| 1 | 100-6002 |
PREPARING ROW | 39.82 | STA |
$500.00 |
$500.00 |
$500.00 |
$1,000.00 |
$2,500.00 |
$1,200.00 |
$300.00 |
$618.06 |
$525.00 |
| 2 | 100-6003 |
PREPARING ROW(TREE)(5" TO 12" DIA) | 1 | EA |
$725.00 |
$500.00 |
$500.00 |
$1,440.00 |
$1,060.86 |
$300.00 |
$500.00 |
$827.04 |
$800.00 |
| 3 | 104-6015 |
REMOVING CONC (SIDEWALKS) | 4 | SY |
$15.00 |
$25.00 |
$54.00 |
$92.60 |
$84.12 |
$20.00 |
$50.00 |
$109.80 |
$200.00 |
| 4 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 371 | SY |
$15.00 |
$25.00 |
$20.00 |
$11.00 |
$9.07 |
$20.00 |
$7.70 |
$26.03 |
$15.00 |
| 5 | 104-6028 |
REMOVING CONC (MISC) | 3 | SY |
$12.00 |
$25.00 |
$500.00 |
$535.00 |
$112.16 |
$20.00 |
$25.00 |
$165.96 |
$500.00 |
| 6 | 104-6029 |
REMOVING CONC (CURB OR CURB & GUTTER) | 759 | LF |
$8.00 |
$10.00 |
$10.00 |
$6.50 |
$4.43 |
$20.00 |
$7.30 |
$10.13 |
$33.00 |
| 7 | 105-6015 |
REMOVING STAB BASE & ASPH PAV (8"-10") | 91 | SY |
$4.40 |
$5.00 |
$50.00 |
$18.30 |
$17.83 |
$20.00 |
$20.70 |
$28.62 |
$70.00 |
| 8 | 110-6003 |
EXCAVATION (SPECIAL) | 320 | CY |
$10.00 |
$5.00 |
$20.00 |
$29.90 |
$25.01 |
$10.00 |
$79.00 |
$36.11 |
$54.00 |
| 9 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 131 | CY |
$15.00 |
$15.00 |
$22.00 |
$18.50 |
$31.76 |
$20.00 |
$27.00 |
$71.54 |
$76.00 |
| 10 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 1,487 | SY |
$1.00 |
$5.00 |
$8.92 |
$11.40 |
$11.92 |
$1.00 |
$10.00 |
$4.46 |
$9.00 |
| 11 | 162-6002 |
BLOCK SODDING | 1,487 | SY |
$4.00 |
$5.00 |
$7.42 |
$6.90 |
$6.36 |
$3.00 |
$10.00 |
$5.56 |
$7.50 |
| 12 | 168-6001 |
VEGETATIVE WATERING | 23.2 | MG |
$20.00 |
$20.00 |
$110.00 |
$51.80 |
$40.54 |
$10.00 |
$560.00 |
$79.66 |
$62.00 |
| 13 | 340-6034 |
D-GR HMA(SQ) TY-C PG64-22 | 50 | TON |
$150.00 |
$115.00 |
$450.00 |
$50.00 |
$434.51 |
$100.00 |
$500.00 |
$340.33 |
$300.00 |
| 14 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 51 | SY |
$4.00 |
$3.00 |
$65.00 |
$107.00 |
$324.61 |
$2.00 |
$400.00 |
$105.46 |
$100.00 |
| 15 | 420-6002 |
CL A CONC (MISC) | 7 | CY |
$540.00 |
$550.00 |
$800.00 |
$1,130.00 |
$637.43 |
$600.00 |
$540.00 |
$1,126.30 |
$385.00 |
| 16 | 432-6001 |
RIPRAP (CONC)(4 IN) | 0.5 | CY |
$500.00 |
$750.00 |
$1,000.00 |
$880.78 |
$1,774.86 |
$600.00 |
$540.00 |
$2,361.58 |
$1,000.00 |
| 17 | 462-6047 |
CONC BOX CULV (4 FT X 2 FT)(EXTEND) | 5 | LF |
$515.00 |
$675.00 |
$800.00 |
$1,010.00 |
$1,708.00 |
$750.00 |
$1,750.00 |
$1,219.92 |
$825.00 |
| 18 | 465-6233 |
INLET (COMP) (TY SIDEWALK BRIDGE) | 2 | EA |
$5,900.00 |
$7,750.00 |
$6,000.00 |
$10,000.00 |
$11,245.17 |
$7,500.00 |
$7,000.00 |
$15,471.53 |
$7,500.00 |
| 19 | 466-6181 |
WINGWALL (PW - 1) (HW=6 FT) | 1 | EA |
$15,000.00 |
$17,500.00 |
$10,000.00 |
$10,000.00 |
$7,897.55 |
$15,000.00 |
$25,000.00 |
$12,832.48 |
$13,000.00 |
| 20 | 479-6001 |
ADJUSTING MANHOLES | 1 | EA |
$1,500.00 |
$1,250.00 |
$300.00 |
$901.00 |
$2,121.73 |
$1,400.00 |
$2,500.00 |
$1,742.98 |
$2,750.00 |
| 21 | 479-6005 |
ADJUSTING MANHOLES (WATER VALVE BOX) | 1 | EA |
$1,240.00 |
$1,250.00 |
$1,825.00 |
$745.00 |
$1,591.28 |
$800.00 |
$750.00 |
$1,615.48 |
$2,200.00 |
| 22 | 496-6006 |
REMOV STR (HEADWALL) | 1 | EA |
$1,450.00 |
$1,000.00 |
$2,500.00 |
$1,120.00 |
$1,682.36 |
$1,200.00 |
$3,500.00 |
$1,825.63 |
$1,650.00 |
| 23 | 500-6001 |
MOBILIZATION | 1 | LS |
$55,950.60 |
$60,000.00 |
$50,000.00 |
$53,500.00 |
$66,000.00 |
$50,000.00 |
$15,000.00 |
$82,841.18 |
$130,000.00 |
| 24 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$10,000.00 |
$1,500.00 |
$2,745.00 |
$3,080.00 |
$4,209.98 |
$8,000.00 |
$2,125.00 |
$1,670.93 |
$1,500.00 |
| 25 | 506-6034 |
CONSTRUCTION PERIMETER FENCE | 1,667 | LF |
$4.00 |
$5.00 |
$3.30 |
$2.85 |
$4.24 |
$3.00 |
$5.00 |
$6.89 |
$3.25 |
| 26 | 506-6035 |
SANDBAGS FOR EROSION CONTROL | 50 | EA |
$6.00 |
$5.00 |
$65.00 |
$6.40 |
$10.60 |
$3.00 |
$10.00 |
$8.42 |
$7.00 |
| 27 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 3,334 | LF |
$4.00 |
$5.00 |
$8.60 |
$4.15 |
$3.98 |
$4.00 |
$5.00 |
$4.38 |
$4.50 |
| 28 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 3,334 | LF |
$1.00 |
$5.00 |
$1.75 |
$0.9600 |
$1.06 |
$0.5000 |
$2.00 |
$1.02 |
$1.00 |
| 29 | 529-6002 |
CONC CURB (TY II) | 1,091 | LF |
$20.00 |
$20.00 |
$28.00 |
$16.20 |
$18.30 |
$20.00 |
$23.00 |
$23.82 |
$27.65 |
| 30 | 529-6015 |
CONC CURB (TY C1) | 838 | LF |
$149.82 |
$65.00 |
$30.00 |
$46.10 |
$21.49 |
$150.00 |
$20.00 |
$72.74 |
$88.48 |
| 31 | 529-6020 |
CONC CURB & GUTTER (ARMOR CURB) | 20 | LF |
$344.77 |
$250.00 |
$350.00 |
$364.00 |
$270.01 |
$500.00 |
$205.00 |
$424.76 |
$254.38 |
| 32 | 530-6002 |
INTERSECTIONS (ACP) | 51 | SY |
$80.00 |
$45.00 |
$60.00 |
$130.00 |
$402.97 |
$60.00 |
$400.00 |
$316.20 |
$110.60 |
| 33 | 530-6004 |
DRIVEWAYS (CONC) | 652 | SY |
$75.00 |
$75.00 |
$80.00 |
$130.00 |
$54.17 |
$80.00 |
$136.00 |
$127.21 |
$98.43 |
| 34 | 530-6016 |
DRIVEWAYS (BASE) | 125 | SY |
$25.00 |
$25.00 |
$25.00 |
$42.90 |
$23.20 |
$30.00 |
$71.00 |
$54.81 |
$33.18 |
| 35 | 531-6001 |
CONC SIDEWALKS (4") | 2,164 | SY |
$55.00 |
$65.00 |
$48.75 |
$59.00 |
$44.45 |
$50.00 |
$78.00 |
$58.43 |
$49.77 |
| 36 | 531-6004 |
CURB RAMPS (TY 1) | 2 | EA |
$2,270.00 |
$1,800.00 |
$1,850.00 |
$1,890.00 |
$2,732.10 |
$1,500.00 |
$1,400.00 |
$2,042.85 |
$2,090.34 |
| 37 | 531-6010 |
CURB RAMPS (TY 7) | 8 | EA |
$1,900.00 |
$2,000.00 |
$1,850.00 |
$1,890.00 |
$1,960.18 |
$1,600.00 |
$1,675.00 |
$2,042.85 |
$2,090.34 |
| 38 | 531-6013 |
CURB RAMPS (TY 10) | 5 | EA |
$1,900.00 |
$2,000.00 |
$2,150.00 |
$1,890.00 |
$1,908.72 |
$1,600.00 |
$2,200.00 |
$2,421.26 |
$2,090.34 |
| 39 | 560-6005 |
MAILBOX INSTALL-D (TWG-POST) TY 2 | 3 | EA |
$300.00 |
$300.00 |
$184.00 |
$171.00 |
$169.75 |
$400.00 |
$200.00 |
$185.08 |
$442.40 |
| 40 | 624-6010 |
GROUND BOX TY D (162922)W/APRON | 1 | EA |
$940.00 |
$1,250.00 |
$3,000.00 |
$1,600.00 |
$1,591.28 |
$1,000.00 |
$1,000.00 |
$1,109.08 |
$2,765.00 |
| 41 | 624-6028 |
REMOVE GROUND BOX | 1 | EA |
$275.00 |
$150.00 |
$350.00 |
$1,070.00 |
$530.42 |
$200.00 |
$300.00 |
$229.08 |
$1,106.00 |
| 42 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$421.00 |
$750.00 |
$570.00 |
$528.00 |
$525.12 |
$500.00 |
$594.00 |
$553.58 |
$884.80 |
| 43 | 644-6067 |
IN SM RD SN SUP&AM (INST SIGN ONLY) | 1 | EA |
$249.00 |
$250.00 |
$172.50 |
$160.00 |
$159.13 |
$200.00 |
$180.00 |
$174.08 |
$663.60 |
| 44 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 14 | EA |
$400.00 |
$250.00 |
$350.00 |
$432.00 |
$429.65 |
$400.00 |
$490.00 |
$458.47 |
$553.00 |
| 45 | 644-6078 |
REMOVE SM RD SN SUP&AM (SIGN ONLY) | 1 | EA |
$75.00 |
$50.00 |
$50.00 |
$48.00 |
$47.74 |
$60.00 |
$55.00 |
$58.58 |
$221.20 |
| 46 | 658-6018 |
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND | 2 | EA |
$70.00 |
$50.00 |
$80.00 |
$80.00 |
$79.56 |
$60.00 |
$90.00 |
$91.58 |
$110.60 |
| 47 | 658-6019 |
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND(BR) | 1 | EA |
$46.00 |
$50.00 |
$80.00 |
$80.00 |
$79.56 |
$60.00 |
$90.00 |
$91.58 |
$165.90 |
| 48 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 3 | EA |
$26.00 |
$20.00 |
$23.00 |
$21.30 |
$21.22 |
$20.00 |
$50.00 |
$31.08 |
$110.60 |
| 49 | 666-6099 |
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) | 8 | EA |
$33.00 |
$40.00 |
$290.00 |
$183.00 |
$265.22 |
$250.00 |
$120.00 |
$121.35 |
$110.60 |
| 50 | 666-6243 |
PAVEMENT SEALER (YLD TRI) | 8 | EA |
$21.00 |
$20.00 |
$230.00 |
$91.40 |
$212.16 |
$200.00 |
$210.00 |
$66.35 |
$165.90 |
| 51 | 678-6022 |
PAV SURF PREP FOR MRK (18")(YLD TRI) | 8 | EA |
$30.00 |
$10.00 |
$172.50 |
$45.70 |
$159.12 |
$150.00 |
$30.00 |
$38.85 |
$55.30 |
| 52 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$9,000.00 |
$7,500.00 |
$12,075.00 |
$8,500.00 |
$8,486.91 |
$8,995.00 |
$16,280.00 |
$12,061.53 |
$8,033.76 |
| 53 | 6027-6008 |
GROUND BOX (PREPARE) | 1 | EA |
$200.00 |
$300.00 |
$200.00 |
$3,200.00 |
$1,591.28 |
$300.00 |
$1,000.00 |
$421.58 |
$2,212.00 |
| 54 | 6185-6002 |
TMA (STATIONARY) | 88 | DAY |
$210.00 |
$250.00 |
$230.00 |
$311.00 |
$350.00 |
$230.00 |
$265.00 |
$332.47 |
$427.33 |