Contact information
- julie.reynolds@hodgesandson.com
- Phone
- (903) 884-2326
- Fax
- (903) 884-2275
- Address
- 2480 CR 3340, OMAHA, TX 75571
- TxDOT prequalification
- Construction qualified
472BidsSep 10, 2013 to Nov 3, 2026
56Wins (low bidder)
11.9%Win rate
$114,156,877Total won
Competitor scorecard
Last 5 years in Texas13.1%Win rate27 of 206 bids
+18.4%Average bid vs estimate
+2.3%Winning bids vs estimate
+29.2%Over the low bid when they loseAverage field: 7.1 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| THK CONSTRUCTION LLC | 61 | 13 | 48 | 21% |
| SKYLINE BRIDGE LLC | 56 | 20 | 36 | 36% |
| COPPELL CONSTRUCTION CO., INC. | 50 | 27 | 23 | 54% |
| EARTH BUILDERS, L.P. | 49 | 32 | 17 | 65% |
| EAST TEXAS BRIDGE, INC. | 46 | 24 | 22 | 52% |
| HIGHWAY 19 CONSTRUCTION LLC | 42 | 11 | 31 | 26% |
| STX CIVIL | 40 | 13 | 27 | 33% |
| KNIFE RIVER CORPORATION - SOUTH | 39 | 17 | 22 | 44% |
| TALBERT COMPANIES LLC | 33 | 17 | 16 | 52% |
| TEXAS STEEL INDUSTRIAL PLACING, LLC | 32 | 16 | 16 | 50% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 3, 2026 | 0917-30-068 | CR 244 (FCR 344) @ DEEP CREEK - BR FY 26Burleson · Bryan | 7 of 15 | $832,669 | $721,844C & W SOUTHERN LLC | +15.4% |
| Nov 3, 2026 | 6508-47-001 | FY27 Supplemental BPM 1Childress · Childress | 13 of 15 | $1,995,650 | $792,433ICOS MANAGEMENT, LLC | +151.8% |
| Sep 3, 2026 | 0722-03-016 | Bridge Replacement Anderson CreekRed River · Paris | 8 of 8 | $1,843,764 | $1,474,741LONGVIEW BRIDGE AND ROAD, L… | +25.0% |
| Sep 3, 2026 | 0844-04-011 | FM 1547 @ Buck CreekCollingsworth · Childress | 5 of 7 | $4,089,657 | $3,017,334COPPELL CONSTRUCTION CO., I… | +35.5% |
| Sep 3, 2026 | 0917-31-036 | CR 444 AT BEDIAS CREEKMadison · Bryan | 7 of 7 | $1,376,783 | $1,143,373FUQUA CONSTRUCTION CO., INC. | +20.4% |
| Sep 3, 2026 | 0901-19-198 | BRIDGE REPLACEMENT -29Grayson · Paris | 6 of 8 | $2,601,427 | $2,130,337RB CONTRACTING, LLC | +22.1% |
| Sep 2, 2026 | 0427-01-042 | White Oak CreekRed River · Paris | 7 of 7 | $2,146,297 | $1,792,908HIGHWAY 19 CONSTRUCTION LLC | +19.7% |
| Sep 2, 2026 | 0903-28-073 | CR 194/Howard Rd @ N Frk Village Cr&DrawMontague · Wichita Falls | 2 of 6 | $2,845,260 | $2,804,230TEXAS STEEL INDUSTRIAL PLAC… | +1.5% |
| Sep 2, 2026 | 0913-09-134 | CR 125 Bridge Replacement 2711Wharton · Yoakum | 9 of 12 | $3,464,249 | $2,677,071Rucoba & Maya Construction,… | +29.4% |
| Aug 6, 2026 | 0911-28-082 | CR 1170 at Sikes Creek - HBPHouston · Lufkin | 6 of 6 | $3,422,483 | $2,809,388THK CONSTRUCTION LLC | +21.8% |
| Aug 6, 2026 | 0901-21-022 | CR NW 1018 Bridge ReplacementFranklin · Paris | 1 of 5 | $1,492,466 | $1,492,466 | Won |
| Aug 6, 2026 | 0902-20-238 | CR 1590; at Big Sandy CreekWise · Fort Worth | 1 of 8 | $961,912 | $961,912 | Won |
| Aug 5, 2026 | 0917-16-040 | CR 244 At Eads CreekLeon · Bryan | 2 of 8 | $2,579,009 | $2,572,458THK CONSTRUCTION LLC | +0.3% |
| Aug 5, 2026 | 0901-29-100 | CR 35080 Bridge ReplacementLamar · Paris | 1 of 8 | $800,948 | $800,948 | Won |
| Aug 5, 2026 | 0913-28-101 | CR403 BRIDGE REPLACEMENT 2609Fayette · Yoakum | 4 of 9 | $1,936,028 | $1,617,207TREVWAY, INC. | +19.7% |
| Aug 5, 2026 | 0902-38-134 | CR 452/Dennis Rd: At Patrick CreekParker · Fort Worth | 1 of 10 | $1,531,854 | $1,531,854 | Won |
| Aug 5, 2026 | 6488-31-001 | FY27 BPMJasper · Beaumont | 8 of 8 | $3,596,745 | $1,880,325PATHFIELD INVESTMENTS LLC | +91.3% |
| Jul 1, 2026 | 0909-40-079 | BR | CR 254 @ PERRY CREEK |(MAP #82)Limestone · Waco | 3 of 8 | $2,377,286 | $2,080,558TUCAN CONTRACTING, LLC | +14.3% |
| Jun 3, 2026 | 0918-46-334 | Frankford Rd WB AT Furneaux CreekDenton · Dallas | 5 of 5 | $3,220,896 | $2,342,967TUCAN CONTRACTING, LLC | +37.5% |
| Jun 3, 2026 | 0067-18-010 | US 87 NBI 05-219-0-0067-03-135Swisher · Lubbock | 8 of 9 | $4,592,854 | $2,742,796PATHFIELD INVESTMENTS LLC | +67.5% |
| Jun 2, 2026 | 0919-13-020 | CR 430 at McFaddin Creek TributaryPanola · Atlanta | 2 of 7 | $2,619,044 | $2,349,069THK CONSTRUCTION LLC | +11.5% |
| Jun 2, 2026 | 0105-04-047 | SH 70 @ Quitaque RiverMotley · Childress | 3 of 9 | $3,932,668 | $3,403,214SKYLINE BRIDGE LLC | +15.6% |
| May 7, 2026 | 0920-30-090 | S BURTON RD @ SANDY CREEK(BRIDGE REPLACEOrange · Beaumont | 2 of 3 | $1,972,581 | $1,783,411SKYLINE BRIDGE LLC | +10.6% |
| May 7, 2026 | 1271-01-013 | FM 1107; 1271-01-013; BRWilson · San Antonio | 16 of 17 | $1,636,689 | $948,875D&S CONCRETE CONTRACTORS LLC | +72.5% |
| May 7, 2026 | 0909-22-206 | BR | Old Robinson Rd @ DrainMcLennan · Waco | 6 of 6 | $906,866 | $578,158C & W SOUTHERN LLC | +56.9% |
| May 6, 2026 | 0901-19-212 | Rehab Historic Bridge Craft RdGrayson · Paris | 1 of 10 | $802,935 | $802,935 | Won |
| May 6, 2026 | 0916-26-023 | PostOakRD Goliad At Manahuilla Cr BridgeGoliad · Corpus Christi | 10 of 13 | $1,474,491 | $1,135,008DELGADO'S CONTRACTORS, LLC | +29.9% |
| May 6, 2026 | 0077-07-010 | FM 72 at Spring Creek BridgeIrion · San Angelo | 10 of 10 | $7,703,009 | $4,405,521DELGADO'S CONTRACTORS, LLC | +74.8% |
| Apr 8, 2026 | 1790-02-048 | SL 323, S. OF US 271 - UPRR, BRGSmith · Tyler | 7 of 9 | $1,730,479 | $1,516,226DRAKE COMPANIES LLC | +14.1% |
| Apr 8, 2026 | 0908-23-058 | REPLACE BRIDGE CR 305 @ ALKALI CRK TRIBFisher · Abilene | 4 of 7 | $2,008,199 | $1,880,830TUCAN CONTRACTING, LLC | +6.8% |
| Apr 8, 2026 | 0909-40-081 | BR | @ WILLIAMS CREEK |(MAP #2)Limestone · Waco | 5 of 10 | $1,982,744 | $1,810,423TUCAN CONTRACTING, LLC | +9.5% |
| Apr 8, 2026 | 0902-51-029 | CS; OLD GRANBURY RD OVER WALNUT CRKHood · Fort Worth | 4 of 8 | $678,119 | $632,977GARRET SHIELDS INFRASTRUCTU… | +7.1% |
| Apr 7, 2026 | 0908-23-045 | CR 412 AT COTTONWOOD CRK TRIBFisher · Abilene | 3 of 6 | $3,830,110 | $3,158,064SKYLINE BRIDGE LLC | +21.3% |
| Apr 7, 2026 | 0917-19-062 | CR 830 AT EAST FORK OF MILL CREEK - BRWashington · Bryan | 7 of 9 | $932,970 | $732,054GARRET SHIELDS INFRASTRUCTU… | +27.4% |
| Apr 7, 2026 | 0909-38-100 | BR | CR 325 | FCR 461 @ Hog CreekFalls · Waco | 4 of 12 | $1,141,772 | $1,047,281BLACKSMITH VENTURES LLC | +9.0% |
| Mar 5, 2026 | 0920-06-040 | CR 2018 @Hackberry Branch Brg ReplaceNewton · Beaumont | 1 of 8 | $1,485,796 | $1,485,796 | Won |
| Mar 5, 2026 | 1097-01-018 | Loring Creek ReliefHunt · Paris | 1 of 12 | $2,085,509 | $2,085,509 | Won |
| Mar 5, 2026 | 0394-03-045 | FM 699 at Unnamed Trib of Eight Mile CkPanola · Atlanta | 7 of 10 | $796,466 | $492,768C & W SOUTHERN LLC | +61.6% |
| Mar 5, 2026 | 0901-19-229 | Katy Trail Phase TwoGrayson · Paris | 9 of 11 | $3,200,555 | $2,744,602SCOUT 5 CONSTRUCTION LLC | +16.6% |
| Feb 5, 2026 | 0918-18-142 | NW CR 4340 at Frost BranchNavarro · Dallas | 3 of 15 | $1,350,760 | $1,223,665TUCAN CONTRACTING, LLC | +10.4% |
| Feb 5, 2026 | 0446-06-018 | FM 1093 BRIDGE REPLACEMENT 2610Austin · Yoakum | 11 of 12 | $7,008,535 | $4,981,962R CONSTRUCTION CIVIL, LLC | +40.7% |
| Feb 5, 2026 | 0026-06-033 | US 90 BRIDGE REPLACEMENT 2304-1Colorado · Yoakum | 8 of 14 | $4,619,302 | $3,715,521R CONSTRUCTION CIVIL, LLC | +24.3% |
| Feb 5, 2026 | 0912-34-213 | CR 234 (C Meyer Rd) at Bee CreekFort Bend · Houston | 8 of 9 | $2,557,497 | $1,818,854TREVWAY, INC. | +40.6% |
| Feb 5, 2026 | 0902-49-074 | CR 351; at Bell BranchErath · Fort Worth | 3 of 12 | $635,574 | $625,625DELGADO'S CONTRACTORS, LLC | +1.6% |
| Feb 4, 2026 | 0912-34-207 | CR 209 (Hopkins Rd) at Turkey CreekFort Bend · Houston | 12 of 13 | $3,967,590 | $2,787,245TREVWAY, INC. | +42.3% |
| Feb 4, 2026 | 0902-49-069 | CR; CR 218 OVER DUFFAU CRKErath · Fort Worth | 2 of 9 | $1,003,230 | $976,095THK CONSTRUCTION LLC | +2.8% |
| Feb 4, 2026 | 0902-20-097 | CR; ROBERTS RD AT PANTHER CREEKWise · Fort Worth | 2 of 9 | $875,953 | $875,772THK CONSTRUCTION LLC | +0.0% |
| Jan 7, 2026 | 0009-09-115 | IH 30 Clendling CreekHopkins · Paris | 6 of 6 | $4,600,065 | $2,279,665THK CONSTRUCTION LLC | +101.8% |
| Jan 7, 2026 | 1302-01-025 | FM 1160 BRIDGE REPLACEMENT 2305Wharton · Yoakum | 8 of 10 | $3,330,887 | $2,791,031TEXAS STEEL INDUSTRIAL PLAC… | +19.3% |
| Jan 6, 2026 | 0913-29-067 | CR 281 BRIDGE REPLACEMENT 2609Lavaca · Yoakum | 8 of 10 | $1,512,344 | $1,153,910STX CIVIL | +31.1% |
| Jan 6, 2026 | 0136-04-052 | SH 19 Lake Creek BRG MNTDelta · Paris | 8 of 10 | $4,032,711 | $2,541,166GIBSON & ASSOCIATES, INC. | +58.7% |
| Jan 6, 2026 | 0050-11-027 | BS 6 NB AT SH 6 SB - BRGrimes · Bryan | 7 of 8 | $4,559,867 | $2,838,056GIBSON & ASSOCIATES, INC. | +60.7% |
| Dec 3, 2025 | 0925-15-016 | CR 384 @ Duck CreekDickens · Childress | 3 of 5 | $1,124,297 | $1,016,531STX CIVIL | +10.6% |
| Dec 3, 2025 | 0974-03-014 | FM 604 AT JIM NED CREEKTaylor · Abilene | 3 of 9 | $3,629,241 | $2,697,516J. H. STRAIN & SONS, INC. | +34.5% |
| Dec 3, 2025 | 0716-03-012 | FM 806 BRIDGE REPLACEMENT 2303Colorado · Yoakum | 11 of 12 | $2,305,300 | $1,598,214HUNTER INDUSTRIES, LTD. | +44.2% |
| Dec 3, 2025 | 1262-01-016 | FM 1115 BRIDGE REPLACEMENT 2305Fayette · Yoakum | 7 of 8 | $1,996,246 | $1,375,081HUNTER INDUSTRIES, LTD. | +45.2% |
| Dec 2, 2025 | 0420-10-018 | FM 1300 BRIDGE REPLACEMENT 2305Wharton · Yoakum | 9 of 10 | $3,465,133 | $2,667,278SCOUT 5 CONSTRUCTION LLC | +29.9% |
| Dec 2, 2025 | 0833-13-014 | FM 2039 AT PORTER CREEK - BRBurleson · Bryan | 7 of 9 | $2,948,270 | $2,315,333LARRY YOUNG PAVING, INC. | +27.3% |
| Nov 6, 2025 | 0908-23-049 | CR 122 AT CLEARFORK BRAZOS RIVERFisher · Abilene | 2 of 8 | $1,872,743 | $1,728,544COPPELL CONSTRUCTION CO., I… | +8.3% |
| Nov 5, 2025 | 0315-06-047 | SH 105 AT JACKSON CREEK - BRWashington · Bryan | 11 of 12 | $4,503,546 | $2,813,308LARRY YOUNG PAVING, INC. | +60.1% |
| Nov 5, 2025 | 6478-22-001 | Bridge Work DWHill · Waco | 7 of 7 | $2,243,050 | $1,179,951TAYLOR BRIDGE LLC | +90.1% |
| Oct 9, 2025 | 0546-01-040 | FM 71 at Lacy CreekTitus · Atlanta | 6 of 7 | $1,515,332 | $1,331,903THK CONSTRUCTION LLC | +13.8% |
| Oct 9, 2025 | 0043-06-097 | US 70 at FM 1763Wilbarger · Wichita Falls | 5 of 5 | $4,688,569 | $3,176,311ALTUS CONSTRUCTION LLC | +47.6% |
| Oct 9, 2025 | 0908-20-029 | REPLACE BRIDGE CR 314 at DRAWNolan · Abilene | 6 of 8 | $1,158,615 | $918,429DELGADO'S CONTRACTORS, LLC | +26.2% |
| Oct 9, 2025 | 0901-19-222 | Calf Creek Rd Bridge ReplacementGrayson · Paris | 3 of 10 | $2,866,357 | $2,742,958HIGHWAY 19 CONSTRUCTION LLC | +4.5% |
| Oct 8, 2025 | 0459-02-012 | FM 1580 at Mims CreekFreestone · Bryan | 4 of 7 | $2,796,538 | $2,573,940PMCO CONSTRUCTION LLC | +8.6% |
| Oct 8, 2025 | 0903-06-027 | Hancock St at Dry Frk Lttle WichitaClay · Wichita Falls | 1 of 8 | $1,149,814 | $1,149,814 | Won |
| Oct 8, 2025 | 0903-30-047 | CR 238 (Sign CR 128W) at Paradise CreekWilbarger · Wichita Falls | 3 of 5 | $1,547,216 | $1,424,111SKYLINE BRIDGE LLC | +8.6% |
| Sep 5, 2025 | 1747-02-017 | REPLACE FM 1835 BRIDGE DOUBLE MTN FORKStonewall · Abilene | 1 of 10 | $3,884,350 | $3,884,350 | Won |
| Sep 5, 2025 | 0574-02-022 | FM 636 at Willow CreekNavarro · Dallas | 4 of 8 | $11,175,915 | $9,649,382INDUS ROAD & BRIDGE, INC. | +15.8% |
| Sep 4, 2025 | 2591-01-015 | FM 2610_At Menard Creek - HBPPolk · Lufkin | 2 of 7 | $2,486,932 | $2,472,737THK CONSTRUCTION LLC | +0.6% |
| Sep 4, 2025 | 0918-46-300 | TRINITY ROAD AT COOPER CREEK IN CITY OFDenton · Dallas | 2 of 8 | $1,651,972 | $1,636,169SKYLINE BRIDGE LLC | +1.0% |
| Aug 8, 2025 | 6480-11-001 | 2026 - BPM WF AreaWichita · Wichita Falls | 5 of 9 | $1,932,450 | $1,492,330BUILT RIGHT CONSTRUCTION OF… | +29.5% |
| Aug 8, 2025 | 0902-38-136 | McVoid Rd: at Tributary of Walnut CreekParker · Fort Worth | 2 of 8 | $870,896 | $829,673WESTFIELD INSURANCE COMPANY | +5.0% |
| Aug 8, 2025 | 0902-38-135 | Kings Gate Rd: at Clear Fork Trinity RvParker · Fort Worth | 3 of 8 | $1,734,885 | $1,536,599WESTFIELD INSURANCE COMPANY | +12.9% |
| Aug 7, 2025 | 0911-39-074 | CR 3689_At Cypress Creek - HBPShelby · Lufkin | 1 of 8 | $1,630,098 | $1,630,098 | Won |
| Jul 2, 2025 | 0982-05-011 | FM 923 at Bush Knob CrThrockmorton · Wichita Falls | 3 of 8 | $747,184 | $728,607C & W SOUTHERN LLC | +2.5% |
| Jul 2, 2025 | 0918-22-162 | On Harris Rd at Hog CreekEllis · Dallas | 5 of 10 | $2,904,746 | $2,531,308WESTFIELD INSURANCE COMPANY | +14.8% |
| Jul 2, 2025 | 0911-28-061 | CR 4700_LEE CREEK - HBPHouston · Lufkin | 4 of 6 | $1,484,351 | $1,408,212BLACKSMITH VENTURES LLC | +5.4% |
| Jul 1, 2025 | 0704-06-016 | FM 94 @ DrawMotley · Childress | 5 of 7 | $2,746,723 | $1,837,101STX CIVIL | +49.5% |
| Jul 1, 2025 | 0267-02-043 | SH 159 Bridge Replacement 2507Fayette · Yoakum | 9 of 10 | $5,575,560 | $4,282,480ACME BRIDGE COMPANY, INC. | +30.2% |
| Jul 1, 2025 | 0918-22-159 | CR OLD ALMA ROAD AT DRAWEllis · Dallas | 6 of 13 | $3,326,560 | $3,124,045STX CIVIL | +6.5% |
| Jul 1, 2025 | 0901-19-221 | Prescott Rd Bridge ReplacementGrayson · Paris | 4 of 11 | $2,473,129 | $2,294,027RB CONTRACTING, LLC | +7.8% |
| Jul 1, 2025 | 0903-15-106 | CR 258/SIGN CR 341 at DrawCooke · Wichita Falls | 2 of 8 | $2,514,569 | $2,437,821THK CONSTRUCTION LLC | +3.1% |
| Jun 5, 2025 | 0925-10-037 | CR 20 @ Lelia Lake Creek DonleyDonley · Childress | 3 of 10 | $986,805 | $954,735SKYLINE BRIDGE LLC | +3.4% |
| Jun 5, 2025 | 0911-04-098 | Bering Road at Long King Creek - HBPPolk · Lufkin | 6 of 8 | $1,976,212 | $1,653,086TRUE ROADS CONSTRUCTION LLC | +19.5% |
| Jun 5, 2025 | 0902-49-072 | CR 454 @ Bosque RiverErath · Fort Worth | 2 of 9 | $930,246 | $866,897STX CIVIL | +7.3% |
| Jun 4, 2025 | 0919-03-066 | CR 1301at Eight Mile CreekHarrison · Atlanta | 4 of 6 | $1,669,145 | $1,320,898TRUE ROADS CONSTRUCTION LLC | +26.4% |
| Jun 4, 2025 | 0913-28-091 | CR 222 BRIDGE REPLACEMENT 2206-3Fayette · Yoakum | 5 of 10 | $1,503,044 | $1,169,874ACME BRIDGE COMPANY, INC. | +28.5% |
| Jun 4, 2025 | 0909-29-047 | BR | @ Leon River | Map #206Hamilton · Waco | 3 of 11 | $4,324,387 | $4,196,407COPPELL CONSTRUCTION CO., I… | +3.0% |
| Jun 4, 2025 | 0385-02-030 | FM 4; at Weaver BranchHood · Fort Worth | 7 of 7 | $3,241,068 | $2,382,295STX CIVIL | +36.0% |
| May 2, 2025 | 0909-38-095 | BR | CR 162 | FCR 245 @Hogpen CreekFalls · Waco | 4 of 8 | $2,575,339 | $2,238,703A. L. HELMCAMP, INC. | +15.0% |
| May 2, 2025 | 0403-01-050 | SH 156 SB_STEPHENS CREEK - BSSPSan Jacinto · Lufkin | 5 of 8 | $5,134,662 | $4,304,421SKYLINE BRIDGE LLC | +19.3% |
| May 1, 2025 | 0553-03-034 | SH 7 at Morral Creek (BR)Nacogdoches · Lufkin | 7 of 8 | $8,690,667 | $6,230,927THK CONSTRUCTION LLC | +39.5% |
| May 1, 2025 | 0092-13-031 | BI 45-F at Post Oak CreekNavarro · Dallas | 10 of 10 | $5,095,375 | $3,850,000PMCO CONSTRUCTION LLC | +32.3% |
| Apr 3, 2025 | 0913-28-095 | CR 320 BRIDGE REPLACEMENT 2709Fayette · Yoakum | 7 of 10 | $2,570,923 | $2,036,158TREVWAY, INC. | +26.3% |
| Feb 7, 2025 | 0042-06-077 | US 287 @ Drainage DitchDonley · Childress | 1 of 3 | $4,458,100 | $4,458,100 | Won |
| Feb 7, 2025 | 0275-02-075 | BI 40D EB Bridge ReplacementCarson · Amarillo | 6 of 6 | $16,788,394 | $9,874,035ALTUS CONSTRUCTION LLC | +70.0% |
| Feb 6, 2025 | 0137-05-035 | SH 25 at Mid Fork Little Wichita RiverArcher · Wichita Falls | 7 of 7 | $9,279,389 | $6,506,472ALTUS CONSTRUCTION LLC | +42.6% |
| Jan 8, 2025 | 0920-12-049 | CR 139 @ BIG SANDY CREEK-BRIDGE REPLACEJasper · Beaumont | 3 of 8 | $2,022,615 | $1,980,225ISI CONTRACTING, INC. | +2.1% |
| Jan 8, 2025 | 0910-12-143 | E.Tyler St, Mill Creek, RBRVan Zandt · Tyler | 4 of 8 | $1,362,132 | $1,162,543EAST TEXAS BRIDGE, INC. | +17.2% |
| Jan 8, 2025 | 0901-19-216 | Bridge Replacement Sister Grove CreekGrayson · Paris | 3 of 6 | $2,080,627 | $1,816,247THK CONSTRUCTION LLC | +14.6% |
| Jan 8, 2025 | 0907-13-017 | 0907-13-017 CR REPLACE BRIDGE AND APPROARunnels · San Angelo | 6 of 8 | $3,311,857 | $1,997,089J. H. STRAIN & SONS, INC. | +65.8% |
| Jan 7, 2025 | 0283-03-024 | SH 79 Str 03-005-0283-03-005 Repl Culv MArcher · Wichita Falls | 6 of 6 | $4,100,588 | $3,345,238SKYLINE BRIDGE LLC | +22.6% |
| Jan 7, 2025 | 0010-02-107 | IH 30 WB Bill Bradford Bridge RepairHopkins · Paris | 12 of 12 | $1,534,100 | $339,000GRANITE CONSTRUCTION COMPANY | +352.5% |
| Dec 3, 2024 | 0909-38-090 | BR | FCR 157 @ COPPERAS CREEK |(MAP #83)Falls · Waco | 6 of 8 | $3,256,282 | $2,820,729SKYLINE BRIDGE LLC | +15.4% |
| Nov 6, 2024 | 0902-40-032 | CAMPSEY RD OVER TRIB OF CROOKED CREEKJack · Fort Worth | 4 of 6 | $1,076,073 | $788,118YOKO EXCAVATING, LLC | +36.5% |
| Aug 1, 2024 | 0909-37-068 | BRIDGE REPLACEMENTHill · Waco | 6 of 6 | $1,008,910 | $759,759PMCO CONSTRUCTION LLC | +32.8% |
| Aug 1, 2024 | 0901-28-105 | BRIDGE REPLACEMENTHopkins · Paris | 5 of 5 | $875,963 | $562,559THK CONSTRUCTION LLC | +55.7% |
| Jun 5, 2024 | 0006-15-038 | BRIDGE REPLACEMENTNolan · Abilene | 1 of 1 | $8,441,703 | $8,441,703 | Won |
| Jun 5, 2024 | 0919-30-061 | BRIDGE REPLACEMENTTitus · Atlanta | 4 of 8 | $891,675 | $723,297THK CONSTRUCTION LLC | +23.3% |
| Jun 5, 2024 | 0925-09-036 | BRIDGE REPLACEMENTHall · Childress | 5 of 6 | $999,564 | $879,885THK CONSTRUCTION LLC | +13.6% |
| May 3, 2024 | 2030-01-011 | REPLACE BRIDGE AND APPROACHESUpshur · Atlanta | 3 of 4 | $3,616,494 | $3,343,733EAST TEXAS BRIDGE, INC. | +8.2% |
| May 3, 2024 | 0917-12-088 | BRIDGE REPLACEMENTMilam · Bryan | 8 of 10 | $1,368,807 | $974,112C. E. BARKER, LTD. | +40.5% |
| Apr 4, 2024 | 3198-02-018 | BRIDGE MAINTENANCESan Jacinto · Lufkin | 1 of 2 | $4,878,702 | $4,878,702 | Won |
| Apr 4, 2024 | 0157-04-056 | BRIDGE REPLACEMENTHaskell · Abilene | 5 of 6 | $5,836,019 | $4,673,134COPPELL CONSTRUCTION CO., I… | +24.9% |
| Apr 4, 2024 | 0913-28-092 | BRIDGE REPLACEMENTFayette · Yoakum | 9 of 10 | $1,472,980 | $954,925C. E. BARKER, LTD. | +54.3% |
| Apr 4, 2024 | 6453-47-001 | CROSS DRAINAGE STRUCTURE REPAIRRed River · Paris | 4 of 7 | $968,670 | $853,971RB CONTRACTING, LLC | +13.4% |
| Mar 6, 2024 | 0918-18-133 | BRIDGE REPLACEMENTNavarro · Dallas | 1 of 5 | $3,379,522 | $3,379,522 | Won |
| Mar 6, 2024 | 0923-17-090 | BRIDGE REPLACEMENTComanche · Brownwood | 1 of 3 | $3,808,132 | $3,808,132 | Won |
| Mar 6, 2024 | 0435-01-083 | BRIDGE REPLACEMENTLamar · Paris | 3 of 3 | $4,504,625 | $3,732,598THK CONSTRUCTION LLC | +20.7% |
| Mar 6, 2024 | 1511-01-013 | REPLACE BRIDGE AND APPROACHESUpshur · Atlanta | 3 of 4 | $1,994,460 | $1,790,148THK CONSTRUCTION LLC | +11.4% |
| Mar 5, 2024 | 1709-02-021 | BRIDGE REPLACEMENTFannin · Paris | 3 of 4 | $3,702,608 | $2,948,142HIGHWAY 19 CONSTRUCTION LLC | +25.6% |
| Mar 5, 2024 | 6460-74-001 | BRIDGE REPAIRHardeman · Childress | 12 of 12 | $969,410 | $491,426ICOS MANAGEMENT, LLC | +97.3% |
| Feb 2, 2024 | 1396-01-013 | BRIDGE REPLACEMENTKaufman · Dallas | 6 of 10 | $6,837,425 | $5,443,324HIGHWAY 19 CONSTRUCTION LLC | +25.6% |
| Feb 2, 2024 | 0540-02-027 | BRIDGE REPLACEMENTRobertson · Bryan | 9 of 9 | $2,408,838 | $1,750,130KNIFE RIVER CORPORATION - S… | +37.6% |
| Feb 1, 2024 | 0381-01-017 | BRIDGE REPLACEMENTChildress · Childress | 3 of 4 | $7,411,710 | $6,310,486ALTUS CONSTRUCTION LLC | +17.5% |
| Feb 1, 2024 | 0901-19-204 | BRIDGE REPLACEMENTGrayson · Paris | 5 of 7 | $1,994,900 | $1,590,709HIGHWAY 19 CONSTRUCTION LLC | +25.4% |
| Jan 5, 2024 | 1031-05-018 | BRIDGE REPLACEMENTShackelford · Abilene | 3 of 4 | $2,999,592 | $2,414,952A GREATER AUSTIN DEVELOPMEN… | +24.2% |
| Jan 4, 2024 | 2189-01-020 | BRIDGE REPLACEMENTScurry · Abilene | 1 of 1 | $7,348,905 | $7,348,905 | Won |
| Dec 6, 2023 | 0244-07-009 | BRIDGE REPLACEMENTJasper · Beaumont | 3 of 5 | $1,933,043 | $1,733,589RAYFORD'S TRUCK & TRACTOR | +11.5% |
| Dec 6, 2023 | 0908-27-006 | BRIDGE REPLACEMENTKent · Abilene | 3 of 3 | $986,075 | $878,015EARTH BUILDERS, L.P. | +12.3% |
| Dec 6, 2023 | 0901-30-018 | BRIDGE REPLACEMENTRains · Paris | 4 of 8 | $530,978 | $424,043TRUE ROADS CONSTRUCTION, LLC | +25.2% |
| Dec 5, 2023 | 0901-19-227 | BRIDGE MAINTENANCEGrayson · Paris | 5 of 5 | $1,359,150 | $851,850MB WESTERN INDUSTRIAL CONTR… | +59.6% |
| Dec 5, 2023 | 0911-08-049 | BRIDGE REPLACEMENTNacogdoches · Lufkin | 5 of 10 | $2,719,693 | $2,041,759THK CONSTRUCTION LLC | +33.2% |
| Dec 5, 2023 | 0814-01-037 | BRIDGE REPLACEMENTBaylor · Wichita Falls | 2 of 4 | $3,472,898 | $2,860,939THK CONSTRUCTION LLC | +21.4% |
| Dec 5, 2023 | 6454-49-001 | BRIDGE PREVENTATIVE MAINTENANCEHall · Childress | 12 of 12 | $819,000 | $421,800PATHFIELD INVESTMENTS LLC | +94.2% |
| Nov 2, 2023 | 1652-01-015 | BRIDGE REPLACEMENTFisher · Abilene | 6 of 6 | $1,827,667 | $684,071ICOS MANAGEMENT, LLC | +167.2% |
| Nov 2, 2023 | 1360-01-030 | BRIDGE REPLACEMENTJones · Abilene | 2 of 5 | $1,789,746 | $1,671,854COPPELL CONSTRUCTION CO., I… | +7.1% |
| Nov 2, 2023 | 6451-13-001 | BRIDGE PREVENTATIVE MAINTENANCEVan Zandt · Tyler | 9 of 9 | $1,252,894 | $739,193RED BARON BUILDING COMPANY,… | +69.5% |
| Sep 7, 2023 | 0901-32-103 | BRIDGE REPLACEMENTFannin · Paris | 4 of 6 | $2,693,584 | $2,295,795THK CONSTRUCTION LLC | +17.3% |
| Aug 3, 2023 | 0920-06-037 | BRIDGE REPLACEMENTNewton · Beaumont | 4 of 7 | $1,897,424 | $1,497,066RAYFORD'S TRUCK & TRACTOR | +26.7% |
| Aug 3, 2023 | 0917-18-082 | BRIDGE REPLACEMENTRobertson · Bryan | 4 of 4 | $867,068 | $663,959FUQUA CONSTRUCTION CO., INC. | +30.6% |
| Aug 3, 2023 | 0902-39-029 | BRIDGE REPLACEMENTPalo Pinto · Fort Worth | 2 of 3 | $955,666 | $724,492PMCO CONSTRUCTION LLC | +31.9% |
| Aug 3, 2023 | 0844-03-013 | BRIDGE REPLACEMENTCollingsworth · Childress | 1 of 5 | $10,872,131 | $10,872,131 | Won |
| Aug 3, 2023 | 1895-02-013 | REPLACE BRIDGE AND APPROACHESHarrison · Atlanta | 4 of 4 | $4,434,595 | $3,496,301THK CONSTRUCTION LLC | +26.8% |
| Aug 2, 2023 | 6436-53-001 | BRIDGE PREVENTATIVE MAINTENANCEArcher · Wichita Falls | 5 of 5 | $3,175,145 | $1,834,460PATHFIELD INVESTMENTS LLC | +73.1% |
| Aug 2, 2023 | 0917-17-076 | BRIDGE REPLACEMENTGrimes · Bryan | 2 of 6 | $2,324,656 | $2,278,373FORDE CONSTRUCTION COMPANY,… | +2.0% |
| Aug 2, 2023 | 0917-27-047 | BRIDGE REPLACEMENTWalker · Bryan | 2 of 5 | $939,480 | $832,940TREVWAY, INC. | +12.8% |
| Aug 2, 2023 | 0917-20-046 | BRIDGE REPLACEMENTFreestone · Bryan | 4 of 5 | $741,481 | $609,028THK CONSTRUCTION LLC | +21.7% |
| Jun 28, 2023 | 0311-02-033 | BRIDGE REPLACEMENTHall · Childress | 3 of 3 | $12,854,648 | $9,334,727EARTH BUILDERS, L.P. | +37.7% |
| Jun 28, 2023 | 0456-02-028 | BRIDGE REPLACEMENTFreestone · Bryan | 4 of 4 | $7,006,815 | $5,652,868A. L. HELMCAMP, INC. | +24.0% |
| Jun 28, 2023 | 0901-22-122 | BRIDGE REPLACEMENTHunt · Paris | 3 of 4 | $1,140,669 | $1,080,968HIGHWAY 19 CONSTRUCTION LLC | +5.5% |
| Jun 27, 2023 | 0910-16-156 | BRIDGE REPLACEMENTSmith · Tyler | 5 of 7 | $5,690,075 | $4,280,740BAKER & COMPANY CONSTRUCTIO… | +32.9% |
| Jun 27, 2023 | 0910-12-139 | BRIDGE REPLACEMENTVan Zandt · Tyler | 2 of 6 | $1,413,558 | $1,393,630TRUE ROADS CONSTRUCTION, LLC | +1.4% |
| Jun 27, 2023 | 0908-23-053 | BRIDGE REPLACEMENTFisher · Abilene | 2 of 3 | $934,914 | $917,198DELGADO'S CONTRACTORS, LLC | +1.9% |
| May 5, 2023 | 1669-01-007 | BRIDGE REPLACEMENTRusk · Tyler | 4 of 4 | $2,179,485 | $1,892,090TRUE ROADS CONSTRUCTION, LLC | +15.2% |
| May 5, 2023 | 0918-11-100 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 1 of 6 | $1,534,310 | $1,534,310 | Won |
| May 5, 2023 | 0901-28-097 | BRIDGE REPLACEMENTHopkins · Paris | 3 of 3 | $999,628 | $842,684THK CONSTRUCTION LLC | +18.6% |
| May 5, 2023 | 0909-29-046 | REPLACE BRIDGE AND APPROACHESHamilton · Waco | 3 of 4 | $1,005,240 | $906,656KNIFE RIVER CORPORATION - S… | +10.9% |
| May 5, 2023 | 0917-18-085 | BRIDGE REPLACEMENTRobertson · Bryan | 4 of 4 | $977,388 | $722,351FUQUA CONSTRUCTION CO., INC. | +35.3% |
| May 5, 2023 | 0903-06-026 | BRIDGE REPLACEMENTClay · Wichita Falls | 2 of 4 | $1,025,630 | $815,142THK CONSTRUCTION LLC | +25.8% |
| May 4, 2023 | 0908-33-106 | BRIDGE REPLACEMENTTaylor · Abilene | 3 of 3 | $1,643,216 | $1,316,532J. H. STRAIN & SONS, INC. | +24.8% |
| May 4, 2023 | 0910-16-154 | BRIDGE REPLACEMENTSmith · Tyler | 6 of 8 | $607,079 | $468,057HIGHWAY 19 CONSTRUCTION LLC | +29.7% |
| Apr 5, 2023 | 0043-05-112 | BRIDGE REPLACEMENTWilbarger · Wichita Falls | 1 of 2 | $3,882,921 | $3,882,921 | Won |
| Apr 5, 2023 | 0909-37-065 | BRIDGE REPLACEMENTHill · Waco | 3 of 3 | $708,183 | $558,558PMCO CONSTRUCTION LLC | +26.8% |
| Feb 1, 2023 | 2034-01-013 | BRIDGE REPLACEMENTScurry · Abilene | 2 of 4 | $1,545,565 | $1,393,947COPPELL CONSTRUCTION CO., I… | +10.9% |
| Jan 6, 2023 | 0570-03-019 | BRIDGE REPLACEMENTYoung · Wichita Falls | 2 of 5 | $8,424,229 | $7,845,445INDUS ROAD & BRIDGE, INC. | +7.4% |
| Jan 5, 2023 | 0917-19-053 | BRIDGE REPLACEMENTWashington · Bryan | 5 of 7 | $913,320 | $815,696FUQUA CONSTRUCTION CO., INC. | +12.0% |
| Jan 5, 2023 | 0923-17-091 | BRIDGE REPLACEMENTComanche · Brownwood | 1 of 4 | $1,187,288 | $1,187,288 | Won |
| Jan 5, 2023 | 0903-29-027 | BRIDGE REPLACEMENTArcher · Wichita Falls | 1 of 5 | $824,216 | $824,216 | Won |
| Jan 5, 2023 | 0923-22-025 | BRIDGE REPLACEMENTStephens · Brownwood | 2 of 2 | $1,210,620 | $1,073,352PROJECT ALLIED RESOURCES, L… | +12.8% |
| Nov 3, 2022 | 0913-28-082 | BRIDGE REPLACEMENTFayette · Yoakum | 1 of 8 | $1,338,297 | $1,338,297 | Won |
| Nov 2, 2022 | 0288-01-040 | BRIDGE MAINTENANCEComanche · Brownwood | 6 of 7 | $3,518,800 | $2,724,265STRUCTURAL INTEGRITY GROUP … | +29.2% |
| Nov 2, 2022 | 0909-28-035 | BRIDGE REPLACEMENTBosque · Waco | 1 of 4 | $799,353 | $799,353 | Won |
| Oct 7, 2022 | 6420-95-001 | BRIDGE PREVENTATIVE MAINTENANCECass · Atlanta | 7 of 10 | $773,785 | $606,935THK CONSTRUCTION LLC | +27.5% |
| Oct 7, 2022 | 0919-19-083 | CONSTRUCT SIDEWALKS AND PEDESTRIAN CURB RAMPSBowie · Atlanta | 3 of 5 | $917,668 | $760,142BLACKSTONE CONCRETE VENTURE… | +20.7% |
| Oct 7, 2022 | 0907-14-010 | BRIDGE REPLACEMENTCoke · San Angelo | 2 of 3 | $758,160 | $659,587DELGADO'S CONTRACTORS, LLC | +14.9% |
| Oct 7, 2022 | 0570-03-021 | REMOVAL AND/OR REPLACEMENT AND/OR DISPOSALYoung · Wichita Falls | 5 of 7 | $390,460 | $251,150TALBRAN ENTERPRISES LLC | +55.5% |
| Sep 7, 2022 | 1028-01-030 | BRIDGE REPLACEMENTMills · Brownwood | 4 of 4 | $4,466,706 | $3,930,712ACME BRIDGE COMPANY, INC. | +13.6% |
| Aug 4, 2022 | 1650-01-010 | BRIDGE REPLACEMENTHall · Childress | 3 of 5 | $1,888,230 | $1,575,474EARTH BUILDERS, L.P. | +19.9% |
| Aug 3, 2022 | 0400-03-015 | BRIDGE REPLACEMENTHopkins · Paris | 3 of 4 | $1,604,195 | $1,347,539HIGHWAY 19 CONSTRUCTION LLC | +19.0% |
| Aug 3, 2022 | 0902-20-102 | BRIDGE REPLACEMENTWise · Fort Worth | 2 of 3 | $1,013,418 | $883,443WESSON CONSTRUCTION SERVICE… | +14.7% |
| Aug 3, 2022 | 0832-02-029 | BRIDGE REPLACEMENTWilbarger · Wichita Falls | 3 of 3 | $1,616,329 | $1,277,219BUILT RIGHT CONSTRUCTION OF… | +26.6% |
| Jun 30, 2022 | 0901-19-214 | BRIDGE REPLACEMENTGrayson · Paris | 1 of 4 | $999,796 | $999,796 | Won |
| Jun 29, 2022 | 0263-05-024 | BRIDGE REPLACEMENTFisher · Abilene | 4 of 5 | $4,711,771 | $3,716,744STATELINE CONSTRUCTION, LLC | +26.8% |
| Jun 29, 2022 | 0911-28-048 | BRIDGE REPLACEMENTHouston · Lufkin | 4 of 4 | $1,198,046 | $876,155THK CONSTRUCTION LLC | +36.7% |
| Jun 29, 2022 | 0901-27-046 | BRIDGE REPLACEMENTRed River · Paris | 5 of 5 | $1,401,695 | $1,091,166HIGHWAY 19 CONSTRUCTION LLC | +28.5% |
| Apr 7, 2022 | 0917-30-057 | BRIDGE REPLACEMENTBurleson · Bryan | 2 of 4 | $1,481,164 | $1,449,786TREVWAY, INC. | +2.2% |
| Mar 4, 2022 | 1780-01-009 | BRIDGE REPLACEMENTMills · Brownwood | 3 of 5 | $1,761,786 | $1,685,451ACME BRIDGE COMPANY, INC. | +4.5% |
| Mar 4, 2022 | 0919-03-060 | REPLACE BRIDGE AND APPROACHESHarrison · Atlanta | 6 of 10 | $530,328 | $481,045THK CONSTRUCTION LLC | +10.2% |
| Mar 4, 2022 | 0901-29-091 | BRIDGE REPLACEMENTLamar · Paris | 1 of 3 | $579,521 | $579,521 | Won |
| Mar 3, 2022 | 0136-01-066 | BRIDGE REPLACEMENTHunt · Paris | 2 of 4 | $3,174,929 | $2,620,776HIGHWAY 19 CONSTRUCTION LLC | +21.1% |
| Mar 3, 2022 | 0919-13-018 | BRIDGE REPLACEMENTPanola · Atlanta | 4 of 9 | $533,846 | $489,998RAYFORD'S TRUCK & TRACTOR | +8.9% |
| Mar 3, 2022 | 0919-22-034 | REPLACE BRIDGE AND APPROACHESMarion · Atlanta | 6 of 9 | $419,667 | $324,589THK CONSTRUCTION LLC | +29.3% |
| Mar 3, 2022 | 0176-02-127 | BRIDGE MAINTENANCEAngelina · Lufkin | 3 of 6 | $331,800 | $281,620SJ&J CONSTRUCTION, LLC | +17.8% |
| Feb 4, 2022 | 0910-07-078 | BRIDGE REPLACEMENTGregg · Tyler | 5 of 6 | $745,108 | $638,113SOUTH TEXAS ILLUMINATION, L… | +16.8% |
| Feb 3, 2022 | 0901-32-101 | BRIDGE REPLACEMENTFannin · Paris | 3 of 5 | $567,203 | $470,244THK CONSTRUCTION LLC | +20.6% |
| Jan 7, 2022 | 0118-08-075 | BRIDGE REPLACEMENTNacogdoches · Lufkin | 6 of 6 | $3,478,110 | $2,490,125DREWERY CONSTRUCTION COMPAN… | +39.7% |
| Jan 7, 2022 | 0923-17-088 | BRIDGE REPLACEMENTComanche · Brownwood | 5 of 5 | $2,345,813 | $1,969,718KNIFE RIVER CORPORATION - S… | +19.1% |
| Jan 7, 2022 | 0910-16-147 | BRIDGE REPLACEMENTSmith · Tyler | 8 of 9 | $1,619,587 | $1,258,294THK CONSTRUCTION LLC | +28.7% |
| Jan 7, 2022 | 0901-22-117 | BRIDGE REPLACEMENTHunt · Paris | 2 of 5 | $1,576,099 | $1,348,336HIGHWAY 19 CONSTRUCTION LLC | +16.9% |
| Jan 6, 2022 | 0903-15-105 | BRIDGE REPLACEMENTCooke · Wichita Falls | 5 of 5 | $1,822,972 | $1,461,248CDM HOLDINGS, LLC | +24.8% |
| Dec 2, 2021 | 0923-09-066 | BRIDGE REPLACEMENTEastland · Brownwood | 1 of 5 | $1,317,857 | $1,317,857 | Won |
| Dec 2, 2021 | 1040-02-022 | BRIDGE REPLACEMENTHall · Childress | 4 of 7 | $1,356,461 | $1,177,468COPPELL CONSTRUCTION CO., I… | +15.2% |
| Dec 2, 2021 | 0098-11-005 | BRIDGE REPLACEMENTHardeman · Childress | 1 of 5 | $654,248 | $654,248 | Won |
| Nov 4, 2021 | 2117-02-015 | BRIDGE REPLACEMENTTrinity · Lufkin | 2 of 3 | $1,712,326 | $1,544,163DREWERY CONSTRUCTION COMPAN… | +10.9% |
| Sep 2, 2021 | 0918-47-148 | REPLACE BRIDGE AND APPROACHESDallas · Dallas | 3 of 7 | $1,772,151 | $1,766,279SEMA CONSTRUCTION, INC. | +0.3% |
| Sep 2, 2021 | 0908-33-101 | BRIDGE REPLACEMENTTaylor · Abilene | 7 of 7 | $1,178,697 | $786,841THK CONSTRUCTION LLC | +49.8% |
| Sep 2, 2021 | 0902-20-110 | BRIDGE REPLACEMENTWise · Fort Worth | 1 of 6 | $769,195 | $769,195 | Won |
| Aug 5, 2021 | 0606-01-007 | STATE PARK IMPROVEMENTSSmith · Tyler | 7 of 8 | $3,388,100 | $2,399,846ENCINO LANDSCAPE, INC. | +41.2% |
| Aug 5, 2021 | 0902-38-129 | BRIDGE REPLACEMENTParker · Fort Worth | 2 of 4 | $985,564 | $919,705ED BELL CONSTRUCTION COMPANY | +7.2% |
| Aug 5, 2021 | 6377-87-001 | CULVERT REPAIRCoryell · Waco | 3 of 3 | $826,026 | $486,782CROSS PLUS CONSTRUCTION, LLC | +69.7% |
| Aug 4, 2021 | 1191-03-033 | REPLACE BRIDGE AND APPROACHESLimestone · Waco | 2 of 3 | $3,336,528 | $2,816,412STATELINE CONSTRUCTION, LLC | +18.5% |
| Jul 2, 2021 | 0008-02-073 | BRIDGE REPLACEMENTParker · Fort Worth | 6 of 7 | $2,366,096 | $2,139,284NEW WORLD CONTRACTING, LLC | +10.6% |
| Jul 2, 2021 | 0911-28-051 | BRIDGE REPLACEMENTHouston · Lufkin | 3 of 5 | $1,233,757 | $1,191,639A. L. HELMCAMP, INC. | +3.5% |
| Jul 2, 2021 | 0919-30-062 | BRIDGE REPLACEMENTTitus · Atlanta | 1 of 5 | $558,400 | $558,400 | Won |
| Jul 2, 2021 | 0901-28-094 | BRIDGE REPLACEMENTHopkins · Paris | 2 of 4 | $259,253 | $247,021HIGHWAY 19 CONSTRUCTION LLC | +5.0% |
| Jul 1, 2021 | 0834-02-031 | BRIDGE REPLACEMENTHill · Waco | 6 of 7 | $3,442,805 | $3,137,766KNIFE RIVER CORPORATION - S… | +9.7% |
| Jul 1, 2021 | 0911-04-087 | BRIDGE REPLACEMENTPolk · Lufkin | 2 of 6 | $1,832,482 | $1,594,107THK CONSTRUCTION LLC | +15.0% |
| Jul 1, 2021 | 0901-29-094 | REHABILITATE BRIDGELamar · Paris | 2 of 6 | $522,699 | $499,929HIGHWAY 19 CONSTRUCTION LLC | +4.6% |
| Jun 4, 2021 | 0010-10-026 | REPLACE BRIDGE AND APPROACHESCass · Atlanta | 1 of 5 | $6,039,515 | $6,039,515 | Won |
| Jun 4, 2021 | 0042-12-082 | BRIDGE REPLACEMENTChildress · Childress | 4 of 8 | $2,315,750 | $2,074,853CDM HOLDINGS, LLC | +11.6% |
| Jun 4, 2021 | 0288-03-032 | BRIDGE REPLACEMENTEastland · Brownwood | 3 of 4 | $2,069,702 | $1,898,890PIERCE R & B LLC | +9.0% |
| Jun 4, 2021 | 0911-28-049 | BRIDGE REPLACEMENTHouston · Lufkin | 2 of 4 | $1,727,739 | $1,693,606STATELINE CONSTRUCTION, LLC | +2.0% |
| Jun 4, 2021 | 0983-02-022 | BRIDGE REPLACEMENTFisher · Abilene | 3 of 5 | $1,718,119 | $1,468,421SALINAS CONSTRUCTION TECHNO… | +17.0% |
| Jun 3, 2021 | 0513-01-017 | REPLACE BRIDGE & APPROACHESCoryell · Waco | 7 of 7 | $7,928,368 | $5,087,623BIG CREEK CONSTRUCTION, LTD. | +55.8% |
| Jun 3, 2021 | 0797-07-032 | BRIDGE REPLACEMENTCollingsworth · Childress | 8 of 8 | $1,894,724 | $954,519EARTH BUILDERS, L.P. | +98.5% |
| Jun 3, 2021 | 1409-03-020 | BRIDGE REPLACEMENTShelby · Lufkin | 4 of 4 | $1,858,545 | $1,320,205LONGVIEW BRIDGE AND ROAD, L… | +40.8% |
| Jun 3, 2021 | 0923-06-083 | BRIDGE REPLACEMENTBrown · Brownwood | 5 of 5 | $716,815 | $498,499PIERCE R & B LLC | +43.8% |
| May 6, 2021 | 0118-08-076 | BRIDGE REPLACEMENTNacogdoches · Lufkin | 4 of 6 | $6,537,014 | $5,478,921STATELINE CONSTRUCTION, LLC | +19.3% |
| May 6, 2021 | 0908-33-100 | DRAINAGE IMPROVEMENTSTaylor · Abilene | 8 of 8 | $279,470 | $174,853TALBRAN ENTERPRISES LLC | +59.8% |
| May 5, 2021 | 2589-01-023 | BRIDGE REPLACEMENTAngelina · Lufkin | 2 of 5 | $5,719,385 | $5,264,189A. L. HELMCAMP, INC. | +8.6% |
| May 5, 2021 | 0995-01-026 | BRIDGE REPLACEMENTNavarro · Dallas | 1 of 9 | $2,712,402 | $2,712,402 | Won |
| Apr 8, 2021 | 0182-01-017 | IMPROVE GUARDRAIL TO DESIGN STANDARDS, S.E.T.'SEastland · Brownwood | 5 of 6 | $2,910,781 | $2,098,1843LW CIVIL LLC | +38.7% |
| Apr 8, 2021 | 0913-22-052 | BRIDGE REPLACEMENTGonzales · Yoakum | 6 of 12 | $1,257,999 | $1,049,085SEFBO PIPELINE BRIDGE, INCO… | +19.9% |
| Apr 7, 2021 | 0138-10-029 | SAFETY TREAT FIXED OBJECTSCass · Atlanta | 8 of 9 | $3,442,120 | $2,714,171H. V. CAVER, INC. | +26.8% |
| Apr 7, 2021 | 0913-09-102 | REPLACE BRIDGE AND APPROACHESWharton · Yoakum | 4 of 7 | $1,445,785 | $1,244,084SB CONTRACTORS LLC | +16.2% |
| Apr 7, 2021 | 0914-25-008 | BRIDGE REPLACEMENTLlano · Austin | 1 of 8 | $1,599,440 | $1,599,440 | Won |
| Apr 7, 2021 | 0907-14-009 | BRIDGE REPLACEMENTCoke · San Angelo | 1 of 5 | $398,585 | $398,585 | Won |
| Apr 7, 2021 | 0909-22-180 | REPLACE BRIDGE AND APPROACHESMcLennan · Waco | 1 of 8 | $458,027 | $458,027 | Won |
| Apr 7, 2021 | 0459-01-080 | BRIDGE MAINTENANCEFreestone · Bryan | 11 of 11 | $1,850,243 | $926,052GIBSON & ASSOCIATES, INC. | +99.8% |
| Apr 7, 2021 | 0914-26-009 | REHABILITATE BRIDGEMason · Austin | 5 of 10 | $256,951 | $173,539BLACKSMITH VENTURES LLC | +48.1% |
| Mar 16, 2021 | 6354-94-001 | BRIDGE REPAIRHenderson · Tyler | 5 of 7 | $85,150 | $49,650RED BARON BUILDING COMPANY,… | +71.5% |
| Mar 16, 2021 | 6365-14-001 | BRIDGE REPAIRHenderson · Tyler | 2 of 8 | $225,859 | $205,234RED BARON BUILDING COMPANY,… | +10.0% |
| Mar 5, 2021 | 0903-15-084 | BRIDGE REPLACEMENTCooke · Wichita Falls | 2 of 7 | $2,172,880 | $2,136,179STATELINE CONSTRUCTION, LLC | +1.7% |
| Mar 5, 2021 | 2127-01-010 | BRIDGE REPLACEMENTHutchinson · Amarillo | 7 of 8 | $4,076,421 | $3,371,389GILVIN-TERRILL, LTD. | +20.9% |
| Mar 5, 2021 | 0910-12-134 | BRIDGE REPLACEMENTVan Zandt · Tyler | 4 of 10 | $1,371,140 | $1,247,129EAST TEXAS BRIDGE, INC. | +9.9% |
| Mar 5, 2021 | 0902-38-120 | BRIDGE REPLACEMENTParker · Fort Worth | 3 of 12 | $1,121,679 | $1,069,862SEMA CONSTRUCTION, INC. | +4.8% |
| Mar 4, 2021 | 0495-08-108 | REPLACE BRIDGE & APPROACHESHarrison · Atlanta | 3 of 6 | $3,712,682 | $3,399,555EAST TEXAS BRIDGE, INC. | +9.2% |
| Feb 4, 2021 | 0802-02-069 | INTERSECTION IMPROVEMENTSWichita · Wichita Falls | 2 of 6 | $2,910,393 | $2,851,006COPPELL CONSTRUCTION CO., I… | +2.1% |
| Feb 4, 2021 | 0901-19-191 | BRIDGE REPLACEMENTGrayson · Paris | 3 of 12 | $356,128 | $334,515STATELINE CONSTRUCTION, LLC | +6.5% |
| Jan 7, 2021 | 0090-06-044 | REPLACE EXISTING BRIDGESPotter · Amarillo | 2 of 7 | $5,831,927 | $5,207,276INTEGRITY SERVICES, LLC | +12.0% |
| Jan 7, 2021 | 1526-01-019 | BRIDGE REPLACEMENTScurry · Abilene | 1 of 7 | $2,902,279 | $2,902,279 | Won |
| Jan 7, 2021 | 0642-01-021 | HAZARD ELIMINATION & SAFETYHunt · Paris | 8 of 9 | $1,085,410 | $636,887TALBRAN ENTERPRISES LLC | +70.4% |
| Dec 17, 2020 | 6371-69-001 | BPM - ABUTMENT AND RIPRAP EROSION REPAIRLamar · Paris | 7 of 8 | $308,024 | $177,715SHALOM SERVICES CORPORATION | +73.3% |
| Dec 17, 2020 | 6371-70-001 | BPM - EROSION AND ROCK RIPRAP REPAIRSLamar · Paris | 10 of 12 | $171,402 | $121,579JC ROAD MAINTENANCE, LLC | +41.0% |
| Dec 3, 2020 | 0310-01-043 | BRIDGE MAINTENANCEDonley · Childress | 7 of 12 | $900,000 | $599,478INTEGRITY SERVICES, LLC | +50.1% |
| Dec 3, 2020 | 6351-10-001 | BPM - BRIDGE REPAIRSCollin · Dallas | 13 of 14 | $549,160 | $348,405DBI SERVICES, LLC | +57.6% |
| Dec 3, 2020 | 6366-45-001 | BRIDGE PREVENTIVE MAINTENANCEMcLennan · Waco | 8 of 9 | $872,902 | $623,661JAMES CONSTRUCTION GROUP, L… | +40.0% |
| Dec 2, 2020 | 0596-02-040 | REPLACE BRIDGE AND APPROACHESEllis · Dallas | 9 of 16 | $2,968,180 | $2,491,390KNIFE RIVER CORPORATION - S… | +19.1% |
| Nov 5, 2020 | 0033-01-040 | BRIDGE REPLACEMENT & APPROACHESStonewall · Abilene | 3 of 8 | $4,534,986 | $4,007,232INTEGRITY SERVICES, LLC | +13.2% |
| Nov 5, 2020 | 0918-11-096 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 3 of 14 | $884,247 | $839,520STATELINE CONSTRUCTION, LLC | +5.3% |
| Oct 2, 2020 | 0923-06-077 | REPLACE BRIDGE AND APPROACHESBrown · Brownwood | 1 of 7 | $1,018,524 | $1,018,524 | Won |
| Oct 2, 2020 | 0047-01-063 | REMOVE/REPLACE BRIDGE RAILGrayson · Paris | 10 of 10 | $2,320,262 | $1,354,337J.D. ABRAMS, L.P. | +71.3% |
| Oct 2, 2020 | 0909-40-076 | REPLACE BRIDGE AND APPROACHESLimestone · Waco | 3 of 9 | $789,454 | $733,162FUQUA CONSTRUCTION CO., INC. | +7.7% |
| Oct 1, 2020 | 0902-48-732 | BRIDGE REPLACEMENTTarrant · Fort Worth | 2 of 11 | $884,813 | $879,188ED BELL CONSTRUCTION COMPANY | +0.6% |
| Oct 1, 2020 | 0902-48-893 | BRIDGE REPLACEMENTTarrant · Fort Worth | 4 of 12 | $1,144,635 | $1,053,948COPPELL CONSTRUCTION CO., I… | +8.6% |
| Oct 1, 2020 | 6366-77-001 | CULVERT REPLACEMENTFranklin · Paris | 5 of 6 | $481,562 | $409,190STATELINE CONSTRUCTION, LLC | +17.7% |
| Sep 4, 2020 | 0911-28-043 | REPLACE BRIDGE AND APPROACHESHouston · Lufkin | 2 of 7 | $932,996 | $862,803STATELINE CONSTRUCTION, LLC | +8.1% |
| Sep 3, 2020 | 0390-05-006 | REPLACE BRIDGE AND APPROACHESSan Augustine · Lufkin | 4 of 5 | $1,844,195 | $1,485,267LONGVIEW BRIDGE AND ROAD, L… | +24.2% |
| Sep 3, 2020 | 0009-22-005 | BRIDGE REPLACEMENTHunt · Paris | 1 of 7 | $620,676 | $620,676 | Won |
| Sep 3, 2020 | 0905-17-016 | BRIDGE REPLACEMENTSwisher · Lubbock | 5 of 6 | $748,343 | $552,000BLACKSTONE CONCRETE VENTURE… | +35.6% |
| Sep 3, 2020 | 6366-64-001 | MISCELLANEOUS BRIDGE REPAIREastland · Brownwood | 6 of 6 | $1,329,540 | $614,197BECK-REIT & SONS, LTD. | +116.5% |
| Aug 6, 2020 | 0569-04-020 | REPLACE BRIDGE AND APPROACHESHarrison · Atlanta | 3 of 6 | $3,217,389 | $2,545,188STATELINE CONSTRUCTION, LLC | +26.4% |
| Aug 6, 2020 | 0902-48-892 | BRIDGE REPLACEMENTTarrant · Fort Worth | 9 of 9 | $850,301 | $516,409IBCTX, LLC | +64.7% |
| Aug 5, 2020 | 0902-48-850 | BRIDGE REPLACEMENTTarrant · Fort Worth | 7 of 8 | $908,763 | $533,000FLUOR HEAVY CIVIL, LLC | +70.5% |
| Jul 9, 2020 | 0908-19-026 | BRIDGE REPLACEMENTScurry · Abilene | 1 of 5 | $2,002,574 | $2,002,574 | Won |
| Jul 8, 2020 | 0909-40-075 | REPLACE BRIDGE AND APPROACHESLimestone · Waco | 2 of 10 | $1,729,977 | $1,360,592A. L. HELMCAMP, INC. | +27.1% |
| Jul 8, 2020 | 0911-28-039 | REPLACE BRIDGE AND APPROACHESHouston · Lufkin | 6 of 8 | $930,870 | $732,077STATELINE CONSTRUCTION, LLC | +27.2% |
| Jun 5, 2020 | 0330-01-033 | REPLACE BRIDGES AND APPROACHESBowie · Atlanta | 4 of 6 | $4,497,963 | $3,919,949EAST TEXAS BRIDGE, INC. | +14.7% |
| Jun 5, 2020 | 0923-06-058 | REPLACE BRIDGE AND APPROACHESBrown · Brownwood | 3 of 7 | $604,324 | $570,000PIERCE R & B LLC | +6.0% |
| Jun 4, 2020 | 0923-09-063 | REPLACE BRIDGE AND APPROACHESEastland · Brownwood | 1 of 5 | $858,823 | $858,823 | Won |
| Jun 4, 2020 | 0923-17-079 | REPLACE BRIDGE AND APPROACHESComanche · Brownwood | 2 of 6 | $942,818 | $939,512KNIFE RIVER CORPORATION - S… | +0.4% |
| Jun 4, 2020 | 0903-28-070 | REPLACE BRIDGE AND APPROACHESMontague · Wichita Falls | 1 of 5 | $443,571 | $443,571 | Won |
| May 8, 2020 | 0789-04-006 | BRIDGE REPLACEMENTSwisher · Lubbock | 2 of 4 | $1,732,674 | $1,543,188BLACKSTONE CONCRETE VENTURE… | +12.3% |
| May 7, 2020 | 0908-24-050 | BRIDGE REPLACMENTJones · Abilene | 2 of 5 | $2,030,304 | $1,790,933J. H. STRAIN & SONS, INC. | +13.4% |
| May 7, 2020 | 0923-17-087 | REPLACE BRIDGE AND APPROACHESComanche · Brownwood | 4 of 10 | $675,580 | $591,668ENCINO LANDSCAPE, INC. | +14.2% |
| May 7, 2020 | 6353-74-001 | CULVERT REPLACEMENTClay · Wichita Falls | 8 of 9 | $1,052,150 | $619,585CDM HOLDINGS, LLC | +69.8% |
| Apr 9, 2020 | 0917-30-055 | BRIDGE REPLACEMENTBurleson · Bryan | 6 of 7 | $1,996,540 | $1,458,198FUQUA CONSTRUCTION CO., INC. | +36.9% |
| Apr 8, 2020 | 0808-01-061 | BRIDGE RE-DECKING. CONCRETE OVERLAY BRIDGE REHAB.Falls · Waco | 3 of 4 | $2,066,719 | $1,990,000JAMES CONSTRUCTION GROUP, L… | +3.9% |
| Apr 8, 2020 | 0911-28-047 | BRIDGE REPLACEMENTHouston · Lufkin | 4 of 7 | $2,337,075 | $1,895,914STATELINE CONSTRUCTION, LLC | +23.3% |
| Apr 8, 2020 | 0917-20-039 | BRIDGE REPLACEMENTFreestone · Bryan | 6 of 11 | $587,295 | $479,341KNIFE RIVER CORPORATION - S… | +22.5% |
| Mar 5, 2020 | 0910-12-021 | REPLACE BRIDGE & APPROACHESVan Zandt · Tyler | 3 of 9 | $1,197,849 | $1,069,893EAST TEXAS BRIDGE, INC. | +12.0% |
| Mar 5, 2020 | 0908-20-026 | BRIDGE REPLACEMENTNolan · Abilene | 1 of 3 | $830,651 | $830,651 | Won |
| Mar 5, 2020 | 1584-01-029 | BRIDGE REPLACEMENTTyler · Beaumont | 3 of 6 | $835,394 | $783,916DREWERY CONSTRUCTION COMPAN… | +6.6% |
| Mar 4, 2020 | 0910-08-076 | REPLACE BRIDGES & APPROACHESAnderson · Tyler | 5 of 8 | $1,726,065 | $1,452,727STATELINE CONSTRUCTION, LLC | +18.8% |
| Mar 4, 2020 | 0910-36-129 | REPLACE BRIDGE & APPROACHESCherokee · Tyler | 4 of 8 | $2,278,370 | $1,943,347STATELINE CONSTRUCTION, LLC | +17.2% |
| Mar 4, 2020 | 0910-35-034 | REPLACE BRIDGE & APPROACHESWood · Tyler | 2 of 7 | $1,486,095 | $1,332,153STATELINE CONSTRUCTION, LLC | +11.6% |
| Mar 4, 2020 | 0910-12-138 | BRIDGE REPLACEMENTVan Zandt · Tyler | 6 of 9 | $612,884 | $552,443STATELINE CONSTRUCTION, LLC | +10.9% |
Active prime contracts 1
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0042-06-077Let Feb 7, 2025 | DonleyChildress · US 287 | BRIDGE REPLACEMENT | $4,461,300 | 99% |
Subcontracts on active jobs 35
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0245-08-054Let Jan 6, 2026 | LONGVIEW BRIDGE AND ROAD, LTD. | RuskTyler | BRIDGE REPLACEMENT | 1.55% | $214,879 |
| 0974-03-014Let Dec 3, 2025 | J. H. STRAIN & SONS, INC. | TaylorAbilene | BRIDGE REPLACEMENT | 5.01% | $137,244 |
| 0925-15-016Let Dec 3, 2025 | STX CIVIL | DickensChildress | BRIDGE REPLACEMENT | 8.01% | $81,424 |
| 0833-13-014Let Dec 2, 2025 | LARRY YOUNG PAVING, INC. | BurlesonBryan | BRIDGE REPLACEMENT | 0% | $0 |
| 0315-06-047Let Nov 5, 2025 | LARRY YOUNG PAVING, INC. | WashingtonBryan | BRIDGE REPLACEMENT | 0% | $0 |
| 0574-02-022Let Sep 5, 2025 | INDUS ROAD & BRIDGE, INC. | NavarroDallas | BRIDGE REPLACEMENT | 4.26% | $419,471 |
| 0495-07-081Let Sep 5, 2025 | LONGVIEW BRIDGE AND ROAD, LTD. | GreggTyler | BRIDGE REPLACEMENT | 4.13% | $1,590,465 |
| 2591-01-015Let Sep 4, 2025 | THK CONSTRUCTION LLC | PolkLufkin | BRIDGE REPLACEMENT | 12.75% | $315,657 |
| 0902-38-136Let Aug 8, 2025 | WESTFIELD INSURANCE COMPANY | ParkerFort Worth | BRIDGE REPLACEMENT | 5.89% | $48,868 |
| 0211-07-046Let Aug 7, 2025 | ACME BRIDGE COMPANY, INC. | LeeAustin | BRIDGE REPLACEMENT | 3.7% | $499,929 |
| 2158-01-019Let Aug 7, 2025 | LONGVIEW BRIDGE AND ROAD, LTD. | GreggTyler | WIDEN NON-FREEWAY | 1.44% | $340,846 |
| 0982-05-011Let Jul 2, 2025 | C & W SOUTHERN LLC | ThrockmortonWichita Falls | BRIDGE REPLACEMENT | 7.17% | $53,083 |
| 0918-22-162Let Jul 2, 2025 | WESTFIELD INSURANCE COMPANY | EllisDallas | BRIDGE REPLACEMENT | 6.88% | $178,351 |
| 0901-19-221Let Jul 1, 2025 | RB CONTRACTING, LLC | GraysonParis | BRIDGE REPLACEMENT | 11.25% | $272,163 |
| 0918-22-159Let Jul 1, 2025 | STX CIVIL | EllisDallas | BRIDGE REPLACEMENT | 6.63% | $211,831 |
| 0903-15-106Let Jul 1, 2025 | THK CONSTRUCTION LLC | CookeWichita Falls | BRIDGE REPLACEMENT | 9.01% | $223,045 |
| 0902-49-072Let Jun 5, 2025 | STX CIVIL | ErathFort Worth | BRIDGE REPLACEMENT | 7.22% | $64,039 |
| 0553-03-034Let May 1, 2025 | THK CONSTRUCTION LLC | NacogdochesLufkin | BRIDGE REPLACEMENT | 4.34% | $271,376 |
| 0137-05-035Let Feb 6, 2025 | ALTUS CONSTRUCTION LLC | ArcherWichita Falls | BRIDGE REPLACEMENT | 2.96% | $193,106 |
| 0901-19-216Let Jan 8, 2025 | THK CONSTRUCTION LLC | GraysonParis | BRIDGE REPLACEMENT | 8.65% | $154,851 |
| 0610-03-104Let Sep 6, 2024 | THK CONSTRUCTION LLC | TitusAtlanta | MAINTENANCE | 1.76% | $136,520 |
| 0042-12-089Let Sep 6, 2024 | WESTFIELD INSURANCE COMPANY | ChildressChildress | BRIDGE REPLACEMENT | 3.93% | $160,682 |
| 0620-01-019Let Jul 10, 2024 | L & N BRIDGE, LLC | FanninParis | BRIDGE REPLACEMENT | 8.82% | $258,086 |
| 0033-05-089Let Jul 9, 2024 | FNF CONSTRUCTION, INC. | JonesAbilene | REHABILITATION OF EXISTING ROAD | 1.07% | $427,379 |
| 0044-04-048Let Jun 6, 2024 | A. L. HELMCAMP, INC. | MontagueWichita Falls | WIDEN FREEWAY | 0.65% | $260,189 |
| 0191-02-066Let Aug 3, 2023 | EAST TEXAS BRIDGE, INC. | CherokeeTyler | INTERCHANGE (NEW OR RECONSTRUCTED) | 0.76% | $524,435 |
| 0520-04-026Let May 4, 2023 | LONGVIEW BRIDGE AND ROAD, LTD. | MarionAtlanta | BRIDGE REPLACEMENT | 3.62% | $1,991,051 |
| 0650-01-035Let Sep 8, 2022 | NOBLES ROAD CONSTRUCTION, INC. | NolanAbilene | WIDEN NON-FREEWAY | 5.31% | $771,020 |
| 0176-02-118Let Jun 2, 2022 | LONGVIEW BRIDGE AND ROAD, LTD. | AngelinaLufkin | CONVERT NON-FREEWAY TO FREEWAY | 1.99% | $1,270,416 |
| 0610-07-097Let Jun 2, 2022 | LONGVIEW BRIDGE AND ROAD, LTD. | BowieAtlanta | NEWLOCATION NON-FREEWAY | 1.1% | $785,416 |
| 0917-30-057Let Apr 7, 2022 | TREVWAY, INC. | BurlesonBryan | BRIDGE REPLACEMENT | 3.43% | $50,385 |
| 0910-07-072Let Mar 3, 2022 | RAGLE CONSTRUCTION, INC. | GreggTyler | BRIDGE REPLACEMENT | 2.99% | $307,010 |
| 0221-05-065Let Nov 4, 2021 | LONGVIEW BRIDGE AND ROAD, LTD. | TitusAtlanta | BRIDGE REPLACEMENT | 0% | $0 |
| 2502-01-021Let Aug 5, 2021 | JAMES CONSTRUCTION GROUP, LLC | BellWaco | WIDEN NON-FREEWAY | 0.51% | $180,525 |
| 0610-07-113Let May 8, 2020 | LONGVIEW BRIDGE AND ROAD, LTD. | BowieAtlanta | WIDEN FREEWAY | 0% | $0 |