110Let jobs
$632,796,572Total low bids
$604,191,060Total estimates
+4.7%Low bids vs estimates
Apr 2019 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 17, 2019 | 6344-28-001RMC - 634428001 | Montague Wichita Falls |
TREE TRIMMING & BRUSH REMOVALUS 82 · | $266,623 | $329,795 | CATOCON, INC. | +23.7% | 2 |
| Apr 17, 2019 | 6342-94-001RMC - 634294001 | Wichita Wichita Falls |
PAVEMENT TEXTURINGUS 287 · | $253,866 | $297,800 | TOTAL HIGHWAY MAINTENANCE, LLC | +17.3% | 1 |
| Apr 4, 2019 | 6332-23-001BPM - 633223001 | Wood Tyler |
BRIDGE PROVENTATIVE MAINTENANCEFM 17 · | $299,630 | $268,797 | RED BARON BUILDING COMPANY, L.L.C. | -10.3% | 5 |
| Apr 4, 2019 | 6341-24-001RMC - 634124001 | Smith Tyler |
BRIDGE REPAIRIH 20 · | $71,139 | $74,575 | GIBSON & ASSOCIATES, INC. | +4.8% | 3 |
| Apr 3, 2019 | 0076-01-029NH 1802(325) | Pecos Odessa |
ROADWAY WIDENING TO A MODIFIED SUPER 2US 67 · | $46,872,979 | $48,936,556 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | +4.4% | 4 |
| Apr 3, 2019 | 0172-05-115NH 2019(978) | Ellis Dallas |
GR, RV, DR, BR, RET WALL, CUL, SIGN, PV MKUS 287 · | $36,969,721 | $37,276,577 | OHL USA, INC. | +0.8% | 9 |
| Apr 3, 2019 | 3532-02-011C 3532-2-11 | Webb Laredo |
BASE,ACP,GRAD,STR,PAV MRKFM 3338 · | $22,551,599 | $23,429,429 | ANDERSON COLUMBIA CO., INC. | +3.9% | 2 |
| Apr 3, 2019 | 0145-05-032STP 2019(750) | Hale Lubbock |
PAVEMENT REPAIR, LEVEL-UP, OVERLAYUS 70 · | $14,105,189 | $18,510,115 | DUININCK, INC. | +31.2% | 2 |
| Apr 3, 2019 | 0072-06-074NH 2019(776) | Kendall San Antonio |
RECONFG RAMPS & WIDEN FR TO CONVERT TO ONE WAY OPIH 10 · | $18,670,375 | $18,335,085 | AUSTIN BRIDGE & ROAD SERVICES, LP | -1.8% | 6 |
| Apr 3, 2019 | 0912-72-363STP 2017(407)MM | Harris Houston |
RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS,CS · | $16,135,786 | $17,999,505 | HARPER BROTHERS CONSTRUCTION LLC | +11.6% | 4 |
| Apr 3, 2019 | 0051-02-101STP 2019(765)TAP | Harris Houston |
ADD BIKE LANESSH 3 · | $12,575,141 | $13,951,960 | ANGEL BROTHERS HOLDINGS CORP. | +10.9% | 2 |
| Apr 3, 2019 | 0348-03-030C 348-3-30 | Karnes Corpus Christi |
REHAB ROADWAY AND ADD PASSING LANESSH 80 · | $14,368,033 | $13,738,005 | HUNTER INDUSTRIES, LTD. | -4.4% | 7 |
| Apr 3, 2019 | 0353-04-106NH 2019(718) | Dallas Dallas |
MILL, CONC FULL DEPTH REPAIR, OVERLAY & PVMNT MRKSS 348 · | $9,273,287 | $12,971,191 | AUSTIN BRIDGE & ROAD SERVICES, LP | +39.9% | 2 |
| Apr 3, 2019 | 0133-02-025NH 2019(590) | Knox Childress |
SUPER 2US 82 · | $10,556,028 | $11,182,988 | A. L. HELMCAMP, INC. | +5.9% | 3 |
| Apr 3, 2019 | 0247-01-057NH 2019(679) | Panola Atlanta |
PLANE ACP, ACP SURF, & PAV MARKUS 79 · | $9,847,685 | $8,993,197 | MADDEN CONTRACTING COMPANY, LLC. | -8.7% | 4 |
| Apr 3, 2019 | 0039-02-070NH 2019(954) | Hidalgo Pharr |
REHABILITATE ROADWAYUS 83 · | $8,135,944 | $8,019,897 | FOREMOST PAVING, INC. | -1.4% | 2 |
| Apr 3, 2019 | 0049-06-079NH 2019(977) | Robertson Bryan |
OVERLAYSH 6 · | $8,634,712 | $7,687,391 | BIG CREEK CONSTRUCTION, LTD. | -11.0% | 4 |
| Apr 3, 2019 | 0133-07-029NH 2019(736) | Archer Wichita Falls |
OVERLAYSH 114 · | $6,915,676 | $7,554,038 | ZACK BURKETT CO. | +9.2% | 2 |
| Apr 3, 2019 | 0045-18-038NH 2019(723) | Grayson Paris |
OVERLAYUS 82 · | $7,649,585 | $7,390,533 | AUSTIN BRIDGE & ROAD SERVICES, LP | -3.4% | 4 |
| Apr 3, 2019 | 0047-18-086NH 2019(618) | Grayson Paris |
FREEWAY OPERATIONAL IMPROVEMENTSUS 75 · | $4,419,625 | $4,623,050 | ED BELL CONSTRUCTION COMPANY | +4.6% | 2 |
| Apr 3, 2019 | 0010-08-056STP 2019(770)HES | Morris Atlanta |
IMPROVE GUARDRAIL TO DESIGN STANDARUS 67 · | $5,691,960 | $4,509,224 | CDM HOLDINGS, LLC | -20.8% | 8 |
| Apr 3, 2019 | 6341-47-001RMC - 634147001 | Kaufman Dallas |
FLEXIBLE PAVEMENT REPAIRUS 80 · | $4,148,604 | $4,205,488 | FOUTSCO PAVING COMPANY, LLC | +1.4% | 4 |
| Apr 3, 2019 | 0561-01-024STP 2019(719) | Kaufman Dallas |
REHABILITATE EXISTING PAVMENT AND SLOPE FAIL RPRSH 274 · | $3,733,825 | $3,753,155 | TEXAS MATERIALS GROUP, INC. | +0.5% | 6 |
| Apr 3, 2019 | 0320-01-072STP 2019(598) | Bell Waco |
MILL/OVLYSH 95 · | $5,231,397 | $3,571,167 | TEXAS MATERIALS GROUP, INC. | -31.7% | 4 |
| Apr 3, 2019 | 0220-05-075NH 2019(774) | Cameron Pharr |
PROPOSED RAISED MEDIANSH 48 · | $2,878,918 | $3,422,327 | TEXAS CORDIA CONSTRUCTION, LLC | +18.9% | 2 |
| Apr 3, 2019 | 2250-02-017STP 2019(798)HES | Denton Dallas |
INSTALL MEDIAN CONCRETE BARRIERSSL 288 · | $3,192,171 | $3,179,441 | ED BELL CONSTRUCTION COMPANY | -0.4% | 10 |
| Apr 3, 2019 | 0070-03-049NH 2000(292) | Concho San Angelo |
RENOVATION OF SAFETY REST AREAUS 87 · | $2,183,538 | $3,089,889 | DCI CONTRACTING, INC. | +41.5% | 1 |
| Apr 3, 2019 | 6343-65-001RMC - 634365001 | De Witt Yoakum |
CALL OUT ASPHALTIC CONCRETE PAVEMENT OVERLAYUS 183 · | $2,834,232 | $3,029,377 | HUNTER INDUSTRIES, LTD. | +6.9% | 5 |
| Apr 3, 2019 | 0916-00-215STP 2019(780) | Nueces Corpus Christi |
DISTRICT WIDE PAVEMENT MARKING AND MARKERSVA · | $2,572,317 | $2,803,253 | PAVEMENT MARKINGS INC. | +9.0% | 4 |
| Apr 3, 2019 | 0220-07-064STP 2019(897) | Cameron Pharr |
REPLACE RAIL AT BRIDGE AND REPAIR APPROACHESSH 48 · | $1,395,276 | $2,475,986 | SCR CIVIL CONSTRUCTION, LLC | +77.5% | 1 |
| Apr 3, 2019 | 0904-08-004BR 2018(472) | Hansford Amarillo |
REPLACE EXISTING OFF SYSTEM BRIDGECR · | $1,515,660 | $1,745,583 | EARTH BUILDERS, L.P. | +15.2% | 5 |
| Apr 3, 2019 | 0051-03-111NH 2019(766) | Galveston Houston |
BASE REP, SC, O/L & TRAFFIC SIGNAL UPDATESH 3 · | $1,578,431 | $1,662,372 | ANGEL BROTHERS HOLDINGS CORP. | +5.3% | 2 |
| Apr 3, 2019 | 0915-00-221STP 2019(684) | Bexar San Antonio |
DISTRICTWIDE TRAFFIC CONTROL DEVICEVA · | $1,505,516 | $1,539,906 | D&G ENERGY CORPORATION | +2.3% | 3 |
| Apr 3, 2019 | 0918-47-178STP 2019(720)HES | Dallas Dallas |
IMPROVEMENT OF TRAFFIC SIGNALSCS · | $1,024,877 | $1,330,000 | DURABLE SPECIALTIES, INC. | +29.8% | 3 |
| Apr 3, 2019 | 0825-02-021STP 2019(894)HES | McCulloch Brownwood |
UPGRADE GUARDRAIL AND SAFETY TREAT FIXED OBJECTSUS 190 · | $1,186,168 | $1,191,746 | SJ&J CONSTRUCTION, LLC | +0.5% | 3 |
| Apr 3, 2019 | 1024-01-076STP 2019(761)HES | Chambers Beaumont |
GR, BS, ACP, RUMBLE STRIPSFM 565 · | $951,302 | $1,057,947 | ANGEL BROTHERS HOLDINGS CORP. | +11.2% | 3 |
| Apr 3, 2019 | 6342-30-001RMC - 634230001 | Rains Paris |
RIPRAP REPAIRSH 276 · | $699,160 | $1,022,250 | FNH CONSTRUCTION, LLC | +46.2% | 5 |
| Apr 3, 2019 | 0905-00-106C 905-00-106 | Lubbock Lubbock |
RAISED PAVEMENT MARKERSVA · | $945,295 | $987,438 | BRYDL CONTRACTING, INC. | +4.5% | 1 |
| Apr 3, 2019 | 0086-05-018STP 2019(749)HES | Duval Laredo |
PROFILE EDGELINE MARKINGS,PROFILE CENTERLINE MRKGSSH 359 · | $1,213,985 | $877,188 | PAVEMENT MARKINGS INC. | -27.7% | 5 |
| Apr 3, 2019 | 0889-04-078STP 2019(734)HES | Smith Tyler |
IMPROVE DRAINAGE, UPGRADE GUARD RAILFM 346 · | $805,303 | $799,066 | LONGVIEW BRIDGE AND ROAD, LTD. | -0.8% | 8 |
| Apr 3, 2019 | 0904-00-186STP 2019(728) | Potter Amarillo |
UPGRADE EXISTING ROADWAY ILLUMINATION TO LEDVA · | $761,550 | $748,100 | CDM HOLDINGS, LLC | -1.8% | 2 |
| Apr 3, 2019 | 6336-60-001RMC - 633660001 | El Paso El Paso |
TRAFFIC MANAGEMENT SYSTEMIH 10 · | $693,005 | $692,028 | TRI STATE ELECTRIC, LTD. | -0.1% | 1 |
| Apr 3, 2019 | 0354-02-027STP 2019(751)HES | Ward Odessa |
SAFETY LIGHTING AT INTERSECTIONSH 115 · | $692,779 | $679,704 | WILLIS ELECTRIC CO., LP | -1.9% | 3 |
| Apr 3, 2019 | 0907-15-006STP 2017(287)TAPS | Concho San Angelo |
PEDESTRIAN IMPROVEMENTS-SIDEWALKS AND LIGHTINGCS · | $612,546 | $676,560 | ENCINO LANDSCAPE, INC. | +10.5% | 3 |
| Apr 3, 2019 | 6342-31-001RMC - 634231001 | Culberson El Paso |
ROADWAY POTHOLE REPAIRRM 652 · | $564,650 | $648,250 | DOUBLE H CONTRACTING INC. | +14.8% | 2 |
| Apr 3, 2019 | 6339-66-001BPM - 633966001 | Upton Odessa |
STRUCTURE REPAIRSH 329 · | $554,836 | $619,968 | SCR CIVIL CONSTRUCTION, LLC | +11.7% | 4 |
| Apr 3, 2019 | 0683-02-075NH 2019(754) | Travis Austin |
INSTALL CONCRETE TRAFFIC BARRIERSRM 620 · | $600,302 | $556,063 | DAN WILLIAMS COMPANY | -7.4% | 7 |
| Apr 3, 2019 | 6344-10-001RMC - 634410001 | Midland Odessa |
EMERGENCY MBGF REPAIR (CALLOUT)IH 20 · | $458,240 | $488,850 | K-BAR SERVICES, INC. | +6.7% | 3 |
| Apr 3, 2019 | 6342-39-001RMC - 634239001 | Culberson El Paso |
INSTALLATION OF EMERGENCY GENERATORUS 62 · | $319,600 | $484,469 | C. F. MCDONALD ELECTRIC, INC. | +51.6% | 1 |
| Apr 3, 2019 | 6334-20-001BPM - 633420001 | Jeff Davis El Paso |
BRIDGE PREVENTIVE MAINTENANCE (BPM)SH 17 · | $410,308 | $460,470 | DAN WILLIAMS COMPANY | +12.2% | 2 |
| Apr 3, 2019 | 6344-08-001RMC - 634408001 | Ector Odessa |
EMERGENCY MBGF REPAIR_(CALLOUT)IH 20 · | $397,725 | $443,850 | K-BAR SERVICES, INC. | +11.6% | 3 |
| Apr 3, 2019 | 6342-88-001RMC - 634288001 | Ector Odessa |
STREET SWEEPINGIH 20 · | $401,504 | $370,044 | J-MEN CONCRETE CONSTRUCTION | -7.8% | 3 |
| Apr 3, 2019 | 6343-43-001RMC - 634343001 | Ector Odessa |
STRIPING (CALLOUT)IH 20 · | $500,000 | $366,600 | L&L COMPANY | -26.7% | 3 |
| Apr 3, 2019 | 6343-38-001RMC - 634338001 | Midland Odessa |
STRIPING (CALLOUT)IH 20 · | $500,000 | $366,600 | L&L COMPANY | -26.7% | 3 |
| Apr 3, 2019 | 6343-70-001RMC - 634370001 | Denton Dallas |
ROADSIDE MOWINGFM 455 · | $301,106 | $346,636 | BRYDL CONTRACTING, INC. | +15.1% | 1 |
| Apr 3, 2019 | 3417-02-032CC 3417-2-32 | Williamson Austin |
GR, BASE, HMACP & PVMT MKSFM 734 · | $146,289 | $248,350 | AARON CONCRETE CONTRACTORS, L.P. | +69.8% | 2 |
| Apr 3, 2019 | 6338-98-001RMC - 633898001 | Childress Childress |
UPGRADE SCHOOL ZONESUS 287 · | $234,190 | $236,128 | MARCOM'S MOWING SERVICE, LLC | +0.8% | 3 |
| Apr 2, 2019 | 0062-01-035BR 2019(689) | Bowie Atlanta |
REPLACE BRIDGES AND APPROACHESSH 8 · | $32,733,661 | $37,733,611 | LONGVIEW BRIDGE AND ROAD, LTD. | +15.3% | 3 |
| Apr 2, 2019 | 0173-02-071STP 2019(711) | Kaufman Dallas |
REHAB EXISTING ROADWAY AND ADD SHOULDERSSH 34 · | $37,208,363 | $36,563,467 | STERLING DELAWARE HOLDING COMPANY, INC. | -1.7% | 9 |
| Apr 2, 2019 | 0015-13-396NH 2018(907) | Travis Austin |
GR, BASE, STRUCT, HMACP & PVMT MKSIH 35 · | $22,225,185 | $24,590,929 | JAMES CONSTRUCTION GROUP, L.L.C. | +10.6% | 4 |
| Apr 2, 2019 | 0490-04-045STP 2019(727) | Roberts |
OVERLAYSH 70 · | $23,322,706 | $23,349,234 | J. LEE MILLIGAN, INC. | +0.1% | 5 |
| Apr 2, 2019 | 0065-07-062NH 2019(818) | Jefferson Beaumont |
WIDEN FREEWAY FROM 4 TO 6 LANESUS 69 · | $21,091,621 | $21,735,072 | ANGEL BROTHERS HOLDINGS CORP. | +3.1% | 4 |
| Apr 2, 2019 | 0072-06-084NH 2019(768) | Kendall San Antonio |
OVERLAY & PVMNT MARKINGS ON MAIN LNSIH 10 · | $22,598,454 | $20,658,006 | CLARK CONSTRUCTION OF TEXAS, INC. | -8.6% | 6 |
| Apr 2, 2019 | 0040-03-064C 40-3-64 | Dallam Amarillo |
OVERLAYUS 87 · | $15,797,809 | $17,114,342 | RK HALL, LLC | +8.3% | 4 |
| Apr 2, 2019 | 0046-01-064NH 2019(724) | Red River Paris |
WIDEN NON-FREEWAYUS 82 · | $12,485,246 | $14,202,162 | RK HALL, LLC | +13.8% | 4 |
| Apr 2, 2019 | 0068-03-033NH 2019(745) | Lynn Lubbock |
THIN OVERLAY MIXUS 87 · | $10,468,157 | $13,819,501 | DUININCK, INC. | +32.0% | 4 |
| Apr 2, 2019 | 0015-09-193NH 2019(747) | Williamson Austin |
GR,BASE,HMACP,SIGNS & PVMT MRKSIH 35 · | $10,555,578 | $10,705,999 | JORDAN FOSTER CONSTRUCTION, LLC | +1.4% | 5 |
| Apr 2, 2019 | 0486-01-032STP 2019(591) | Wheeler Childress |
SUPER 2SH 152 · | $9,228,113 | $9,862,939 | JCCC, INC. | +6.9% | 4 |
| Apr 2, 2019 | 0206-04-042NH 2019(733) | Cherokee Tyler |
PLN,CM TRT,BS&SURF,BR RL,MBGF,PV MKUS 79 · | $8,282,983 | $8,163,209 | MADDEN CONTRACTING COMPANY, LLC. | -1.4% | 5 |
| Apr 2, 2019 | 0039-20-008NH 2019(773) | Cameron Pharr |
WIDEN ROADWAYSS 54 · | $6,920,192 | $7,086,524 | TEXAS CORDIA CONSTRUCTION, LLC | +2.4% | 2 |
| Apr 2, 2019 | 0043-05-108NH 2019(735) | Wilbarger Wichita Falls |
MILL AND OVERLAYUS 287 · | $6,653,793 | $6,884,724 | DUININCK, INC. | +3.5% | 2 |
| Apr 2, 2019 | 0181-01-061STP 2019(789) | Taylor Abilene |
OVERLAYSH 36 · | $3,537,437 | $5,300,067 | J. H. STRAIN & SONS, INC. | +49.8% | 1 |
| Apr 2, 2019 | 2886-02-017C 2886-2-17 | Nueces Corpus Christi |
REHAB ROADWAY AND WIDENFM 2826 · | $4,457,303 | $4,689,384 | J. CARROLL WEAVER, INC. | +5.2% | 5 |
| Apr 2, 2019 | 0009-02-040CM 2019(794) | Dallas Dallas |
TRAFFIC SIGNALS AND INTERSECTION IMPROVEMENTSH 78 · | $3,617,282 | $4,599,653 | GIBSON & ASSOCIATES, INC. | +27.2% | 3 |
| Apr 2, 2019 | 0088-01-068C 88-1-68 | Bee Corpus Christi |
SPOT BASE REPAIR AND NOVACHIP ROADWAYUS 59 · | $5,109,247 | $4,366,328 | HUNTER INDUSTRIES, LTD. | -14.5% | 3 |
| Apr 2, 2019 | 6342-89-001RMC - 634289001 | Robertson Bryan |
HMA OVERLAY, RETROFIT BRIDGE RAIL & MBGFSH 7 · | $4,052,024 | $3,988,301 | KNIFE RIVER CORPORATION - SOUTH | -1.6% | 4 |
| Apr 2, 2019 | 0093-02-021STP 2019(710) | Navarro Dallas |
PAVEMENT REPAIR_AND_OVERLAYSH 14 · | $3,613,692 | $3,351,110 | KNIFE RIVER CORPORATION - SOUTH | -7.3% | 3 |
| Apr 2, 2019 | 6332-04-001RMC - 633204001 | Harris Houston |
GENERAL MAINTENANCE OF IH 45IH 45 · | $2,780,554 | $2,894,122 | ROY JORGENSEN ASSOCIATES, INC. | +4.1% | 3 |
| Apr 2, 2019 | 6343-64-001RMC - 634364001 | Victoria Yoakum |
CALL OUT ASPHALTIC CONCRETE PAVEMENT OVERLAYUS 59 · | $2,834,232 | $2,842,868 | HUNTER INDUSTRIES, LTD. | +0.3% | 2 |
| Apr 2, 2019 | 0508-04-168NH 2019(757) | Jefferson Beaumont |
MILL,ACPSH 73 · | $2,185,266 | $2,402,166 | TEXAS MATERIALS GROUP, INC. | +9.9% | 2 |
| Apr 2, 2019 | 0102-01-114STP 2019(706)HES | Nueces Corpus Christi |
MEDIAN BARRIER, MILLED EDEGLINE RUMBLE STRIPSSH 44 · | $1,637,668 | $2,213,166 | SCR CIVIL CONSTRUCTION, LLC | +35.1% | 1 |
| Apr 2, 2019 | 0008-13-238STP 2016(994)HES | Tarrant Fort Worth |
CONVERT MEDIAN BARRIERIH 20 · | $2,140,580 | $2,096,043 | ALTUS CONSTRUCTION LLC | -2.1% | 3 |
| Apr 2, 2019 | 6342-95-001RMC - 634295001 | Brazos Bryan |
MILL,SEAL,PFC OVERLAY & JOINT CLEANINGSH 6 · | $2,287,229 | $1,895,300 | KNIFE RIVER CORPORATION - SOUTH | -17.1% | 3 |
| Apr 2, 2019 | 6340-18-001RMC - 634018001 | Kaufman Dallas |
GUARD FENCE & CABLE BARRIER REPAIRIH 20 · | $1,739,611 | $1,802,589 | FIREMAN EXCAVATING, INC. | +3.6% | 3 |
| Apr 2, 2019 | 6342-11-001RMC - 634211001 | Jefferson Beaumont |
TRAFFIC CONTROL SERVICESUS 69 · | $1,393,518 | $1,549,084 | AREA WIDE PROTECTIVE, INC. | +11.2% | 1 |
| Apr 2, 2019 | 6335-20-001BPM - 633520001 | Garza Maintenance Division |
BRIDGE PREVENTATIVE MAINTENANCEUS 84 · | $1,328,083 | $1,523,850 | EARTH BUILDERS, L.P. | +14.7% | 4 |
| Apr 2, 2019 | 6341-83-001RMC - 634183001 | Lamar Paris |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 1497 · | $1,945,185 | $1,477,458 | D. L. LENNON INCORPORATED - CONTRACTOR | -24.0% | 3 |
| Apr 2, 2019 | 0903-28-058BR 2015(774) | Montague Wichita Falls |
REPLACE BRIDGE AND APPROACHESCR · | $1,513,627 | $1,372,297 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -9.3% | 7 |
| Apr 2, 2019 | 2825-01-009SSW 2825-1-9 | Burleson Bryan |
WIDEN RDWY, EDGLN, CTRLN PROFL MRKFM 2774 · | $1,225,651 | $1,323,982 | KNIFE RIVER CORPORATION - SOUTH | +8.0% | 5 |
| Apr 2, 2019 | 0037-08-041STP 2019(960)HES | Dimmit Laredo |
PROFILE EDGELINE MARKINGS,PROFILE CENTERLINE MRKGSUS 83 · | $1,691,970 | $1,275,016 | L&L COMPANY | -24.6% | 6 |
| Apr 2, 2019 | 0008-08-076NH 2019(709) | Dallas Dallas |
MILL, OVERLAY & FLEX PVMNT REPAIR ON FRONTAGE RDSSH 180 · | $1,437,450 | $1,120,776 | TEXAS MATERIALS GROUP, INC. | -22.0% | 4 |
| Apr 2, 2019 | 6344-13-001RMC - 634413001 | Hidalgo Pharr |
CLEANING AND SWEEPING, DEBRIS REMOVALIH 2 · | $1,041,462 | $991,681 | PANNELL INDUSTRIES, INC. | -4.8% | 1 |
| Apr 2, 2019 | 0144-03-037STP 2019(732)HES | Calhoun Yoakum |
IMPROVE GUARDRAILUS 87 · | $754,123 | $981,456 | 3LW CIVIL LLC | +30.1% | 3 |
| Apr 2, 2019 | 6343-39-001RMC - 634339001 | Milam Bryan |
MILL AND INLAYUS 77 · | $967,210 | $977,937 | KNIFE RIVER CORPORATION - SOUTH | +1.1% | 5 |
| Apr 2, 2019 | 0314-07-069NH 2019(721) | Parker Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKIH 20 · | $1,191,210 | $925,967 | NORTHEASTERN PAVERS, LLC | -22.3% | 7 |
| Apr 2, 2019 | 6344-12-001RMC - 634412001 | Cameron Pharr |
CLEANING AND SWEEPING, DEBRIS REMOVALIH 69E · | $928,224 | $868,157 | PANNELL INDUSTRIES, INC. | -6.5% | 1 |
| Apr 2, 2019 | 0909-22-176BR 2018(219) | McLennan Waco |
REPL BR & APPRSCR · | $942,046 | $863,438 | KNIFE RIVER CORPORATION - SOUTH | -8.3% | 8 |
| Apr 2, 2019 | 0915-00-192STP 2019(777) | Bexar San Antonio |
SIGNALS,SIGNS,PAV'T MRKSVA · | $1,065,217 | $817,876 | E-Z BEL CONSTRUCTION, LLC | -23.2% | 4 |
| Apr 2, 2019 | 0918-47-062BR 2013(300) | Dallas Dallas |
REPLACE BRIDGE AND APPROACHESCS · | $734,229 | $793,042 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +8.0% | 9 |
| Apr 2, 2019 | 0079-03-048STP 2019(790)HES | Comanche Brownwood |
IMPROVE GUARDRAIL AND SAFETY TREAT FIXED OBJECTSUS 67 · | $757,601 | $759,959 | PIERCE R & B LLC | +0.3% | 7 |
1–100 of 110Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.