| 1 | 100-6002 |
PREPARING ROW | 5.8 | STA |
$3,000.00 |
$2,600.00 |
$3,000.00 |
$3,070.48 |
$8,000.00 |
$4,500.00 |
$13,500.00 |
$18,000.00 |
$3,002.96 |
| 2 | 105-6005 |
REMOVING STAB BASE AND ASPH PAV (3") | 1,138 | SY |
$10.00 |
$12.00 |
$8.00 |
$8.68 |
$17.00 |
$11.00 |
$20.00 |
$8.00 |
$3.03 |
| 3 | 106-6001 |
OBLITERATING ABANDONED ROAD | 2.9 | STA |
$5,000.00 |
$5,000.00 |
$1,000.00 |
$1,685.32 |
$7,000.00 |
$8,500.00 |
$10,000.00 |
$600.00 |
$576.49 |
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 580 | CY |
$15.00 |
$15.00 |
$20.00 |
$27.14 |
$40.00 |
$22.00 |
$20.00 |
$25.00 |
$6.70 |
| 5 | 110-6002 |
EXCAVATION (CHANNEL) | 426 | CY |
$16.00 |
$12.00 |
$24.00 |
$30.31 |
$40.00 |
$31.00 |
$30.00 |
$25.00 |
$7.44 |
| 6 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 243 | CY |
$25.00 |
$12.00 |
$32.00 |
$28.54 |
$60.00 |
$31.00 |
$30.00 |
$25.00 |
$7.81 |
| 7 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 1,805 | SY |
$2.00 |
$3.00 |
$4.00 |
$7.25 |
$3.00 |
$3.50 |
$6.00 |
$3.00 |
$1.08 |
| 8 | 162-6002 |
BLOCK SODDING | 1,805 | SY |
$5.00 |
$4.00 |
$7.50 |
$6.15 |
$7.00 |
$6.00 |
$8.00 |
$3.00 |
$3.12 |
| 9 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 1,805 | SY |
$0.2500 |
$1.00 |
$2.90 |
$2.03 |
$1.00 |
$1.00 |
$2.00 |
$0.0500 |
$0.0820 |
| 10 | 168-6001 |
VEGETATIVE WATERING | 538 | MG |
$25.00 |
$1.00 |
$25.00 |
$30.00 |
$50.00 |
$25.00 |
$20.00 |
$3.00 |
$12.56 |
| 11 | 247-6312 |
FL BS (CMP IN PLC)(TY D GR1-2)(8") | 1,380 | SY |
$19.00 |
$45.00 |
$27.00 |
$15.37 |
$30.00 |
$38.00 |
$25.00 |
$25.00 |
$11.28 |
| 12 | 310-6027 |
PRIME COAT(MC-30 OR AE-P) | 260 | GAL |
$9.00 |
$14.00 |
$14.50 |
$15.43 |
$9.00 |
$9.00 |
$10.00 |
$14.00 |
$3.24 |
| 13 | 316-6024 |
ASPH (CRS-2P) | 217 | GAL |
$11.00 |
$12.00 |
$11.00 |
$11.45 |
$11.00 |
$15.00 |
$20.00 |
$10.50 |
$3.47 |
| 14 | 316-6029 |
ASPH (RC-250) | 122 | GAL |
$19.00 |
$20.00 |
$20.00 |
$21.18 |
$11.00 |
$22.00 |
$60.00 |
$19.75 |
$4.04 |
| 15 | 316-6403 |
AGGR (TY-B GR-5 OR TY-L GR-5) | 5 | CY |
$450.00 |
$1,000.00 |
$930.00 |
$986.00 |
$350.00 |
$1,100.00 |
$3,150.00 |
$900.00 |
$89.53 |
| 16 | 316-6419 |
ASPH (AC-15P, AC-20-5TR OR AC-20XP) | 182 | GAL |
$20.00 |
$14.00 |
$13.25 |
$13.85 |
$140.00 |
$22.00 |
$55.00 |
$12.50 |
$3.66 |
| 17 | 316-6440 |
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) | 10 | CY |
$580.00 |
$1,000.00 |
$825.00 |
$881.60 |
$350.00 |
$1,100.00 |
$1,650.00 |
$800.00 |
$121.68 |
| 18 | 344-6032 |
SUPERPAVE MIXTURES SP-C SAC-B PG64-22 | 144 | TON |
$158.00 |
$185.00 |
$190.00 |
$204.16 |
$150.00 |
$215.00 |
$225.00 |
$190.00 |
$87.81 |
| 19 | 400-6005 |
CEM STABIL BKFL | 74.6 | CY |
$148.00 |
$250.00 |
$225.00 |
$215.92 |
$200.00 |
$325.00 |
$235.00 |
$250.00 |
$65.73 |
| 20 | 416-6004 |
DRILL SHAFT (36 IN) | 286 | LF |
$230.00 |
$190.00 |
$181.00 |
$309.50 |
$350.00 |
$275.00 |
$200.00 |
$300.00 |
$165.32 |
| 21 | 420-6014 |
CL C CONC (ABUT)(HPC) | 41.8 | CY |
$1,000.00 |
$1,000.00 |
$1,100.00 |
$936.07 |
$800.00 |
$1,100.00 |
$900.00 |
$1,500.00 |
$977.92 |
| 22 | 420-6030 |
CL C CONC (CAP)(HPC) | 13.6 | CY |
$1,000.00 |
$1,000.00 |
$1,500.00 |
$1,680.88 |
$800.00 |
$1,450.00 |
$950.00 |
$1,500.00 |
$1,020.60 |
| 23 | 420-6038 |
CL C CONC (COLUMN)(HPC) | 3.1 | CY |
$1,000.00 |
$1,200.00 |
$1,900.00 |
$1,860.45 |
$1,200.00 |
$2,100.00 |
$950.00 |
$3,000.00 |
$791.86 |
| 24 | 422-6002 |
REINF CONC SLAB (HPC) | 4,200 | SF |
$25.00 |
$20.00 |
$20.00 |
$28.92 |
$27.00 |
$26.75 |
$15.00 |
$27.00 |
$19.18 |
| 25 | 422-6016 |
APPROACH SLAB (HPC) | 53.4 | CY |
$500.00 |
$500.00 |
$625.00 |
$568.60 |
$350.00 |
$785.00 |
$800.00 |
$600.00 |
$505.74 |
| 26 | 425-6036 |
PRESTR CONC GIRDER (TX34) | 555.9 | LF |
$130.00 |
$195.00 |
$164.00 |
$186.55 |
$200.00 |
$265.00 |
$150.00 |
$300.00 |
$142.37 |
| 27 | 432-6001 |
RIPRAP (CONC)(4 IN) | 48 | CY |
$500.00 |
$450.00 |
$525.00 |
$548.93 |
$350.00 |
$590.00 |
$500.00 |
$500.00 |
$376.20 |
| 28 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 50 | CY |
$125.00 |
$130.00 |
$140.00 |
$184.83 |
$220.00 |
$185.00 |
$135.00 |
$304.89 |
$108.37 |
| 29 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 20 | CY |
$470.00 |
$500.00 |
$500.00 |
$607.96 |
$450.00 |
$590.00 |
$500.00 |
$500.00 |
$431.26 |
| 30 | 450-6007 |
RAIL (TY T223)(HPC) | 316 | LF |
$100.00 |
$110.00 |
$110.00 |
$138.97 |
$60.00 |
$125.00 |
$135.00 |
$200.00 |
$117.25 |
| 31 | 454-6001 |
SEALED EXPANSION JOINT (4 IN) (SEJ - A) | 60.3 | LF |
$92.00 |
$75.00 |
$100.00 |
$89.41 |
$90.00 |
$110.00 |
$50.00 |
$60.00 |
$89.27 |
| 32 | 464-6001 |
RC PIPE (CL III)(12 IN) | 68 | LF |
$56.00 |
$65.00 |
$55.00 |
$82.74 |
$90.00 |
$65.00 |
$65.00 |
$75.00 |
$40.80 |
| 33 | 464-6005 |
RC PIPE (CL III)(24 IN) | 25 | LF |
$61.00 |
$120.00 |
$75.00 |
$133.10 |
$125.00 |
$125.00 |
$85.00 |
$125.00 |
$67.47 |
| 34 | 467-6326 |
SET (TY II) (12 IN) (RCP) (6: 1) (P) | 6 | EA |
$660.00 |
$2,500.00 |
$800.00 |
$1,104.32 |
$1,200.00 |
$750.00 |
$1,500.00 |
$750.00 |
$606.05 |
| 35 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 2 | EA |
$1,260.00 |
$3,000.00 |
$1,200.00 |
$2,090.32 |
$1,500.00 |
$1,150.00 |
$1,850.00 |
$950.00 |
$1,138.94 |
| 36 | 496-6007 |
REMOV STR (PIPE) | 98 | LF |
$25.00 |
$5.00 |
$15.00 |
$13.27 |
$40.00 |
$50.00 |
$30.00 |
$21.00 |
$15.82 |
| 37 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$27,000.00 |
$12,000.00 |
$20,000.00 |
$14,701.96 |
$25,000.00 |
$19,500.00 |
$120,000.00 |
$25,000.00 |
$19,024.69 |
| 38 | 500-6001 |
MOBILIZATION | 1 | LS |
$65,348.00 |
$75,000.00 |
$79,000.00 |
$86,298.20 |
$90,000.00 |
$90,000.00 |
$100,000.00 |
$109,966.65 |
$625,875.52 |
| 39 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$2,200.00 |
$1,500.00 |
$2,990.00 |
$999.57 |
$2,500.00 |
$5,800.00 |
$3,000.00 |
$5,000.00 |
$6,859.20 |
| 40 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 32 | LF |
$40.00 |
$40.00 |
$43.00 |
$46.40 |
$100.00 |
$40.00 |
$30.00 |
$31.50 |
$28.10 |
| 41 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 32 | LF |
$15.00 |
$20.00 |
$15.00 |
$13.92 |
$20.00 |
$20.00 |
$15.00 |
$15.75 |
$8.01 |
| 42 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 146 | SY |
$15.00 |
$5.00 |
$15.00 |
$16.24 |
$100.00 |
$20.00 |
$40.00 |
$21.00 |
$19.85 |
| 43 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 146 | SY |
$8.00 |
$1.00 |
$9.00 |
$9.28 |
$10.00 |
$12.00 |
$20.00 |
$10.50 |
$6.98 |
| 44 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,175 | LF |
$2.50 |
$2.00 |
$1.57 |
$1.62 |
$7.00 |
$3.00 |
$4.00 |
$1.52 |
$2.34 |
| 45 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,175 | LF |
$1.00 |
$1.00 |
$0.5100 |
$0.4900 |
$2.00 |
$1.00 |
$2.00 |
$0.1100 |
$0.6370 |
| 46 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 212.5 | LF |
$20.00 |
$20.00 |
$22.00 |
$30.16 |
$23.00 |
$25.00 |
$25.00 |
$20.00 |
$20.85 |
| 47 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 4 | EA |
$915.00 |
$1,000.00 |
$1,100.00 |
$1,276.00 |
$1,500.00 |
$1,450.00 |
$1,850.00 |
$795.00 |
$1,131.97 |
| 48 | 540-6014 |
SHORT RADIUS | 25 | LF |
$30.00 |
$30.00 |
$55.00 |
$87.00 |
$53.00 |
$45.00 |
$35.00 |
$22.00 |
$29.92 |
| 49 | 540-6015 |
DRIVEWAY TERMINAL ANCHOR SECTION | 1 | EA |
$650.00 |
$750.00 |
$1,150.00 |
$1,160.00 |
$1,500.00 |
$1,450.00 |
$1,850.00 |
$600.00 |
$805.71 |
| 50 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 150 | LF |
$2.50 |
$2.00 |
$2.50 |
$13.92 |
$5.00 |
$3.00 |
$3.00 |
$2.15 |
$2.57 |
| 51 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 4 | EA |
$213.00 |
$400.00 |
$225.00 |
$290.00 |
$1,000.00 |
$500.00 |
$500.00 |
$105.00 |
$217.87 |
| 52 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$2,570.00 |
$2,400.00 |
$2,750.00 |
$2,958.00 |
$3,000.00 |
$2,850.00 |
$2,850.00 |
$2,625.00 |
$2,571.39 |
| 53 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 1 | EA |
$330.00 |
$400.00 |
$400.00 |
$348.00 |
$200.00 |
$650.00 |
$650.00 |
$315.00 |
$254.42 |
| 54 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 14 | EA |
$305.00 |
$450.00 |
$600.00 |
$522.00 |
$250.00 |
$900.00 |
$650.00 |
$550.00 |
$354.77 |
| 55 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$25.00 |
$40.00 |
$30.00 |
$32.48 |
$77.00 |
$45.00 |
$100.00 |
$20.00 |
$21.45 |
| 56 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 19 | EA |
$30.00 |
$40.00 |
$40.00 |
$52.20 |
$77.00 |
$45.00 |
$100.00 |
$37.00 |
$27.62 |
| 57 | 666-6224 |
PAVEMENT SEALER 4" | 750 | LF |
$0.5500 |
$2.00 |
$1.15 |
$0.0600 |
$4.00 |
$2.00 |
$2.00 |
$1.05 |
$0.0830 |
| 58 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 956 | LF |
$1.50 |
$4.00 |
$1.70 |
$1.45 |
$2.00 |
$3.00 |
$2.00 |
$1.60 |
$0.2700 |
| 59 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 1,160 | LF |
$1.50 |
$4.00 |
$1.70 |
$1.45 |
$2.00 |
$3.00 |
$2.00 |
$1.60 |
$0.2830 |
| 60 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 2,116 | LF |
$0.3000 |
$2.50 |
$1.10 |
$0.0600 |
$1.00 |
$2.00 |
$2.00 |
$1.05 |
$0.0400 |