| 1 | 104-6010 |
REMOVING CONC (RIPRAP) | 6 | CY |
$130.00 |
$50.00 |
$300.00 |
$120.00 |
$319.14 |
$500.00 |
$200.00 |
|
| 2 | 104-6054 |
REMOVING CONCRETE(MOW STRIP) | 770 | LF |
$18.00 |
$2.00 |
$5.00 |
$5.00 |
$3.67 |
$20.00 |
$10.00 |
|
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 150 | CY |
$25.00 |
$35.00 |
$30.00 |
$30.00 |
$24.27 |
$30.00 |
$40.00 |
|
| 4 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 83 | CY |
$15.87 |
$25.00 |
$25.00 |
$30.00 |
$35.80 |
$50.00 |
$75.00 |
|
| 5 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 1,350 | SY |
$4.32 |
$1.75 |
$5.00 |
$5.00 |
$6.74 |
$8.00 |
$7.00 |
|
| 6 | 164-6003 |
BROADCAST SEED (PERM) (RURAL) (CLAY) | 1,350 | SY |
$0.5500 |
$0.7500 |
$1.00 |
$0.8000 |
$0.3100 |
$2.00 |
$1.00 |
|
| 7 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 1,350 | SY |
$2.39 |
$1.25 |
$3.00 |
$1.30 |
$2.31 |
$8.50 |
$1.50 |
|
| 8 | 316-6240 |
AGGR(TY-PD GR-4 SAC-B) | 13 | CY |
$220.00 |
$250.00 |
$350.00 |
$210.00 |
$2,247.58 |
$350.00 |
$600.00 |
|
| 9 | 316-6410 |
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR) | 469 | GAL |
$25.00 |
$12.50 |
$8.00 |
$11.00 |
$17.32 |
$10.00 |
$6.00 |
|
| 10 | 340-6272 |
TACK COAT | 12 | GAL |
$5.00 |
$20.00 |
$8.00 |
$25.00 |
$121.49 |
$10.00 |
$3.00 |
|
| 11 | 400-6006 |
CUT & RESTORING PAV | 115 | SY |
$160.00 |
$85.00 |
$85.00 |
$110.00 |
$199.01 |
$200.00 |
$200.00 |
|
| 12 | 401-6001 |
FLOWABLE BACKFILL | 164 | CY |
$350.00 |
$135.00 |
$125.00 |
$185.00 |
$192.41 |
$350.00 |
$225.00 |
|
| 13 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 106 | LF |
$50.00 |
$5.00 |
$30.00 |
$1.00 |
$13.00 |
$10.00 |
$30.00 |
|
| 14 | 403-6001 |
TEMPORARY SPL SHORING | 306 | SF |
$30.00 |
$12.00 |
$25.00 |
$11.00 |
$64.39 |
$85.00 |
$45.00 |
|
| 15 | 432-6002 |
RIPRAP (CONC)(5 IN) | 84 | CY |
$475.00 |
$435.00 |
$415.00 |
$475.00 |
$412.09 |
$650.00 |
$650.00 |
|
| 16 | 432-6024 |
RIPRAP (STONE COMMON)(DRY)(12 IN) | 15 | CY |
$180.00 |
$250.00 |
$175.00 |
$250.00 |
$310.59 |
$185.00 |
$350.00 |
|
| 17 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 57 | CY |
$456.87 |
$435.00 |
$415.00 |
$490.00 |
$464.00 |
$550.00 |
$625.00 |
|
| 18 | 462-6020 |
CONC BOX CULV (8 FT X 5 FT) | 88 | LF |
$850.00 |
$745.00 |
$850.00 |
$1,000.00 |
$1,126.54 |
$1,000.00 |
$1,000.00 |
|
| 19 | 464-6022 |
RC PIPE (CL IV)(48 IN) | 56 | LF |
$450.00 |
$300.00 |
$385.00 |
$350.00 |
$367.12 |
$450.00 |
$375.00 |
|
| 20 | 466-6182 |
WINGWALL (PW - 1) (HW=7 FT) | 2 | EA |
$10,000.00 |
$22,500.00 |
$12,500.00 |
$25,000.00 |
$23,503.40 |
$20,000.00 |
$35,000.00 |
|
| 21 | 467-6477 |
SET (TY II) (48 IN) (RCP) (4: 1) (C) | 2 | EA |
$2,250.00 |
$5,750.00 |
$7,868.00 |
$7,150.00 |
$6,580.78 |
$8,500.00 |
$9,000.00 |
|
| 22 | 496-6004 |
REMOV STR (SET) | 8 | EA |
$750.00 |
$100.00 |
$800.00 |
$250.00 |
$692.59 |
$1,500.00 |
$200.00 |
|
| 23 | 496-6007 |
REMOV STR (PIPE) | 56 | LF |
$25.00 |
$10.00 |
$20.00 |
$20.00 |
$88.09 |
$50.00 |
$60.00 |
|
| 24 | 496-6016 |
REMOV STR (PIPE) | 3 | EA |
$1,840.00 |
$200.00 |
$1,500.00 |
$1,000.00 |
$2,062.67 |
$1,500.00 |
$500.00 |
|
| 25 | 500-6001 |
MOBILIZATION | 1 | LS |
$25,000.00 |
$33,500.00 |
$40,000.00 |
$48,000.00 |
$58,000.00 |
$60,000.00 |
$175,000.00 |
|
| 26 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 | MO |
$3,500.00 |
$4,000.00 |
$12,500.00 |
$13,500.00 |
$1,500.00 |
$8,500.00 |
$10,000.00 |
|
| 27 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 224 | SY |
$25.00 |
$22.50 |
$25.00 |
$17.50 |
$21.26 |
$40.00 |
$13.00 |
|
| 28 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 224 | SY |
$10.00 |
$4.00 |
$12.00 |
$6.00 |
$7.41 |
$20.00 |
$2.00 |
|
| 29 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 260 | LF |
$10.00 |
$5.00 |
$15.00 |
$7.00 |
$8.40 |
$18.00 |
$7.00 |
|
| 30 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 260 | LF |
$2.00 |
$1.00 |
$5.00 |
$1.00 |
$1.22 |
$9.00 |
$3.00 |
|
| 31 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 2 | MO |
$5,500.00 |
$5,000.00 |
$500.00 |
$4,000.00 |
$7,896.89 |
$7,500.00 |
$5,000.00 |
|
| 32 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 725 | LF |
$22.27 |
$29.00 |
$27.95 |
$30.00 |
$49.69 |
$30.00 |
$30.00 |
|
| 33 | 540-6033 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 2 | EA |
$1,100.00 |
$1,500.00 |
$1,558.75 |
$2,800.00 |
$49.69 |
$1,850.00 |
$2,500.00 |
|
| 34 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 450 | LF |
$6.55 |
$2.50 |
$2.15 |
$3.00 |
$12.15 |
$3.00 |
$2.00 |
|
| 35 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,998.44 |
$3,100.00 |
$3,171.25 |
$4,200.00 |
$4,458.71 |
$3,000.00 |
$3,500.00 |
|
| 36 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$550.03 |
$400.00 |
$215.00 |
$300.00 |
$607.46 |
$3,500.00 |
$250.00 |
|
| 37 | 658-6016 |
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | 15 | EA |
$9.04 |
$25.00 |
$19.35 |
$35.00 |
$22.48 |
$100.00 |
$40.00 |
|
| 38 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 15 | EA |
$27.00 |
$30.00 |
$24.72 |
$25.00 |
$38.88 |
$100.00 |
$40.00 |
|
| 39 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 56 | EA |
$10.00 |
$3.00 |
$8.00 |
$2.00 |
$6.07 |
$5.00 |
$1.00 |
|
| 40 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 28 | EA |
$10.00 |
$3.00 |
$8.00 |
$2.00 |
$6.07 |
$5.00 |
$1.00 |
|
| 41 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 470 | LF |
$6.00 |
$6.50 |
$5.85 |
$5.40 |
$6.62 |
$3.00 |
$5.00 |
|
| 42 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 111 | LF |
$6.00 |
$7.00 |
$6.45 |
$6.00 |
$7.29 |
$3.00 |
$5.00 |
|
| 43 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 359 | LF |
$6.00 |
$6.50 |
$5.85 |
$5.40 |
$6.63 |
$3.00 |
$5.00 |
|
| 44 | 672-6009 |
REFL PAV MRKR TY II-A-A | 8 | EA |
$5.00 |
$110.00 |
$107.50 |
$100.80 |
$121.49 |
$5.00 |
$15.00 |
|
| 45 | 752-6015 |
TREE AND BRUSH REMOVAL | 1 | AC |
$2,000.00 |
$3,500.00 |
$7,500.00 |
$15,000.00 |
$7,334.39 |
$25,000.00 |
$20,000.00 |
|
| 46 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 100 | DAY |
$85.00 |
$100.00 |
$250.00 |
$75.00 |
$103.27 |
$150.00 |
$40.00 |
|
| 47 | 6185-6002 |
TMA (STATIONARY) | 32 | DAY |
$180.00 |
$250.00 |
$250.00 |
$150.00 |
$378.81 |
$250.00 |
$350.00 |
|