.70 |
$13.80 |
$13.00 |
$15.00 |
$55.66 |
| 35 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 160 | SY |
$10.00 |
$6.90 |
$2.15 |
$2.00 |
$3.00 |
$11.66 |
| 36 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 517 | LF |
$3.50 |
$2.30 |
$2.30 |
$2.15 |
$2.50 |
$16.70 |
| 37 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 517 | LF |
$2.00 |
$1.00 |
$1.05 |
$1.00 |
$1.50 |
$3.50 |
| 38 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 96 | LF |
$10.00 |
$5.18 |
$8.50 |
$8.00 |
$10.00 |
$20.89 |
| 39 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 96 | LF |
$2.00 |
$2.00 |
$2.65 |
$2.50 |
$3.00 |
$4.39 |
| 40 | 530-6006 |
DRIVEWAYS (SURF TREAT) | 148 | SY |
$60.00 |
$50.00 |
$74.00 |
$56.53 |
$25.00 |
$65.46 |
| 41 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 37.5 | LF |
$30.00 |
$50.54 |
$36.10 |
$44.00 |
$40.00 |
$112.80 |
| 42 | 540-6014 |
SHORT RADIUS | 31 | LF |
$50.00 |
$65.00 |
$49.10 |
$60.00 |
$55.00 |
$278.39 |
| 43 | 540-6015 |
DRIVEWAY TERMINAL ANCHOR SECTION | 1 | EA |
$1,000.00 |
$862.50 |
$1,530.00 |
$750.00 |
$1,700.00 |
$490.10 |
| 44 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 2 | EA |
$1,500.00 |
$1,339.75 |
$1,660.00 |
$1,165.00 |
$1,800.00 |
$987.55 |
| 45 | 540-6021 |
MTL THRIE-BEAM GD FEN (TIM POST) | 3 | EA |
$1,750.00 |
$2,081.50 |
$2,000.00 |
$1,810.00 |
$2,200.00 |
$2,785.03 |
| 46 | 540-6023 |
MTL BEAM GD FEN TRANS(THRIE BEAM)28" | 1 | EA |
$1,750.00 |
$2,081.50 |
$1,960.00 |
$1,810.00 |
$2,100.00 |
$5,055.10 |
| 47 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 1 | EA |
$3,000.00 |
$3,461.50 |
$2,920.00 |
$3,100.00 |
$3,200.00 |
$2,855.10 |
| 48 | 550-6015 |
REMOVE AND INSTALL EXISTING GATE | 1 | EA |
$3,500.00 |
$450.00 |
$1,060.00 |
$250.00 |
$1,200.00 |
$6,155.10 |
| 49 | 552-6003 |
WIRE FENCE (TY C) | 25 | LF |
$25.00 |
$15.00 |
$26.60 |
$50.00 |
$30.00 |
$53.70 |
| 50 | 644-6076 |
REMOVE SM RD SN SUP&AM | 2 | EA |
$200.00 |
$150.00 |
$532.00 |
$100.00 |
$125.00 |
$602.55 |
| 51 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$35.00 |
$17.25 |
$16.00 |
$15.00 |
$35.00 |
$292.52 |
| 52 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 10 | EA |
$35.00 |
$34.50 |
$31.90 |
$30.00 |
$35.00 |
$285.51 |
| 53 | 666-6224 |
PAVEMENT SEALER 4" | 700 | LF |
$0.5000 |
$1.55 |
$2.45 |
$2.32 |
$6.00 |
$4.55 |
| 54 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 700 | LF |
$10.00 |
$11.00 |
$3.65 |
$3.43 |
$6.00 |
$5.65 |
| 55 | 672-6009 |
REFL PAV MRKR TY II-A-A | 9 | EA |
$60.00 |
$57.50 |
$91.20 |
$85.77 |
$20.00 |
$286.68 |
| 56 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 700 | LF |
$0.2500 |
$1.15 |
$1.80 |
$1.72 |
$3.50 |
$5.65 |
| 57 | 4171-6001 |
INSTALL BRIDGE IDENTIFICATION NUMBERS | 2 | EA |
$500.00 |
$57.50 |
$121.00 |
$200.00 |
$1,500.00 |
$980.68 |
| 58 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$15,000.00 |
$5,560.00 |
$3,700.00 |
$7,500.00 |
$4,500.00 |
$9,402.55 |