202BidsNov 3, 2016 to Aug 3, 2022
16Wins (low bidder)
7.9%Win rate
$31,682,509Total won
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Aug 3, 2022 | 0231-16-035 | HAZARD ELIMINATION & SAFETYBell · Waco | 1 of 5 | $2,084,782 | $2,084,782 | Won |
| Aug 3, 2022 | 0320-01-078 | INSTALL PEDESTRIAN CROSSWALK, INSTALL SIDEWALKSBell · Waco | 4 of 5 | $484,844 | $384,376CROSS PLUS CONSTRUCTION, LLC | +26.1% |
| Mar 4, 2022 | 0919-03-060 | REPLACE BRIDGE AND APPROACHESHarrison · Atlanta | 4 of 10 | $506,889 | $481,045THK CONSTRUCTION LLC | +5.4% |
| Mar 3, 2022 | 0919-13-018 | BRIDGE REPLACEMENTPanola · Atlanta | 3 of 9 | $524,224 | $489,998RAYFORD'S TRUCK & TRACTOR | +7.0% |
| Mar 3, 2022 | 0919-22-034 | REPLACE BRIDGE AND APPROACHESMarion · Atlanta | 5 of 9 | $389,000 | $324,589THK CONSTRUCTION LLC | +19.8% |
| Feb 4, 2022 | 0910-07-078 | BRIDGE REPLACEMENTGregg · Tyler | 4 of 6 | $713,774 | $638,113SOUTH TEXAS ILLUMINATION, L… | +11.9% |
| Feb 3, 2022 | 6391-15-001 | BRIDGE PREVENTATIVE MAINTENANCEAnderson · Tyler | 4 of 6 | $749,480 | $555,213SHALOM SERVICES CORPORATION | +35.0% |
| Jan 7, 2022 | 0923-17-088 | BRIDGE REPLACEMENTComanche · Brownwood | 3 of 5 | $2,047,047 | $1,969,718KNIFE RIVER CORPORATION - S… | +3.9% |
| Jan 7, 2022 | 0910-16-147 | BRIDGE REPLACEMENTSmith · Tyler | 4 of 9 | $1,365,597 | $1,258,294THK CONSTRUCTION LLC | +8.5% |
| Dec 2, 2021 | 0923-09-066 | BRIDGE REPLACEMENTEastland · Brownwood | 2 of 5 | $1,398,204 | $1,317,857HODGES AND SON CONSTRUCTION… | +6.1% |
| Jun 4, 2021 | 0288-03-032 | BRIDGE REPLACEMENTEastland · Brownwood | 1 of 4 | $1,898,890 | $1,898,890 | Won |
| Jun 3, 2021 | 0923-06-083 | BRIDGE REPLACEMENTBrown · Brownwood | 1 of 5 | $498,499 | $498,499 | Won |
| Apr 7, 2021 | 0909-22-180 | REPLACE BRIDGE AND APPROACHESMcLennan · Waco | 4 of 8 | $555,556 | $458,027HODGES AND SON CONSTRUCTION… | +21.3% |
| Mar 5, 2021 | 0903-15-084 | BRIDGE REPLACEMENTCooke · Wichita Falls | 4 of 7 | $2,348,848 | $2,136,179STATELINE CONSTRUCTION, LLC | +10.0% |
| Mar 5, 2021 | 0910-12-134 | BRIDGE REPLACEMENTVan Zandt · Tyler | 5 of 10 | $1,437,438 | $1,247,129EAST TEXAS BRIDGE, INC. | +15.3% |
| Mar 5, 2021 | 0902-38-120 | BRIDGE REPLACEMENTParker · Fort Worth | 2 of 12 | $1,070,000 | $1,069,862SEMA CONSTRUCTION, INC. | +0.0% |
| Mar 4, 2021 | 0495-08-108 | REPLACE BRIDGE & APPROACHESHarrison · Atlanta | 4 of 6 | $3,919,191 | $3,399,555EAST TEXAS BRIDGE, INC. | +15.3% |
| Feb 5, 2021 | 0634-01-014 | HAZARD ELIMINATION & SAFETYCherokee · Tyler | 7 of 8 | $6,298,830 | $5,533,706STATELINE CONSTRUCTION, LLC | +13.8% |
| Feb 4, 2021 | 0843-03-015 | SAFETY TREAT FIXED OBJECTSMarion · Atlanta | 10 of 13 | $1,398,943 | $856,033R & G CONSTRUCTION, LLC | +63.4% |
| Feb 4, 2021 | 0901-19-191 | BRIDGE REPLACEMENTGrayson · Paris | 8 of 12 | $429,702 | $334,515STATELINE CONSTRUCTION, LLC | +28.5% |
| Jan 7, 2021 | 0313-07-020 | BRIDGE MAINTENANCEParker · Fort Worth | 8 of 11 | $1,980,969 | $1,487,925TALBRAN ENTERPRISES LLC | +33.1% |
| Dec 2, 2020 | 0596-02-040 | REPLACE BRIDGE AND APPROACHESEllis · Dallas | 4 of 16 | $2,797,971 | $2,491,390KNIFE RIVER CORPORATION - S… | +12.3% |
| Nov 5, 2020 | 0918-11-096 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 7 of 14 | $1,035,591 | $839,520STATELINE CONSTRUCTION, LLC | +23.4% |
| Oct 2, 2020 | 0923-06-077 | REPLACE BRIDGE AND APPROACHESBrown · Brownwood | 5 of 7 | $1,273,998 | $1,018,524HODGES AND SON CONSTRUCTION… | +25.1% |
| Oct 1, 2020 | 0902-48-732 | BRIDGE REPLACEMENTTarrant · Fort Worth | 9 of 11 | $999,996 | $879,188ED BELL CONSTRUCTION COMPANY | +13.7% |
| Oct 1, 2020 | 0902-48-893 | BRIDGE REPLACEMENTTarrant · Fort Worth | 11 of 12 | $1,453,991 | $1,053,948COPPELL CONSTRUCTION CO., I… | +38.0% |
| Sep 4, 2020 | 0911-28-043 | REPLACE BRIDGE AND APPROACHESHouston · Lufkin | 5 of 7 | $1,076,596 | $862,803STATELINE CONSTRUCTION, LLC | +24.8% |
| Sep 3, 2020 | 0009-22-005 | BRIDGE REPLACEMENTHunt · Paris | 7 of 7 | $834,863 | $620,676HODGES AND SON CONSTRUCTION… | +34.5% |
| Aug 6, 2020 | 0927-01-030 | IMPROVE DRAINAGE, UPGRADE GUARD RAILSmith · Tyler | 3 of 10 | $2,107,354 | $1,833,548A R BROTHERS CONSTRUCTION S… | +14.9% |
| Aug 6, 2020 | 0902-48-892 | BRIDGE REPLACEMENTTarrant · Fort Worth | 3 of 9 | $605,515 | $516,409IBCTX, LLC | +17.3% |
| Aug 6, 2020 | 0910-35-036 | SIDEWALKS AND PEDESTRIAN BRIDGEWood · Tyler | 1 of 8 | $339,131 | $339,131 | Won |
| Aug 6, 2020 | 0569-04-020 | REPLACE BRIDGE AND APPROACHESHarrison · Atlanta | 2 of 6 | $2,887,835 | $2,545,188STATELINE CONSTRUCTION, LLC | +13.5% |
| Aug 5, 2020 | 0134-01-025 | SAFETY TREAT FIXED OBJECTSYoung · Wichita Falls | 1 of 4 | $2,299,229 | $2,299,229 | Won |
| Aug 5, 2020 | 0902-48-850 | BRIDGE REPLACEMENTTarrant · Fort Worth | 3 of 8 | $604,498 | $533,000FLUOR HEAVY CIVIL, LLC | +13.4% |
| Jul 8, 2020 | 0909-40-075 | REPLACE BRIDGE AND APPROACHESLimestone · Waco | 7 of 10 | $1,884,889 | $1,360,592A. L. HELMCAMP, INC. | +38.5% |
| Jul 8, 2020 | 0911-28-039 | REPLACE BRIDGE AND APPROACHESHouston · Lufkin | 4 of 8 | $840,000 | $732,077STATELINE CONSTRUCTION, LLC | +14.7% |
| Jun 5, 2020 | 0330-01-033 | REPLACE BRIDGES AND APPROACHESBowie · Atlanta | 5 of 6 | $4,854,855 | $3,919,949EAST TEXAS BRIDGE, INC. | +23.8% |
| Jun 5, 2020 | 0923-06-058 | REPLACE BRIDGE AND APPROACHESBrown · Brownwood | 1 of 7 | $570,000 | $570,000 | Won |
| Jun 4, 2020 | 0923-09-063 | REPLACE BRIDGE AND APPROACHESEastland · Brownwood | 2 of 5 | $869,521 | $858,823HODGES AND SON CONSTRUCTION… | +1.2% |
| Jun 4, 2020 | 0923-17-079 | REPLACE BRIDGE AND APPROACHESComanche · Brownwood | 3 of 6 | $954,995 | $939,512KNIFE RIVER CORPORATION - S… | +1.6% |
| Jun 4, 2020 | 0903-28-070 | REPLACE BRIDGE AND APPROACHESMontague · Wichita Falls | 3 of 5 | $520,000 | $443,571HODGES AND SON CONSTRUCTION… | +17.2% |
| May 8, 2020 | 1835-02-059 | CONSTRUCT SIDEWALK AND PEDESTRIAN BRIDGEBell · Waco | 7 of 8 | $3,401,347 | $2,447,065TTG UTILITIES, LP | +39.0% |
| May 7, 2020 | 0923-17-087 | REPLACE BRIDGE AND APPROACHESComanche · Brownwood | 2 of 10 | $607,999 | $591,668ENCINO LANDSCAPE, INC. | +2.8% |
| May 7, 2020 | 6353-08-001 | CULVERT REPAIRHenderson · Tyler | 10 of 12 | $419,186 | $298,123RED BARON BUILDING COMPANY,… | +40.6% |
| May 7, 2020 | 6353-74-001 | CULVERT REPLACEMENTClay · Wichita Falls | 5 of 9 | $841,575 | $619,585CDM HOLDINGS, LLC | +35.8% |
| Apr 9, 2020 | 0917-30-055 | BRIDGE REPLACEMENTBurleson · Bryan | 4 of 7 | $1,898,822 | $1,458,198FUQUA CONSTRUCTION CO., INC. | +30.2% |
| Apr 8, 2020 | 2072-01-016 | IMPROVE DRAINAGE, CULVERTS AND UPGRADE GUARD RAILGregg · Tyler | 4 of 8 | $4,298,000 | $3,889,931STATELINE CONSTRUCTION, LLC | +10.5% |
| Apr 8, 2020 | 0911-28-047 | BRIDGE REPLACEMENTHouston · Lufkin | 3 of 7 | $2,300,000 | $1,895,914STATELINE CONSTRUCTION, LLC | +21.3% |
| Apr 8, 2020 | 0917-20-039 | BRIDGE REPLACEMENTFreestone · Bryan | 7 of 11 | $598,833 | $479,341KNIFE RIVER CORPORATION - S… | +24.9% |
| Apr 8, 2020 | 0043-09-142 | UPGRADE BRIDGE AND APPROACH RAILINGWichita · Wichita Falls | 3 of 7 | $969,690 | $948,264HJC FARMS, INC. | +2.3% |
| Mar 5, 2020 | 0910-12-021 | REPLACE BRIDGE & APPROACHESVan Zandt · Tyler | 6 of 9 | $1,247,748 | $1,069,893EAST TEXAS BRIDGE, INC. | +16.6% |
| Mar 4, 2020 | 0910-08-076 | REPLACE BRIDGES & APPROACHESAnderson · Tyler | 6 of 8 | $1,737,795 | $1,452,727STATELINE CONSTRUCTION, LLC | +19.6% |
| Mar 4, 2020 | 0910-36-129 | REPLACE BRIDGE & APPROACHESCherokee · Tyler | 6 of 8 | $2,359,674 | $1,943,347STATELINE CONSTRUCTION, LLC | +21.4% |
| Mar 4, 2020 | 0910-35-034 | REPLACE BRIDGE & APPROACHESWood · Tyler | 4 of 7 | $1,599,862 | $1,332,153STATELINE CONSTRUCTION, LLC | +20.1% |
| Mar 4, 2020 | 0063-01-094 | SAFETY TREAT FIXED OBJECTSHarrison · Atlanta | 9 of 12 | $2,298,632 | $1,847,140LONGVIEW BRIDGE AND ROAD, L… | +24.4% |
| Mar 4, 2020 | 0910-12-138 | BRIDGE REPLACEMENTVan Zandt · Tyler | 5 of 9 | $597,060 | $552,443STATELINE CONSTRUCTION, LLC | +8.1% |
| Feb 6, 2020 | 0095-06-073 | IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAILVan Zandt · Tyler | 8 of 9 | $3,287,323 | $2,544,981BAKER & COMPANY CONSTRUCTIO… | +29.2% |
| Nov 6, 2019 | 0902-39-033 | BRIDGE REPLACEMENTPalo Pinto · Fort Worth | 7 of 8 | $1,349,999 | $1,007,170EAST TEXAS BRIDGE, INC. | +34.0% |
| Oct 3, 2019 | 0681-01-023 | BRIDGE REPLACEMENTWichita · Wichita Falls | 1 of 6 | $1,584,999 | $1,584,999 | Won |
| Oct 2, 2019 | 0909-38-079 | REPL BR & APPRSFalls · Waco | 6 of 6 | $499,897 | $362,831ELLIS-MCGINNIS CONSTRUCTION… | +37.8% |
| Sep 6, 2019 | 6330-15-001 | CULVERT REPLACEMENT - DISTRICTWIDEPanola · Atlanta | 3 of 4 | $536,195 | $472,593SJ&J CONSTRUCTION, LLC | +13.5% |
| Sep 6, 2019 | 6337-05-001 | BRIDGE PREVENTATIVE MAINTENANCESan Augustine · Lufkin | 4 of 6 | $898,890 | $718,542SCOTT TUCKER CONSTRUCTION C… | +25.1% |
| Sep 5, 2019 | 0166-04-043 | CULVERT AND STORM DRAINAGE WORKLeon · Bryan | 3 of 4 | $4,397,592 | $3,722,169A. L. HELMCAMP, INC. | +18.1% |
| Aug 6, 2019 | 1076-01-038 | REPLACE BRIDGE AND APPROACHESThrockmorton · Wichita Falls | 2 of 5 | $2,120,000 | $2,072,677STATELINE CONSTRUCTION, LLC | +2.3% |
| Aug 6, 2019 | 0901-29-081 | BRIDGE REPLACEMENTLamar · Paris | 5 of 6 | $1,033,003 | $777,277HIGHWAY 19 CONSTRUCTION LLC | +32.9% |
| Aug 6, 2019 | 0919-03-059 | BRIDGE REPLACEMENTHarrison · Atlanta | 5 of 6 | $497,980 | $398,057LONGVIEW BRIDGE AND ROAD, L… | +25.1% |
| Jun 5, 2019 | 1145-01-044 | BRIDGE REPLACEMENTLeon · Bryan | 1 of 6 | $2,035,078 | $2,035,078 | Won |
| Jun 5, 2019 | 0909-38-082 | REPL BR & APPRSFalls · Waco | 4 of 6 | $994,994 | $887,644ELLIS-MCGINNIS CONSTRUCTION… | +12.1% |
| Jun 5, 2019 | 0901-19-180 | BRIDGE REPLACEMENTGrayson · Paris | 3 of 8 | $480,000 | $475,467HIGHWAY 19 CONSTRUCTION LLC | +1.0% |
| Jun 4, 2019 | 0901-27-045 | BRIDGE REPLACEMENTRed River · Paris | 5 of 7 | $794,798 | $651,497STATELINE CONSTRUCTION, LLC | +22.0% |
| May 7, 2019 | 0909-38-080 | REPL BR & APPRSLimestone · Waco | 3 of 8 | $1,077,538 | $933,888JAMES CONSTRUCTION GROUP, L… | +15.4% |
| May 7, 2019 | 0435-01-079 | BRIDGE REPLACEMENTLamar · Paris | 6 of 7 | $1,333,354 | $1,008,565HIGHWAY 19 CONSTRUCTION LLC | +32.2% |
| Apr 3, 2019 | 0889-04-078 | IMPROVE DRAINAGE, UPGRADE GUARD RAILSmith · Tyler | 6 of 8 | $1,012,812 | $799,066LONGVIEW BRIDGE AND ROAD, L… | +26.7% |
| Apr 2, 2019 | 0918-47-062 | REPLACE BRIDGE AND APPROACHESDallas · Dallas | 2 of 9 | $798,999 | $793,042HODGES AND SON CONSTRUCTION… | +0.8% |
| Apr 2, 2019 | 0903-28-058 | REPLACE BRIDGE AND APPROACHESMontague · Wichita Falls | 5 of 7 | $1,589,590 | $1,372,297HODGES AND SON CONSTRUCTION… | +15.8% |
| Apr 2, 2019 | 0079-03-048 | IMPROVE GUARDRAIL AND SAFETY TREAT FIXED OBJECTSComanche · Brownwood | 1 of 7 | $759,959 | $759,959 | Won |
| Apr 2, 2019 | 0909-22-176 | REPL BR & APPRSMcLennan · Waco | 4 of 8 | $999,876 | $863,438KNIFE RIVER CORPORATION - S… | +15.8% |
| Mar 6, 2019 | 1390-03-005 | REPLACE BRIDGE & APPROACHESWood · Tyler | 6 of 7 | $1,863,694 | $1,518,306STATELINE CONSTRUCTION, LLC | +22.7% |
| Mar 6, 2019 | 0903-15-085 | REPLACE BRIDGE AND APPROACHESCooke · Wichita Falls | 2 of 9 | $1,147,701 | $1,090,040HODGES AND SON CONSTRUCTION… | +5.3% |
| Mar 5, 2019 | 0910-35-033 | REPLACE BRIDGE AND APPROACHESWood · Tyler | 6 of 10 | $434,000 | $342,388LONGVIEW BRIDGE AND ROAD, L… | +26.8% |
| Mar 5, 2019 | 0910-16-140 | REPLACE BRIDGE AND APPROACHESSmith · Tyler | 7 of 8 | $947,470 | $719,185EAST TEXAS BRIDGE, INC. | +31.7% |
| Mar 5, 2019 | 0010-06-042 | SAFETY TREAT FIXED OBJECTSTitus · Atlanta | 7 of 10 | $2,894,717 | $2,498,030LONGVIEW BRIDGE AND ROAD, L… | +15.9% |
| Mar 5, 2019 | 0909-38-081 | REPL BR & APPRSFalls · Waco | 6 of 6 | $1,623,322 | $1,340,677ELLIS-MCGINNIS CONSTRUCTION… | +21.1% |
| Mar 5, 2019 | 0910-08-068 | REPLACE BRIDGE AND APPROACHESAnderson · Tyler | 9 of 12 | $739,394 | $607,852BAKER & REID COMPANY, LLC | +21.6% |
| Mar 5, 2019 | 0910-16-039 | REPLACE BRIDGE & APPROACHESSmith · Tyler | 4 of 8 | $599,169 | $469,506EAST TEXAS BRIDGE, INC. | +27.6% |
| Mar 5, 2019 | 1176-02-019 | REPLACE BRIDGE AND APPROACHESTitus · Atlanta | 6 of 10 | $1,394,744 | $1,121,133EAST TEXAS BRIDGE, INC. | +24.4% |
| Jan 9, 2019 | 0918-11-089 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 10 of 11 | $845,859 | $641,517HIGHWAY 19 CONSTRUCTION LLC | +31.9% |
| Jan 9, 2019 | 0926-01-023 | STRUCTURES & DRAINAGE IMPROVEMENTSCherokee · Tyler | 10 of 13 | $874,785 | $638,598HIGHWAY 19 CONSTRUCTION LLC | +37.0% |
| Jan 9, 2019 | 0007-10-066 | CLEAN DITCH & GABION MATTRESSPalo Pinto · Fort Worth | 6 of 10 | $479,505 | $419,010TALBRAN ENTERPRISES LLC | +14.4% |
| Jan 9, 2019 | 1310-01-027 | REPLACE BRIDGE AND APPROACHESDenton · Dallas | 7 of 12 | $3,797,779 | $3,324,126HIGHWAY 19 CONSTRUCTION LLC | +14.2% |
| Jan 8, 2019 | 0918-11-090 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 7 of 12 | $1,571,892 | $1,387,159HODGES AND SON CONSTRUCTION… | +13.3% |
| Dec 6, 2018 | 0390-03-035 | SAFETY TREAT FIXED OBJECTSAngelina · Lufkin | 6 of 9 | $998,705 | $776,954STATELINE CONSTRUCTION, LLC | +28.5% |
| Nov 7, 2018 | 0092-13-024 | REPLACE BRIDGE AND APPROACHESNavarro · Dallas | 1 of 15 | $7,970,000 | $7,970,000 | Won |
| Nov 6, 2018 | 6331-53-001 | BRIDGE PREVENTIVE MAINTENANCETitus · Atlanta | 8 of 10 | $888,800 | $623,721STATELINE CONSTRUCTION, LLC | +42.5% |
| Oct 3, 2018 | 2813-01-008 | REHAB AND WIDEN EXISTING PAVMENTHouston · Lufkin | 7 of 8 | $5,637,299 | $4,041,101PINTO CONSTRUCTION CO., INC. | +39.5% |
| Oct 2, 2018 | 6329-68-001 | CULVERT REPAIRClay · Wichita Falls | 5 of 8 | $681,784 | $579,763COPPELL CONSTRUCTION CO., I… | +17.6% |
| Sep 7, 2018 | 1934-02-006 | GR,CMT TRT SBGRD,ACP,OCST,STRS,MBGF,PV MKSmith · Tyler | 8 of 9 | $3,593,265 | $3,017,503LONGVIEW BRIDGE AND ROAD, L… | +19.1% |
| Sep 7, 2018 | 6327-34-001 | MISCELLANEOUS BRIDGE REPAIRSComanche · Brownwood | 4 of 7 | $714,000 | $498,038BECK-REIT & SONS, LTD. | +43.4% |
| Sep 6, 2018 | 0816-04-050 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 1 of 9 | $4,119,000 | $4,119,000 | Won |
| Aug 8, 2018 | 0901-29-082 | BRIDGE REPLACEMENTLamar · Paris | 7 of 7 | $1,368,331 | $1,097,244STATELINE CONSTRUCTION, LLC | +24.7% |
| Aug 8, 2018 | 0902-20-099 | REPLACE BRIDGE AND APPROACHESWise · Fort Worth | 3 of 7 | $569,000 | $529,964HODGES AND SON CONSTRUCTION… | +7.4% |
| Aug 8, 2018 | 0909-38-078 | REPL BR & APPRSFalls · Waco | 3 of 7 | $305,306 | $279,404KNIFE RIVER CORPORATION - S… | +9.3% |
| Aug 7, 2018 | 0909-29-040 | REPL BR & APPRSHamilton · Waco | 5 of 6 | $646,946 | $495,665ELLIS-MCGINNIS CONSTRUCTION… | +30.5% |
| Aug 7, 2018 | 0045-19-053 | HAZARD ELIMINATION & SAFETYGrayson · Paris | 7 of 9 | $4,397,000 | $3,461,445SJ&J CONSTRUCTION, LLC | +27.0% |
| Aug 7, 2018 | 0909-38-071 | REPL BR & APPRSFalls · Waco | 6 of 7 | $565,566 | $439,500ELLIS-MCGINNIS CONSTRUCTION… | +28.7% |
| Jul 11, 2018 | 0176-03-131 | IMPROVE GUARDRAIL TO DES STANDARDSAngelina · Lufkin | 3 of 8 | $1,933,333 | $1,620,249B & E CONSTRUCTION INC | +19.3% |
| Jul 11, 2018 | 0751-02-025 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 5 of 11 | $3,217,717 | $2,718,728B & E CONSTRUCTION INC | +18.4% |
| Jul 11, 2018 | 0902-20-111 | REPLACE BRIDGE AND APPROACHESWise · Fort Worth | 1 of 10 | $516,000 | $516,000 | Won |
| Jul 11, 2018 | 0909-39-127 | REPL BR & APPRSCoryell · Waco | 3 of 7 | $1,140,423 | $1,020,198CAPITAL EXCAVATION COMPANY | +11.8% |
| Jul 11, 2018 | 6319-77-001 | BRIDGE PREVENTATIVE MAINTENANCETarrant · Fort Worth | 5 of 6 | $985,000 | $798,330SCOTT TUCKER CONSTRUCTION C… | +23.4% |
| Jul 10, 2018 | 0901-28-085 | BRIDGE REPLACEMENTHopkins · Paris | 5 of 9 | $320,000 | $253,519HIGHWAY 19 CONSTRUCTION LLC | +26.2% |
| Jul 10, 2018 | 0176-08-024 | IMPROVE GUARDRAIL AND SAFETY TREATAngelina · Lufkin | 5 of 8 | $790,000 | $533,772A R BROTHERS CONSTRUCTION S… | +48.0% |
| Jul 10, 2018 | 1656-03-012 | SAFETY TREAT FIXED OBJECTSFalls · Waco | 5 of 6 | $1,053,530 | $777,557TALBRAN ENTERPRISES LLC | +35.5% |
| Jul 10, 2018 | 6327-18-001 | CROSS DRAINAGE STRUCTURE REPAIRDelta · Paris | 7 of 9 | $669,000 | $519,837TALBRAN ENTERPRISES LLC | +28.7% |
| Jul 10, 2018 | 6329-67-001 | CULVERT REPLACEMENTCooke · Wichita Falls | 2 of 7 | $564,444 | $515,404TALBRAN ENTERPRISES LLC | +9.5% |
| Jun 6, 2018 | 0901-19-181 | BRIDGE REPLACEMENTGrayson · Paris | 4 of 7 | $1,198,000 | $1,074,080EAST TEXAS BRIDGE, INC. | +11.5% |
| Jun 6, 2018 | 0911-28-041 | BRIDGE REPLACEMENTHouston · Lufkin | 8 of 11 | $680,000 | $584,117LONGVIEW BRIDGE AND ROAD, L… | +16.4% |
| Jun 5, 2018 | 0189-01-011 | HAZARD ELIMINATION & SAFETYRed River · Paris | 5 of 11 | $4,000,000 | $2,961,890LONGVIEW BRIDGE AND ROAD, L… | +35.0% |
| Jun 5, 2018 | 0802-02-053 | ENCLOSE DRAINAGE DITCHWichita · Wichita Falls | 5 of 7 | $5,192,519 | $4,475,438EARTH BUILDERS, L.P. | +16.0% |
| Jun 5, 2018 | 6327-38-001 | CULVERT EXTENSION & CROSS DRAINAGEKaufman · Dallas | 8 of 11 | $744,000 | $550,868CROSS PLUS CONSTRUCTION, LLC | +35.1% |
| May 2, 2018 | 0823-01-029 | EXTEND CULVERTS AND WIDEN PAVEMENTCooke · Wichita Falls | 6 of 9 | $3,536,371 | $2,899,372JAGOE-PUBLIC COMPANY | +22.0% |
| May 2, 2018 | 0918-47-176 | CHANNEL WORK, GRDDallas · Dallas | 3 of 11 | $3,234,000 | $2,950,293T KWEST GROUP LLC | +9.6% |
| May 2, 2018 | 0893-01-034 | IMPROVE GUARDRAIL AND SAFETY TREATNacogdoches · Lufkin | 10 of 14 | $1,535,533 | $1,084,003A R BROTHERS CONSTRUCTION S… | +41.7% |
| May 1, 2018 | 0911-38-069 | BRIDGE REPLACEMENTAngelina · Lufkin | 6 of 8 | $445,945 | $388,001TREVWAY, INC. | +14.9% |
| May 1, 2018 | 0902-48-744 | REPLACE AND RELOCATE BRIDGETarrant · Fort Worth | 1 of 9 | $2,379,000 | $2,379,000 | Won |
| May 1, 2018 | 0109-06-040 | IMPROVE GUARDRAIL TO DES. STANDARDHouston · Lufkin | 4 of 7 | $1,034,344 | $877,760A R BROTHERS CONSTRUCTION S… | +17.8% |
| May 1, 2018 | 6304-88-001 | DRAINAGE STRUCTURE MAINTENANCETitus · Atlanta | 2 of 10 | $415,995 | $398,913STATELINE CONSTRUCTION, LLC | +4.3% |
| Apr 4, 2018 | 0903-29-026 | REPLACE BRIDGE AND APPROACHESArcher · Wichita Falls | 5 of 10 | $345,000 | $265,265REECE CONSTRUCTION CO., INC. | +30.1% |
| Apr 4, 2018 | 0917-29-120 | REPLACEMENT OF AN EXISTING BRIDGEBrazos · Bryan | 9 of 10 | $1,042,831 | $772,705PROJECT ALLIED RESOURCES, L… | +35.0% |
| Apr 4, 2018 | 0173-06-043 | HAZARD ELIMINATION & SAFETYHunt · Paris | 3 of 8 | $2,300,000 | $1,784,029CDM HOLDINGS, LLC | +28.9% |
| Apr 4, 2018 | 0902-40-027 | REPLACE BRIDGEJack · Fort Worth | 1 of 7 | $434,443 | $434,443 | Won |
| Apr 4, 2018 | 0909-22-175 | REPL BR & APPRSMcLennan · Waco | 7 of 9 | $779,780 | $586,253PROJECT ALLIED RESOURCES, L… | +33.0% |
| Apr 3, 2018 | 2013-01-012 | SAFETY TREAT FIXED OBJECTSBrown · Brownwood | 7 of 9 | $1,350,000 | $1,024,337L.C. JORDAN & SON | +31.8% |
| Apr 3, 2018 | 0675-01-070 | SAFETY TREAT FIXED OBJECTSFreestone · Bryan | 3 of 7 | $4,000,000 | $3,593,926L.C. JORDAN & SON | +11.3% |
| Apr 3, 2018 | 0903-28-064 | REPLACE BRIDGE AND APPROACHESMontague · Wichita Falls | 3 of 8 | $419,000 | $376,570FNH CONSTRUCTION, LLC | +11.3% |
| Apr 3, 2018 | 0911-04-046 | REPLACE BRIDGE AND APPROACHESPolk · Lufkin | 6 of 10 | $561,000 | $480,183STATELINE CONSTRUCTION, LLC | +16.8% |
| Apr 3, 2018 | 0514-01-041 | REPLACE BRIDGE AND APPROACHESWichita · Wichita Falls | 4 of 8 | $1,062,227 | $877,614FNH CONSTRUCTION, LLC | +21.0% |
| Mar 7, 2018 | 0492-05-026 | REPLACE BRIDGE & APPROACHESSmith · Tyler | 4 of 7 | $2,183,189 | $2,029,446STATELINE CONSTRUCTION, LLC | +7.6% |
| Mar 7, 2018 | 0910-16-125 | REPLACE BRIDGE & APPROACHESSmith · Tyler | 4 of 10 | $877,776 | $833,389STATELINE CONSTRUCTION, LLC | +5.3% |
| Mar 7, 2018 | 0009-04-066 | SLOPE FAILURE REPAIRRockwall · Dallas | 3 of 10 | $2,400,000 | $2,226,102IOWA BRIDGE & CULVERT, LC | +7.8% |
| Mar 6, 2018 | 1157-01-014 | BRIDGE REPLACEMENTAngelina · Lufkin | 6 of 7 | $1,249,130 | $1,023,278STATELINE CONSTRUCTION, LLC | +22.1% |
| Mar 6, 2018 | 0010-19-012 | SAFETY TREAT FIXED OBJECTSBowie · Atlanta | 7 of 11 | $1,864,882 | $1,463,551CDM HOLDINGS, LLC | +27.4% |
| Mar 6, 2018 | 0910-12-125 | REPLACE BRIDGE AND APPROACHESVan Zandt · Tyler | 4 of 11 | $985,556 | $904,835B & E CONSTRUCTION INC | +8.9% |
| Mar 6, 2018 | 0902-39-021 | REPLACE BRIDGE AND APPROACHESPalo Pinto · Fort Worth | 2 of 10 | $844,484 | $826,138HODGES AND SON CONSTRUCTION… | +2.2% |
| Feb 6, 2018 | 6318-12-001 | BRIDGE PREVENTIVE MAINTENANCEGregg · Tyler | 5 of 11 | $259,524 | $210,592CHAMPION INFRASTRUCTURE, LLC | +23.2% |
| Feb 6, 2018 | 6326-87-001 | BRIDGE PREVENTIVE MAINTENANCEAnderson · Tyler | 6 of 10 | $322,812 | $232,133RED BARON BUILDING COMPANY,… | +39.1% |
| Feb 6, 2018 | 6318-13-001 | BRIDGE PREVENTIVE MAINTENANCEGregg · Tyler | 5 of 12 | $195,195 | $167,860RED BARON BUILDING COMPANY,… | +16.3% |
| Feb 6, 2018 | 6318-11-001 | BRIDGE PREVENTIVE MAINTENANCEAnderson · Tyler | 3 of 9 | $144,833 | $129,538L.C. JORDAN & SON | +11.8% |
| Feb 2, 2018 | 0834-04-024 | SFTY TR FX OBJSMcLennan · Waco | 6 of 8 | $1,447,000 | $1,258,844CDM HOLDINGS, LLC | +14.9% |
| Feb 2, 2018 | 0798-01-025 | REPLACE EXISTING BRIDGE AND APPROACHESRoberts · | 6 of 8 | $2,640,000 | $2,093,932STATELINE CONSTRUCTION, LLC | +26.1% |
| Feb 1, 2018 | 1012-03-018 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 2 of 18 | $2,198,889 | $1,885,537L & N BRIDGE, LLC | +16.6% |
| Feb 1, 2018 | 1594-02-012 | REPLACE BRIDGE AND APPROACHESCoryell · Waco | 5 of 8 | $1,316,304 | $1,048,921KNIFE RIVER CORPORATION - S… | +25.5% |
| Feb 1, 2018 | 6299-32-001 | BRIDGE PREVENTIVE MAINTENANCEBowie · Atlanta | 6 of 10 | $1,174,447 | $853,995CDM HOLDINGS, LLC | +37.5% |
| Dec 6, 2017 | 0574-01-029 | REPLACE BRIDGE AND APPROACHESNavarro · Dallas | 1 of 13 | $2,595,950 | $2,595,950 | Won |
| Dec 5, 2017 | 0043-05-107 | DECK AND CONCRETE STRUCTURE REPAIRWilbarger · Wichita Falls | 4 of 8 | $2,199,671 | $1,842,668GIBSON & ASSOCIATES, INC. | +19.4% |
| Dec 5, 2017 | 0055-06-033 | BRIDGE MAINTENANCECoryell · Waco | 10 of 12 | $487,788 | $277,779ELLIS-MCGINNIS CONSTRUCTION… | +75.6% |
| Dec 5, 2017 | 0118-08-074 | IMPROVE GUARDRAIL AND SAFETY TREATNacogdoches · Lufkin | 9 of 9 | $2,481,997 | $1,578,551A R BROTHERS CONSTRUCTION S… | +57.2% |
| Nov 3, 2017 | 6320-20-001 | EROSION/DRAINAGE REPAIRWichita · Wichita Falls | 2 of 9 | $599,539 | $578,952STATELINE CONSTRUCTION, LLC | +3.6% |
| Nov 3, 2017 | 0231-04-056 | SAFETY TREAT FIXED OBJECTSBell · Waco | 6 of 9 | $1,182,890 | $1,063,872BEAR CREEK CONTRACTING, LLC | +11.2% |
| Nov 2, 2017 | 0257-01-047 | DRAINAGE IMPROVEMENTSStephens · Brownwood | 2 of 12 | $238,388 | $223,074REECE CONSTRUCTION CO., INC. | +6.9% |
| Oct 4, 2017 | 0064-01-067 | IMPROVE GUARDRAIL AND SAFETY TREATShelby · Lufkin | 8 of 10 | $1,676,003 | $1,118,356A R BROTHERS CONSTRUCTION S… | +49.9% |
| Oct 4, 2017 | 0117-06-049 | BRIDGE REPAIRHouston · Lufkin | 6 of 6 | $2,765,447 | $1,384,827HODGES AND SON CONSTRUCTION… | +99.7% |
| Oct 3, 2017 | 0923-22-021 | REPLACE BRIDGE AND APPROACHESStephens · Brownwood | 5 of 10 | $798,849 | $676,267HODGES AND SON CONSTRUCTION… | +18.1% |
| Oct 3, 2017 | 6298-16-001 | CULVERT REPAIRVan Zandt · Tyler | 5 of 9 | $547,315 | $430,297RED BARON BUILDING COMPANY,… | +27.2% |
| Aug 9, 2017 | 1163-01-022 | RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MKSmith · Tyler | 2 of 8 | $1,094,547 | $1,077,661STATELINE CONSTRUCTION, LLC | +1.6% |
| Aug 9, 2017 | 0262-07-033 | REPLACE EXISTING BRIDGEMilam · Bryan | 6 of 9 | $853,333 | $668,668KNIFE RIVER CORPORATION - S… | +27.6% |
| Aug 9, 2017 | 0843-07-016 | GR,STR,BASE,SURFACINGHarrison · Atlanta | 2 of 7 | $2,449,450 | $2,284,633LONGVIEW BRIDGE AND ROAD, L… | +7.2% |
| Aug 8, 2017 | 0937-03-016 | SAFETY TREAT FIXED OBJECTSHouston · Lufkin | 3 of 5 | $1,958,588 | $1,576,406L.C. JORDAN & SON | +24.2% |
| Jul 12, 2017 | 0911-39-038 | BRIDGE REPLACEMENTShelby · Lufkin | 7 of 8 | $798,779 | $619,834DREWERY CONSTRUCTION COMPAN… | +28.9% |
| Jul 12, 2017 | 0232-02-021 | REPL BR & APPRSFalls · Waco | 6 of 7 | $2,074,741 | $1,598,159KNIFE RIVER CORPORATION - S… | +29.8% |
| Jul 12, 2017 | 0919-03-057 | REPLACE BRIDGE AND APPROACHESHarrison · Atlanta | 3 of 7 | $474,474 | $444,411STATELINE CONSTRUCTION, LLC | +6.8% |
| Jul 12, 2017 | 0043-09-130 | REPLACE BRIDGE AND APPROACHESWichita · Wichita Falls | 4 of 6 | $2,601,083 | $2,398,060COPPELL CONSTRUCTION CO., I… | +8.5% |
| Jul 11, 2017 | 0751-03-037 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 3 of 8 | $1,459,692 | $1,359,589STATELINE CONSTRUCTION, LLC | +7.4% |
| Jun 7, 2017 | 0903-03-083 | REPLACE BRIDGE AND APPROACHESWichita · Wichita Falls | 3 of 4 | $1,587,534 | $1,293,885EARTH BUILDERS, L.P. | +22.7% |
| Jun 7, 2017 | 0917-17-065 | REPLACE EXISTING BRIDGEGrimes · Bryan | 3 of 8 | $1,040,336 | $905,681TREVWAY, INC. | +14.9% |
| Jun 7, 2017 | 0816-05-019 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 1 of 10 | $1,597,550 | $1,597,550 | Won |
| Jun 6, 2017 | 0917-27-044 | REPLACE EXISTING BRIDGE FACILITYWalker · Bryan | 2 of 7 | $585,580 | $504,030TREVWAY, INC. | +16.2% |
| Jun 6, 2017 | 0910-12-066 | REPLACE RAILROAD OVERPASS & APPROACHESVan Zandt · Tyler | 3 of 5 | $1,829,129 | $1,498,798LONGVIEW BRIDGE AND ROAD, L… | +22.0% |
| Jun 6, 2017 | 0917-12-080 | REPLACE EXISTING BRIDGE FACILITYMilam · Bryan | 5 of 11 | $567,223 | $447,590ELLIS-MCGINNIS CONSTRUCTION… | +26.7% |
| Jun 6, 2017 | 0010-11-069 | CONCRETE STRUCTURE REPAIRBowie · Atlanta | 4 of 10 | $1,664,382 | $1,398,422STATELINE CONSTRUCTION, LLC | +19.0% |
| Jun 6, 2017 | 0136-04-035 | BRIDGE REPLACEMENTDelta · Paris | 6 of 8 | $1,998,989 | $1,665,296L & N BRIDGE, LLC | +20.0% |
| Apr 5, 2017 | 0909-28-022 | REPLACE BRIDGE AND APPROACHESBosque · Waco | 8 of 9 | $1,922,955 | $1,451,177HODGES AND SON CONSTRUCTION… | +32.5% |
| Apr 5, 2017 | 0911-39-048 | REPLACE BRIDGE AND APPROACHESShelby · Lufkin | 3 of 7 | $464,976 | $432,714STATELINE CONSTRUCTION, LLC | +7.5% |
| Apr 5, 2017 | 1308-01-024 | REPLACE BRIDGE & APPROACHESBell · Waco | 7 of 10 | $3,328,627 | $2,950,399J.D. ABRAMS, L.P. | +12.8% |
| Apr 4, 2017 | 0911-28-033 | REPLACE BRIDGE AND APPROACHESHouston · Lufkin | 3 of 9 | $684,194 | $619,444HODGES AND SON CONSTRUCTION… | +10.5% |
| Apr 4, 2017 | 0918-11-091 | REPLACE BR AND APPRSKaufman · Dallas | 3 of 10 | $720,000 | $696,777STATELINE CONSTRUCTION, LLC | +3.3% |
| Mar 7, 2017 | 0910-08-067 | RPLC BRG & APPR, GR, ACP BS & SURF, MBGFAnderson · Tyler | 8 of 9 | $893,692 | $753,676LONGVIEW BRIDGE AND ROAD, L… | +18.6% |
| Mar 7, 2017 | 0118-10-060 | REPLACE BRIDGE AND APPROACHESSan Augustine · Lufkin | 4 of 7 | $2,977,778 | $2,474,845LONGVIEW BRIDGE AND ROAD, L… | +20.3% |
| Mar 7, 2017 | 1810-01-032 | BRIDGE REPLACEMENTNacogdoches · Lufkin | 7 of 8 | $1,998,889 | $1,774,829DREWERY CONSTRUCTION COMPAN… | +12.6% |
| Feb 3, 2017 | 6311-96-001 | BRIDGE AND SCOUR REPAIRSAngelina · Lufkin | 4 of 9 | $425,222 | $286,936CHAMPION INFRASTRUCTURE, LLC | +48.2% |
| Feb 3, 2017 | 3459-01-024 | SFTY TR FX OBJSLimestone · Waco | 2 of 6 | $863,333 | $651,105WEST TEXAS REBAR PLACERS IN… | +32.6% |
| Feb 2, 2017 | 6304-13-001 | BRIDGE PROTECTIVE MAINTENANCECamp · Atlanta | 4 of 8 | $818,018 | $743,841STATELINE CONSTRUCTION, LLC | +10.0% |
| Feb 2, 2017 | 0926-05-008 | SAFETY TREAT FIXED OBJECTSNacogdoches · Lufkin | 6 of 10 | $999,986 | $775,621A R BROTHERS CONSTRUCTION S… | +28.9% |
| Jan 5, 2017 | 0909-22-174 | REPL BR & APPRSMcLennan · Waco | 3 of 9 | $560,000 | $453,594ELLIS-MCGINNIS CONSTRUCTION… | +23.5% |
| Jan 4, 2017 | 0634-01-012 | SAFETY TREAT FIXED OBJECTSCherokee · Tyler | 11 of 11 | $1,452,718 | $1,037,127HIGHWAY 19 CONSTRUCTION LLC | +40.1% |
| Jan 4, 2017 | 0909-22-167 | REPLACE BRIDGE AND APPROACHESMcLennan · Waco | 4 of 8 | $886,889 | $697,710ELLIS-MCGINNIS CONSTRUCTION… | +27.1% |
| Jan 4, 2017 | 0123-07-019 | SAFETY TREAT FIXED OBJECTS, ETC.Shelby · Lufkin | 3 of 11 | $1,340,000 | $1,254,729STATELINE CONSTRUCTION, LLC | +6.8% |
| Dec 1, 2016 | 0903-15-082 | REPLACE BRIDGE AND APPROACHESCooke · Wichita Falls | 4 of 8 | $1,033,333 | $837,894COPPELL CONSTRUCTION CO., I… | +23.3% |
| Dec 1, 2016 | 6308-87-001 | CULVERT REPLACEMENTSmith · Tyler | 7 of 12 | $462,422 | $348,000RED BARON BUILDING COMPANY,… | +32.9% |
| Nov 4, 2016 | 0911-04-072 | BRIDGE REPLACEMENTPolk · Lufkin | 4 of 7 | $1,763,333 | $1,452,874CDM HOLDINGS, LLC | +21.4% |
| Nov 3, 2016 | 1356-01-027 | REPAIR DRAINAGE STRUCTURESCooke · Wichita Falls | 6 of 7 | $1,742,698 | $1,250,025HODGES AND SON CONSTRUCTION… | +39.4% |
| Nov 3, 2016 | 0911-28-037 | CNSTR NEW ENTRANCE RD & PARKING LOTHouston · Lufkin | 4 of 4 | $1,277,777 | $746,461PINTO CONSTRUCTION CO., INC. | +71.2% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.