124Let jobs
$577,675,800Total low bids
$530,744,695Total estimates
+8.8%Low bids vs estimates
Jan 2022 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jan 31, 2022 | 6396-22-001MMC - 639622001 | Brown Brownwood |
EMULSION (MATERIALS ONLY)US 377 · | $105,000 | $98,700 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -6.0% | 4 |
| Jan 31, 2022 | 6396-23-001MMC - 639623001 | San Saba Brownwood |
EMULSION (MATERIALS ONLY)US 190 · | $98,725 | $98,230 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -0.5% | 4 |
| Jan 31, 2022 | 6396-24-001MMC - 639624001 | Lampasas Brownwood |
HOT-MIX COLD-LAID (MATERIALS ONLY)US 281 · | $56,400 | $66,955 | TEXAS MATERIALS GROUP, INC. | +18.7% | 4 |
| Jan 7, 2022 | 0196-07-034STP 2022(386)MM | Dallas Dallas |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESS 366 · | $47,197,573 | $94,966,148 | ARCHER WESTERN CONSTRUCTION, LLC | +101.2% | 2 |
| Jan 7, 2022 | 0228-04-043C 228-4-43 | Andrews Odessa |
ROADWAY REHABILITATIONUS 385 · | $40,055,499 | $37,642,802 | REECE ALBERT, INC. | -6.0% | 5 |
| Jan 7, 2022 | 2296-02-026C 2296-2-26 | Midland Odessa |
CONSTRUCT BRIDGESH 191 · | $27,487,949 | $27,535,250 | REECE ALBERT, INC. | +0.2% | 4 |
| Jan 7, 2022 | 0032-07-029STP 1302(057) | Stonewall Abilene |
WIDEN ROAD - ADD LANESUS 83 · | $19,378,099 | $19,299,562 | DELHUR INDUSTRIES, INC. | -0.4% | 4 |
| Jan 7, 2022 | 0228-02-049F 2022(371) | Gaines Lubbock |
REHABILITATION OF ROADWAYUS 62 · | $18,856,041 | $18,829,752 | WEBBER, LLC | -0.1% | 2 |
| Jan 7, 2022 | 2060-01-037F 2021(489) | McLennan Waco |
WIDEN PAVEMENT AND ADD CURB & GUTTERFM 2113 · | $15,388,383 | $15,387,558 | BIG CREEK CONSTRUCTION, LTD. | 0.0% | 3 |
| Jan 7, 2022 | 0516-02-031F 2022(257) | Goliad Corpus Christi |
REHABILITATE EXISTING ROADWAYSH 239 · | $10,169,973 | $10,110,263 | HUNTER INDUSTRIES, LTD. | -0.6% | 5 |
| Jan 7, 2022 | 0379-01-046F 2022(299) | Hutchinson Amarillo |
REHABILITATE EXISTING ROADWAYSH 136 · | $9,350,961 | $9,504,385 | DUININCK, INC. | +1.6% | 5 |
| Jan 7, 2022 | 2355-01-006C 2355-1-6 | Kaufman Dallas |
REHABILITATE EXISTING ROADWAYFM 2451 · | $7,524,107 | $7,647,971 | KNIFE RIVER CORPORATION - SOUTH | +1.6% | 8 |
| Jan 7, 2022 | 0296-01-038F 2022(243) | Scurry Abilene |
PREVENTIVE MAINTENANCEUS 180 · | $7,954,819 | $7,417,904 | RK HALL, LLC | -6.7% | 3 |
| Jan 7, 2022 | 0228-06-092F 2022(351) | Ector Odessa |
HIGHWAY IMPROVEMENTUS 385 · | $7,403,043 | $6,752,984 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -8.8% | 2 |
| Jan 7, 2022 | 0018-01-094C 18-1-94 | La Salle Laredo |
REHABILITATE EXISTING ROADWAYIH 35 · | $4,596,124 | $4,380,302 | J. CARROLL WEAVER, INC. | -4.7% | 7 |
| Jan 7, 2022 | 1356-01-029F 2022(214) | Cooke Wichita Falls |
SURFACING/ROADWAY RESTORATIONFM 1201 · | $4,621,303 | $4,085,241 | JAGOE-PUBLIC COMPANY | -11.6% | 2 |
| Jan 7, 2022 | 0185-06-012F 2022(253) | Milam Bryan |
PREVENTIVE MAINTENANCEFM 845 · | $4,104,532 | $3,982,426 | BRAZOS PAVING, INC. | -3.0% | 4 |
| Jan 7, 2022 | 0484-01-025BR 2022(244) | Jones Abilene |
BRIDGE REPLACEMENTFM 707 · | $2,728,257 | $3,778,142 | EARTH BUILDERS, L.P. | +38.5% | 1 |
| Jan 7, 2022 | 0134-05-034C 134-5-34 | Jack Fort Worth |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TSH 59 · | $3,295,666 | $3,685,480 | JAGOE-PUBLIC COMPANY | +11.8% | 3 |
| Jan 7, 2022 | 1197-01-021STP 2022(271)HES | Hays Austin |
HAZARD ELIMINATION & SAFETYRM 150 · | $3,079,453 | $3,601,691 | TEXAS MATERIALS GROUP, INC. | +17.0% | 3 |
| Jan 7, 2022 | 6392-31-001RMC - 639231001 | Henderson Tyler |
MILL AND INLAYSL 7 · | $3,041,044 | $3,352,287 | TEXAS MATERIALS GROUP, INC. | +10.2% | 2 |
| Jan 7, 2022 | 0099-01-035STP 2022(260)HES | Coleman Brownwood |
HIGHWAY IMPROVEMENTUS 283 · | $2,950,130 | $3,177,409 | J. H. STRAIN & SONS, INC. | +7.7% | 3 |
| Jan 7, 2022 | 0195-03-096C 195-3-96 | Denton Dallas |
REHABILITATE EXISTING ROADWAYIH 35E · | $2,624,043 | $3,081,758 | ROY JORGENSEN ASSOCIATES, INC. | +17.4% | 3 |
| Jan 7, 2022 | 0172-05-125STP 2022(246)HES | Ellis Dallas |
SAFETY IMPROVEMENT PROJECTSUS 287 · | $3,321,948 | $2,840,168 | GRATIOT CONSTRUCTION, LTD. | -14.5% | 7 |
| Jan 7, 2022 | 0249-03-054F 2022(292) | Archer Wichita Falls |
SURFACING/ROADWAY RESTORATIONUS 281 · | $2,286,669 | $2,498,172 | ZACK BURKETT CO. | +9.2% | 4 |
| Jan 7, 2022 | 0118-08-075BR 2022(295) | Nacogdoches Lufkin |
BRIDGE REPLACEMENTSH 21 · | $2,248,501 | $2,490,125 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +10.7% | 6 |
| Jan 7, 2022 | 0043-02-077F 2022(226) | Hardeman Childress |
ACP OVERLAYUS 287 · | $2,606,752 | $2,452,566 | ZACK BURKETT CO. | -5.9% | 3 |
| Jan 7, 2022 | 6389-23-001RMC - 638923001 | Erath Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 377 · | $1,346,319 | $2,079,701 | NORTHEASTERN PAVERS, LLC | +54.5% | 1 |
| Jan 7, 2022 | 0923-17-088BR 2021(887) | Comanche Brownwood |
BRIDGE REPLACEMENTCR · | $1,822,621 | $1,969,718 | KNIFE RIVER CORPORATION - SOUTH | +8.1% | 5 |
| Jan 7, 2022 | 3417-02-024C 3417-2-24 | Williamson Austin |
DEPTH REPAIR, UNDERSEAL & OVFM 734 · | $1,575,284 | $1,965,252 | LONE STAR PAVING COMPANY | +24.8% | 2 |
| Jan 7, 2022 | 6395-19-001MMC - 639519001 | Jasper Beaumont |
HOT MIX (MATERIAL ONLY)FM 1007 · | $1,418,625 | $1,688,164 | TEXAS MATERIALS GROUP, INC. | +19.0% | 1 |
| Jan 7, 2022 | 0914-33-064BR 1502(645) | Hays Austin |
BRIDGE MAINTENANCECR · | $1,614,622 | $1,535,479 | AUSTIN UNDERGROUND INCORPORATED | -4.9% | 4 |
| Jan 7, 2022 | 0913-28-073BR 2B20(275) | Fayette Yoakum |
BRIDGE REPLACEMENTCR · | $1,425,164 | $1,498,743 | FUQUA CONSTRUCTION CO., INC. | +5.2% | 3 |
| Jan 7, 2022 | 0901-22-117BR 2021(523) | Hunt Paris |
BRIDGE REPLACEMENTCR · | $1,377,957 | $1,348,336 | HIGHWAY 19 CONSTRUCTION LLC | -2.1% | 5 |
| Jan 7, 2022 | 6386-63-001MMC - 638663001 | Blanco Austin |
SEAL COAT ASPHALT (MATERIAL ONLY)US 281 · | $1,336,080 | $1,296,780 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -2.9% | 2 |
| Jan 7, 2022 | 0910-16-147BR 2020(895) | Smith Tyler |
BRIDGE REPLACEMENTCS · | $1,258,233 | $1,258,294 | THK CONSTRUCTION LLC | +0.0% | 9 |
| Jan 7, 2022 | 6389-50-001RMC - 638950001 | Harris Houston |
PAVEMENT MARKINGSSL 8 · | $778,973 | $906,750 | BATTERSON, LLP | +16.4% | 5 |
| Jan 7, 2022 | 6395-01-001RMC - 639501001 | Jefferson Beaumont |
FULL DEPTH CONCRETE REPAIRSH 124 · | $952,105 | $851,265 | SELECT MAINTENANCE, L.L.C. | -10.6% | 4 |
| Jan 7, 2022 | 0258-08-037STP 2022(264)HES | McLennan Waco |
SAFETY LIGHTINGSH 6 · | $881,233 | $770,035 | SOUTH TEXAS ILLUMINATION, LLC | -12.6% | 11 |
| Jan 7, 2022 | 0915-11-032C 915-11-32 | Kendall San Antonio |
STATE PARK IMPROVEMENTSVA · | $617,257 | $723,891 | LCR TOTAL TRANSPORT LLC | +17.3% | 3 |
| Jan 7, 2022 | 6389-28-001RMC - 638928001 | Harris Houston |
DITCH CLEANING AND RESHAPINGIH 69 · | $667,312 | $718,630 | TEXAS DRAINAGE INC. | +7.7% | 2 |
| Jan 7, 2022 | 3516-01-019C 3516-1-19 | Parker Fort Worth |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TFM 3325 · | $914,691 | $714,694 | JAY MILLS CONTRACTING, INCORPORATED | -21.9% | 2 |
| Jan 7, 2022 | 6390-03-001RMC - 639003001 | Johnson Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 3048 · | $658,243 | $705,002 | NORTHEASTERN PAVERS, LLC | +7.1% | 3 |
| Jan 7, 2022 | 6382-12-001RMC - 638212001 | Starr Pharr |
SWEEPING AND DEBRIS REMOVALUS 83 · | $653,320 | $696,288 | SWEEPING CORPORATION OF AMERICA, INC. | +6.6% | 2 |
| Jan 7, 2022 | 2879-02-014F 2022(301) | Bowie Atlanta |
RESURFACE EXISTING ROADWAYFM 2240 · | $636,712 | $651,270 | RK HALL, LLC | +2.3% | 3 |
| Jan 7, 2022 | 0913-00-120C 913-00-120 | De Witt Yoakum |
BRIDGE MAINTENANCEVA · | $663,720 | $573,383 | SCR CIVIL CONSTRUCTION, LLC | -13.6% | 7 |
| Jan 7, 2022 | 6380-46-001RMC - 638046001 | Lubbock Lubbock |
BRIDGE REPAIRIH 27 · | $660,505 | $561,560 | SCR CIVIL CONSTRUCTION, LLC | -15.0% | 4 |
| Jan 7, 2022 | 0271-14-239STP 2022(289)HES | Harris Houston |
HAZARD ELIMINATION & SAFETYIH 610 · | $614,380 | $539,001 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | -12.3% | 8 |
| Jan 7, 2022 | 6384-29-001RMC - 638429001 | Hill Waco |
BRIDGE PREVENTATIVE MAINTENANCESH 81 · | $598,854 | $532,172 | BECK-REIT & SONS, LTD. | -11.1% | 3 |
| Jan 7, 2022 | 6380-96-001RMC - 638096001 | Fort Bend Houston |
BRIDGE PREVENTATIVE MAINTENANCEUS 59 · | $408,117 | $485,029 | ISI CONTRACTING, INC. | +18.8% | 4 |
| Jan 7, 2022 | 6393-58-001RMC - 639358001 | Ector Odessa |
ILLUMINATION MAINTENANCEIH 20 · | $582,868 | $439,583 | VACA UNDERGROUND UTILITIES INC | -24.6% | 2 |
| Jan 7, 2022 | 6393-69-001RMC - 639369001 | Erath Fort Worth |
REFLECTORIZED PAVEMENT MARKINGS & MRKS (LONG LINE)US 281 · | $399,530 | $415,746 | STRIPE-A-ZONE, LLC | +4.1% | 5 |
| Jan 7, 2022 | 6383-65-001RMC - 638365001 | Ector Odessa |
MOWING HIGHWAY RIGHT OF WAYIH 20 · | $406,740 | $402,736 | K-BAR SERVICES, INC. | -1.0% | 3 |
| Jan 7, 2022 | 6394-22-001RMC - 639422001 | Nueces Corpus Christi |
ILLUMINATION MAINTENANCESH 358 · | $501,196 | $402,705 | THIRD COAST SERVICES LLC | -19.7% | 4 |
| Jan 7, 2022 | 0015-09-203C 15-9-203 | Williamson Austin |
PREVENTIVE MAINTENANCEIH 35 · | $273,796 | $399,183 | TEXAS MATERIALS GROUP, INC. | +45.8% | 2 |
| Jan 7, 2022 | 6388-88-001RMC - 638888001 | Fort Bend Houston |
BRIDGE DECK REPAIRUS 59 · | $318,950 | $364,440 | ISI CONTRACTING, INC. | +14.3% | 3 |
| Jan 7, 2022 | 6390-88-001RMC - 639088001 | Reeves Odessa |
MOWING HIGHWAY RIGHT OF WAYIH 20 · | $349,580 | $339,592 | K-BAR SERVICES, INC. | -2.9% | 3 |
| Jan 7, 2022 | 6389-42-001RMC - 638942001 | Waller Houston |
METAL BEAM GUARD FENCE REPAIRUS 290 · | $324,900 | $304,750 | RHINO EQUITY, LLC | -6.2% | 5 |
| Jan 7, 2022 | 6393-09-001MMC - 639309001 | Garza Maintenance Division |
DE-ICING SALT (MATERIAL ONLY)US 84 · | $337,920 | $282,438 | SOUTHWEST ENVIROTX PARTNERS, LLC | -16.4% | 2 |
| Jan 7, 2022 | 6393-45-001MMC - 639345001 | Fannin Paris |
ASPHALT (MATERIAL ONLY)SH 78 · | $308,950 | $281,110 | ERGON ASPHALT & EMULSIONS, INC. | -9.0% | 1 |
| Jan 6, 2022 | 0048-04-094C 48-4-94 | Ellis Dallas |
INTERCHANGE IMPROVEMENTIH 35E · | $48,339,487 | $51,184,067 | AUSTIN BRIDGE & ROAD SERVICES, LP | +5.9% | 8 |
| Jan 6, 2022 | 0033-01-038STP 1302(058) | Stonewall Abilene |
WIDEN ROAD - ADD LANESUS 83 · | $14,213,349 | $14,492,854 | J. H. STRAIN & SONS, INC. | +2.0% | 6 |
| Jan 6, 2022 | 0700-03-145C 700-3-145 | Travis Austin |
HIGHWAY IMPROVEMENTSH 71 · | $12,843,171 | $13,908,751 | HUNTER INDUSTRIES, LTD. | +8.3% | 3 |
| Jan 6, 2022 | 0867-01-017C 867-1-17 | Hamilton Waco |
REHABILITATE AND WIDEN ROADWAYFM 932 · | $13,725,256 | $13,587,883 | BIG CREEK CONSTRUCTION, LTD. | -1.0% | 4 |
| Jan 6, 2022 | 0008-14-119F 2022(230) | Tarrant Fort Worth |
RESURFACE ROADWAYIH 820 · | $10,737,736 | $10,558,103 | JAGOE-PUBLIC COMPANY | -1.7% | 5 |
| Jan 6, 2022 | 0257-03-033C 257-3-33 | Eastland Brownwood |
HIGHWAY IMPROVEMENTSH 6 · | $10,872,478 | $10,087,855 | BIG CREEK CONSTRUCTION, LTD. | -7.2% | 2 |
| Jan 6, 2022 | 0070-02-091F 2022(347) | Tom Green San Angelo |
PREVENTIVE MAINTENANCEUS 87 · | $10,297,869 | $9,737,926 | REECE ALBERT, INC. | -5.4% | 4 |
| Jan 6, 2022 | 0573-01-034C 573-1-34 | Bastrop Austin |
WIDEN ROAD - ADD SHOULDERSSH 304 · | $8,588,390 | $9,387,686 | BIG CREEK CONSTRUCTION, LTD. | +9.3% | 4 |
| Jan 6, 2022 | 0238-04-038F 2022(300) | Dallam Amarillo |
HIGHWAY IMPROVEMENTUS 54 · | $8,541,035 | $8,285,085 | RK HALL, LLC | -3.0% | 3 |
| Jan 6, 2022 | 0179-06-044F 2022(259) | Matagorda Yoakum |
SURFACING/ROADWAY RESTORATIONSH 35 · | $5,940,881 | $6,659,956 | JAMES CONSTRUCTION GROUP, LLC | +12.1% | 4 |
| Jan 6, 2022 | 0195-03-101STP 2022(247)HES | Denton Dallas |
RESURFACINGIH 35E · | $7,176,948 | $6,077,319 | JAGOE-PUBLIC COMPANY | -15.3% | 3 |
| Jan 6, 2022 | 6383-36-001RMC - 638336001 | Parker Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 20 · | $6,363,924 | $5,987,133 | NORTHEASTERN PAVERS, LLC | -5.9% | 5 |
| Jan 6, 2022 | 0133-01-049F 2022(352) | King Childress |
REHABILITATIONUS 82 · | $6,063,882 | $5,768,976 | A. L. HELMCAMP, INC. | -4.9% | 5 |
| Jan 6, 2022 | 0030-01-035F 2022(348) | Ochiltree |
HIGHWAY IMPROVEMENTUS 83 · | $5,554,805 | $5,571,551 | DUININCK, INC. | +0.3% | 4 |
| Jan 6, 2022 | 0157-04-057C 157-4-57 | Haskell Abilene |
PREVENTIVE MAINTENANCEUS 277 · | $5,647,939 | $5,473,497 | ZACK BURKETT CO. | -3.1% | 5 |
| Jan 6, 2022 | 6388-52-001RMC - 638852001 | Tarrant Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 20 · | $6,484,838 | $5,107,234 | FOUTSCO PAVING COMPANY, LLC | -21.2% | 5 |
| Jan 6, 2022 | 6394-77-001RMC - 639477001 | Nueces Corpus Christi |
DRY DOCKING FERRY BOATSSH 361 · | $5,198,550 | $4,995,000 | PALACIOS SHIPYARD, INC. | -3.9% | 1 |
| Jan 6, 2022 | 0378-06-022BR 2022(272) | Cherokee Tyler |
BRIDGE REPLACEMENTSH 135 · | $4,189,281 | $4,193,459 | HIGHWAY 19 CONSTRUCTION LLC | +0.1% | 6 |
| Jan 6, 2022 | 0515-01-071F 2022(258) | Jackson Yoakum |
SURFACING/ROADWAY RESTORATIONFM 616 · | $3,826,644 | $3,684,182 | BRANNAN PAVING CO., LTD. | -3.7% | 6 |
| Jan 6, 2022 | 0848-04-049BR 2022(263) | Medina San Antonio |
BRIDGE REPLACEMENTFM 462 · | $2,908,909 | $3,176,381 | RELMCO, INC. | +9.2% | 4 |
| Jan 6, 2022 | 0079-01-038C 79-1-38 | Brown Brownwood |
RAILROAD CROSSING IMPROVEMENTSUS 67 · | $2,775,459 | $3,046,555 | PRATER DIRT WORK LLC | +9.8% | 4 |
| Jan 6, 2022 | 0200-11-107BR 2021(143) | Jefferson Beaumont |
BRIDGE MAINTENANCEUS 69 · | $3,667,056 | $2,889,132 | FORDE CONSTRUCTION COMPANY, INC. | -21.2% | 5 |
| Jan 6, 2022 | 0127-01-037F 2022(288) | Eastland Brownwood |
PREVENTIVE MAINTENANCEUS 183 · | $2,966,327 | $2,839,911 | DUININCK, INC. | -4.3% | 5 |
| Jan 6, 2022 | 0905-00-109F 2022(306) | Lubbock Lubbock |
SURFACING/ROADWAY RESTORATIONVA · | $2,844,892 | $2,816,960 | O. TREVINO CONSTRUCTION, LLC | -1.0% | 2 |
| Jan 6, 2022 | 0907-00-198F 2022(291) | Tom Green San Angelo |
HIGHWAY IMPROVEMENTVA · | $3,243,010 | $2,812,849 | L&L COMPANY | -13.3% | 7 |
| Jan 6, 2022 | 0596-01-023C 596-1-23 | Hill Waco |
REHABILITATE ROADWAY AND ADD CONCRETE PAVEMENTFM 66 · | $2,407,365 | $2,787,393 | BIG CREEK CONSTRUCTION, LTD. | +15.8% | 3 |
| Jan 6, 2022 | 6376-19-001RMC - 637619001 | Brazos Bryan |
MILL AND INLAYSH 6 · | $2,366,070 | $2,511,623 | KNIFE RIVER CORPORATION - SOUTH | +6.2% | 4 |
| Jan 6, 2022 | 6392-48-001RMC - 639248001 | Harris Houston |
SWEEPING AND DEBRIS REMOVALIH 69 · | $2,140,157 | $2,509,840 | PROFESSIONAL TRAFFIC CONTROL LLC | +17.3% | 2 |
| Jan 6, 2022 | 6391-33-001RMC - 639133001 | Rusk Tyler |
MILL AND INLAYFM 13 · | $2,391,372 | $2,448,269 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +2.4% | 3 |
| Jan 6, 2022 | 0224-01-061C 224-1-61 | Clay Wichita Falls |
REHABILITATE EXISTING ROADWAYUS 287 · | $2,052,620 | $2,016,367 | JAGOE-PUBLIC COMPANY | -1.8% | 4 |
| Jan 6, 2022 | 0901-19-195C 901-19-195 | Grayson Paris |
PREVENTIVE MAINTENANCEVA · | $1,494,500 | $1,790,000 | GHB EQUIPMENT COMPANY, L.L.C. | +19.8% | 3 |
| Jan 6, 2022 | 6389-52-001RMC - 638952001 | Galveston Houston |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)FM 517 · | $1,310,762 | $1,676,953 | PROFESSIONAL TRAFFIC CONTROL LLC | +27.9% | 6 |
| Jan 6, 2022 | 0177-02-095F 2022(296) | San Jacinto Lufkin |
HIGHWAY IMPROVEMENTUS 59 · | $1,597,055 | $1,479,910 | MOORE BROTHERS CONSTRUCTION COMPANY | -7.3% | 2 |
| Jan 6, 2022 | 0903-15-105BR 2021(641) | Cooke Wichita Falls |
BRIDGE REPLACEMENTCR · | $1,592,070 | $1,461,248 | CDM HOLDINGS, LLC | -8.2% | 5 |
| Jan 6, 2022 | 0049-09-090STP 2022(235)HES | Brazos Bryan |
INSTALL RAISED MEDIANUS 190 · | $1,834,314 | $1,448,127 | GRATIOT CONSTRUCTION, LTD. | -21.1% | 6 |
| Jan 6, 2022 | 0267-01-033BR 2022(254) | Fayette Yoakum |
BRIDGE REPAIR & UPGRADING RAILINGSH 237 · | $908,268 | $1,212,845 | ACME BRIDGE COMPANY, INC. | +33.5% | 2 |
| Jan 6, 2022 | 6388-70-001RMC - 638870001 | Harris Houston |
TRAFFIC SIGNAL MAINTENANCEIH 610 · | $1,429,142 | $1,141,643 | LINDSEY ELECTRIC, L.P. | -20.1% | 7 |
| Jan 6, 2022 | 0925-00-078C 925-00-78 | Childress Childress |
STRIPINGVA · | $1,062,125 | $991,061 | TEXAS PANHANDLE CONSTRUCTION, INC. | -6.7% | 3 |
| Jan 6, 2022 | 0904-00-198C 904-00-198 | Potter Amarillo |
HIGHWAY IMPROVEMENTVA · | $842,609 | $989,731 | CENTERLINE TECHNOLOGIES, LLC | +17.5% | 3 |
| Jan 6, 2022 | 0919-00-081F 2022(293) | Cass Atlanta |
SEAL COAT PAVEMENT MARKINGSVA · | $1,146,416 | $934,909 | STRIPING TECHNOLOGY, L.P. | -18.4% | 4 |
1–100 of 124Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.