161Let jobs
$860,932,831Total low bids
$785,198,770Total estimates
+9.6%Low bids vs estimates
Aug 2019 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 28, 2019 | 6349-28-001RMC - 634928001 | Comanche Brownwood |
INSTALL CURVE SIGN (NORTH)FM 1476 · | $225,600 | $213,420 | SHORT-LINE CORPORATION | -5.4% | 7 |
| Aug 28, 2019 | 6349-29-001RMC - 634929001 | Mills Brownwood |
INSTALL CURVE SIGNS (SOUTH)FM 572 · | $283,240 | $213,220 | L. UNITED BUILDING COMPANY | -24.7% | 8 |
| Aug 21, 2019 | 6309-18-001RMC - 630918001 | Uvalde San Antonio |
REMOVE RIPRAP, CONC RIPRAPRM 1050 · | $131,175 | $123,675 | 4WARD CONSTRUCTION LLC | -5.7% | 1 |
| Aug 21, 2019 | 6348-48-001RMC - 634848001 | Medina San Antonio |
PICNIC AREA MAINTENANCEUS 90 · | $48,800 | $44,300 | ABOVE ALL CONSTRUCTION | -9.2% | 2 |
| Aug 16, 2019 | 6345-42-001RMC - 634542001 | Collin Dallas |
TREE & BRUSH REMOVAL AND TRIMMINGUS 75 · | $176,308 | $166,375 | TERRY ENTERPRISES | -5.6% | 4 |
| Aug 15, 2019 | 6342-35-001RMC - 634235001 | Grayson Paris |
CRACK SEALUS 82 · | $253,042 | $247,754 | CRACKSEAL OF TEXAS, LLC | -2.1% | 5 |
| Aug 15, 2019 | 6346-70-001RMC - 634670001 | Lamar Paris |
CRACK SEALFM 79 · | $258,988 | $223,846 | D & M CONTRACTORS, LLC | -13.6% | 5 |
| Aug 15, 2019 | 6348-59-001RMC - 634859001 | Hopkins Paris |
CRACK SEALIH 30 · | $195,520 | $188,527 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -3.6% | 5 |
| Aug 15, 2019 | 6348-66-001RMC - 634866001 | Hunt Paris |
CRACK SEALIH 30 · | $134,670 | $91,482 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -32.1% | 5 |
| Aug 13, 2019 | 6339-43-001RMC - 633943001 | Nueces Corpus Christi |
MOWING RIGHT OF WAYUS 77 · | $271,537 | $326,389 | R&M INCORPORATED | +20.2% | 1 |
| Aug 13, 2019 | 6344-93-001RMC - 634493001 | Leon Bryan |
TREE TRIMMING & BRUSH REMOVALSH 75 · | $271,800 | $290,052 | DEKALB TREE SPECIALIST | +6.7% | 3 |
| Aug 13, 2019 | 6345-55-001RMC - 634555001 | Williamson Austin |
PIPE REPLACEMENTFM 112 · | $258,211 | $289,057 | BECK-REIT & SONS, LTD. | +11.9% | 5 |
| Aug 13, 2019 | 6344-97-001RMC - 634497001 | Walker Bryan |
TREE TRIMMING & BRUSH REMOVALSH 75 · | $298,050 | $285,800 | GEORGE MEEKS LANDPRO, INC. | -4.1% | 3 |
| Aug 13, 2019 | 6347-82-001RMC - 634782001 | Ector Odessa |
CLEANING AND SEALING CRACKSIH 20 · | $257,000 | $222,444 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -13.4% | 5 |
| Aug 13, 2019 | 6347-44-001RMC - 634744001 | Navarro Dallas |
CLEANING & SEALING JOINTS AND/OR CRACKSUS 287 · | $239,700 | $192,846 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -19.5% | 5 |
| Aug 13, 2019 | 6339-38-001RMC - 633938001 | Nueces Corpus Christi |
MOWING HIGHWAY RIGHT OF WAYIH 37 · | $155,494 | $190,234 | R&M INCORPORATED | +22.3% | 2 |
| Aug 13, 2019 | 6345-29-001RMC - 634529001 | Kaufman Dallas |
ON-CALL REFLECTORIZED PAVEMENT MARKINGSIH 20 · | $211,406 | $188,720 | STRIPING TECHNOLOGY, L.P. | -10.7% | 2 |
| Aug 13, 2019 | 6347-24-001RMC - 634724001 | Midland Odessa |
SMALL SIGN REPLACEMENT (CALLOUT)IH 20 · | $197,500 | $183,530 | JDI POWER LLC | -7.1% | 7 |
| Aug 13, 2019 | 6347-25-001RMC - 634725001 | Ector Odessa |
SMALL SIGN REPLACEMENT (CALLOUT)IH 20 · | $197,500 | $183,530 | JDI POWER LLC | -7.1% | 6 |
| Aug 13, 2019 | 6344-91-001RMC - 634491001 | Freestone Bryan |
TREE TRIMMING & BRUSH REMOVALFM 80 · | $193,700 | $182,190 | K & R CONTRACTORS | -5.9% | 5 |
| Aug 13, 2019 | 6339-97-001RMC - 633997001 | Tarrant Fort Worth |
CLEANING AND SEALING JOINTS AND CRACKSIH 30 · | $127,988 | $164,886 | D & M CONTRACTORS, LLC | +28.8% | 2 |
| Aug 13, 2019 | 6345-43-001RMC - 634543001 | Navarro Dallas |
REFLECTORIZED PAVEMENT MARKINGSIH 45 · | $169,775 | $140,757 | TOTAL HIGHWAY MAINTENANCE, LLC | -17.1% | 2 |
| Aug 13, 2019 | 6344-42-001RMC - 634442001 | Johnson Fort Worth |
CLEANING AND SEALING JOINTS AND CRACKSFM 2331 · | $144,879 | $132,650 | CHAMPION INFRASTRUCTURE, LLC | -8.4% | 2 |
| Aug 13, 2019 | 6344-89-001RMC - 634489001 | Brazos Bryan |
TREE TRIMMING & BRUSH REMOVALFM 974 · | $117,800 | $120,890 | ROAD SOLUTIONS L.L.C. | +2.6% | 2 |
| Aug 13, 2019 | 6345-38-001RMC - 634538001 | Ellis Dallas |
JOINT AND/OR CRACK SEALUS 77 · | $143,425 | $120,837 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -15.7% | 3 |
| Aug 13, 2019 | 6344-92-001RMC - 634492001 | Grimes Bryan |
TREE TRIMMING & BRUSH REMOVALSH 90 · | $124,000 | $117,970 | GEORGE MEEKS LANDPRO, INC. | -4.9% | 3 |
| Aug 13, 2019 | 6344-98-001RMC - 634498001 | Washington Bryan |
TREE TRIMMING & BRUSH REMOVALFM 389 · | $101,100 | $96,270 | GEORGE MEEKS LANDPRO, INC. | -4.8% | 3 |
| Aug 13, 2019 | 6347-57-001RMC - 634757001 | Andrews Odessa |
CLEANING AND SEALING CRACKSFM 1788 · | $124,800 | $72,719 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -41.7% | 6 |
| Aug 13, 2019 | 6344-90-001RMC - 634490001 | Burleson Bryan |
TREE TRIMMING & BRUSH REMOVALFM 975 · | $77,060 | $72,689 | JBM IRRIGATION | -5.7% | 2 |
| Aug 13, 2019 | 6347-09-001RMC - 634709001 | Milam Bryan |
PICNIC AREA MAINTENANCEUS 79 · | $39,050 | $36,340 | ABOVE ALL CONSTRUCTION | -6.9% | 5 |
| Aug 8, 2019 | 6348-38-001RMC - 634838001 | Pecos Odessa |
CLEANING AND SEALING CRACKSIH 10 · | $134,540 | $91,053 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -32.3% | 2 |
| Aug 7, 2019 | 0500-04-105NH 1902(105) | Galveston Houston |
WIDEN FREEWAYIH 45 · | $147,513,606 | $165,825,007 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | +12.4% | 4 |
| Aug 7, 2019 | 0025-02-219NH 1902(314) | Bexar San Antonio |
WIDEN FREEWAYIH 10 · | $62,147,181 | $91,651,868 | JORDAN FOSTER CONSTRUCTION, LLC | +47.5% | 5 |
| Aug 7, 2019 | 0003-01-055STP 2019(990)TAPS | Culberson El Paso |
CONSTRUCT REST AREAIH 10 · | $23,710,370 | $29,328,229 | J.D. ABRAMS, L.P. | +23.7% | 5 |
| Aug 7, 2019 | 0004-02-060STP 1902(276)HES | Ward Odessa |
INSTALL MEDIAN BARRIERSIH 20 · | $23,238,929 | $28,675,420 | DAN WILLIAMS COMPANY | +23.4% | 4 |
| Aug 7, 2019 | 1801-02-017STP 1902(311) | Cameron Pharr |
REHAB & WIDENING EXISTING ROADWAYFM 1847 · | $18,147,673 | $19,989,898 | FOREMOST PAVING, INC. | +10.2% | 2 |
| Aug 7, 2019 | 2133-02-014STP 1902(281) | Milam Bryan |
REHABILITATION OF EXISTING ROADFM 485 · | $20,093,535 | $17,254,988 | JAMES CONSTRUCTION GROUP, L.L.C. | -14.1% | 5 |
| Aug 7, 2019 | 0715-01-022STP 1902(298)HES | Gonzales Yoakum |
SAFETY TREAT FIXED OBJECTS,ETC.FM 108 · | $13,561,435 | $12,569,350 | HUNTER INDUSTRIES, LTD. | -7.3% | 3 |
| Aug 7, 2019 | 0134-06-052STP 1902(258) | Wise Fort Worth |
RESURFACE ROADWAYFM 1810 · | $11,269,208 | $10,846,610 | ED BELL CONSTRUCTION COMPANY | -3.8% | 3 |
| Aug 7, 2019 | 3510-05-043C 3510-5-43 | Harris Houston |
INSTALL HIGH MAST LIGHTINGSH 99 · | $11,770,279 | $9,799,999 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -16.7% | 7 |
| Aug 7, 2019 | 0005-01-114STP 1902(277)HES | Ector Odessa |
INSTALL MEDIAN BARRIERSBI 20-E · | $11,620,656 | $9,595,982 | SCR CIVIL CONSTRUCTION, LLC | -17.4% | 4 |
| Aug 7, 2019 | 0378-03-017STP 1902(170) | Smith Tyler |
BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,STRS,PV MKSH 135 · | $7,884,833 | $8,695,777 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +10.3% | 4 |
| Aug 7, 2019 | 6340-27-001RMC - 634027001 | Williamson Austin |
SURFACE TEXTURING FOR SKID RESISTANCESH 130 · | $9,105,045 | $8,092,997 | DIAMOND SURFACE, INC. | -11.1% | 4 |
| Aug 7, 2019 | 0156-05-061STP 1902(036)HES | Archer Wichita Falls |
INSTALL MEDIAN CABLE BARRIERUS 82 · | $9,315,215 | $7,252,069 | SCR CIVIL CONSTRUCTION, LLC | -22.1% | 6 |
| Aug 7, 2019 | 0144-04-043STP 1902(293) | Calhoun Yoakum |
PAVEMENT REPAIR AND RESURFACINGSH 238 · | $4,603,230 | $4,717,939 | HUNTER INDUSTRIES, LTD. | +2.5% | 3 |
| Aug 7, 2019 | 0907-00-193STP 1902(278) | Tom Green San Angelo |
SIDEWALKS AND CURB RAMPSVA · | $3,234,121 | $4,491,790 | FNH CONSTRUCTION, LLC | +38.9% | 1 |
| Aug 7, 2019 | 0014-03-100STP 2019(934)HES | Johnson Fort Worth |
GR, BS, DR, PAVIH 35W · | $4,149,431 | $4,345,364 | TEXAS MATERIALS GROUP, INC. | +4.7% | 4 |
| Aug 7, 2019 | 0902-00-163C 902-00-163 | Tarrant Fort Worth |
REHABILITATE EXISTING ROADWAYVA · | $3,115,975 | $3,677,405 | O. TREVINO CONSTRUCTION, LLC | +18.0% | 3 |
| Aug 7, 2019 | 1603-03-039NH 1902(353) | Tarrant Fort Worth |
RESURFACE ROADWAYFM 1709 · | $3,079,548 | $3,540,605 | JAGOE-PUBLIC COMPANY | +15.0% | 4 |
| Aug 7, 2019 | 0089-07-161STP 1902(295)HES | Wharton Yoakum |
INSTALL MEDIAN BARRIERUS 59 · | $3,524,441 | $3,284,618 | SCR CIVIL CONSTRUCTION, LLC | -6.8% | 5 |
| Aug 7, 2019 | 1835-02-056STP 1902(272) | Bell Waco |
MILL/OVLYFM 1741 · | $2,996,784 | $3,284,016 | LONE STAR PAVING COMPANY | +9.6% | 3 |
| Aug 7, 2019 | 0100-12-009STP 1902(300)HES | Karnes Corpus Christi |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 2509 · | $3,052,810 | $3,244,111 | TIERRA LEASE SERVICE, LLC | +6.3% | 6 |
| Aug 7, 2019 | 3465-02-011STP 1902(287) | Gregg Tyler |
PLANING,PV RPR,OCST,SIDEWALK, PED FACILITY, PV MKFM 3272 · | $3,329,740 | $3,110,849 | REYNOLDS & KAY, LTD. | -6.6% | 3 |
| Aug 7, 2019 | 0685-01-032STP 1802(483) | Wichita Wichita Falls |
RECONFIGURE RAMPSS 325 · | $2,114,525 | $3,107,601 | A. L. HELMCAMP, INC. | +47.0% | 1 |
| Aug 7, 2019 | 0913-21-048BR 2018(625) | Matagorda Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,976,434 | $2,769,565 | FUSED INDUSTRIES, LLC | +40.1% | 1 |
| Aug 7, 2019 | 3048-01-017STP 1902(333) | Fort Bend Houston |
ADD LEFT TURN LANE AND ACP OVERLAYFM 2977 · | $2,416,853 | $2,581,584 | JAMES CONSTRUCTION GROUP, L.L.C. | +6.8% | 3 |
| Aug 7, 2019 | 0039-02-072STP 1902(312)HES | Hidalgo Pharr |
SFT - HAZARD ELIMINATION & SAFETYUS 83 · | $1,740,246 | $2,177,829 | CLORE EQUIPMENT LLC | +25.1% | 2 |
| Aug 7, 2019 | 1440-01-020BR 1902(289) | Fayette Yoakum |
BRIDGE REPLACEMENTFM 957 · | $2,333,125 | $2,138,476 | SB CONTRACTORS LLC | -8.3% | 3 |
| Aug 7, 2019 | 6347-65-001RMC - 634765001 | San Jacinto Lufkin |
MILL AND INLAYUS 59 · | $1,842,544 | $1,998,581 | MOORE BROTHERS CONSTRUCTION COMPANY | +8.5% | 2 |
| Aug 7, 2019 | 6345-96-001RMC - 634596001 | Harris Houston |
GUARDRAIL REPAIRSL 8 · | $1,474,375 | $1,994,275 | ROY JORGENSEN ASSOCIATES, INC. | +35.3% | 2 |
| Aug 7, 2019 | 0912-72-566NH 1902(330) | Harris Houston |
RESTRIPING OF MAINLANESVA · | $2,562,589 | $1,894,119 | PROFESSIONAL TRAFFIC CONTROL LLC | -26.1% | 4 |
| Aug 7, 2019 | 0902-00-216STP 2019(722) | Tarrant Fort Worth |
CONSTRUCT RAMPSVA · | $1,629,565 | $1,766,886 | PROJECT ALLIED RESOURCES, LLC | +8.4% | 2 |
| Aug 7, 2019 | 0177-01-112BR 1902(283) | Polk Lufkin |
BRIDGE MAINTENANCEUS 59 · | $1,781,724 | $1,536,274 | SCR CIVIL CONSTRUCTION, LLC | -13.8% | 6 |
| Aug 7, 2019 | 0062-06-058STP 1902(305)HES | Marion Atlanta |
INSTALL MEDIAN BARRIERUS 59 · | $1,768,224 | $1,452,714 | H. V. CAVER, INC. | -17.8% | 2 |
| Aug 7, 2019 | 6341-74-001RMC - 634174001 | Hill Waco |
BASE FAILURE PAVEMENT REPAIRSH 22 · | $999,951 | $1,425,926 | BIG CREEK CONSTRUCTION, LTD. | +42.6% | 3 |
| Aug 7, 2019 | 6341-68-001RMC - 634168001 | Bell Waco |
BASE FAILURE PAYMENT REPAIRUS 190 · | $1,198,299 | $1,314,219 | AUSTIN MATERIALS, LLC | +9.7% | 5 |
| Aug 7, 2019 | 0171-05-098NH 1902(259) | Tarrant Fort Worth |
RESURFACE ROADWAYSH 199 · | $1,018,339 | $1,243,381 | PEACHTREE CONSTRUCTION, LTD. | +22.1% | 3 |
| Aug 7, 2019 | 2150-04-077STP 1902(255)HES | Webb Laredo |
INSTALL / UPGRADE ROADWAY LIGHTINGFM 1472 · | $1,230,739 | $1,135,289 | VACA UNDERGROUND UTILITIES INC | -7.8% | 3 |
| Aug 7, 2019 | 0001-02-060STP 2019(705)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYSH 20 · | $965,164 | $1,060,041 | TRI STATE ELECTRIC, LTD. | +9.8% | 1 |
| Aug 7, 2019 | 0025-02-223STP 1902(318) | Bexar San Antonio |
LANDSCAPE & SCENIC ENHANCEMENTIH 10 · | $1,218,003 | $1,049,982 | TIGHT LINE CONSTRUCTION, LLC | -13.8% | 4 |
| Aug 7, 2019 | 6347-64-001RMC - 634764001 | Shelby Lufkin |
MILL AND INLAYUS 59 · | $976,896 | $939,778 | MOORE BROTHERS CONSTRUCTION COMPANY | -3.8% | 2 |
| Aug 7, 2019 | 6341-73-001RMC - 634173001 | Hamilton Waco |
BASE FAILURE PAVEMENT REPAIRUS 84 · | $712,137 | $879,594 | BIG CREEK CONSTRUCTION, LTD. | +23.5% | 4 |
| Aug 7, 2019 | 6346-16-001BPM - 634616001 | Baylor Wichita Falls |
BRIDGE PREVENTATIVE MAINTENANCEUS 277 · | $789,860 | $833,013 | DRS CONSTRUCTION, INC. | +5.5% | 5 |
| Aug 7, 2019 | 1380-01-018STP 1902(270)HES | Franklin Paris |
HAZARD ELIMINATION & SAFETYFM 1448 · | $814,565 | $801,629 | LONGVIEW BRIDGE AND ROAD, LTD. | -1.6% | 6 |
| Aug 7, 2019 | 6344-57-001RMC - 634457001 | El Paso El Paso |
MISCELLANEOUS CONCRETE REPAIRIH 10 · | $737,925 | $720,085 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -2.4% | 3 |
| Aug 7, 2019 | 0022-10-070STP 1902(254)HES | Val Verde Laredo |
SAFETY IMPROVEMENT PROJECTSUS 90 · | $738,412 | $692,972 | VANN/ELLI, INC. | -6.2% | 2 |
| Aug 7, 2019 | 0902-90-039STP 1902(263)HES | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALCS · | $511,921 | $529,601 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +3.5% | 3 |
| Aug 7, 2019 | 6341-71-001RMC - 634171001 | Coryell Waco |
BASE FAILURE PAVEMENT REPAIRUS 281 · | $419,052 | $512,219 | BIG CREEK CONSTRUCTION, LTD. | +22.2% | 4 |
| Aug 7, 2019 | 6345-25-001RMC - 634525001 | Rockwall Dallas |
SWEEPING & DEBRIS REMOVALIH 30 · | $671,080 | $498,624 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -25.7% | 2 |
| Aug 7, 2019 | 0014-07-103STP 1902(129)HES | Hill Waco |
INSTALL CABLE MEDIAN BARRIERSH 81 · | $513,738 | $482,159 | CROSS PLUS CONSTRUCTION, LLC | -6.1% | 4 |
| Aug 7, 2019 | 1603-03-038STP 1902(335)HES | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALFM 1709 · | $529,620 | $442,796 | WORLD FIBER TECHNOLOGIES, LLC | -16.4% | 5 |
| Aug 7, 2019 | 6347-31-001RMC - 634731001 | Hill Waco |
CRACK SEALSH 81 · | $452,244 | $419,983 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -7.1% | 3 |
| Aug 7, 2019 | 6344-79-001RMC - 634479001 | Dallas Dallas |
CLEAN & SEAL JOINT AND/OR CRACK ASPHALTIH 30 · | $479,349 | $414,074 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -13.6% | 3 |
| Aug 7, 2019 | 6339-31-001RMC - 633931001 | Nacogdoches Lufkin |
UPGRADING MBGFSH 7 · | $395,520 | $413,947 | 3LW CIVIL LLC | +4.7% | 3 |
| Aug 7, 2019 | 6347-54-001RMC - 634754001 | Hill Waco |
TREE TRIM,BRUSH,DRIFTWOOD AND DEBRIS REMOVALFM 308 · | $372,900 | $336,502 | CROSS PLUS CONSTRUCTION, LLC | -9.8% | 1 |
| Aug 7, 2019 | 1529-02-010STP 2019(642) | Scurry Abilene |
SIDEWALK ADA IMPROVEMENTSFM 1607 · | $190,298 | $197,824 | TALBRAN ENTERPRISES LLC | +4.0% | 3 |
| Aug 7, 2019 | 0976-01-040STP 1902(324)HES | Harris Houston |
ADD LEFT TURN LANEFM 865 · | $148,345 | $189,822 | MAIN LANE INDUSTRIES LTD. | +28.0% | 2 |
| Aug 7, 2019 | 0914-04-309C 914-4-309 | Travis Austin |
STATE PARK IMPROVEMENTSCS · | $157,563 | $185,709 | FNH CONSTRUCTION, LLC | +17.9% | 3 |
| Aug 7, 2019 | 0508-04-176NH 1902(358) | Jefferson Beaumont |
BRIDGE MAINTENANCESH 73 · | $120,808 | $113,770 | CHAMPION INFRASTRUCTURE, LLC | -5.8% | 4 |
| Aug 7, 2019 | 0909-22-183STP 1902(128)HES | McLennan Waco |
HAZARD ELIMINATION & SAFETYCS · | $74,240 | $109,680 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +47.7% | 1 |
| Aug 6, 2019 | 0037-10-037NH 2019(047) | Webb Laredo |
BASE,ACP,GRAD,STR,PAV MRKUS 83 · | $59,197,012 | $68,572,893 | ANDERSON COLUMBIA CO., INC. | +15.8% | 2 |
| Aug 6, 2019 | 3538-01-036STP 2019(797) | Montgomery Houston |
WIDEN FROM 2 TO 4 LANESSH 242 · | $66,032,353 | $65,322,057 | JAMES CONSTRUCTION GROUP, L.L.C. | -1.1% | 5 |
| Aug 6, 2019 | 0003-05-054STP 1902(275)HES | Reeves Odessa |
INSTALL MEDIAN BARRIERSIH 20 · | $24,210,116 | $27,958,749 | DAN WILLIAMS COMPANY | +15.5% | 5 |
| Aug 6, 2019 | 0683-01-056NH 2019(996) | Williamson Austin |
INTERSECTION & OPERATIONAL IMPROVEMENTSRM 620 · | $26,803,522 | $27,468,704 | BRIDGES AND ROADS, LLC | +2.5% | 5 |
| Aug 6, 2019 | 0228-02-048NH 2019(612) | Gaines Lubbock |
MILL, HMA BASE, CRCPUS 62 · | $12,264,301 | $17,313,800 | WEBBER, LLC | +41.2% | 2 |
| Aug 6, 2019 | 0238-03-064NH 2020(034) | Dallam Amarillo |
THICK OVERLAY AND PAVEMENT REPAIRUS 54 · | $13,993,637 | $14,364,734 | RK HALL, LLC | +2.7% | 4 |
| Aug 6, 2019 | 2689-01-023STP 1902(245)MM | Travis Austin |
RECONSTRUCT EXIST 2LN RDWY TO 4 LN DIVIDED W/CLTLFM 2304 · | $10,214,980 | $12,151,984 | DAN WILLIAMS COMPANY | +19.0% | 3 |
| Aug 6, 2019 | 0342-02-054NH 1902(320) | Hidalgo Pharr |
REHABILITATION OF EXISTING ROADWAYSH 107 · | $11,030,085 | $10,978,593 | FOREMOST PAVING, INC. | -0.5% | 3 |
| Aug 6, 2019 | 0043-05-110STP 1902(143)HES | Wilbarger Wichita Falls |
INSTALL MEDIAN CABLE BARRIERUS 70 · | $8,954,955 | $8,701,329 | SCR CIVIL CONSTRUCTION, LLC | -2.8% | 4 |
| Aug 6, 2019 | 0287-03-032BR 1902(288) | Gonzales Yoakum |
BRIDGE REPLACEMENTSH 80 · | $9,260,523 | $8,087,779 | AUSTIN BRIDGE & ROAD SERVICES, LP | -12.7% | 5 |
1–100 of 161Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.