| 1 | 100-6002 |
PREPARING ROW | 1 | STA |
$1,500.00 |
$20,000.00 |
$1,100.00 |
$18,000.00 |
|
| 2 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 709 | SY |
$12.00 |
$25.00 |
$9.50 |
$20.00 |
|
| 3 | 104-6054 |
REMOVING CONCRETE(MOW STRIP) | 710 | LF |
$15.00 |
$13.75 |
$5.00 |
$9.00 |
|
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 8,179 | CY |
$8.27 |
$12.25 |
$8.00 |
$15.00 |
|
| 5 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 3,829 | CY |
$15.00 |
$13.50 |
$8.00 |
$8.00 |
|
| 6 | 134-6001 |
BACKFILL (TY A) | 2.72 | STA |
$255.00 |
$1,000.00 |
$375.00 |
$450.00 |
|
| 7 | 134-6002 |
BACKFILL (TY B) | 194.25 | STA |
$147.00 |
$235.00 |
$375.00 |
$100.00 |
|
| 8 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 137,500 | SY |
$1.00 |
$1.00 |
$0.9000 |
$0.4000 |
|
| 9 | 164-6054 |
BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 137,500 | SY |
$0.9000 |
$0.7600 |
$0.8500 |
$0.7200 |
|
| 10 | 164-6055 |
BONDED FBR MTRX SEED (TEMP)(WARM) | 68,750 | SY |
$0.7200 |
$0.6400 |
$0.8000 |
$0.6300 |
|
| 11 | 164-6056 |
BONDED FBR MTRX SEED (TEMP)(COOL) | 68,750 | SY |
$0.7500 |
$0.6200 |
$0.8000 |
$0.6200 |
|
| 12 | 168-6001 |
VEGETATIVE WATERING | 1,513 | MG |
$15.00 |
$10.00 |
$3.50 |
$15.00 |
|
| 13 | 260-6001 |
LIME (HYDRATED LIME (DRY)) | 260 | TON |
$180.00 |
$155.00 |
$180.00 |
$176.00 |
|
| 14 | 260-6027 |
LIME TRT (EXST MATL)(8") | 12,540 | SY |
$3.60 |
$3.00 |
$4.00 |
$3.80 |
|
| 15 | 275-6001 |
CEMENT | 260 | TON |
$144.46 |
$155.00 |
$160.00 |
$165.00 |
|
| 16 | 275-6010 |
CEMENT TREAT (SUBGRADE) (8") | 12,540 | SY |
$2.50 |
$2.95 |
$4.00 |
$3.80 |
|
| 17 | 314-6012 |
EMULS ASPH (EROSN CONT)(CSS-1) | 1,870 | GAL |
$4.00 |
$4.00 |
$3.75 |
$6.00 |
|
| 18 | 316-6406 |
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) | 74,466 | GAL |
$2.90 |
$3.00 |
$3.10 |
$2.90 |
|
| 19 | 316-6407 |
AGGR (TY-PD GR-3 OR TY-PL GR-3) | 1,266 | CY |
$125.00 |
$98.00 |
$185.00 |
$110.00 |
|
| 20 | 342-6002 |
PFC (ASPHALT) PG76-22 | 671 | TON |
$125.00 |
$0.0100 |
$146.50 |
$140.00 |
|
| 21 | 342-6006 |
PFC-C (AGGREGATE)(PG76 MIX) SAC-A | 10,516 | TON |
$120.00 |
$155.00 |
$146.50 |
$140.00 |
|
| 22 | 344-6011 |
SUPERPAVE MIXTURES SP-B PG64-22 | 11,708 | TON |
$98.00 |
$106.50 |
$105.00 |
$100.00 |
|
| 23 | 344-6034 |
SUPERPAVE MIXTURES SP-C PG64-22 | 18,667 | TON |
$100.00 |
$110.00 |
$109.00 |
$100.00 |
|
| 24 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 1,000 | SY |
$45.00 |
$52.00 |
$55.00 |
$55.00 |
|
| 25 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 11,260 | SY |
$55.00 |
$62.00 |
$62.00 |
$65.00 |
|
| 26 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 711 | SY |
$2.50 |
$6.00 |
$6.00 |
$6.00 |
|
| 27 | 354-6023 |
PLANE ASPH CONC PAV(0" TO 4") | 1,244 | SY |
$3.00 |
$6.50 |
$5.50 |
$6.00 |
|
| 28 | 354-6051 |
PLANE ASPH CONC PAV (0" TO 1 1/2") | 730 | SY |
$2.00 |
$6.00 |
$6.50 |
$6.00 |
|
| 29 | 420-6071 |
CL C CONC (COLLAR) | 2 | EA |
$1,000.00 |
$1,200.00 |
$2,700.00 |
$1,600.00 |
|
| 30 | 432-6001 |
RIPRAP (CONC)(4 IN) | 3 | CY |
$560.00 |
$1,200.00 |
$500.00 |
$950.00 |
|
| 31 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 44 | CY |
$450.00 |
$450.00 |
$500.00 |
$580.00 |
|
| 32 | 464-6003 |
RC PIPE (CL III)(18 IN) | 3,078 | LF |
$53.00 |
$48.00 |
$42.00 |
$50.00 |
|
| 33 | 464-6005 |
RC PIPE (CL III)(24 IN) | 56 | LF |
$75.00 |
$85.00 |
$61.00 |
$105.00 |
|
| 34 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 184 | EA |
$850.00 |
$683.00 |
$705.00 |
$800.00 |
|
| 35 | 467-6390 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 | EA |
$1,400.00 |
$1,300.00 |
$810.00 |
$850.00 |
|
| 36 | 480-6001 |
CLEAN EXIST CULVERTS | 1 | EA |
$1,100.00 |
$3,000.00 |
$2,200.00 |
$2,800.00 |
|
| 37 | 496-6016 |
REMOV STR (PIPE) | 93 | EA |
$700.00 |
$75.00 |
$465.00 |
$875.00 |
|
| 38 | 500-6001 |
MOBILIZATION | 1 | LS |
$350,000.00 |
$570,238.59 |
$550,000.00 |
$800,000.00 |
|
| 39 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 21 | MO |
$6,500.00 |
$5,000.00 |
$2,000.00 |
$15,100.00 |
|
| 40 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 200 | LF |
$20.00 |
$26.50 |
$35.00 |
$32.00 |
|
| 41 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 1,220 | LF |
$32.00 |
$30.00 |
$38.00 |
$33.00 |
|
| 42 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 1,420 | LF |
$8.00 |
$7.00 |
$8.75 |
$4.00 |
|
| 43 | 506-6029 |
EARTHWORK (EROSN & SEDMT CONT, IN VEH) | 1,000 | CY |
$20.00 |
$16.00 |
$10.00 |
$20.00 |
|
| 44 | 506-6030 |
BACKHOE WORK (EROSION & SEDMT CONT) | 150 | HR |
$70.00 |
$105.00 |
$48.00 |
$70.00 |
|
| 45 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 7,437 | LF |
$4.00 |
$3.00 |
$3.25 |
$2.60 |
|
| 46 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 7,437 | LF |
$0.6800 |
$1.00 |
$0.6500 |
$0.6000 |
|
| 47 | 506-6046 |
TRACKHOE WORK (EROSION & SEDMT CONT) | 150 | HR |
$150.00 |
$170.00 |
$80.00 |
$92.00 |
|
| 48 | 512-6005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 360 | LF |
$29.00 |
$70.00 |
$114.00 |
$85.00 |
|
| 49 | 512-6029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 360 | LF |
$5.00 |
$21.00 |
$20.00 |
$17.00 |
|
| 50 | 512-6041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 360 | LF |
$8.00 |
$35.00 |
$27.00 |
$30.00 |
|
| 51 | 530-6002 |
INTERSECTIONS (ACP) | 3,898 | SY |
$36.00 |
$32.00 |
$51.00 |
$50.00 |
|
| 52 | 530-6005 |
DRIVEWAYS (ACP) | 1,242 | SY |
$36.00 |
$46.00 |
$26.00 |
$28.00 |
|
| 53 | 530-6006 |
DRIVEWAYS (SURF TREAT) | 6,160 | SY |
$15.00 |
$14.00 |
$26.00 |
$18.00 |
|
| 54 | 530-6008 |
TURNOUTS (ACP) | 230 | SY |
$25.00 |
$30.00 |
$41.00 |
$30.00 |
|
| 55 | 530-6017 |
DRIVEWAYS (CONC) (HES) | 621 | SY |
$90.00 |
$100.00 |
$90.00 |
$135.00 |
|
| 56 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 67,050 | LF |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1600 |
|
| 57 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 33,525 | LF |
$0.1500 |
$0.1700 |
$0.1700 |
$0.1600 |
|
| 58 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 620 | LF |
$30.00 |
$23.25 |
$20.00 |
$20.00 |
|
| 59 | 540-6004 |
MTL THRIE-BEAM GD FEN (STEEL POST) | 4 | LF |
$1,650.00 |
$1,800.00 |
$2,000.00 |
$1,700.00 |
|
| 60 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 620 | LF |
$3.00 |
$2.50 |
$2.25 |
$2.50 |
|
| 61 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,400.00 |
$2,650.00 |
$3,000.00 |
$2,700.00 |
|
| 62 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$265.00 |
$210.00 |
$225.00 |
$250.00 |
|
| 63 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$1,600.00 |
$2,625.00 |
$2,500.00 |
$1,200.00 |
|
| 64 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$820.00 |
$1,050.00 |
$1,000.00 |
$1,000.00 |
|
| 65 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$1,000.00 |
$9,765.00 |
$10,000.00 |
$10,000.00 |
|
| 66 | 560-6004 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 19 | EA |
$190.00 |
$199.50 |
$300.00 |
$200.00 |
|
| 67 | 560-6005 |
MAILBOX INSTALL-D (TWG-POST) TY 2 | 3 | EA |
$230.00 |
$231.00 |
$350.00 |
$230.00 |
|
| 68 | 560-6006 |
MAILBOX INSTALL-M (TWG-POST) TY 2 | 1 | EA |
$330.00 |
$393.75 |
$500.00 |
$400.00 |
|
| 69 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 2 | EA |
$725.00 |
$535.50 |
$750.00 |
$540.00 |
|
| 70 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 103 | EA |
$350.00 |
$294.00 |
$425.00 |
$300.00 |
|
| 71 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 50 | EA |
$35.00 |
$30.00 |
$25.00 |
$30.00 |
|
| 72 | 662-6001 |
WK ZN PAV MRK NON-REMOV (W)4"(BRK) | 11,976 | LF |
$0.3000 |
$0.1600 |
$0.1600 |
$0.1500 |
|
| 73 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 124,506 | LF |
$0.2800 |
$0.1100 |
$0.1100 |
$0.1000 |
|
| 74 | 662-6016 |
WK ZN PAV MRK NON-REMOV (W)24"(SLD) | 824 | LF |
$5.00 |
$2.63 |
$2.75 |
$2.50 |
|
| 75 | 662-6032 |
WK ZN PAV MRK NON-REMOV (Y)4"(BRK) | 830 | LF |
$0.2500 |
$0.1600 |
$0.1500 |
$0.1500 |
|
| 76 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 118,072 | LF |
$0.1900 |
$0.1100 |
$0.1100 |
$0.1000 |
|
| 77 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 1,799 | EA |
$0.8000 |
$1.00 |
$1.00 |
$0.6500 |
|
| 78 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 3,079 | EA |
$1.00 |
$1.00 |
$1.00 |
$0.6500 |
|
| 79 | 662-6112 |
WK ZN PAV MRK SHT TERM RMV (W)(4") | 5,394 | LF |
$1.00 |
$0.9100 |
$1.05 |
$0.6000 |
|
| 80 | 662-6113 |
WK ZN PAV MRK SHT TERM RMV (Y)(4") | 26,944 | LF |
$1.08 |
$1.14 |
$1.05 |
$0.6000 |
|
| 81 | 666-6006 |
REFL PAV MRK TY I (W)4"(DOT)(100MIL) | 1,446 | LF |
$1.00 |
$1.05 |
$1.10 |
$1.10 |
|
| 82 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 412 | LF |
$6.00 |
$5.78 |
$5.75 |
$5.80 |
|
| 83 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 5,988 | LF |
$0.3000 |
$0.4600 |
$0.4500 |
$0.4500 |
|
| 84 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 67,050 | LF |
$0.3000 |
$0.4000 |
$0.4000 |
$0.4000 |
|
| 85 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 415 | LF |
$0.2500 |
$0.4600 |
$0.4500 |
$0.4500 |
|
| 86 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 63,836 | LF |
$0.2500 |
$0.4000 |
$0.4000 |
$0.4000 |
|
| 87 | 668-6083 |
PREFAB PAV MRK TY C (W) (LNDP ARROW) | 8 | EA |
$490.00 |
$420.00 |
$450.00 |
$420.00 |
|
| 88 | 668-6089 |
PREFAB PAV MRK TY C (W) (RR XING) | 1 | EA |
$1,000.00 |
$787.50 |
$850.00 |
$780.00 |
|
| 89 | 672-6007 |
REFL PAV MRKR TY I-C | 310 | EA |
$2.90 |
$3.68 |
$4.00 |
$4.00 |
|
| 90 | 672-6009 |
REFL PAV MRKR TY II-A-A | 745 | EA |
$2.72 |
$3.68 |
$4.00 |
$4.00 |
|
| 91 | 4020-6001 |
PERMEABLE CONCRETE EDGE DRAIN | 1,350 | LF |
$35.00 |
$70.00 |
$60.00 |
$60.00 |
|
| 92 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$15,000.00 |
$6,000.00 |
$15,000.00 |
|
| 93 | 6185-6001 |
TMA (STATIONARY) | 1 | EA |
$2,300.00 |
$4,500.00 |
$25,000.00 |
$25,000.00 |
|
| 94 | 6185-6003 |
TMA (MOBILE OPERATION) | 50 | HR |
$500.00 |
$26.25 |
$28.00 |
$28.00 |
|